CN107700559A - A kind of pulling and pressing integrated attachment means of transmission line tower foundation strength test - Google Patents

A kind of pulling and pressing integrated attachment means of transmission line tower foundation strength test Download PDF

Info

Publication number
CN107700559A
CN107700559A CN201711242727.0A CN201711242727A CN107700559A CN 107700559 A CN107700559 A CN 107700559A CN 201711242727 A CN201711242727 A CN 201711242727A CN 107700559 A CN107700559 A CN 107700559A
Authority
CN
China
Prior art keywords
riser
plate
bottom plate
pressing plate
pressing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711242727.0A
Other languages
Chinese (zh)
Other versions
CN107700559B (en
Inventor
齐道坤
刘湘莅
王刚
郭新菊
路晓军
李君章
席小娟
梁晟
景川
王文峰
肖波
杨敏
李勇
刘存凯
唐旻
周铁军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Henan Electric Power Co Ltd
Henan Power Transmission and Transformation Construction Co Ltd
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Henan Electric Power Co Ltd
Henan Power Transmission and Transformation Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Henan Electric Power Co Ltd, Henan Power Transmission and Transformation Construction Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711242727.0A priority Critical patent/CN107700559B/en
Publication of CN107700559A publication Critical patent/CN107700559A/en
Application granted granted Critical
Publication of CN107700559B publication Critical patent/CN107700559B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The present invention provides a kind of pulling and pressing integrated attachment means of transmission line tower foundation strength test, including upper connector and lower connector, lower connector includes base, upper connector includes pressing plate, base includes bottom plate, the first mounting hole being connected with foundation bolt is set on bottom plate, support bindiny mechanism is set on bottom plate, support the top of bindiny mechanism that pressing plate is set, the second mounting hole being connected with counterforce device is set on pressing plate, corresponding support bindiny mechanism sets elongated hole among pressing plate, supports the top of bindiny mechanism to be connected through the elongated hole on pressing plate with puller system.The present invention passes through a base being connected with pole and tower foundation foundation bolt, puller system and one piece of pressing plate being connected with counterforce device, form a kind of tension that can meet simultaneously in pole and tower foundation experiment, the attachment means of the pressure-resistant antipodal external force transmission needs of two kinds of force directions, its is rational in infrastructure, easy to assembly, effectively evades because tensile test impacts the problem of rear attachment means can not be dismantled to foundation bolt.

Description

A kind of pulling and pressing integrated attachment means of transmission line tower foundation strength test
Technical field
The present invention relates to transmission line of electricity technical field, and in particular to a kind of transmission line tower foundation strength test tension and compression one Body attachment means.
Background technology
According to transmission line tower foundation stressing conditions, when carrying out transmission line tower foundation strength test, not only The pressure test on basis is carried out, while also to carry out the tensile test on basis;Transmission line foundation is tested and common building base Plinth is different, and building foundation is because without tensile test, the connection between basis and counterforce device is relatively simple, is also not present more Situation about changing, for transmission line tower foundation strength test, in order to obtain the data close with actual conditions, it is necessary in tension Carry out repeatedly applying external force experiment repeatedly between pressure test;According to transmission line of electricity operating experience, iron tower foundation is by upper After the effect of pull out force, deformed between the nut and screw rod of basic foundation bolt due to being extruded by column foot bottom plate so that Nut can not be dismantled normally, be tested for underlying strength, then cause test period and difficulty increase.
Publication No. 107036881A disclosure of the invention is a kind of to be used for electric pole pull force tester, including bottom fixes The electric pole being connected in fixed seat, first crossbeam and second cross beam are connected by column in fixed seat, one is connected on first crossbeam Group device for hooping, load dynamometer and flexometer are connected in the front side of electric pole, in second cross beam by connecting one group of connecting rod, every An image recorder is respectively mounted on individual connecting rod, image recorder is correspondingly arranged with electric pole, and one group is also connected with second cross beam Fix bar, a pressure sensor being correspondingly arranged with electric pole is respectively mounted in each fix bar.Advantages of the present invention:The present invention The bottom of electric pole is fixed, electric pole is sling by suspension bracket in centre, is at horizontality, connects and carries in the other end of electric pole Lotus dynamometer and flexometer, image recorder is set in the surrounding of electric pole, while image is projected on display screen, while in electricity Sensor is used for the deformation for perceiving electric pole, the change of comprehensive detection electric pole respectively around bar.But there is above-mentioned carry in the invention To the problem of, after pulling force is born, screw rod and nut easily deform upon and cause dismounting difficult.
The content of the invention
In view of this, the present invention provides a kind of pulling and pressing integrated attachment means of transmission line tower foundation strength test, with solution Certainly carry out pullout tests into the transfer process of pressure test, due between the nut and screw rod of basic foundation bolt due to by squeeze Pressure deforms, and causes nut and tensile connecting device normally to dismantle, the problem of causing pressure-resistant attachment means not install.
In order to solve the above technical problems, the present invention provides a kind of pulling and pressing integrated connection of transmission line tower foundation strength test Device, including upper connector and lower connector, the lower connector include the foundation bolt and puller system with pole and tower foundation The base of connection, the upper connector include the pressing plate being connected with the load carrier of counterforce device, and the base includes bottom plate, institute The first mounting hole that setting is connected with the foundation bolt on bottom plate is stated, support bindiny mechanism, the branch are set on the bottom plate The top for supportting bindiny mechanism sets the pressing plate, and the second mounting hole being connected with the counterforce device, institute are set on the pressing plate The middle corresponding support bindiny mechanism for stating pressing plate sets elongated hole, and the top of the support bindiny mechanism is passed through on the pressing plate Elongated hole be connected with the puller system.
Further, the base is an integrated model, and the bottom plate is square, and first mounting hole is arranged on institute State the corner of bottom plate, first mounting hole is circular hole, the aperture and position of first mounting hole and is made a strength test The foundation bolt of pole and tower foundation is engaged.
Further, the support bindiny mechanism includes welding the first riser and the second riser of setting on the bottom plate, First riser and the second riser are vertically set on the bottom plate, second riser be two, first riser with Second riser is vertical, and second riser is connected with the center line of first riser, and second riser is separately positioned on institute The both sides of the first riser are stated, the front and rear side of first riser is connected with symmetrical two sides on the bottom plate respectively, and described The outside of two risers is connected with two other side on the bottom plate, and the crown center welding of first riser sets triangle Connecting plate, the connecting plate are engaged with the elongated hole on the pressing plate, and the elongated hole is rectangle structure, is set on the connecting plate Put the connecting hole being connected with the puller system, first riser and the second riser upper end are smooth and be generally aligned in the same plane, and First riser and the second riser upper end carry the pressing plate.
Further, before and after first riser side lower end both sides set the first stiffened panel, first stiffened panel with The bottom plate connection, first stiffened panel is vertical with first riser and bottom plate respectively, the lower end two of second riser Side is vertically arranged the second stiffened panel, second stiffened panel and the bottom plate vertical connection, the upper end both sides of second riser The 3rd stiffened panel is vertically arranged, the upper end of the 3rd stiffened panel is smooth and is located at first riser and the second riser upper end In same plane.
Further, the 3rd stiffened panel, the first riser, the plane residing for the second riser upper end with where the bottom plate Plane be parallel to each other.
Further, the elongated hole and the post gap of the connecting plate installation are less than 0.3 millimeter so that connecting plate is to pressing plate Play position-limiting action.
Further, four limiting plates are set on the pressing plate, the limiting plate is arranged on the both sides of the elongated hole two-by-two, The limiting plate is parallel with the long axis of the elongated hole, and the limiting plate is vertical with the pressing plate, and the limiting plate is arranged on institute State between the second mounting hole side corresponding with the long axis both sides of elongated hole on pressing plate.
The present invention is connected by a base being connected with pole and tower foundation foundation bolt, puller system and one piece with counterforce device The pressing plate connect, a kind of tension that can meet simultaneously in pole and tower foundation experiment of composition, pressure-resistant two kinds of force directions are antipodal External force transmission need attachment means, attachment means of the invention are rational in infrastructure, easy to assembly, power transmission is clear, improve efficiency, Investment reduction, reduce difficulty while, effectively evaded because tensile test impacts rear attachment means to foundation bolt can not The problem of dismounting.
Brief description of the drawings
Fig. 1 is the front view of the lower connector of the present invention;
Fig. 2 is the top view of the lower connector of the present invention;
Fig. 3 is the side view of the lower connector of the present invention;
Fig. 4 is the structural representation of the lower connector of the present invention;
Fig. 5 is the structural representation of pressing plate of the present invention;
Fig. 6 is the structural representation of the present invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention Accompanying drawing 1-6, the technical scheme of the embodiment of the present invention is clearly and completely described.Obviously, described embodiment is this The part of the embodiment of invention, rather than whole embodiments.Based on described embodiments of the invention, the common skill in this area The every other embodiment that art personnel are obtained, belongs to the scope of protection of the invention.
Embodiment one, the invention provides a kind of pulling and pressing integrated attachment means of transmission line tower foundation strength test, bag Connector and lower connector are included, the lower connector includes the bottom being connected with the foundation bolt and puller system of pole and tower foundation Seat, the upper connector include the pressing plate 10 being connected with the load carrier of counterforce device, and the base includes bottom plate 8, the bottom The first mounting hole 9 being connected with the foundation bolt is set on plate 8, support bindiny mechanism, the support are set on the bottom plate 8 The top of bindiny mechanism sets the pressing plate 10, and the second mounting hole being connected with the counterforce device is set on the pressing plate 10 11, the middle corresponding support bindiny mechanism of the pressing plate 10 sets elongated hole 12, and the top of the support bindiny mechanism passes through Elongated hole 12 on the pressing plate 10 is connected with the puller system.Supporting body of the bottom plate as whole device, and on bottom plate One mounting hole is responsible for being connected with foundation bolt, and the support bindiny mechanism on bottom plate is then connected with puller system, plays transmission pulling force Effect, realize the test to tension.Pressing plate is arranged in support bindiny mechanism, and the second reserved mounting hole is used for connecting counter-force The load carrier of device, the pressure that applies to base of carrying counterforce device, so as to by shaft tower pedestal of the pressure transmission to lower section, reality Now to measuring body test.
The base is an integrated model, and the bottom plate 8 is square, and first mounting hole 9 is arranged on the bottom plate 8 Corner, first mounting hole 8 is circular hole, the aperture and position of first mounting hole 8 and the shaft tower to make a strength test The foundation bolt on basis is engaged, convenient to connect the first mounting hole on bottom plate with foundation bolt, convenient operation.
The support bindiny mechanism includes welding the first riser 3 and the second riser 5 of setting on the bottom plate 8, and described the One riser 3 and the second riser 5 are vertically set on the bottom plate 8, and second riser 5 is two, first riser 3 and the Two risers 5 are vertical, and second riser 5 is connected with the center line of first riser 3, and second riser 5 is separately positioned on The both sides of first riser 3, the front and rear side of first riser 3 are connected with symmetrical two sides on the bottom plate 8 respectively, institute The outside for stating the second riser 5 is connected with two other side on the bottom plate 8, and the crown center welding of first riser 3 is set The connecting plate 2 of triangle, the connecting plate 2 are engaged with the elongated hole 12 on the pressing plate 10, and the elongated hole 12 is rectangle knot Structure, the connecting hole 1 being connected with the puller system, the upper end of 3 and second riser of the first riser 5 are set on the connecting plate 2 Smoothly and it is generally aligned in the same plane, and the upper end of 3 and second riser of the first riser 5 carries the pressing plate 10.Elongated hole on pressing plate , can be so that pressure to be stood from first positioned at the upper end of the first riser and the second riser after pressing plate installation for through connecting plate Plate and the second riser pass to pedestal, very firmly.And connecting plate coordinates with elongated hole, and spacing work can also be played to pressing plate With avoiding pressing plate dislocation from sliding so as to there is accident.First riser and the second riser upper end are smooth, avoid pressing plate crooked, and the The annexation of the annexation and the first riser, the second riser and bottom plate of one riser and the second riser, it is ensured that support Fastness, and the weight of itself can be effectively reduced while maximum support is realized.
The lower end both sides of side set the first stiffened panel 7, first stiffened panel 7 and the bottom before and after first riser 3 Plate 8 connects, and first stiffened panel 7 is vertical with first riser 3 and bottom plate 8 respectively, the lower end both sides of second riser 5 It is vertically arranged the second stiffened panel 6, second stiffened panel 6 and the vertical connection of bottom plate 8, the upper end two of second riser 5 Side is vertically arranged the 3rd stiffened panel 4, the upper end of the 3rd stiffened panel 4 it is smooth and with the riser 5 of the first riser 3 and second In end is generally aligned in the same plane.First stiffened panel and the second stiffened panel add the first riser and connected with bottom plate, the second riser and bottom plate The fastness connect, and the 3rd stiffened panel is coordinated with the first riser and the second riser upper end, plays the supporting role to pressing plate.
3rd stiffened panel 4, the first riser 3, the plane residing for the upper end of the second riser 5 with it is flat where the bottom plate 8 Face is parallel to each other.The balance of pressing plate is more can guarantee that, effectively avoids the generation of compression test failure.
Embodiment two
The present embodiment and the difference of embodiment one are:
The elongated hole 12 and the post gap of the installation of connecting plate 2 are less than 0.3 millimeter so that connecting plate 2 plays limit to pressing plate 10 Position effect.Gap is smaller, and position-limiting action is more preferable, and the stability of test is higher.
Four limiting plates 13 are set on the pressing plate 10, the limiting plate 13 is arranged on the both sides of the elongated hole 12 two-by-two, The limiting plate 13 is parallel with the long axis of the elongated hole 12, and the limiting plate 13 is vertical with the pressing plate 10, the limiting plate 13 are arranged between second mounting hole 11 side corresponding with the long axis both sides of elongated hole 12 on pressing plate 10.Limiting plate can be right The load carrier progress of counterforce device is spacing, coordinates with elongated hole, more preferable for spacing effect, can bear bigger lateral pressure Power, balance control is more preferable when being realized for resistance to compression.
Described above is the preferred embodiment of the present invention, it is noted that for those skilled in the art For, on the premise of principle of the present invention is not departed from, some improvements and modifications can also be made, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (7)

  1. A kind of 1. pulling and pressing integrated attachment means of transmission line tower foundation strength test, it is characterised in that:Including upper connector and Lower connector, the lower connector include the base being connected with the foundation bolt and puller system of pole and tower foundation, the upper company Junctor includes the pressing plate that be connected with the load carrier of counterforce device, and the base includes bottom plate, on the bottom plate setting with it is described First mounting hole of foundation bolt connection, support bindiny mechanism is set on the bottom plate, and the top of the support bindiny mechanism is set The pressing plate is put, the second mounting hole being connected with the counterforce device is set on the pressing plate, institute is corresponded among the pressing plate State support bindiny mechanism and elongated hole is set, the top of the support bindiny mechanism fills through the elongated hole on the pressing plate and the pulling force Put connection.
  2. 2. the pulling and pressing integrated attachment means of transmission line tower foundation strength test as claimed in claim 1, it is characterised in that:Institute It is an integrated model to state base, and the bottom plate is square, and first mounting hole is arranged on the corner of the bottom plate, described the One mounting hole is circular hole, aperture and position and the foundation bolt phase of the pole and tower foundation to make a strength test of first mounting hole Coordinate.
  3. 3. the pulling and pressing integrated attachment means of transmission line tower foundation strength test as claimed in claim 2, it is characterised in that:Institute Stating support bindiny mechanism includes welding the first riser and the second riser of setting on the bottom plate, and first riser and second stand Plate is vertically set on the bottom plate, and second riser is two, and first riser is vertical with the second riser, and described second Riser is connected with the center line of first riser, and second riser is separately positioned on the both sides of first riser, described The front and rear side of first riser is connected with symmetrical two sides on the bottom plate respectively, outside and the bottom plate of second riser Upper two other side connection, the crown center welding of first riser set the connecting plate of triangle, the connecting plate and institute The elongated hole stated on pressing plate is engaged, and the elongated hole is rectangle structure, sets on the connecting plate and is connected with the puller system Connecting hole, first riser and the second riser upper end are smooth and are generally aligned in the same plane, and first riser and second vertical Plate upper end carries the pressing plate.
  4. 4. the pulling and pressing integrated attachment means of transmission line tower foundation strength test as claimed in claim 3, it is characterised in that:Institute The lower end both sides for stating side before and after the first riser set the first stiffened panel, and first stiffened panel is connected with the bottom plate, and described the One stiffened panel is vertical with first riser and bottom plate respectively, and the lower end both sides of second riser are vertically arranged the second reinforcement Plate, second stiffened panel and the bottom plate vertical connection, the upper end both sides of second riser are vertically arranged the 3rd stiffened panel, The upper end of 3rd stiffened panel is smooth and is generally aligned in the same plane with first riser and the second riser upper end interior.
  5. 5. the pulling and pressing integrated attachment means of transmission line tower foundation strength test as claimed in claim 4, it is characterised in that:Institute The 3rd stiffened panel, the first riser, the plane residing for the second riser upper end is stated to be parallel to each other with the plane where the bottom plate.
  6. 6. the pulling and pressing integrated attachment means of transmission line tower foundation strength test as claimed in claim 5, it is characterised in that:Institute State elongated hole and the post gap of the connecting plate installation is less than 0.3 millimeter so that connecting plate plays position-limiting action to pressing plate.
  7. 7. the pulling and pressing integrated attachment means of transmission line tower foundation strength test as claimed in claim 6, it is characterised in that:Institute Four limiting plates of setting on pressing plate are stated, the limiting plate is arranged on the both sides of the elongated hole, the limiting plate and the length two-by-two The long axis in hole are parallel, and the limiting plate is vertical with the pressing plate, and the limiting plate is arranged on second mounting hole and pressing plate Between side corresponding to the long axis both sides of upper elongated hole.
CN201711242727.0A 2017-11-30 2017-11-30 Tension-compression integrated connecting device for power transmission line tower foundation strength test Active CN107700559B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711242727.0A CN107700559B (en) 2017-11-30 2017-11-30 Tension-compression integrated connecting device for power transmission line tower foundation strength test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711242727.0A CN107700559B (en) 2017-11-30 2017-11-30 Tension-compression integrated connecting device for power transmission line tower foundation strength test

Publications (2)

Publication Number Publication Date
CN107700559A true CN107700559A (en) 2018-02-16
CN107700559B CN107700559B (en) 2023-05-12

Family

ID=61186039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711242727.0A Active CN107700559B (en) 2017-11-30 2017-11-30 Tension-compression integrated connecting device for power transmission line tower foundation strength test

Country Status (1)

Country Link
CN (1) CN107700559B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109030181A (en) * 2018-08-28 2018-12-18 国网河南省电力公司西峡县供电公司 A kind of electric power line pole tower intensity detecting device
CN109797773A (en) * 2019-03-11 2019-05-24 浙江大学城市学院 The assembling type steel structure tower crane cushion cap of freely adjustable angles and positions
CN110014240A (en) * 2019-04-29 2019-07-16 中电建武汉铁塔有限公司 Electric power pylon column foot welding procedure
CN110241869A (en) * 2019-07-15 2019-09-17 重庆科技学院 A kind of foundation bearing capacity plate dynamic loading experiment device and method
CN110541430A (en) * 2019-09-25 2019-12-06 国网福建省电力有限公司电力科学研究院 Root-opening adjustable narrow foundation tower steel structure foundation and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1048112A (en) * 1996-08-02 1998-02-20 Fujita Corp Test of pull-out strength of anchor bolt for machinery
WO2017107959A1 (en) * 2015-12-22 2017-06-29 广东中科华大工程技术检测有限公司 Simple connection device for use in vertical uplift resistance static load test of foundation pile
CN106908330A (en) * 2017-03-10 2017-06-30 浙江华电器材检测研究所 Compound cross-arm single-direction and dual-direction combination bend test device
CN207512801U (en) * 2017-11-30 2018-06-19 国家电网公司 A kind of pulling and pressing integrated attachment device of pole and tower foundation strength test

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1048112A (en) * 1996-08-02 1998-02-20 Fujita Corp Test of pull-out strength of anchor bolt for machinery
WO2017107959A1 (en) * 2015-12-22 2017-06-29 广东中科华大工程技术检测有限公司 Simple connection device for use in vertical uplift resistance static load test of foundation pile
CN106908330A (en) * 2017-03-10 2017-06-30 浙江华电器材检测研究所 Compound cross-arm single-direction and dual-direction combination bend test device
CN207512801U (en) * 2017-11-30 2018-06-19 国家电网公司 A kind of pulling and pressing integrated attachment device of pole and tower foundation strength test

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109030181A (en) * 2018-08-28 2018-12-18 国网河南省电力公司西峡县供电公司 A kind of electric power line pole tower intensity detecting device
CN109797773A (en) * 2019-03-11 2019-05-24 浙江大学城市学院 The assembling type steel structure tower crane cushion cap of freely adjustable angles and positions
CN109797773B (en) * 2019-03-11 2023-08-18 浙江大学城市学院 Assembled steel structure tower crane foundation bearing platform capable of freely adjusting angle and position
CN110014240A (en) * 2019-04-29 2019-07-16 中电建武汉铁塔有限公司 Electric power pylon column foot welding procedure
CN110241869A (en) * 2019-07-15 2019-09-17 重庆科技学院 A kind of foundation bearing capacity plate dynamic loading experiment device and method
CN110241869B (en) * 2019-07-15 2023-12-01 重庆科技学院 Device and method for testing dynamic load of foundation bearing capacity flat plate
CN110541430A (en) * 2019-09-25 2019-12-06 国网福建省电力有限公司电力科学研究院 Root-opening adjustable narrow foundation tower steel structure foundation and construction method

Also Published As

Publication number Publication date
CN107700559B (en) 2023-05-12

Similar Documents

Publication Publication Date Title
CN107700559A (en) A kind of pulling and pressing integrated attachment means of transmission line tower foundation strength test
CN207512801U (en) A kind of pulling and pressing integrated attachment device of pole and tower foundation strength test
CN106680095A (en) Assembled special-shaped-column-structured loading device and test method thereof
CN106013279B (en) Fan foundation test loading device and method
CN206601297U (en) Assembled special-shaped column structure loading device
CN206671163U (en) A kind of multispecimen bonded joint moisture and hot ageing and alternate load coupling test device
CN210834463U (en) Can unite compression fatigue testing machine to carry out tensile fatigue test's tool equipment
CN202141635U (en) Conversion device capable of realizing landing tensile impact test
CN217331619U (en) Aeroengine ground test bench
CN101823207B (en) Hydraulic bracket test-bed pin shaft installation monitoring device
CN207556986U (en) Multi purpose space loading test platform
CN105547561A (en) Riser clamp pressure direction testing device and method
CN109855984A (en) A kind of unidirectional compression shear loading device and its application method
CN206019997U (en) A kind of steel construction support body static test loading device
CN105486521B (en) Ten thousand become aluminium section bar car end motion platform
CN112683668A (en) Static load test device for communication support
CN216010127U (en) Special rack for load bearing test of suspension bracket
CN208155576U (en) A kind of anti-horizontal loading device for detecting performance of railing
CN208833598U (en) A kind of measuring device of pulling experiment
CN210774639U (en) Horizontal force bearing device of dynamic testing machine
CN205785810U (en) A kind of drive axle support means
CN210824889U (en) Damping support of rope winding system for detecting resistance of live-line work insulating rope
CN205120499U (en) Device of test stone material intensity
CN209542042U (en) A kind of big magnitude impact test tooling of elevating lever
CN209040656U (en) It is a kind of with the electric power tower being readily transported

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant