CN207525739U - A kind of underwater directional vehicle steel pile casting with construction operation platform - Google Patents
A kind of underwater directional vehicle steel pile casting with construction operation platform Download PDFInfo
- Publication number
- CN207525739U CN207525739U CN201721510482.0U CN201721510482U CN207525739U CN 207525739 U CN207525739 U CN 207525739U CN 201721510482 U CN201721510482 U CN 201721510482U CN 207525739 U CN207525739 U CN 207525739U
- Authority
- CN
- China
- Prior art keywords
- operation panel
- steel pile
- pile casting
- annular operation
- stream
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 49
- 239000010959 steel Substances 0.000 title claims abstract description 49
- 238000005266 casting Methods 0.000 title claims abstract description 42
- 238000010276 construction Methods 0.000 title claims abstract description 31
- 239000002002 slurry Substances 0.000 claims abstract description 40
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 10
- 238000004513 sizing Methods 0.000 claims abstract description 8
- 238000005728 strengthening Methods 0.000 claims abstract description 5
- 238000007599 discharging Methods 0.000 claims description 2
- 229920002472 Starch Polymers 0.000 claims 2
- 235000019698 starch Nutrition 0.000 claims 2
- 239000008107 starch Substances 0.000 claims 1
- 239000002689 soil Substances 0.000 abstract description 6
- 230000002787 reinforcement Effects 0.000 abstract description 5
- 230000008595 infiltration Effects 0.000 abstract 1
- 238000001764 infiltration Methods 0.000 abstract 1
- 238000005553 drilling Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
- 210000002435 tendon Anatomy 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a kind of underwater directional vehicle steel pile castings with construction operation platform, steel pile casting body including being used for underwater directional vehicle, the external side of steel pile casting is installed with annular operation panel, and the annular operation panel lower part is equipped with to discharge the stream sizing device of mud and the reinforcing rib for strengthening annular operation panel intensity.The utility model is simple in structure, the annular operation panel lower surface of setting is contacted with ground, the ground for avoiding annular operation panel lower part is damaged, and be conducive to maintain the relatively clean and tidy of construction site to a certain extent, annular operation panel lower part is provided with reinforcing rib, working steel reinforcement cage etc. can be placed on annular operation panel, take conveniently, substantially increase construction efficiency;Timely mud can be discharged by the slurry tube slot of setting, mud infiltration steel pile casting body is avoided to lead to annular operation panel lower part, and the soil is porous, advantageously ensures that the geology of annular operation panel lower part is not washed, improves the quality of construction.
Description
Technical field
The utility model is related to technical field of building construction, specifically a kind of underwater drilling with construction operation platform fills
Note stake steel pile casting.
Background technology
At present under water in the work progress of cast-in-situ bored pile, since soil property is unstable, there is mud etc. further to dislike in addition
Change soil property, leading to the construction of reinforced concrete core-tube, the retaining wall device to hole stake frequently with steel is protected there are larger difficulty, is prevented
Only collapse hole avoids influencing construction speed and construction quality.
Existing steel pile casting be mostly according to hole stake size with iron sheet hoop into an inner hollow annular bucket, in this way
Although steel pile casting can stablize hole wall, the hole that prevents from collapsing, isolation surface water, but underwater directional vehicle cannot be efficiently solved
The problem of construction site is filthy, it is impossible to which protection operation ground can not ensure the standard construction and construction quality at scene, construction effect
Rate is low, and effect is poor.
Utility model content
The purpose of this utility model is to provide a kind of underwater directional vehicle steel pile casting with construction operation platform,
To solve the problems mentioned in the above background technology.
To achieve the above object, the utility model provides following technical solution:
A kind of underwater directional vehicle steel pile casting with construction operation platform, including being used for underwater directional vehicle
Steel pile casting body, the external side of steel pile casting are installed with annular operation panel, and the annular operation panel lower part is equipped with to discharge mud
Stream sizing device and reinforcing rib for strengthening annular operation panel intensity, the stream sizing device include being fixedly arranged under annular operation panel
The stream slurry riser in portion and the stream slurry transverse slat for being fixedly arranged on stream slurry bottom of the riser.
As further program of the utility model:The stream slurry riser and stream slurry transverse slat surround the stream to circulate for mud
Tube seat is starched, one end of stream slurry riser and one end of stream slurry transverse slat are fixedly connected with steel pile casting body.
As further program of the utility model:Offer what is be connected with slurry tube slot one end on the steel pile casting body
Stream slurry hole.
As further program of the utility model:The lower part two corners of the slurry tube slot are arcuate structure.
As further program of the utility model:The reinforcing rib is equidistantly set in a ring along the external side of steel pile casting
It puts.
Compared with prior art, the beneficial effects of the utility model are:The utility model is simple in structure, fabricates cost
Low, the annular operation panel lower surface of setting is contacted with ground, and the ground for avoiding annular operation panel lower part is damaged, and certain
Be conducive to maintain the relatively clean and tidy of construction site in degree, annular operation panel lower part is provided with reinforcing rib, improves annular operation
Working steel reinforcement cage etc. can be placed on annular operation panel by the intensity of plate, taken conveniently, substantially increased construction efficiency;
Timely mud can be discharged by the slurry tube slot of setting, mud is avoided, which to penetrate into steel pile casting body, leads to the soil of annular operation panel lower part
Matter is loose, advantageously ensures that the geology of annular operation panel lower part is not washed, improves the quality of construction, meanwhile, slurry tube slot
Lower part two corners are arcuate structure, prevent plowing from mud tube, and under the premise of satisfying the use demand, extend mud tube uses the longevity
Life;The setting of annular operation panel reduces the gradient of steel pile casting body, meets specification requirements when using, ensure that steel pile casting body
Verticality, solve the problems, such as steel pile casting body at the construction field (site) embedded, using effect is good.
Description of the drawings
Fig. 1 is the front view of the utility model.
Fig. 2 is the bottom view of the utility model.
In figure:1- steel pile castings body, 2- annulars operation panel, 3- streams sizing device, 31- stream slurries riser, 32- stream slurries transverse slat, 4- add
Strengthening tendons, 5- slurry tube slots.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained shall fall within the protection scope of the present invention.
Please refer to Fig.1-2, in the utility model embodiment, a kind of underwater directional vehicle with construction operation platform is used
Steel pile casting, the steel pile casting body 1 including being used for underwater directional vehicle, 1 outside of steel pile casting body are installed with annular operation panel 2,
Annular operation panel 2 lower part is equipped with to discharge the stream sizing device 3 of mud and the reinforcement for strengthening annular 2 intensity of operation panel
Muscle 4, along 1 outside of steel pile casting body, spaced set, the stream sizing device 3 include being fixedly arranged on annular the reinforcing rib 4 in a ring
The stream slurry riser 31 of operation panel lower part and the stream slurry transverse slat 32 for being fixedly arranged on 31 bottom of stream slurry riser, the stream slurry riser 31 and stream are starched
Transverse slat 32 surrounds the slurry tube slot 5 to circulate for mud, and the lower part two corners of slurry tube slot 5 are arcuate structure, stream slurry riser 31
One end and one end of stream slurry transverse slat 32 are fixedly connected with steel pile casting body 1, are offered on the steel pile casting body 1 and slurry tube slot 5
The stream slurry hole that one end is connected.
The utility model is simple in structure, in use, annular 2 lower part of operation panel is embedded at underwater drilling, annular operation
2 lower surface of plate and the ground at drilling top touch, and the height that annular 2 top of operation panel is elevated above the soil is controlled in 30cm extremely
50cm meets specification requirements when using, meanwhile, the setting of annular operation panel can reduce inclining for the steel pile casting body 1 on embedment ground
Gradient, in use, the lower surface of annular operation panel is bonded with ground, annular operation panel is in horizontality, ensure that steel pile casting
The verticality of body 1 solves the problems, such as at the construction field (site) embedded of steel pile casting body 1.
Annular operation panel is the doughnut-shaped steel plate for being fixedly arranged on the outside of steel pile casting body 1, be equipped in the lower part of annular operation panel 2 along
The reinforcing rib 4 of the circumferential spaced set of steel pile casting body 1, the setting of reinforcing rib 4 substantially increase the intensity of annular operation panel 2,
Geological condition can carry the weight of working steel reinforcement cage etc. under the premise of allowing, steel reinforcement cage etc. can be directly placed at annular operation
It on plate 2, is taken when facilitating construction, substantially increases construction efficiency, meanwhile, the setting of annular operation panel 2 effectively avoids position
It is damaged in the ground of annular 2 lower part of operation panel, and is conducive to maintain the relatively clean and tidy of construction site to a certain extent.
The slurry tube slot 5 surrounded by stream slurry riser 31 and stream slurry transverse slat 32 is additionally provided in annular 2 lower part of operation panel, is used
In the process, 5 one end of slurry tube slot can be connected to the mud tube for discharging mud, mud is facilitated to be starched through slurry tube slot 5 and with stream
The mud tube discharge of 5 one end of tube seat connection, avoids mud from penetrating into the soil property for leading to annular 2 lower part of operation panel along steel pile casting body 1
It is loose, it advantageously ensures that the geology of annular 2 lower part of operation panel is not washed, improves the quality of construction, the lower part of slurry tube slot 5
Two corners are arcuate structure, convenient to be connect with mud tube, meanwhile, scuffing of the slurry tube slot 5 to mud tube is effectively prevented, is being met
Under the premise of use demand, the service life of mud tube is extended.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned exemplary embodiment, and
And in the case of the spirit or essential attributes without departing substantially from the utility model, it can realize that this practicality is new in other specific forms
Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new
The range of type is indicated by the appended claims rather than the foregoing description, it is intended that by containing in the equivalent requirements of the claims is fallen
All changes in justice and range are embraced therein.Any reference numeral in claim should not be considered as limitation
Involved claim.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in each embodiment can also be properly combined, forms those skilled in the art
The other embodiment being appreciated that.
Claims (5)
1. a kind of underwater directional vehicle steel pile casting with construction operation platform, the steel including being used for underwater directional vehicle
Casing body(1), it is characterised in that:The steel pile casting body(1)Outside is installed with annular operation panel(2), the annular operation panel(2)
Lower part is equipped with the stream sizing device for discharging mud(3)With for strengthening annular operation panel(2)The reinforcing rib of intensity(4), it is described
Flow sizing device(3)Stream including being fixedly arranged on annular operation panel lower part starches riser(31)Riser is starched with stream is fixedly arranged on(31)The stream of bottom
Starch transverse slat(32).
2. the underwater directional vehicle steel pile casting according to claim 1 with construction operation platform, it is characterised in that:
The stream slurry riser(31)Transverse slat is starched with stream(32)Surround the slurry tube slot to circulate for mud(5), stream slurry riser(31)One
End and stream slurry transverse slat(32)One end with steel pile casting body(1)It is fixedly connected.
3. the underwater directional vehicle steel pile casting according to claim 1 with construction operation platform, it is characterised in that:
The steel pile casting body(1)On offer and slurry tube slot(5)The stream slurry hole that one end is connected.
4. the underwater directional vehicle steel pile casting according to claim 2 with construction operation platform, it is characterised in that:
The slurry tube slot(5)Lower part two corners be arcuate structure.
5. the underwater directional vehicle steel pile casting according to claim 1 with construction operation platform, it is characterised in that:
The reinforcing rib(4)Along steel pile casting body(1)Outside spaced set in a ring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721510482.0U CN207525739U (en) | 2017-11-13 | 2017-11-13 | A kind of underwater directional vehicle steel pile casting with construction operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721510482.0U CN207525739U (en) | 2017-11-13 | 2017-11-13 | A kind of underwater directional vehicle steel pile casting with construction operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207525739U true CN207525739U (en) | 2018-06-22 |
Family
ID=62582067
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721510482.0U Expired - Fee Related CN207525739U (en) | 2017-11-13 | 2017-11-13 | A kind of underwater directional vehicle steel pile casting with construction operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207525739U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853569A (en) * | 2019-03-28 | 2019-06-07 | 中国建筑第四工程局有限公司 | A kind of method and device of Soft Clay pouring pile hole steel pile casting anti-settling deviation |
-
2017
- 2017-11-13 CN CN201721510482.0U patent/CN207525739U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853569A (en) * | 2019-03-28 | 2019-06-07 | 中国建筑第四工程局有限公司 | A kind of method and device of Soft Clay pouring pile hole steel pile casting anti-settling deviation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105804059A (en) | Cast-in-situ bored pile hole-forming device and method | |
CN107130633A (en) | A kind of steel tube concrete clay model bag stake is combined soil-baffling structure construction technology | |
CN103046543A (en) | Antiskid pile with hollow outer isosceles trapezoid cross section and in unequal interval arrangement | |
CN104695879B (en) | A kind of stake holes is rinsed and takes out sand hole method | |
CN208472708U (en) | A kind of grouting behind shaft or drift lining filling pile structure | |
CN104790982B (en) | A kind of bored tunnel superdeep holes grouting sleeve shell material | |
CN207525739U (en) | A kind of underwater directional vehicle steel pile casting with construction operation platform | |
CN205857173U (en) | A kind of Novel steel casing sheath applying bored concrete pile on the water | |
CN108824471A (en) | A kind of deep water drift net multi-column pier foundation and its construction method | |
CN103046539B (en) | Antiskid pile with outer isosceles trapezoid cross section and in unequal interval arrangement | |
CN107938694A (en) | Gravity type water jetting at high pressure percussion mechanism and its help heavy method | |
JP6588797B2 (en) | Excavation injection rod for pile construction and pile construction method using the same | |
CN208472717U (en) | A kind of depth back filled region bored concrete pile steel pile casting retaining wall | |
CN211037023U (en) | Pipe well dewatering well arranged at bottom of underground diaphragm wall | |
CN207228194U (en) | It is a kind of to be used to twist the piling bar for inhaling ship and twist to inhale ship | |
CN207512742U (en) | A kind of pipe-line system for the downward pumping concrete of deep basal pit | |
CN207376611U (en) | A kind of composite foundation anti-floating pile | |
CN108301405B (en) | The connection structure of assembled steel pipe concrete-pile and reinforced beam | |
CN210194663U (en) | Steel-pipe pile foundation reinforced structure | |
CN207959192U (en) | A kind of underground current water layer cast-in-situ bored pile structure | |
CN106522293B (en) | Method for correcting error with raft foundation building | |
CN205296128U (en) | Prose style free from parallelism concrete core drainage reinforcing pile is handled to composite foundation | |
CN206220148U (en) | Mud equipment is inhaled in gaslift | |
CN204875796U (en) | Check type steel sheet piling cofferdam water spray formula cloth magazine attachment | |
CN109680978A (en) | Basement increasing layer underpinning construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180622 |