CN207530748U - A kind of support guide splicing structure - Google Patents

A kind of support guide splicing structure Download PDF

Info

Publication number
CN207530748U
CN207530748U CN201721738752.3U CN201721738752U CN207530748U CN 207530748 U CN207530748 U CN 207530748U CN 201721738752 U CN201721738752 U CN 201721738752U CN 207530748 U CN207530748 U CN 207530748U
Authority
CN
China
Prior art keywords
groove portion
guide groove
mounting blocks
guide rail
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721738752.3U
Other languages
Chinese (zh)
Inventor
蒙凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Xingda Yang Mechanical And Electrical Installation Co Ltd
Original Assignee
Shenzhen Xingda Yang Mechanical And Electrical Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Xingda Yang Mechanical And Electrical Installation Co Ltd filed Critical Shenzhen Xingda Yang Mechanical And Electrical Installation Co Ltd
Priority to CN201721738752.3U priority Critical patent/CN207530748U/en
Application granted granted Critical
Publication of CN207530748U publication Critical patent/CN207530748U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/40Solar thermal energy, e.g. solar towers
    • Y02E10/47Mountings or tracking
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model discloses a kind of support guide splicing structures,It solves to be fixed by bolts in the prior art and is spliced to form longer guide rail,So that it needs to spend longer time installation during installation and tightens bolt,So that the technical issues of installation of stent entirety is more complicated,Its key points of the technical solution are that including several guide rail parts,Guide rail part includes support entity part and guide groove portion,The guiding groove section partial cross-section is T shapes,Described guide groove portion one end is equipped with and the matched mounting blocks of guide groove portion,Limit assembly is equipped in the mounting blocks,The limit assembly includes sliding in the locating part in the mounting blocks and the compressed spring between the locating part and the mounting blocks inside,The guide groove portion other end offers and the matched limit hole of the locating part in the width direction,The guide rail simple installation of stent is reached,Quickly,And then it can efficiently complete the purpose of the installation of stent entirety.

Description

A kind of support guide splicing structure
Technical field
The utility model is related to photovoltaic solar cell mounting technique field, more specifically, it relates to which a kind of stent is led Rail splicing structure.
Background technology
With the worsening shortages of the energy, the utilization of renewable green energy resource have been to be concerned by more and more people, especially It is that the utilization of solar energy is favored by common people.Solar energy is as cleaning, safe, the sustainable and reliable energy, solar energy Photovoltaic system is expanding rapidly its application in terms of the energy and industrial technology exploitation.Now, more and more, various types Solar panel be installed in roof or large area depletion region surface, for carrying out solar power generation.For flat roof, Most of mounting means for adding stent using clump, the clump being used to support additionally is manufactured on roof, will be propped up by screw Frame is fixed on clump, and electromagnetic assembly is supported with metal framework.
Now retrieve the Chinese utility model patent that a notification number is CN20180876U, entitled solar cell Mounting bracket.The program discloses a kind of solar energy cell plate mounting bracket, including the first guide rail and respectively positioned at the first guide rail Second guide rail of both sides, first and second guide rail have upper and lower surface;And positioned at the first guide rail upper table A plurality of first support portions in face and respectively positioned at a plurality of the of second guide rail upper surface of the first guide rail both sides Two support portions, the first support portion top have the first clamping part, have the second clamping part at the top of second support portion, too Positive energy solar panel is mounted between first clamping part and second clamping part, the lower surface of first and second guide rail It is contacted with building roof surface or ground.
In practical use and installation process, the first guide rail and the second guide rail in the program are whole longer, for fortune Defeated convenience is generally several isometric components, is bolted is spliced to form longer guide rail when mounted.In splicing, Four bolts are at least needed between component two-by-two so that need to spend longer time installation during installation and tighten spiral shell Bolt so that the installation of stent entirety is more complicated.
Utility model content
The purpose of this utility model is to provide a kind of support guide splicing structure, reaches the guide rail simple installation, fast of stent Speed, and then can efficiently complete the purpose of the installation of stent entirety.
The above-mentioned technical purpose of the utility model technical scheme is that:A kind of support guide is assembled Structure, including several guide rail parts for being used to be assembled into guide rail, the support contacted when the guide rail part includes the use of with ground Entity part and the guide groove portion positioned at the support entity part upper end, the guiding groove section partial cross-section is T shapes, described to lead To slot part one end be equipped with the matched mounting blocks of the guide groove portion, limit assembly, the limit are equipped in the mounting blocks Hyte part includes sliding in the locating part in the mounting blocks and the pressure between the locating part and the mounting blocks inside Contracting spring, the guide groove portion other end offer and the matched limit hole of the locating part in the width direction.
By using above-mentioned technical proposal, during installation, first press locating part and locating part sliding packed up in mounting blocks, The mounting blocks alignment guide groove portion other end is inserted into, when locating part is aligned with limit hole, compressed spring is by the bullet of compression generation Limit hole is inserted into the sliding of power drive locating part, is realized that limiting is fixed, compared to being fixed by bolts in the prior art, has been reached branch It is the guide rail simple installation of frame, quick, and then can efficiently complete the purpose of the installation of stent entirety.
Preferably, the guide groove portion other end front end face offers and the limit along the guide rail part width direction The solution lockhole of position hole conducting, the guide groove portion other end front end face are equipped with solution lock set, and the solution lock set includes sliding insert In the unlock piece for solving lockhole and the unlocking board being connect with the unlock piece, the unlocking board and the guiding groove section sub-headend Face is rotatablely connected, and the end face of the unlocking board towards the unlock piece offers the sliding slot of T shapes, during the unlock piece end is equipped with Studding, the intermediolateral column and the unlock piece are T-shaped, and the intermediolateral column sliding is in the sliding slot.
By using above-mentioned technical proposal, when needing to dismantle guide rail, being unlocked by pressing plate, unlock piece slides towards limit hole, Intermediolateral column slides and rotates relative to sliding slot so that unlock piece is more preferably inserted into inside limit hole, and unlock piece pushes locating part to slip away Limit hole realizes and releases limiting, the detachable guide groove portion of mounting blocks solves the setting of lock set so that in dismounting guide rail more It is easy.
Preferably, the guide groove portion other end is equipped with the targeting port of prism-frustum-shaped, and the targeting port is far from the limiting Nose end area is more than towards the limit hole end area.
By using above-mentioned technical proposal, the setting of targeting port so that pressing locating part is not needed to when mounted, by leading To mouth so that locating part sliding is packed up, so that installation is more convenient.
Preferably, the mounting blocks are equipped with and the matched sealing block of the targeting port with the guide groove portion connecting pin.
By using above-mentioned technical proposal, the setting of sealing block so that the leakproofness and globality after installation are more preferable.
Preferably, the end that the locating part is located at outside the mounting blocks offers and the matched inclination of the targeting port Face.
By using above-mentioned technical proposal, the cooperation of inclined surface and targeting port, further such that easier for installation So that mounting blocks are inserted into the guide groove portion other end.
Preferably, limit assembly described in two groups is equipped in the mounting blocks, corresponding, the guide groove portion other end is set Have and solve lock set described in two groups.
By using above-mentioned technical proposal, two groups of limit assemblies may be such that limiting fixation more consolidates.
Preferably, limit assembly described in two groups is aligned along the guide rail part width direction, and lock set point is solved described in two groups It Wei Yu not front/rear end of the guide groove portion other end along the guide rail part length direction.
By using above-mentioned technical proposal, two groups of solution lock sets are located at front/rear end respectively so that the more bonus point in dismounting Not.
In conclusion the utility model has the advantages that:
First, compared to being fixed by bolts in the prior art, the guide rail simple installation of stent, quick, Jin Erneng have been reached Efficiently complete the purpose of the installation of stent entirety;
2nd, the setting of targeting port so that pressing locating part is not needed to when mounted, by targeting port so that locating part slides It packs up, so that installation is more convenient;
3rd, the setting of sealing block so that the leakproofness and globality after installation are more preferable;
4th, the cooperation of inclined surface and targeting port, further such that easier for installation so that mounting blocks are inserted into guiding The slot part other end;
5th, two groups of limit assemblies may be such that limiting fixation more consolidates, and two groups of solution lock sets are located at front/rear end respectively, So that more distinguish in dismounting.
Description of the drawings
Fig. 1 is the overall structure diagram of the utility model embodiment;
Fig. 2 be the utility model embodiment middle guide component exploded after biopsy cavity marker devices structure diagram;
Fig. 3 is the partial enlarged view at A in Fig. 2;
Fig. 4 is the partial enlarged view at B in Fig. 2.
In figure:1st, guide rail part;11st, entity part is supported;12nd, guide groove portion;121st, limit hole;122nd, targeting port; 2nd, mounting blocks;21st, limiting slot;31st, locating part;311st, inclined surface;32nd, compressed spring;41st, unlock piece;42nd, unlocking board;421、 Sliding slot;43rd, intermediolateral column;5th, sealing block.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
A kind of support guide splicing structure, as shown in Figure 1, including several guide rail parts 1, the structure of all guide rail parts 1 With it is in the same size, several guide rail parts 1 are assembled into guide rail.The support entity portion contacted when guide rail part 1 includes the use of with ground Points 11 and the guide groove portion 12 positioned at 11 upper end of support entity part, 12 section of guide groove portion is T shapes, guide groove portion 12 For installing fixed solar cell module.
As shown in Figures 2 and 3,12 one end of guide groove portion is equipped with and 12 matched mounting blocks 2 of guide groove portion, mounting blocks Limit assembly is equipped in 2.Limiting slot 21 is offered in mounting blocks 2, limit assembly includes sliding in the locating part 31 of limiting slot 21 And the compressed spring 32 between bottom in locating part 31 and limiting slot 21, locating part 31 are slided along 1 width direction of guide rail part It moves.12 other end of guide groove portion offers and 31 matched limit hole 121 of locating part in the width direction.During installation, first press Locating part 31 causes the sliding of locating part 31 to pack up in limiting slot 21, and mounting blocks 2 are aligned 12 other end of guide groove portion and are inserted into, When locating part 31 is aligned with limit hole 121, the elastic force driving locating part 31 that compressed spring 32 is generated by compression slides insertion limiting Hole 121 realizes that limiting is fixed.
With reference to shown in Fig. 4,12 other end front end face of guide groove portion is offered along 1 width direction of guide rail part and limit hole The solution lockhole of 121 conductings.12 other end front end face of guide groove portion is equipped with solution lock set.It solves lock set and includes sliding in solution lockhole Unlock piece 41 and the unlocking board 42 that is connect with unlock piece 41, unlocking board 42 be rotatablely connected with 12 front end face of guide groove portion.Solution The end face of jam plate 42 towards unlock piece 41 offers the sliding slot 421 of T shapes, and 41 end of unlock piece is equipped with intermediolateral column 43, intermediolateral column 43 It is T-shaped with unlock piece 41, and intermediolateral column 43 is slid in sliding slot 421.When needing to dismantle guide rail, being unlocked by pressing plate 42, unlock piece 41 It is slid in towards limit hole 121, intermediolateral column 43 slides and rotates relative to sliding slot 421 so that unlock piece 41 is more preferably inserted into limiting Inside hole 121, unlock piece 41 pushes locating part 31 to slip away limit hole 121, realizes and releases limiting, 2 detachable guide groove of mounting blocks Part 12.
As shown in Figures 2 and 3,12 other end of guide groove portion offers the targeting port 122 of prism-frustum-shaped, and targeting port 122 is remote It is more than from 121 end area of limit hole towards 121 end area of limit hole.Mounting blocks 2 are equipped with the end that guide groove portion 12 is connect With 122 matched sealing block 5 of targeting port so that globality and better tightness after installation.Locating part 31 is located at outside limiting slot 21 End offer with 122 matched inclined surface 311 of targeting port, further such that installation when it is more convenient, targeting port 122 is with inclining The cooperation on inclined-plane 311 preferably to push locating part 31 towards sliding in limiting slot 21, so that mounting blocks 2 are more easily It is inserted into 12 other end of guide groove portion.
Two groups of limit assemblies are equipped in mounting blocks 2, corresponding, 12 other end outer surface of guide groove portion is equipped with two groups of unlocks Component.The setting of two groups of limit assemblies so that more consolidated after installation.Width side of two groups of limit assemblies along guide rail part 1 Corresponding to alignment, two groups of solution lock sets are respectively arranged on 12 other end of guide groove portion along before and after 1 length direction of guide rail part End face so that more convenient during installation and removal.
Operation principle:In assembled guide rail, the mounting blocks 2 of a guide rail part 1 are aligned leading for another guide rail part 1 It is inserted into 12 other end of slot part, locating part 31 is packed up in the case where the cooperation of targeting port 122 and inclined surface 311 pushes in limiting slot 21 Interior, after mounting blocks 2 are inserted into, locating part 31 is aligned with limit hole 121, and the elastic force that compressed spring 32 is generated by compression drives locating part Limit hole 121 is inserted into 31 slidings, realizes that limiting is fixed.When needing to dismantle guide rail, being unlocked by pressing plate 42, unlocking board 42 pushes solution Locating part 31 is pushed the limit hole 121 that slips away by latch fitting 41 towards sliding in limit hole 121, unlock piece 41, is realized and is released limiting admittedly It is fixed, you can to separate adjacent guide rail part 1.
This specific embodiment is only explanation to the utility model, is not the limitation to the utility model, ability Field technique personnel can as needed make the present embodiment the modification of no creative contribution after this specification is read, but As long as it is all protected in the right of the utility model by Patent Law.

Claims (7)

1. a kind of support guide splicing structure, including several guide rail parts (1) for being used to be assembled into guide rail, the guide rail part (1) the support entity part (11) and the guiding positioned at described support entity part (11) upper end contacted when including the use of with ground Slot part (12), guide groove portion (12) section are T shapes, it is characterized in that:Described guide groove portion (12) one end be equipped with The matched mounting blocks of the guide groove portion (12) (2), the mounting blocks (2) are interior to be equipped with limit assembly, the limit assembly packet Sliding is included in the locating part (31) in the mounting blocks (2) and set on the locating part (31) and the mounting blocks (2) inside Between compressed spring (32), guide groove portion (12) other end offers in the width direction to be matched with the locating part (31) Limit hole (121).
2. a kind of support guide splicing structure according to claim 1, it is characterized in that:The guide groove portion (12) is another One end front end face offers the solution lockhole be connected with the limit hole (121) along the guide rail part (1) width direction, described to lead Solution lock set is equipped with to slot part (12) other end front end face, the solution lock set includes the sliding unlock piece for inserting in the solution lockhole (41) and with the unlock piece (41) unlocking board (42) connecting, the unlocking board (42) and the guide groove portion (12) front end Face is rotatablely connected, and the end face of unlocking board (42) towards the unlock piece (41) offers the sliding slot (421) of T shapes, the solution Latch fitting (41) end is equipped with intermediolateral column (43), and the intermediolateral column (43) and the unlock piece (41) are T-shaped, the intermediolateral column (43) It slides in the sliding slot (421).
3. a kind of support guide splicing structure according to claim 2, it is characterized in that:The guide groove portion (12) is another Targeting port (122) of the end equipped with prism-frustum-shaped, the targeting port (122) are more than far from the limit hole (121) end area towards institute State limit hole (121) end area.
4. a kind of support guide splicing structure according to claim 3, it is characterized in that:The mounting blocks (2) are led with described It is equipped with and the targeting port (122) matched sealing block (5) to slot part (12) connecting pin.
5. a kind of support guide splicing structure according to claim 4, it is characterized in that:The locating part (31) is positioned at described The end of mounting blocks (2) outside offers and the targeting port (122) matched inclined surface (311).
6. a kind of support guide splicing structure according to claim 2-5 any one, it is characterized in that:The mounting blocks (2) limit assembly described in two groups is equipped in, corresponding, guide groove portion (12) other end is equipped with unlock group described in two groups Part.
7. a kind of support guide splicing structure according to claim 6, it is characterized in that:Limit assembly described in two groups is described in Guide rail part (1) width direction is aligned, and lock set is solved described in two groups and is located at the guide groove portion (12) other end respectively along institute State the front/rear end of guide rail part (1) length direction.
CN201721738752.3U 2017-12-13 2017-12-13 A kind of support guide splicing structure Active CN207530748U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721738752.3U CN207530748U (en) 2017-12-13 2017-12-13 A kind of support guide splicing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721738752.3U CN207530748U (en) 2017-12-13 2017-12-13 A kind of support guide splicing structure

Publications (1)

Publication Number Publication Date
CN207530748U true CN207530748U (en) 2018-06-22

Family

ID=62579001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721738752.3U Active CN207530748U (en) 2017-12-13 2017-12-13 A kind of support guide splicing structure

Country Status (1)

Country Link
CN (1) CN207530748U (en)

Similar Documents

Publication Publication Date Title
CN209941986U (en) Curtain wall construction convenient to installation
CN110821034B (en) House building builds quick concatenation formula assembly wall board
CN207530748U (en) A kind of support guide splicing structure
CN107159924A (en) A kind of light fixture production drilling machine for being easily installed drill bit
CN216043749U (en) Assembled concrete shield tunnel section of jurisdiction
CN103925271A (en) Locking mechanism quick to mount and demount and exhibition stand
CN202613698U (en) Tube pressing plate device for air conditioner indoor unit
CN207195376U (en) Attachment means and there is its display screen
CN207652359U (en) A kind of roof solar rack mounting structure
CN207298350U (en) A kind of bursting diaphragm being easily installed
CN201725652U (en) Dry type transformer housing
CN207115296U (en) Board fastening structure and board erecting device
CN203718677U (en) Connecting structure for LED (Light Emitting Diode) lamp tube
CN219178952U (en) On-spot sampling equipment coupling assembling
CN219392595U (en) Computer modular server
CN218323362U (en) Hang stone material curtain futilely
CN207424049U (en) A kind of three electronic electric energy meters convenient for handling
CN207582875U (en) A kind of dismountable wallboard
CN220848069U (en) Building structure connecting piece
CN206609335U (en) Cooling tower filler device
CN218678797U (en) Energy storage direct current converter convenient to installation
CN117071790B (en) Curtain wall building and construction method thereof
CN209207479U (en) A kind of architectural electricity construction and installation device
CN218091801U (en) Lock catch connecting structure of floor
CN215484339U (en) Wall decorative board fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant