CN207528079U CN201721679434.4U CN201721679434U CN207528079U CN 207528079 U CN207528079 U CN 207528079U CN 201721679434 U CN201721679434 U CN 201721679434U CN 207528079 U CN207528079 U CN 207528079U
Authority
CN
China
Prior art keywords
air
conducting sleeve
heat conducting
receiver
tubular heater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721679434.4U
Other languages
Chinese (zh)
Inventor
孙振华
刘玉环
殷作曲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201721679434.4U priority Critical patent/CN207528079U/en
Application granted granted Critical
Publication of CN207528079U publication Critical patent/CN207528079U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Abstract

The utility model discloses a kind of air preheating systems of tubular heater, including heat conducting sleeve, the top and bottom of the heat conducting sleeve are threaded with epimere smoke pipe and hypomere smoke pipe respectively, the heat conducting sleeve is internally provided with the first air receiver and the second air receiver, the lower part of second air receiver is connected by the second ventilation duct with seal thermal-insulation box, the side of the epimere smoke pipe is communicated with air heat exchanger, air-introduced machine is installed on the flue of the air heat exchanger, the air heat exchanger lower part is connected by third venting pipe with seal thermal-insulation box, the air outlet for air pump and the intrinsic combustion chamber of heating furnace.By the design of heat conducting sleeve, air can be heated using the heat in flue, air preheat ample time;By the design of heat conducting sleeve and air heat exchanger, the heat in flue can be made full use of, and does not influence the stable gas pressure in flue, while stable air preheat effect can be provided.

Description

A kind of air preheating system of tubular heater
Technical field
The utility model is related to heating furnace technical field, specially a kind of air preheating system of tubular heater.
Background technology
Tubular heater is a kind of direct heated type heating equipment, is mainly used for heating liquid or gas industrial chemicals, institute Usually there are fuel oil and fuel gas with fuel.The heat transfer type of tubular heater is based on radiant heat transfer.Tubular heater, including Furnace body and residual neat recovering system are heated, residual neat recovering system includes air preheater, and wherein air preheater is by on-condensing Two sections of air preheater and condensation regenerative air heater form, and condensate liquid collecting pit, air-introduced machine are additionally provided in residual neat recovering system And air blower, condensate liquid collecting pit are directly arranged in below condensation regenerative air heater, condensate liquid collecting pit is connected with air-introduced machine, Air blower is connected with condensation regenerative air heater.The exhaust gas temperature of its heating furnace can be reduced to 100 DEG C or so, realize and contain in flue gas The partial condensation of sour water steam, and while recovered flue gas low temperature sensible heat, the latent heat of vaporization of energy recovery section steam containing sour water, Thermal efficiency of heating furnace is further improved, it is energy saving.
However in the air preheating system of existing tubular heater, need to keep certain air pressure can just make in flue It is abundant to obtain heating furnace burning;Therefore it needs strictly to control speed and the flue gas velocity of air-introduced machine when in use to keep steady in flue Fixed air pressure, due to the limited speed of air-introduced machine, the heat exchange speed in air heat exchanger heat exchange is slower, it is impossible to fully right Air is preheated.
Utility model content
The purpose of this utility model is to provide a kind of air preheating systems of tubular heater, air can be carried out double It preheats again, pre-heat effect is good, to solve the problems mentioned in the above background technology.
To achieve the above object, the utility model provides following technical solution:A kind of air preheat system of tubular heater System, including heat conducting sleeve, the top and bottom of the heat conducting sleeve are threaded with epimere smoke pipe and hypomere smoke pipe respectively, described Heat conducting sleeve is internally provided with the first air receiver and the second air receiver, and the lower part of first air receiver passes through the first ventilation duct It is connected with seal thermal-insulation box, the lower part of second air receiver is connected by the second ventilation duct with seal thermal-insulation box, the epimere The side of smoke pipe is communicated with air heat exchanger, and air-introduced machine is equipped on the flue of the air heat exchanger, and the air changes Hot device lower part is connected by third venting pipe with seal thermal-insulation box, and the side of the seal thermal-insulation box is communicated with for air pump, described For the air outlet of air pump and the intrinsic combustion chamber of heating furnace.
Preferably, the first solenoid valve, are separately installed on first ventilation duct, the second ventilation duct and third venting pipe Two solenoid valves and gas flow valve.
Preferably, the top of the heat conducting sleeve offers the air inlet convenient for the first air receiver and the second air receiver air inlet Mouthful.
Preferably, fixing sleeve is connected to muff on the heat conducting sleeve.
Preferably, the hypomere smoke pipe is fixedly connected on the top of heating furnace body.
Preferably, the automatically controlled end of first solenoid valve, second solenoid valve and gas flow valve respectively with dsp controller Control output end be electrically connected.
Compared with prior art, the beneficial effects of the utility model are:
1st, by the design of heat conducting sleeve, air can be heated using the heat in flue, the air preheat time Abundance, pre-heat effect are good;
2nd, by the design of heat conducting sleeve and air heat exchanger, than it is independent using air heat exchanger, can make full use of Heat in flue, and the stable gas pressure in flue is not influenced, while can provide stable air preheat effect.
Description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the A-A cross-sectional views in the utility model Fig. 1;
Fig. 3 is the electric connection system block diagram of the utility model.
In figure:1 heating furnace body, 2 combustion chambers, 3 hypomere smoke pipes, 4 first ventilation ducts, 5 first solenoid valves, 6 muffs, 7 Heat conducting sleeve, 8 first air receivers, 9 air inlets, 10 epimere smoke pipes, 11 air-introduced machines, 12 air heat exchangers, 13 second air receivers, 14 Second solenoid valve, 15 second ventilation ducts, 16 seal thermal-insulation boxes, 17 are for air pump, 18 third venting pipes, 19 gas flow valves, 20 Dsp controller.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the utility model provides a kind of technical solution:The air preheating system of the tubular heater, packet Heat conducting sleeve 7 is included, the top and bottom of the heat conducting sleeve 7 are threaded with epimere smoke pipe 10 and hypomere smoke pipe 3, smoke pipe respectively It is divided into two sections, installation, dismounting and easy to clean, the heat conducting sleeve 7 is internally provided with the first air receiver 8 and the second air receiver 13, the lower part of first air receiver 8 is connected by the first ventilation duct 4 with seal thermal-insulation box 16, second air receiver 13 Lower part is connected by the second ventilation duct 15 with seal thermal-insulation box 16, and the side of the epimere smoke pipe 10 is communicated with air heat exchanger 12, air-introduced machine 11 is installed, the flue gas of flue lower part is led to sky by air-introduced machine 11 on the flue of the air heat exchanger 12 In gas heat exchanger 12, flue is returned to after heat exchange, 12 lower part of air heat exchanger passes through third venting pipe 18(Third venting pipe 18 are used for blowing air)It is connected with seal thermal-insulation box 16, the side of the seal thermal-insulation box 16 is communicated with for air pump 17, the air feed The air outlet of pump 17 is connected with the combustion chamber 2 in heating furnace body 1.
Specifically, it is separately installed with the first electromagnetism on first ventilation duct 4, the second ventilation duct 15 and third venting pipe 18 Valve 5, second solenoid valve 14 and gas flow valve 19 pass through the first solenoid valve 5 and the on-off action of second solenoid valve 14, Ke Yiyi Secondary alternating uses the first air receiver 8 and the second air receiver 13, provides the grace time of an air heat-exchange, improves heat exchange Effect.
Specifically, the top of the heat conducting sleeve 7 offer convenient for 13 air inlet of the first air receiver 8 and the second air receiver into Air port 9, the design of air inlet 9 are for the ease of air receiver air inlet, while also set up airstrainer on air inlet 9.
Specifically, fixing sleeve is connected to muff 6 on the heat conducting sleeve 7, the effect of muff 6 is to prevent heat from dissipating outward Hair reduces thermal loss.
Specifically, the hypomere smoke pipe 3 is fixedly connected on the top of heating furnace body 1.
Specifically, the automatically controlled end of first solenoid valve 5, second solenoid valve 14 and gas flow valve 19 respectively with DSP The control output end of controller 20 is electrically connected, and the first solenoid valve 5 and the second electromagnetism can be achieved by the effect of dsp controller 20 Automatically controlling for valve 14, it is very convenient.
Operation principle:When in use, heat conducting sleeve 7 and air heat exchanger 12 can preheat air, and be communicated to In seal thermal-insulation box 16, by carrying out air feed for air pump 17;The first air receiver 8 and the second air receiver are provided in heat conducting sleeve 7 13, by the dsp controller 20 successively alternately opening of the first solenoid valve 5 of control and second solenoid valve 14, so as to be used alternatingly the One air receiver 8 and the second air receiver 13(Interval time is arranged on 5-10 seconds), the same time, the gas in an air receiver is taken out Go out to use, the air of another air receiver is preheated(Air has more sufficient preheating time, and pre-heat effect is more preferable), together When, cooperation air heat exchanger 12 uses, and effect is more preferable.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of air preheating system of tubular heater, including heat conducting sleeve(7), it is characterised in that:The heat conducting sleeve(7) Top and bottom be threaded with epimere smoke pipe respectively(10)With hypomere smoke pipe(3), the heat conducting sleeve(7)Inside setting There is the first air receiver(8)With the second air receiver(13), first air receiver(8)Lower part pass through the first ventilation duct(4)With it is close Seal incubator(16)Connection, second air receiver(13)Lower part pass through the second ventilation duct(15)With seal thermal-insulation box(16)Even It is logical, the epimere smoke pipe(10)Side be communicated with air heat exchanger(12), the air heat exchanger(12)Flue on Air-introduced machine is installed(11), the air heat exchanger(12)Lower part passes through third venting pipe(18)With seal thermal-insulation box(16)Even It is logical, the seal thermal-insulation box(16)Side be communicated with for air pump(17), it is described to supply air pump(17)Air outlet and heating furnace sheet Body(1)Interior combustion chamber(2)Connection.
2. a kind of air preheating system of tubular heater according to claim 1, it is characterised in that:First ventilation Pipe(4), the second ventilation duct(15)With third venting pipe(18)On be separately installed with the first solenoid valve(5), second solenoid valve(14) And gas flow valve(19).
3. a kind of air preheating system of tubular heater according to claim 1, it is characterised in that:The heat conducting sleeve (7)Top offer convenient for the first air receiver(8)With the second air receiver(13)The air inlet of air inlet(9).
4. a kind of air preheating system of tubular heater according to claim 1, it is characterised in that:The heat conducting sleeve (7)Upper fixing sleeve is connected to muff(6).
5. a kind of air preheating system of tubular heater according to claim 1, it is characterised in that:The hypomere smoke pipe (3)It is fixedly connected on heating furnace body(1)Top.
6. a kind of air preheating system of tubular heater according to claim 2, it is characterised in that:First electromagnetism Valve(5), second solenoid valve(14)And gas flow valve(19)Automatically controlled end respectively with dsp controller(20)Control output end It is electrically connected.
CN201721679434.4U 2017-12-06 2017-12-06 A kind of air preheating system of tubular heater Expired - Fee Related CN207528079U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721679434.4U CN207528079U (en) 2017-12-06 2017-12-06 A kind of air preheating system of tubular heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721679434.4U CN207528079U (en) 2017-12-06 2017-12-06 A kind of air preheating system of tubular heater

Publications (1)

Publication Number Publication Date
CN207528079U true CN207528079U (en) 2018-06-22

Family

ID=62577817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721679434.4U Expired - Fee Related CN207528079U (en) 2017-12-06 2017-12-06 A kind of air preheating system of tubular heater

Country Status (1)

Country Link
CN (1) CN207528079U (en)

Similar Documents

Publication Publication Date Title
CN102538203B (en) Waste heat recovering device for conduction oil furnace
CN203810913U (en) Petrochemical-industry tubular heating furnace with regenerative burners
CN201463276U (en) Finned diaphragm wall condensation type vacuum boiler
CN109186092A (en) Energy saving and environment friendly condensing gas wall hanging stove
CN104279754B (en) Natural gas heat conducting oil boiler waste heat comprehensive utilization system
CN104567437A (en) Flue gas waste heat utilizing system of coal gangue brickkiln
CN207528079U (en) A kind of air preheating system of tubular heater
CN208920822U (en) Paper mill afterheat utilizing system
CN209130850U (en) Secondary steam heat recovery system for hotel laundry condensed water
CN204026997U (en) A tractor serves several purposes temperature regulates vacuum hot water unit
CN106196125B (en) A kind of exhaust-gas treatment structure applied to incinerator
CN205842615U (en) A kind of biomass efficient horizontal boiler
CN105823215B (en) High-efficient two condensing gas module stoves
CN206018671U (en) A kind of exhaust-gas treatment structure for being applied to incinerator
CN202792886U (en) Energy-saving baking system
CN204372912U (en) Oil shale semi-coke fluidized bed combustion heat pipe-type circulating mash gas heating furnace
CN207035496U (en) A kind of condensation gas boiler
CN102537917A (en) Boiler smoke-gas residual-heat recovering device with temperature regulator
CN208952418U (en) A kind of gas heat conducting oil furnace
CN207035908U (en) A kind of flue gas heat-exchange unit
CN102012039A (en) Forced circulation air preheat system
CN202002140U (en) Forced circulation air preheating system
CN205579623U (en) Condensing air preheating flue gas waste heat recovery device
CN104534462B (en) Oil shale semi-coke fluidized bed combustion heat pipe-type circulating mash gas heating furnace
CN108980867A (en) Vertical RTO incineration system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180622