CN207525768U - Combine the gravity type bottom hull basis of anchoring pile and consolidated subsoil - Google Patents
Combine the gravity type bottom hull basis of anchoring pile and consolidated subsoil Download PDFInfo
- Publication number
- CN207525768U CN207525768U CN201720509930.9U CN201720509930U CN207525768U CN 207525768 U CN207525768 U CN 207525768U CN 201720509930 U CN201720509930 U CN 201720509930U CN 207525768 U CN207525768 U CN 207525768U
- Authority
- CN
- China
- Prior art keywords
- anchoring pile
- pipe valve
- basis
- bottom hull
- gravity type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
Combine the gravity type bottom hull basis of anchoring pile and consolidated subsoil, it is characterized in that bottom hull has the Marine Reinforced Concrete Structures block of notch for bottom, top surface installing note concrete pipe valve and the pipe valve that sprays water with high pressure, concret block bottom surface surrounding buries steel skirtboard, quadrangle sets the bell-mouthed anchoring pile sleeve assembly of band of no less than six, according to need, concret block installs several steel columns, it is whole steel column for phytal zone, spreading scheme need to be used, then make horn mouth at the top of the steel column and fill diaphragm of rubber, post jamb sets slip casting pipe valve, bottom surface adds anchor plate, it constructs such as anchoring pile sleeve style, the utility model can be widely applied to each water conservancy project structure basis.
Description
Technical field
The utility model is related to a kind of gravity type bottom hull bases for combining anchoring pile and consolidated subsoil, are to traditional gravity type
Bottom hull basis and the improvement on water conservancy project structure basis, the utility model belong to Underwater Engineering and ocean engineering field.
Background technology
The platform abbreviation settling type platform on gravity type bottom hull basis.It is the important kind of offshore oil mobile platform, base
Plinth is gravity type bottom hull basis, it is mainly by two points of Group into first, the bottom hull of closed box composition, the closed box of bottom hull can
It is divided into the cuddy of several separations, a part is ballast tank, and a part is variable buoyancy compartment, and another part is the deeper skirt that buries
Plate, the platform on gravity type bottom hull basis is in place rear toward variable buoyancy compartment water filling, is inserted into soil and allowed by the gravity and skirtboard of bottom hull
Platform stable, this similarly suitable all kinds of water conservancy project structure bases of form structure.Its great advantage is self installation and mobility,
Variable buoyancy compartment water filling is excluded, bottom hull can refloat migration.Due to being gravity type foundation, i.e., before gravity is base fixed
Carry, it requires that bottom hull has the comparable scale of construction, it is big that this just generates steel using amount, it is of high cost the problem of, require in addition that and be located sea bed energy
Preferable frictional resistance is provided, because of frictional resistance=gravity x friction coefficient, the flexible subserate as the Bohai Sea, gravity type bottom hull basis is just not
It is applicable in.If this type basis need not the excessive scale of construction, it is big to remove steel amount, it is of high cost and high to sea bed geologic requirements the shortcomings that,
Retain its self installation and mobility advantage again, be undoubtedly significant to the construction of all kinds of water conservancy project structures.
Bibliography
[1] " Wei 10-3 N Marginal Oil Field easy development engineering overviews and feature " document source:Chinese Academy of Sciences's Shanghai smelting
Golden research institute;Materials Physics and Chemistry (profession) doctoral thesis author:Ancient country ties up
[2] " underwater cup-shaped foundation that the setting of heavy and consolidated subsoil is helped with the sluicing " patent No.:TL
201020276443.0 inventor:Ancient country ties up
Invention content
The purpose of this utility model is by the indignant thought on gravity type bottom hull basis, and removal conventional articulated gravity formula bottom hull basis is substantially
Amount, it is big to remove steel amount, it is of high cost and high to sea bed geologic requirements the shortcomings that, and retain its self installation and mobility advantage,
Used technical solution is;
1. bottom hull has the Marine Reinforced Concrete Structures block of notch for bottom;Top surface sets note concrete pipe valve and high pressure water jet pipe
Valve, concret block bottom surface surrounding bury steel skirtboard, and quadrangle sets the bell-mouthed anchoring pile sleeve assembly of band of no less than six, according to need
Concret block is wanted to install several steel columns.
2. the above-mentioned block of armored concrete according to need installs steel column, it is whole steel column for phytal zone, spreading side need to be used
Case then makes horn mouth and fills diaphragm of rubber at the top of the steel column, and post jamb sets slip casting pipe valve, and bottom surface adds anchor plate, construction such as anchor
Pile protection cartridge type sample.
The principle of this design be for area of base it is larger settling type basis, vertical support-as readily satisfy, main lance
Shield is resistant slide, i.e., basis should provide enough horizontal supporting power, prevents from occurring to slide along the bottom of foundation or bottom surface subjacent bed coming
Design, bibliography [1] has specific considerations, this is the paper Chinese that inventor herein delivers on International Academic Conference
Version.Above-mentioned several measures is effectively ensure that resistant slide target creates condition.Be first for anchoring pile squeeze into create it is slotting
Enter and righting condition, spray water after secondly bottom hull is in place by noting pipe of concrete pumping slurries, while by high pressure water jet pipe, then
Change note concrete, bottom frictional resistance will be greatly improved in this way.The utility model can be widely applied to each water conservancy project structure basis, such as
Wave energy electric generator basis, offshore wind power foundation, net cage basis, platform and off-shore structure basis etc..
Description of the drawings
Fig. 1 the utility model horizontal layout schematic diagrames;
Fig. 2 the utility model facade arranges schematic diagram;
Fig. 3 1-1 sections state anchoring pile bush structure schematic diagram;
Fig. 4 high pressure water jet pipe organigrams.
Wherein:1. for armored concrete block, 101. steel skirtboards, 2. steel columns, 201. anchor plates, 3. slip casting pipe valves, 4. notes
Concrete pipe valve, 5. spray water with high pressure pipe valve, 6. sluicing playpipes, 7. anchoring pile sleeve assemblies, 701. anchoring pile ferrule barrels,
702. sleeve horn mouth .703. horn mouth guide plates, 704. sleeve positioning plates, 705. mud guards, 706. slip casting pipe valves, 8. anchors
Stake, 9. superstructure columns, 10. connection flexible pipes.
Specific embodiment
The armored concrete block 1 for giving field ramming processed good on land, it should be noted that being that a. uses cement for construction in sea, b. is using thin
Aggregate strengthens density, and c. covers to reinforcement thicken, and presses figure installing steel skirtboard 101, steel column 2, anchoring pile sleeve assembly 7, and note is mixed
Solidifying soil pipe valve 4, spray water with high pressure pipe valve 5, and steel skirtboard 101 is by being inserted into armored concrete block depth reliably to anchor.
When 1 scale of construction of armored concrete block is larger, should be lightered by partly latent to erecting bed waterborne, armored concrete block
It is refuted on 1 then using passage method, armored concrete block 1, which is tied up, ties up aerated capsule, and partly latent is refuted sinking and removed, and ties up and ties up aerated capsule and put
Gas sits bottom by armored concrete block 1, when armored concrete skirtboard injection mud, starts the pipe valve 5. that sprays water with high pressure and washes away,
The electric submersible pump started simultaneously forms negative pressure, steel together with reinforced concrete block weight power through noting 4 pumping slurries of concrete pipe valve
Reinforced concrete block 1 sinks down into designed elevation.With same system, note concrete pipe valve 4 changes note concrete special, is reinforced with reaching
Ground purpose.
Anchoring pile 8 is squeezed into, the high-strength buckle slurry so far gravity of combination anchoring pile and consolidated subsoil of splashing is injected by slip casting pipe valve 706
Accomplish on formula bottom hull basis.Superstructure supporting leg is inserted into steel column 2 with crane after superstructure ships, passes through slip casting pipe valve 3, note
Enter high-strength buckle slurry of splashing.
The utility model detaches on basis with superstructure, has actually followed offshore oil jacket construction thinking, because
And there is simple and practical good operability, walk out a Tiao Xin roads for large volume gravity type bottom hull base application.
Claims (2)
1. the gravity type bottom hull basis of anchoring pile and consolidated subsoil is combined, it is characterized in that bottom hull is mixed for the extra large work reinforcing bar that notch is arranged at bottom
Solidifying soil block body, top surface installing note concrete pipe valve and the pipe valve that sprays water with high pressure, concret block bottom surface surrounding bury steel skirtboard, quadrangle
If the bell-mouthed anchoring pile sleeve assembly of band of no less than six, according to need, concret block installs several steel columns.
2. the gravity type bottom hull basis of combination anchoring pile according to claim 1 and consolidated subsoil, it is characterized in that reinforced concrete
The steel column of soil block body installing is whole steel column for phytal zone, need to use spreading scheme, then make horn mouth simultaneously at the top of the steel column
Diaphragm of rubber is filled, post jamb sets slip casting pipe valve, and bottom surface adds anchor plate, is configured to anchoring pile sleeve style.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720509930.9U CN207525768U (en) | 2017-05-02 | 2017-05-02 | Combine the gravity type bottom hull basis of anchoring pile and consolidated subsoil |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720509930.9U CN207525768U (en) | 2017-05-02 | 2017-05-02 | Combine the gravity type bottom hull basis of anchoring pile and consolidated subsoil |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207525768U true CN207525768U (en) | 2018-06-22 |
Family
ID=62575229
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720509930.9U Active CN207525768U (en) | 2017-05-02 | 2017-05-02 | Combine the gravity type bottom hull basis of anchoring pile and consolidated subsoil |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207525768U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109371895A (en) * | 2018-11-12 | 2019-02-22 | 交通运输部天津水运工程科学研究所 | It is a kind of for increasing the pitch non-slip mat of coefficient of friction |
CN110499777A (en) * | 2019-09-17 | 2019-11-26 | 大连理工大学 | A kind of novel nail type bottom hull basis |
-
2017
- 2017-05-02 CN CN201720509930.9U patent/CN207525768U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109371895A (en) * | 2018-11-12 | 2019-02-22 | 交通运输部天津水运工程科学研究所 | It is a kind of for increasing the pitch non-slip mat of coefficient of friction |
CN110499777A (en) * | 2019-09-17 | 2019-11-26 | 大连理工大学 | A kind of novel nail type bottom hull basis |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101148890B (en) | Bridge caisson composite pile foundation and reverse construction method thereof | |
CN103967031B (en) | A kind of caisson of consolidated subsoil and stake combination foundation and construction method thereof | |
US11585064B2 (en) | Hollow subsea foundations | |
CN102953341A (en) | Overhead trestle structure built on non-covering steep bare rocks in deep rapids | |
CN104912045B (en) | Pier constitution water bottom is fixed to use hollow cylinder pier and its construction method of installation | |
CN102561371B (en) | Steel caisson enclosure structure at island-tunnel combination part and construction method thereof | |
CN104452829B (en) | A kind of pile-raft foundation float Structure and construction method | |
CN102322069B (en) | Underwater combination base of open caisson and steel pipe piles and construction method | |
CN203213136U (en) | Caisson and pile combined foundation of consolidated subsoil | |
CN103015367B (en) | High-efficiency economical construction method for revetment | |
CN106884433A (en) | Control vibrations pile pulling causes the structure of underground structure depression and control depression method | |
CN108661081A (en) | A kind of inverted tension type anchor cable system support suspension tunnel structure | |
CN108951334B (en) | Construction method of road subgrade structure | |
CN102979039A (en) | Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream | |
CN203701127U (en) | Underwater gravity type foundation | |
KR20160080028A (en) | Multipurpose artifical island | |
CN207525768U (en) | Combine the gravity type bottom hull basis of anchoring pile and consolidated subsoil | |
CN101260664A (en) | Soft soil foundation large scale steel float lock head construction method | |
CN203049443U (en) | High level trestle structure arranged on steep bare rock of deepwater torrent unsheathed layer | |
CN104818713A (en) | Profile steel cement soil pile construction method adaptive to various stratums | |
CN110093971A (en) | The Combined water pump house and its construction method of subterranean tunnel | |
CN102733407A (en) | Two-ring grouted single pile foundation | |
CN202170512U (en) | Underwater combined base for open caisson and steel pipe piles | |
CN106988317A (en) | One kind is used for underground pipe gallery method for processing foundation | |
CN104727325B (en) | A kind of method of construction of polder sea wall |