CN203129613U - Building trowel - Google Patents
Building trowel Download PDFInfo
- Publication number
- CN203129613U CN203129613U CN 201320038453 CN201320038453U CN203129613U CN 203129613 U CN203129613 U CN 203129613U CN 201320038453 CN201320038453 CN 201320038453 CN 201320038453 U CN201320038453 U CN 201320038453U CN 203129613 U CN203129613 U CN 203129613U
- Authority
- CN
- China
- Prior art keywords
- cutter hub
- trowel
- cutter
- building
- hub
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Processing Of Stones Or Stones Resemblance Materials (AREA)
Abstract
The utility model discloses a building trowel which comprises a first trowel body, a trowel holder installed at one end of the first trowel body and a handle sleeve on the trowel holder. A second trowel body is detachably installed on the trowel back of the first trowel body. because two detachable trowel bodies are arranged on the building trowel, one trowel body can be used for building a wall and the other trowel body can be used for breaking a brick in the building construction process, worker are prevented from carrying a plurality of tools when constructing, labor intensity of the workers is reduced and working efficiency is improved. The two trowel bodies are detachably connected, and therefore one trowel body can be directly replaced when being damaged, and waste is avoided.
Description
Technical field
The utility model relates to technical field of buildings, and in particular, particularly a kind of building is built cutter.
Background technology
In building operations, often need use the block cutter, and the common structure of existing building block cutter is the monolithic whole formula, the construction worker when operating with it owing to have only the edge of a knife process of building a wall, when breaking brick as needs, need use special clip axe, this makes the construction worker generally all carry two or a plurality of instrument in work progress, it is big to exist labour intensity, operates shortcomings such as uncomfortable.And break brick when operation with special clip axe, the construction worker also will change instrument, has a strong impact on operating efficiency.These problems are perplexing the construction worker for a long time, can not get solving always.
Summary of the invention
The technical problems to be solved in the utility model provide a kind of can realize simultaneously building a wall and disconnected brick function, reduce labour intensity, the building of increasing work efficiency builds cutter.
The purpose of this utility model is achieved through the following technical solutions:
A kind of building is built cutter, comprises first cutter hub, is installed on the hilt of described first cutter hub, one end, and is placed in the handle on the described hilt, dismountable second cutter hub that is equipped with on the knife back of described first cutter hub.
Preferably, it is trapezoidal slide block that described first cutter hub upper end is provided with the cross section, and the described second cutter hub lower end is provided with the chute that matches with described slide block.
Preferably, the cross sectional shape of described first cutter hub and second cutter hub is trapezoidal, and the knife back place width of described first cutter hub and second cutter hub is respectively greater than first cutter hub and the second cutter hub point of a knife place width.
Preferably, also be provided with circular hanging hole on described first cutter hub.
The utlity model has following beneficial effect:
1, two dismountable cutter hubs are set, in building construction process, can adopt a cutter hub to build a wall like this, another cutter hub brick that breaks has been avoided carrying a plurality of instruments when the workman constructs, and has reduced working strength of workers and has increased the power of work.
2, two cutter hubs are removably connected, when one of them cutter hub damages, can directly change the cutter hub of this damage, avoided waste.
Description of drawings
Fig. 1 is that building described in the utility model is built knife structure figure;
Fig. 2 is the A-A direction sectional view of Fig. 1 described in the utility model.
Description of reference numerals: 1, first cutter hub, 2, hilt, 3, handle, 4, second cutter hub, 5, slide block, 6, chute, 7, circular hanging hole.
The specific embodiment
The utility model is described in more detail below in conjunction with the drawings and specific embodiments.
Consult shown in Fig. 1-2, the utility model provides a kind of building to build cutter, comprises first cutter hub 1, is installed on the hilt 2 of described first cutter hub, 1 one ends, and is placed in the handle 3 on the described hilt 2, dismountable second cutter hub 4 that is equipped with on the knife back of described first cutter hub 1.The concrete mode that removably connects is: it is trapezoidal slide block 5 that first cutter hub, 1 upper end is provided with the cross section, and described second cutter hub 4 lower ends are provided with the chute 6 that matches with described slide block 5, and namely first cutter hub 1 slides onto in the chute 6 of second cutter hub 4 by slide block 5.And build for convenience cutter build a wall and disconnected brickwork is done, the cross sectional shape of first cutter hub 1 and second cutter hub 4 all is set to trapezoidal, and the knife back place width of first cutter hub 1 and second cutter hub 4 is respectively greater than first cutter hub 1 and second cutter hub, 4 point of a knife place width.For convenience of the convenient storage when not using, on described first cutter hub 1, also be provided with circular hanging hole 7 simultaneously.The utility model is described by above-mentioned structure, its advantage is: two dismountable first cutter hubs 1 and second cutter hub 4 are set on the one hand, like this in building construction process, can adopt first cutter hub 1 to build a wall, second cutter hub, 4 disconnected bricks, avoided when the workman constructs, carrying a plurality of instruments, reduced working strength of workers and increased the power of working; On the other hand first cutter hub 1 and second cutter hub 4 are removably connected, when wherein any one cutter hub damages, can directly change the cutter hub of this damage, avoided waste.
Above-described embodiment is the utility model preferred implementation; but embodiment of the present utility model is not restricted to the described embodiments; and other any do not deviate from change, the modification done under spiritual essence of the present utility model and the principle, substitutes, combination, simplify; as the position of slide block 5 and chute 6 is replaced; all should be the substitute mode of equivalence, be included within the protection domain of the present utility model.
Claims (4)
1. a building is built cutter, comprise first cutter hub (1), be installed on the hilt (2) of described first cutter hub (1) one end, and be placed in the handle (3) on the described hilt (2), it is characterized in that: dismountable second cutter hub (4) that is equipped with on the knife back of described first cutter hub (1).
2. building according to claim 1 is built cutter, it is characterized in that: it is trapezoidal slide block (5) that described first cutter hub (1) upper end is provided with the cross section, and described second cutter hub (4) lower end is provided with the chute (6) that matches with described slide block (5).
3. building according to claim 1 and 2 is built cutter, it is characterized in that: the cross sectional shape of described first cutter hub (1) and second cutter hub (4) is trapezoidal, and the knife back place width of described first cutter hub (1) and second cutter hub (4) is respectively greater than first cutter hub (1) and second cutter hub (4) point of a knife place width.
4. building according to claim 1 and 2 is built cutter, it is characterized in that: also be provided with circular hanging hole (7) on described first cutter hub (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320038453 CN203129613U (en) | 2013-01-18 | 2013-01-18 | Building trowel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320038453 CN203129613U (en) | 2013-01-18 | 2013-01-18 | Building trowel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203129613U true CN203129613U (en) | 2013-08-14 |
Family
ID=48937605
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320038453 Expired - Fee Related CN203129613U (en) | 2013-01-18 | 2013-01-18 | Building trowel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203129613U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522570A (en) * | 2016-11-16 | 2017-03-22 | 成都佳美嘉科技有限公司 | Building construction cleaver |
-
2013
- 2013-01-18 CN CN 201320038453 patent/CN203129613U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522570A (en) * | 2016-11-16 | 2017-03-22 | 成都佳美嘉科技有限公司 | Building construction cleaver |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CL2016001260A1 (en) | Wear parts control | |
CN203129613U (en) | Building trowel | |
CN204728732U (en) | A kind of multi-use architecture trowel | |
CN205134701U (en) | Take gypsum board of scale setpoint | |
CN203160296U (en) | Handheld pneumatic operation tool | |
CN105370052A (en) | Novel building masonry knife | |
CN204001795U (en) | A kind of multifunctional sax | |
CN203050139U (en) | Masonry trowel | |
CN215168241U (en) | Bricklayer's knife | |
CN203412307U (en) | Multifunctional construction building blade | |
CN206554529U (en) | One kind faces side opening protective device | |
CN201386394Y (en) | Cleaver | |
CN202943720U (en) | Detachable carpentry chisel | |
CN208105915U (en) | A kind of Multifunction plastering knife | |
CN205476358U (en) | Multi -use architecture cleaver | |
CN201116399Y (en) | Multifunctional putty knife | |
CN203247860U (en) | Building knife for construction | |
CN204826690U (en) | Multi -functional cleaver | |
CN204645682U (en) | A kind of novel building brick cutter | |
CN204532123U (en) | A kind of construction work drilling bracket | |
CN206784970U (en) | A kind of multifunctional sax | |
CN202866290U (en) | Dual-purpose spring bricklaying trowel | |
CN203716510U (en) | Special bricklaying tossing shovel | |
CN203003713U (en) | Multi-functional clamp | |
CN202450791U (en) | Convenient brick trowel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130814 Termination date: 20160118 |
|