CN207512801U - A kind of pulling and pressing integrated attachment device of pole and tower foundation strength test - Google Patents

A kind of pulling and pressing integrated attachment device of pole and tower foundation strength test Download PDF

Info

Publication number
CN207512801U
CN207512801U CN201721639770.6U CN201721639770U CN207512801U CN 207512801 U CN207512801 U CN 207512801U CN 201721639770 U CN201721639770 U CN 201721639770U CN 207512801 U CN207512801 U CN 207512801U
Authority
CN
China
Prior art keywords
riser
plate
bottom plate
pole
connect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721639770.6U
Other languages
Chinese (zh)
Inventor
齐道坤
刘湘莅
王刚
郭新菊
路晓军
李君章
席小娟
梁晟
景川
王文峰
肖波
杨敏
李勇
刘存凯
唐旻
周铁军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Henan Electric Power Co Ltd
Henan Power Transmission and Transformation Construction Co Ltd
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Henan Electric Power Co Ltd
Henan Power Transmission and Transformation Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Henan Electric Power Co Ltd, Henan Power Transmission and Transformation Construction Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201721639770.6U priority Critical patent/CN207512801U/en
Application granted granted Critical
Publication of CN207512801U publication Critical patent/CN207512801U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model provides a kind of pulling and pressing integrated attachment device of pole and tower foundation strength test, including upper connector and lower connector, lower connector includes pedestal, upper connector includes pressing plate, pedestal includes bottom plate, the first mounting hole being connect with foundation bolt is set on bottom plate, setting support bindiny mechanism on bottom plate, support the top setting pressing plate of bindiny mechanism, the second mounting hole being connect with counterforce device is set on pressing plate, the intermediate corresponding support bindiny mechanism setting slot hole of pressing plate, supports the top of bindiny mechanism that the slot hole on pressing plate is passed through to be connect with puller system.The pedestal and one piece of pressing plate being connect with counterforce device that the utility model is connect by one with pole and tower foundation foundation bolt, puller system, form a kind of attachment device of the antipodal external force transmission needs of tension that can meet simultaneously in pole and tower foundation experiment, pressure-resistant two kinds of force directions, its is rational in infrastructure, easy to assembly, effectively evades because tensile test impacts foundation bolt the problem of rear attachment device can not be dismantled.

Description

A kind of pulling and pressing integrated attachment device of pole and tower foundation strength test
Technical field
The utility model is related to transmission line of electricity technical fields, and in particular to a kind of pulling and pressing integrated company of pole and tower foundation strength test Connection device.
Background technology
According to transmission line tower foundation stressing conditions, when carrying out transmission line tower foundation strength test, not only The pressure test on basis is carried out, while also to carry out the tensile test on basis;Transmission line foundation is tested and common building base Plinth is different, and building foundation is since without tensile test, the connection between basis and counterforce device is relatively simple, and also there is no more Situation about changing for transmission line tower foundation strength test, in order to obtain the data close with actual conditions, is needed in tension It carries out repeatedly applying external force experiment repeatedly between pressure test;According to transmission line of electricity operating experience, iron tower foundation is by upper After the effect of pull out force, deform between the nut and screw rod of basic foundation bolt due to being squeezed by column foot bottom plate so that Nut can not be dismantled normally, and underlying strength is tested, then test period and difficulty is caused to increase.
The utility model of Publication No. 107036881A discloses one kind for electric pole pull force tester, including bottom The electric pole being fixedly connected in fixed seat connects first crossbeam and second cross beam by column in fixed seat, connects on first crossbeam One group of device for hooping is connect, load dynamometer and flexometer are connected in the front side of electric pole, in second cross beam by connecting one group of connecting rod, An image recorder is respectively mounted on each connecting rod, image recorder is correspondingly arranged with electric pole, is also connected on second cross beam One group of fixed link is respectively mounted a pressure sensor being correspondingly arranged with electric pole in each fixed link.The utility model it is excellent Point:The utility model fixes the bottom of electric pole, and electric pole is sling by hanger in centre, horizontality is at, in electric pole Other end connection load dynamometer and flexometer, image recorder is set in the surrounding of electric pole, while image projected aobvious In display screen, while sensor is used to perceive the deformation of electric pole, the variation of comprehensive detection electric pole respectively around electric pole.It but should Utility model there are it is mentioned above the problem of, after pulling force is born, screw rod and nut easily deform upon and cause dismounting tired It is difficult.
Utility model content
In view of this, the utility model provides a kind of pulling and pressing integrated attachment device of pole and tower foundation strength test, with solve into Row pullout tests are into the transfer process of pressure test, due to being sent out between the nut and screw rod of basic foundation bolt due to being squeezed Change shape, the problem of causing nut and tensile connecting device that cannot normally dismantle, cause pressure-resistant attachment device that can not install.
In order to solve the above technical problems, the utility model provides a kind of pole and tower foundation strength test pulling and pressing integrated connection dress It puts, including upper connector and lower connector, the lower connector includes connecting with the foundation bolt and puller system of pole and tower foundation The pedestal connect, the upper connector include the pressing plate being connect with the load carrier of counterforce device, and the pedestal includes bottom plate, described The first mounting hole being connect with the foundation bolt on bottom plate is set, support bindiny mechanism, the support are set on the bottom plate The top of bindiny mechanism sets the pressing plate, and the second mounting hole being connect with the counterforce device is set on the pressing plate, described The intermediate corresponding support bindiny mechanism setting slot hole of pressing plate, the top of the support bindiny mechanism is passed through on the pressing plate Slot hole is connect with the puller system.
Further, the pedestal is an integrated model, and the bottom plate is rectangular, and first mounting hole is arranged on institute State the quadrangle of bottom plate, first mounting hole is circular hole, the aperture and position of first mounting hole and is made a strength test The foundation bolt of pole and tower foundation matches.
Further, the support bindiny mechanism includes welding the first riser and the second riser of setting on the bottom plate, First riser and the second riser are vertically set on the bottom plate, second riser be two, first riser with Second riser is vertical, and second riser is connect with the center line of first riser, and second riser is separately positioned on institute The both sides of the first riser are stated, the front and rear side of first riser is connect respectively with two sides symmetrical on the bottom plate, and described The outside of two risers is connect with two other side on the bottom plate, the crown center welding setting triangle of first riser Connecting plate, the connecting plate are matched with the slot hole on the pressing plate, and the slot hole is rectangle structure, is set on the connecting plate Put the connecting hole being connect with the puller system, first riser and the second riser upper end are smooth and be generally aligned in the same plane, and First riser and the second riser upper end carry the pressing plate.
Further, before and after first riser side lower end both sides set the first stiffened panel, first stiffened panel with The bottom plate connection, first stiffened panel is vertical with first riser and bottom plate respectively, the lower end two of second riser Side is vertically arranged the second stiffened panel, second stiffened panel and the bottom plate vertical connection, the upper end both sides of second riser Third stiffened panel is vertically arranged, the upper end of the third stiffened panel is smooth and is located at first riser and the second riser upper end In same plane.
Further, the third stiffened panel, the first riser, the plane residing for the second riser upper end with where the bottom plate Plane be mutually parallel.
Further, the slot hole and the post gap of the connecting plate installation are less than 0.3 millimeter so that connecting plate is to pressing plate Play position-limiting action.
Further, four limiting plates are set on the pressing plate, the limiting plate is arranged on the both sides of the slot hole two-by-two, The limiting plate is parallel with the long axis of the slot hole, and the limiting plate is vertical with the pressing plate, and the limiting plate is arranged on institute It states between the second mounting hole side corresponding with the long axis both sides of slot hole on pressing plate.
The pedestal and one piece and counter-force dress that the utility model is connect by one with pole and tower foundation foundation bolt, puller system Put the pressing plate of connection, a kind of tension that can meet simultaneously in pole and tower foundation experiment of composition, pressure-resistant two kinds of complete phases of force direction Anti- external force transmits the attachment device needed, and the attachment device of the utility model is rational in infrastructure, easy to assembly, power transmission is clear, While improving efficiency, investment reduction, reduce difficulty, effectively evade and having been connected after being impacted because of tensile test to foundation bolt The problem of device can not be dismantled.
Description of the drawings
Fig. 1 is the front view of connector under the utility model;
Fig. 2 is the vertical view of connector under the utility model;
Fig. 3 is the side view of connector under the utility model;
Fig. 4 is the structure diagram of connector under the utility model;
Fig. 5 is the structure diagram of the utility model pressing plate;
Fig. 6 is the structure diagram of the utility model.
Specific embodiment
Purpose, technical scheme and advantage to make the utility model embodiment are clearer, new below in conjunction with this practicality The attached drawing 1-6 of type embodiment, is clearly and completely described the technical solution of the utility model embodiment.Obviously, it is described Embodiment be the utility model part of the embodiment, instead of all the embodiments.Based on described the utility model Embodiment, those of ordinary skill in the art's all other embodiments obtained shall fall within the protection scope of the present invention.
Embodiment one, the utility model provides a kind of pulling and pressing integrated attachment device of pole and tower foundation strength test, including upper Connector and lower connector, the lower connector include the pedestal being connect with the foundation bolt and puller system of pole and tower foundation, The upper connector includes the pressing plate 10 being connect with the load carrier of counterforce device, and the pedestal includes bottom plate 8, the bottom plate 8 It is upper that the first mounting hole 9 being connect with the foundation bolt is set, support bindiny mechanism is set on the bottom plate 8, and the support connects The top of connection mechanism sets the pressing plate 10, and the second mounting hole 11 being connect with the counterforce device is set on the pressing plate 10, The support bindiny mechanism setting slot hole 12 is corresponded among the pressing plate 10, the top of the support bindiny mechanism is described in Slot hole 12 on pressing plate 10 is connect with the puller system.Supporting body of the bottom plate as whole device, and the first peace on bottom plate Dress hole is responsible for connecting with foundation bolt, and the support bindiny mechanism on bottom plate then connect with puller system, plays the work for transmitting pulling force With realizing the test to tension.Pressing plate is mounted in support bindiny mechanism, and the second reserved mounting hole is used for connecting counterforce device Load carrier, the pressure that applies to pedestal of carrying counterforce device, so as to by pressure transmission to the shaft tower pedestal of lower section, realization pair Measuring body test.
The pedestal is an integrated model, and the bottom plate 8 is rectangular, and first mounting hole 9 is arranged on the bottom plate 8 Quadrangle, first mounting hole 8 is circular hole, the aperture and position of first mounting hole 8 and the shaft tower to make a strength test The foundation bolt on basis matches, and facilitates and connects the first mounting hole on bottom plate with foundation bolt, is conveniently operated.
The support bindiny mechanism includes welding the first riser 3 and the second riser 5 of setting on the bottom plate 8, and described the One riser 3 and the second riser 5 are vertically set on the bottom plate 8, and second riser 5 is two, first riser 3 and the Two risers 5 are vertical, and second riser 5 is connect with the center line of first riser 3, and second riser 5 is separately positioned on The both sides of first riser 3, the front and rear side of first riser 3 are connect respectively with two sides symmetrical on the bottom plate 8, institute The outside for stating the second riser 5 is connect with two other side on the bottom plate 8, the crown center welding setting of first riser 3 The connecting plate 2 of triangle, the connecting plate 2 are matched with the slot hole 12 on the pressing plate 10, and the slot hole 12 is rectangle knot Structure sets the connecting hole 1 being connect with the puller system, 3 and second riser of the first riser, 5 upper end on the connecting plate 2 It smoothly and is generally aligned in the same plane, and 3 and second riser of the first riser, 5 upper end carries the pressing plate 10.Slot hole on pressing plate For across connecting plate, the upper end of the first riser and the second riser being located at after pressing plate installation, can stand pressure from first Plate and the second riser pass to pedestal, very securely.And connecting plate coordinates with slot hole, and the work of limiting can also be played to pressing plate With, avoid pressing plate dislocation slide so as to accident occur.First riser and the second riser upper end are smooth, avoid pressing plate crooked, and the The connection relation of the connection relation and the first riser, the second riser and bottom plate of one riser and the second riser, it is ensured that support Fastness, and can effectively reduce the weight of itself while maximum support is realized.
The lower end both sides of side set the first stiffened panel 7, first stiffened panel 7 and the bottom before and after first riser 3 Plate 8 connects, and first stiffened panel 7 is vertical with first riser 3 and bottom plate 8 respectively, the lower end both sides of second riser 5 It is vertically arranged the second stiffened panel 6, second stiffened panel 6 and 8 vertical connection of bottom plate, the upper end two of second riser 5 Side is vertically arranged third stiffened panel 4, the upper end of the third stiffened panel 4 it is smooth and on 3 and second riser 5 of the first riser In end is generally aligned in the same plane.First stiffened panel and the second stiffened panel increase the first riser and connect with bottom plate, the second riser and bottom plate The fastness connect, and third stiffened panel is coordinated with the first riser and the second riser upper end, plays the supporting role to pressing plate.
The third stiffened panel 4, the first riser 3, the plane residing for 5 upper end of the second riser are flat where with the bottom plate 8 Face is mutually parallel.It more can guarantee the balance of pressing plate, effectively avoid the generation of compression test failure.
Embodiment two
The difference between this embodiment and the first embodiment lies in:
The slot hole 12 and the post gap of 2 installation of connecting plate are less than 0.3 millimeter so that connecting plate 2 plays pressing plate 10 To position-limiting action.Gap smaller, position-limiting action is more preferable, the stability higher of test.
Four limiting plates 13 are set on the pressing plate 10, the limiting plate 13 is arranged on the both sides of the slot hole 12 two-by-two, The limiting plate 13 is parallel with the long axis of the slot hole 12, and the limiting plate 13 is vertical with the pressing plate 10, the limiting plate 13 are arranged between second mounting hole 11 side corresponding with the long axis both sides of slot hole 12 on pressing plate 10.Limiting plate can be right The load carrier of counterforce device is limited, and is coordinated with slot hole, more preferable for the effect of limiting, can bear the lateral pressure of bigger Power, balance control is more preferable when being realized for resistance to compression.
The above is the preferred embodiment of the utility model, it is noted that for the ordinary skill of the art For personnel, under the premise of principle described in the utility model is not departed from, several improvements and modifications can also be made, these improvement The scope of protection of the utility model is also should be regarded as with retouching.

Claims (7)

1. a kind of pulling and pressing integrated attachment device of pole and tower foundation strength test, it is characterised in that:Including upper connector and lower connector, The lower connector includes the pedestal that connect with the foundation bolt and puller system of pole and tower foundation, the upper connector including with The pressing plate of the load carrier connection of counterforce device, the pedestal include bottom plate, set on the bottom plate and connect with the foundation bolt The first mounting hole connect, setting support bindiny mechanism on the bottom plate, the top of the support bindiny mechanism set the pressing plate, The second mounting hole being connect with the counterforce device, the intermediate corresponding support connection machine of the pressing plate are set on the pressing plate Structure sets slot hole, and the top of the support bindiny mechanism passes through the slot hole on the pressing plate to be connect with the puller system.
2. the pulling and pressing integrated attachment device of pole and tower foundation strength test as described in claim 1, it is characterised in that:The pedestal is One integrated model, the bottom plate are rectangular, and first mounting hole is arranged on the quadrangle of the bottom plate, first mounting hole For circular hole, the aperture and position of first mounting hole are matched with the foundation bolt of the pole and tower foundation to make a strength test.
3. the pulling and pressing integrated attachment device of pole and tower foundation strength test as claimed in claim 2, it is characterised in that:The support connects Connection mechanism includes the first riser and the second riser that setting is welded on the bottom plate, and first riser and the second riser are vertically set It puts on the bottom plate, second riser is two, and first riser is vertical with the second riser, second riser and institute The center line connection of the first riser is stated, second riser is separately positioned on the both sides of first riser, first riser Front and rear side connect respectively with two sides symmetrical on the bottom plate, the outside of second riser and on the bottom plate other two The connection of side, the connecting plate of the crown center welding setting triangle of first riser, the connecting plate on the pressing plate Slot hole match, the slot hole is rectangle structure, and the connecting hole being connect with the puller system is set on the connecting plate, First riser and the second riser upper end are smooth and are generally aligned in the same plane, and first riser and the carrying of the second riser upper end The pressing plate.
4. the pulling and pressing integrated attachment device of pole and tower foundation strength test as claimed in claim 3, it is characterised in that:Described first is vertical The lower end both sides of side set the first stiffened panel before and after plate, and first stiffened panel is connect with the bottom plate, first stiffened panel Vertical with first riser and bottom plate respectively, the lower end both sides of second riser are vertically arranged the second stiffened panel, and described Two stiffened panels and the bottom plate vertical connection, the upper end both sides of second riser are vertically arranged third stiffened panel, the third The upper end of stiffened panel is smooth and is generally aligned in the same plane with first riser and the second riser upper end interior.
5. the pulling and pressing integrated attachment device of pole and tower foundation strength test as claimed in claim 4, it is characterised in that:The third adds Gusset, the first riser, the plane residing for the second riser upper end are mutually parallel with the plane where the bottom plate.
6. the pulling and pressing integrated attachment device of pole and tower foundation strength test as claimed in claim 5, it is characterised in that:The slot hole with The post gap of the connecting plate installation is less than 0.3 millimeter so that connecting plate plays position-limiting action to pressing plate.
7. the pulling and pressing integrated attachment device of pole and tower foundation strength test as claimed in claim 6, it is characterised in that:On the pressing plate Four limiting plates are set, and the limiting plate is arranged on the both sides of the slot hole, the long axis of the limiting plate and the slot hole two-by-two Line is parallel, and the limiting plate is vertical with the pressing plate, and the limiting plate is arranged on second mounting hole and slot hole on pressing plate Between the corresponding side in long axis both sides.
CN201721639770.6U 2017-11-30 2017-11-30 A kind of pulling and pressing integrated attachment device of pole and tower foundation strength test Active CN207512801U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721639770.6U CN207512801U (en) 2017-11-30 2017-11-30 A kind of pulling and pressing integrated attachment device of pole and tower foundation strength test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721639770.6U CN207512801U (en) 2017-11-30 2017-11-30 A kind of pulling and pressing integrated attachment device of pole and tower foundation strength test

Publications (1)

Publication Number Publication Date
CN207512801U true CN207512801U (en) 2018-06-19

Family

ID=62542587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721639770.6U Active CN207512801U (en) 2017-11-30 2017-11-30 A kind of pulling and pressing integrated attachment device of pole and tower foundation strength test

Country Status (1)

Country Link
CN (1) CN207512801U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700559A (en) * 2017-11-30 2018-02-16 国家电网公司 A kind of pulling and pressing integrated attachment means of transmission line tower foundation strength test
CN110014242A (en) * 2019-04-29 2019-07-16 中电建武汉铁塔有限公司 Electric power pylon column foot welding procedure
CN110470536A (en) * 2019-07-30 2019-11-19 西安理工大学 A kind of masonry cartridge type component compression shear composite force experiment loading unit and loading method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700559A (en) * 2017-11-30 2018-02-16 国家电网公司 A kind of pulling and pressing integrated attachment means of transmission line tower foundation strength test
CN110014242A (en) * 2019-04-29 2019-07-16 中电建武汉铁塔有限公司 Electric power pylon column foot welding procedure
CN110014242B (en) * 2019-04-29 2021-07-30 中电建武汉铁塔有限公司 Welding process for tower foot of power transmission tower
CN110470536A (en) * 2019-07-30 2019-11-19 西安理工大学 A kind of masonry cartridge type component compression shear composite force experiment loading unit and loading method

Similar Documents

Publication Publication Date Title
CN107700559A (en) A kind of pulling and pressing integrated attachment means of transmission line tower foundation strength test
CN207512801U (en) A kind of pulling and pressing integrated attachment device of pole and tower foundation strength test
CN104034596A (en) Lever horizontal-pulling type concrete creep and elasticity modulus test device
CN209485847U (en) The adjustable drawing load testing machine at any angle of one kind
CN206281629U (en) A kind of wind tunnel test grid arrangement apparatus
CN101823207B (en) Hydraulic bracket test-bed pin shaft installation monitoring device
CN208981167U (en) Suspension type constructing tie beam device
CN210834463U (en) Can unite compression fatigue testing machine to carry out tensile fatigue test's tool equipment
CN204374012U (en) A kind of drop impact tension test truss conversion equipment realizing elimination inertia force influence
CN207556986U (en) Multi purpose space loading test platform
CN206208652U (en) Terminal box test equipment
CN204228437U (en) A kind of carton compression proving installation
CN209016553U (en) A kind of gate pole crossing frame
CN105486521B (en) Ten thousand become aluminium section bar car end motion platform
CN112683668A (en) Static load test device for communication support
CN206379690U (en) One kind is exempted to weld flexible crane span structure
CN216010127U (en) Special rack for load bearing test of suspension bracket
CN208833598U (en) A kind of measuring device of pulling experiment
CN220153785U (en) Temporary-empty tension testing device
CN210774639U (en) Horizontal force bearing device of dynamic testing machine
CN201632825U (en) Pin mounting and monitoring device of hydraulic bracket testing board
CN115030782B (en) Intelligent load measuring device for steam turbine cylinder
CN207371068U (en) Built-in type square tube basketball stands
CN210824889U (en) Damping support of rope winding system for detecting resistance of live-line work insulating rope