CN207525741U - A kind of plastic sheath pile pile - Google Patents

A kind of plastic sheath pile pile Download PDF

Info

Publication number
CN207525741U
CN207525741U CN201721396414.6U CN201721396414U CN207525741U CN 207525741 U CN207525741 U CN 207525741U CN 201721396414 U CN201721396414 U CN 201721396414U CN 207525741 U CN207525741 U CN 207525741U
Authority
CN
China
Prior art keywords
pile
cover
plastic
plastic bushing
plastic sheath
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721396414.6U
Other languages
Chinese (zh)
Inventor
肖晓光
乔海洋
隋伟
曹维存
李冬雪
杜彬彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201721396414.6U priority Critical patent/CN207525741U/en
Application granted granted Critical
Publication of CN207525741U publication Critical patent/CN207525741U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of plastic sheath pile piles, it is related to pile tube technical field, the stake includes pile top, pile body and pile cover, pile top is round table-like, and pile body is rectangular-shape cylindric, that pile top is cylindric or section is square, pile top, pile body, pile cover are sequentially connected setting from bottom to top, pile top, pile body and pile cover three are an integral structure and are concrete material, and arrangement of reinforcement is equipped in pile body and pile cover, and plastic bushing is also cased on the pile body.Very good using effect, project cost after this work, the settlement after construction and jump vehicle phenomenon in treatment of soft foundation section have obtained good solution.

Description

A kind of plastic sheath pile pile
Technical field
The utility model is related to pile tube technical fields.
Background technology
In China, the ground foundation of Bohai Rim bank is essentially coast with silty mud sediment and gravel matter seashore, basis itself Weakness must carry out consolidation process when this area builds high-grade highway to ground.
The processing mode of soft base is mainly solved using rigid composite foundation processing method, and common have the prestressing force prefabricated Thin-wall pipe pile, cast-in-situ concrete thin-wall pipe pile, cement mixing method etc..These stakes mostly have stronger rigidity, can be effectively right Composite foundation carries out consolidation process, and the depth of processing is relatively deep, duration shorter the advantages of being them.But using at these method soft bases Effect, project cost etc. are not very ideal after work after reason, the settlement after construction in treatment of soft foundation section and jump vehicle phenomenon still ten Divide serious.
So a kind of pile pile that can be solved the above problems is needed now.
Utility model content
The technical problem to be solved by the present invention is to provide a kind of plastic sheath pile piles, can solve the above problems.
The technical solution is a kind of plastic sheath pile pile, which includes pile top, pile body and pile cover, the pile top to be round table-like, The pile body is cylindric, the pile top is cylindric or section is square rectangular-shape, the pile top, pile body, pile cover It is sequentially connected setting from bottom to top, the pile top, pile body and pile cover three are an integral structure and are concrete material, in institute It states in pile body and pile cover and is equipped with arrangement of reinforcement, plastic bushing is also cased on the pile body.
Preferably, the radius of the pile body is less than the radius in the larger face of the pile top, the pile body and the pile top compared with Big face connection and the two coaxial arrangement.
Preferably, the larger face of the pile top is equipped with the retainer ring of annular, and the retainer ring is concrete material and and pile top It is an integral structure, the outer diameter of the retainer ring is equal to the internal diameter of plastic bushing, and the plastic bushing is stuck on the retainer ring and leads to Cross gluing knot.
Preferably, the arrangement of reinforcement includes the steel reinforcement cage being arranged in the pile body and the netted muscle being arranged in pile cover, institute It states steel reinforcement cage and netted muscle is connected with each other.
Preferably, the plastic bushing be pvc pipe, the plastic bushing be single-walled pipe, the inside and outside wall of the plastic bushing It is threaded.
Preferably, the pile top is concrete prefabricated, and the pile body and pile cover are built for concrete cast-in-situ.
The advantageous effect of the utility model is (1), there is convenient, environmental protection:Static pressure pile-sinking is taken to construct in construction, first Then sinking sleeve carries out pile concrete cast in situs, construction equipment noise is small, and construction speed is fast, easy to operate, to ring around Border influence is small, pollution is small.(2), there is the features such as whole quality of pile is higher, and soft foundation treatment effect is preferable:PTTC with conventional vibration Immersed tube in situ concrete pile gives full play to external screw-thread and the larger frictional resistance of the periphery soil body compared to single wall screw plastic casing is increased Power acts on, and improves bearing capacity, reliable in quality.Construction quality is easy to control, whole quality of pile is higher, soft foundation treatment effect compared with It is good.(3), there is the features such as construction speed is fast, easily controllable, project cost is relatively low:Casing can be first set in batch, then is filled in batch Concrete is noted, construction speed is easily controllable, and construction speed is very fast.And stake is long and pile strength can become according to geological conditions scene Intensity becomes the long adjusted design of stake, adaptable while relatively low project cost.
Description of the drawings
The structure diagram of Fig. 1 the utility model.
Wherein, 1, pile top, 2, pile body, 3, pile cover, 4, plastic bushing.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description:As shown in Figure 1 A kind of plastic sheath pile pile, the stake include pile top 1, pile body 2 and pile cover 3, and the pile top 1 is round table-like, and the pile body 2 is cylinder Shape, the pile top 1 for cylindric or section be square rectangular-shape, the pile top 1, pile body 2, pile cover 3 from bottom to top according to Secondary connection setting, the pile top 1, pile body 2 and 3 three of pile cover are an integral structure and are concrete material, in the pile body 2 Arrangement of reinforcement is equipped with in pile cover 3, plastic bushing 4 is also cased on the pile body 2.
The radius of the pile body 2 is less than the radius in the larger face of the pile top, the pile body 2 and the larger face of the pile top 1 Connection and the two coaxial arrangement.
The larger face of the pile top 1 is equipped with the retainer ring of annular, and the retainer ring is integrated for concrete material and with pile top 1 Formula structure, the outer diameter of the retainer ring are equal to the internal diameter of plastic bushing 4, and the plastic sheath 4 is stuck on the retainer ring and passes through gluing Knot.
The arrangement of reinforcement includes the steel reinforcement cage being arranged in the pile body 2 and the netted muscle being arranged in pile cover 3, the reinforcing bar Cage and netted muscle are connected with each other.
The plastic bushing 4 be pvc pipe, the plastic bushing 4 be single-walled pipe, the equal band of inside and outside wall of the plastic bushing 4 There is screw thread.
The pile top 1 is concrete prefabricated, and the pile body 2 and pile cover 3 are built for concrete cast-in-situ.
The installation process of the pile pile is:A kind of plastic bushing pile driving construction engineering method, the engineering method include the following steps:
1) pile top is made;Pile top is concrete material, and the pile top is truncated cone-shaped,
2) pile top is connect with plastic bushing;Plastic bushing material is PVC, and the plastic bushing is larger with the pile top The center in face connects and axis is vertical with larger face.
3) stake machine is in place, centering, and plastic bushing is inserted into immersed tube;After plastic bushing is completely inserted into immersed tube, immersed tube is withstood The larger face of the pile top, the surfaces externally and internally of the plastic bushing are threaded, 4) using stake machine by pile top and plastic bushing Squeeze into reinforcement depth, while the water filling into plastic bushing;
5) immersed tube, the displacement of stake machine are promoted out on, drawn water to plastic bushing, cut pipe and check;
6) cover board soil box is excavated at plastic bushing exposing to make cover board clay model or install the cover board mould of finished product, then matched Then muscle carries out pouring for concrete;The concrete is that standard is C30, and arrangement of reinforcement includes laying steel reinforcement cage in plastic bushing With the laying cover board muscle in cover board clay model or cover board mould, the immersed tube is steel pipe, and the internal diameter of the immersed tube is outer compared with plastic bushing The big 1cm of diameter, if using cover board clay model, cover board clay model is a diameter of 50cm, and the circular groove or the length of side of a height of 20cm are 50cm, high For the square groove of 20cm, place mat has 50mm thickness microlith melon seeds piece and 20mm solid cement mortars to do bed course, reinforcing bar in the cover board clay model Ready-made steel reinforcement cage is put into plastic bushing by cage in-situ precast, length 3.5m, construction when, and be laid flat it is whole after can be used Bar dowel or mortar pad are fixed temporarily, and beyond 22cm at the top of plastic bushing, bottom, top layer arrangement of reinforcement with cover board muscle connect steel reinforcement cage It connects, protective layer is controlled using mortar pad, and protective layer thickness is not less than 25mm.
7) steel modeling grid is laid with after conserving, and connect with cover board, 20cm bed courses is laid with after health, flattens plane to flattening height Journey.
PTTC are single wall screw plastic casing on-site concrete pile (Plast ic TubeCast-in-place Conceret e Pile) abbreviation, it is made of pile top, plastic bushing, casing inner concrete, four part of top blind flange, presses Certain spacing is squeezed into plastic bushing in the ground to need reinforcement, pours into a mould pile with concrete in plastic bushing, and pour into a mould lid Plate, the method for processing foundation for being laid with bed course and TGXG formation pile formula rigid pile composite foundation.Its engineering design is plastics Tube-in-tube pile using single wall, it is inside and outside be screw thread PVC plastic casing, cover board use C30 concretings.The stake of pipe outside diameter 16cm Body, the size of the cover plate are 50 × 20cm of Φ;The pile body of pipe outside diameter 20cm, the size of the cover plate are 60 × 20cm of Φ.The principle of PTTC is Plastic bushing is squeezed by root in supporting course at a certain distance using static pressure ancillary vibration hidden pipe pile machine, plastic bushing is sealed for bottom Close, open top, after block plastic bushing to be segmented all is set, then it is unified excavate cover board clay model, place steel reinforcement cage and Cover board arrangement of reinforcement.Unified to pour into a mould pile to the plastic bushing C30 concrete continuous being embedded in ground, plastic bushing no longer takes Go out.After pile concrete reaches some strength, the horizontal reinforcing bodies such as steel modeling grid are laid on cover board top;Pile body, bed course, level Reinforcing body and embankment collectively form plastic sheath pile pile geosynthetic reinforced pile supported embankments on soft soil system.
The machineries such as common board-plugging device, oscillation pipe sinking machine can be used in stake machine selection.During using vibration sinking tube machinery, it should control The diameter of immersed tube about 1cm more bigger than single wall screw plastic casing.According to designing pile length, the bracket height and steel bushing for determining stake machine are sunk The effective length of pipe, the bracket height of stake machine and the effective length of steel bushing immersed tube should be higher by 6~8m in configuration than designing pile length. The scaffold reaction of bearing at the machine immersed tube of counterweight stake should be calculated and be demarcated before test pile, it is desirable that be held not less than single pile design Carry 2 times of power.The length mark as unit of rice is drawn in stake machine rack, for being observed during immersed tube, recording embedded depth.
Levelling of the land is carried out to piling construction region, and 20cm is laid in the range of the 3m of both sides in roadbed piling construction region Thick rubble is as bed course.Open drain and french drain around pile sinking Active workings should be set, ensured in construction site without ponding.It is heavy Ground, underground obstacle, pipeline in the range of pile driving construction etc. should be cleared up or change shifting and finish.In the range of neighbouring pile sinking areas adjacent Building to be protected and pipeline is needed to take suitable safeguard measure, and carry out corresponding detection.
According to the requirement that reinforcing pile is grown, by the plastic bushing of manufacture cutting (connection) into appropriate length, it is desirable that set to adding Gu plastic bushing overhead height is high not less than the pile body top mark of requirement after depth and appropriate affluence;By the plastic bushing of well cutting with Pile top connection sealing is secured, is then put into the plastic bushing with pile top in steel pipe from steel pipe bottom, and pile top is aligned with stake position, The accurate precast pile tip buried of button starts immersed tube, and the stabilization of adjustment stake machine is paid attention to during immersed tube, forbids to tilt and misplace.Machinery The subsidence velocity of immersed tube is typically about 2m/min, and motor should be started when immersed tube to designed elevation and scaffold, and original place vibration staying is not small In 10s, to ensure that pile top enters 1.5 times of supporting course not less than stake diameter, and plastic bushing is protected in water filling, water filling is most Whole depth should reach 500mm below nozzle absolute altitude, and the construction depth of stake is aided with penetration control, pile penetration control by designing pile length Standard processed is:20cm or so/min, the specific Con trolling index of pile penetration can be determined according to test pile.If geological conditions and geologic prospect report Announcement is subject to the construction depth that reality is controlled by degree of pouring into there are larger difference, it is ensured that stake end insertion design hard stratum.
Speed general control keeps uniformity in 0.8~1.0m/min, pipe-pulling speed during tube drawing, during tube drawing not Allow anti-plug.Steel pipe is extracted and plastic bushing is stayed in into underground, telephone-moving to next position, iterative process continues embedded set Pipe.(general plastic bushing, which stays, to be set beyond pile cover bottom absolute altitude after drawing water and extra plastic bushing being carried out section pipe and arranged 150mm), depth inspection is carried out to plastic bushing, and protects the cleaning in plastic bushing at any time, sundries is not allowed to enter as possible, it can Using plastic film or plank covering nozzle.
1st, with the comparison of pile for prestressed pipe:Its mechanized construction degree of prestressing pipe pile construction is high, construction input is big, although It is easy to operate, it is easy to control, it is easily guaranteed, has a wide range of application on bearing capacity, anti-bending strength, extraction-resistant behavior, but engineering is made Valency is relatively high.
2nd, compared with cast-in-situ concrete thin-wall pipe pile:Cast-in-situ concrete thin-wall pipe pile is identical with bored pile construction mechanism, work of constructing Skill is more ripe, and with its processed soft base, bearing capacity can obtain larger guarantee.But its construction technology is complex, and the duration takes Longer, mud is larger to ambient contamination, and project cost is higher.
3rd, with the comparison of cement mixing pile:Cement mixing pile driving construction is simpler, and bearing power increase amplitude is big, short time limit, nothing Soil compaction effect, construction quality are not easily controlled, and pile quality is uneven, and bearing capacity is not high, and extraction-resistant behavior is low, while to environment dirt It contaminates larger, is suitably applied in complex ground treatment, and project cost is not also cheap.
4th, PTTC do not need to use a large amount of reinforcing bars and bulk transport as prefabricated pile and set mechanical equipment, not yet It needs to match stake in advance, setting machinery and concrete can continuously construct so as to reduce operating expenses, can compared with pile for prestressed pipe Saving construction cost 20%.
5th, the building wastes yield such as mud is few during PTTC pile driving constructions, and soil disturbance is small, and pollution is small, to surrounding enviroment Influence it is small, treatment effect is apparent, is a kind of environmentally protective reinforcing soft foundation technology, have good social benefit.
6th, the construction technology construction equipment less investment, into appearance convenient transportation, technique is relatively simple.Meanwhile can first into It criticizes and sets casing, then concrete perfusion in batch, compared with other construction technologies, the construction period is shorter, has preferable economic benefit.
The advantageous effect of the utility model is (1), there is convenient, environmental protection:Static pressure pile-sinking is taken to construct in construction, first Then sinking sleeve carries out pile concrete cast in situs, construction equipment noise is small, and construction speed is fast, easy to operate, to ring around Border influence is small, pollution is small.(2), there is the features such as whole quality of pile is higher, and soft foundation treatment effect is preferable:PTTC with conventional vibration Immersed tube in situ concrete pile gives full play to external screw-thread and the larger frictional resistance of the periphery soil body compared to single wall screw plastic casing is increased Power acts on, and improves bearing capacity, reliable in quality.Construction quality is easy to control, whole quality of pile is higher, soft foundation treatment effect compared with It is good.(3), there is the features such as construction speed is fast, easily controllable, project cost is relatively low:Casing can be first set in batch, then is filled in batch Concrete is noted, construction speed is easily controllable, and construction speed is very fast.And stake is long and pile strength can become according to geological conditions scene Intensity becomes the long adjusted design of stake, adaptable while relatively low project cost.

Claims (6)

1. a kind of plastic sheath pile pile, it is characterized in that:The stake includes pile top, pile body and pile cover, and the pile top is round table-like, the stake As cylindric, the pile top is cylindric or section is square rectangular-shape, the pile top, pile body, pile cover under to On be sequentially connected setting, the pile top, pile body and pile cover three are an integral structure and are concrete material, in the pile body With arrangement of reinforcement is equipped in pile cover, be also cased with plastic bushing on the pile body.
2. a kind of plastic sheath pile pile according to claim 1, it is characterized in that:The radius of the pile body be less than the pile top compared with The radius in big face, the pile body is connect with the larger face of the pile top and the two is coaxially disposed.
3. a kind of plastic sheath pile pile according to claim 2, it is characterized in that:The larger face of the pile top is equipped with annular Retainer ring, the retainer ring are an integral structure for concrete material and with pile top, and the outer diameter of the retainer ring is equal to the interior of plastic bushing Diameter, the plastic bushing are stuck on the retainer ring and pass through gluing knot.
4. a kind of plastic sheath pile pile according to claim 3, it is characterized in that:The arrangement of reinforcement includes being arranged in the pile body Steel reinforcement cage and the netted muscle that is arranged in pile cover, the steel reinforcement cage and netted muscle be connected with each other.
5. a kind of plastic sheath pile pile according to claim 4, it is characterized in that:The plastic bushing be pvc pipe, the plastics Casing is single-walled pipe, and the inside and outside wall of the plastic bushing is threaded.
6. a kind of plastic sheath pile pile according to claim 5, it is characterized in that:The pile top is concrete prefabricated, the stake Body and pile cover are built for concrete cast-in-situ.
CN201721396414.6U 2017-10-24 2017-10-24 A kind of plastic sheath pile pile Expired - Fee Related CN207525741U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721396414.6U CN207525741U (en) 2017-10-24 2017-10-24 A kind of plastic sheath pile pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721396414.6U CN207525741U (en) 2017-10-24 2017-10-24 A kind of plastic sheath pile pile

Publications (1)

Publication Number Publication Date
CN207525741U true CN207525741U (en) 2018-06-22

Family

ID=62571132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721396414.6U Expired - Fee Related CN207525741U (en) 2017-10-24 2017-10-24 A kind of plastic sheath pile pile

Country Status (1)

Country Link
CN (1) CN207525741U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114808908A (en) * 2022-05-07 2022-07-29 泰安众科建材有限公司 Method for reinforcing soft foundation based on medium-high carbon steel wire mesh
TWI780912B (en) * 2021-09-15 2022-10-11 蔡景堯 foundation pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI780912B (en) * 2021-09-15 2022-10-11 蔡景堯 foundation pile
CN114808908A (en) * 2022-05-07 2022-07-29 泰安众科建材有限公司 Method for reinforcing soft foundation based on medium-high carbon steel wire mesh

Similar Documents

Publication Publication Date Title
CN102433876B (en) Multi-compartment casing composite pile and construction method thereof
CN103074891B (en) Double-layer plastic sleeve bulk material and concrete stiffness core composite pile and construction method thereof
CN103526770B (en) A kind of construction method of high antiseepage anti-floating pile raft structure
CN1837511B (en) Double-rowed cofferdam and method for manufacturing the same
CN108560542B (en) Waste tire coated building slag bidirectional reinforcement and construction method thereof
CN204059332U (en) A kind of concrete precast pipe pile and piling prepressing Soft Ground device
CN104110038A (en) Construction method for large-area pit support structure in deep-sludge type soft soil area
CN105464074B (en) A kind of artificial digging pile high polymer grouting safeguard structure and its construction method
CN100510281C (en) Semi-reverse construction method for ultra-large-diameter and ultra-buried depth storage tank
CN212866028U (en) River course limit sewage pipe network combines sheet-like barricade arrangement structure of stake
CN103510511A (en) Top-reinforced cast-in-place concrete thin-wall pipe pile and construction method
CN105297757A (en) Construction method for quicksand layer pile foundation
CN104480956B (en) A kind of minor diameter mold-bagged concrete pile composite foundation
CN107299650A (en) A kind of remote open caisson casting method for correcting error
CN207525741U (en) A kind of plastic sheath pile pile
CN203594041U (en) Piled raft structure with good resistance to seepage and buoyancy
CN100575616C (en) Vacuum curtain water stop and atmospheric pressure support deep pit digging construction method
CN213897154U (en) Soft soil foundation pit bottom curing structure
CN203066064U (en) Double-layer plastic sleeve discrete material and concrete stiffening core combined pile
CN205475206U (en) Drainage formula cast in situ concrete thin wall tubular pile
CN203891012U (en) Novel filling pile with prearranged clay pile
CN107916665A (en) A kind of plastic bushing pile driving construction engineering method
CN203498828U (en) Top reinforced cast-in-place concrete thin-wall pipe pile
CN105484279A (en) Drainage cast-in-situ concrete thin-wall pipe pile construction method
CN210151776U (en) Structure of balance weight type retaining wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180622

Termination date: 20201024

CF01 Termination of patent right due to non-payment of annual fee