CN207499485U - The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway - Google Patents

The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway Download PDF

Info

Publication number
CN207499485U
CN207499485U CN201721352861.1U CN201721352861U CN207499485U CN 207499485 U CN207499485 U CN 207499485U CN 201721352861 U CN201721352861 U CN 201721352861U CN 207499485 U CN207499485 U CN 207499485U
Authority
CN
China
Prior art keywords
construction
cutting device
dirty
elevator shaft
floor construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721352861.1U
Other languages
Chinese (zh)
Inventor
杨泓斌
刘灿团
焦鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zengcheng Bi Gui Garden Property Development Co Ltd
Original Assignee
Zengcheng Bi Gui Garden Property Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zengcheng Bi Gui Garden Property Development Co Ltd filed Critical Zengcheng Bi Gui Garden Property Development Co Ltd
Priority to CN201721352861.1U priority Critical patent/CN207499485U/en
Application granted granted Critical
Publication of CN207499485U publication Critical patent/CN207499485U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model is related to a kind of pollution cutting device of floor construction building elevator shaft and construction elevator hoistways.Wherein, the pollution cutting device of the floor construction building elevator shaft includes sub-truss, cuts dirty baffle and delivery pipe.Sub-truss is used to be installed in construction elevator well headroom madial wall.It cuts dirty baffle to be installed on sub-truss, cuts the side wall of dirty baffle for being engaged with construction elevator well headroom madial wall, cut on dirty baffle and offer pollutant emission mouth.Delivery pipe one end is connected with pollutant emission mouth, and the delivery pipe other end is used to lead to staircase catchment.The pollution cutting device of above-mentioned floor construction building elevator shaft, the pollutants such as cement mortar, external wall construction water and rainwater can be avoided to continue on, and elevator shaft side wall is past to flow down, also the pollutants such as cement mortar, external wall construction water and rainwater can be avoided to flow into the indoor environment of floor construction building, the dry operation of the indoor environment of floor construction building will not be affected, and can shorten construction period.

Description

The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway
Technical field
The utility model is related to floor construction building technical field, more particularly to a kind of floor construction building elevator shaft Pollution cutting device and construction elevator hoistway.
Background technology
During traditional operation floor building pouring construction, the pollutants such as external wall construction water, cement mortar, rainwater can edge The hoistway wall for elevator shaft flows from top to bottom.The pollutants such as cement mortar, external wall construction water and rainwater will be attached to elevator In the hoistway wall of hoistway, so as to pollute elevator shaft side wall.In addition, the pollutants such as cement mortar, external wall construction water and rainwater Also it can be flowed into along the hole on elevator shaft side wall in the indoor environment of floor construction building, to the room of floor construction building Interior decoration operation affects greatly, and influences floor construction building and completes the duration.
Invention content
Based on this, it is necessary to which the defects of overcoming the prior art, provide a kind of floor construction building elevator shaft cuts dirty dress It puts and construction elevator hoistway, it can avoid the pollutants such as cement mortar, external wall construction water and rainwater from making elevator shaft side wall Into pollution, the pollutants such as cement mortar, external wall construction water and rainwater can also be avoided to flow into the indoor ring of floor construction building In border.
Its technical solution is as follows:A kind of pollution cutting device of floor construction building elevator shaft including sub-truss, cuts dirty gear Plate and delivery pipe, the sub-truss are used to be installed in construction elevator well headroom madial wall;Described section of dirty baffle is installed in institute It states on sub-truss, the side wall of described section of dirty baffle is described for being engaged with the construction elevator well headroom madial wall It cuts on dirty baffle and offers pollutant emission mouth;Described delivery pipe one end is connected with the pollutant emission mouth, the discharge The pipe other end is used to lead to staircase catchment or elevator pit.
A kind of construction elevator hoistway, including construction elevator hoistway main body, N-1 layers of the construction elevator hoistway main body and N-2 The pollution cutting device of the floor construction building elevator shaft is equipped on the madial wall of layer, wherein, structure construction based on N Layer.
The above-mentioned pollution cutting device of floor construction building elevator shaft and construction elevator hoistway, can be installed in construction elevator Well headroom madial wall, such as the madial wall of N-1 and N-2 layers of construction elevator hoistway is installed in, at the top of such floor construction building The pollutants such as cement mortar, external wall construction water and the rainwater that work progress generates are through cutting dirty baffle, from pollutant emission mouth It flows into delivery pipe, through discharged to staircase catchment, so as to avoid cement mortar, external wall construction water and rain The pollutants such as water continue on elevator shaft side wall toward flowing down, and can also avoid the dirts such as cement mortar, external wall construction water and rainwater Dye object is flowed into the indoor environment of floor construction building.Dry operation, floor construction can be carried out below such elevator shaft The dry operation of the indoor environment of building will not be affected, and can shorten construction period.
The pollution cutting device of the floor construction building elevator shaft, which further includes, in one of the embodiments, is arranged on institute The waterproof cloth cut on dirty baffle is stated, the waterproof cloth is equipped with sewage draining exit, the sewage draining exit and the pollutant emission mouth position phase It should.In this way, waterproof cloth can enhance the water resistance for cutting dirty baffle, the pollutants such as cement mortar, external wall construction water and rainwater are kept away From cutting the hole of dirty baffle, stitching continuation toward flowing down, the pollutants such as cement mortar, external wall construction water and rainwater is made to pass through floss hole, dirt Dye object floss hole is emitted into delivery pipe.Optionally, waterproof cloth is colour bar cloth.
The upper surface of the waterproof cloth is the inclined-plane for being inclined relative to horizontal setting in one of the embodiments, institute Inclined-plane is stated for pollutant to be directed to the sewage draining exit.
The sub-truss is disposed on described cut under dirty baffle including several side by side in one of the embodiments, Angle steel on side;Described angle steel one end is used to be fixed at the wherein side of the construction elevator hoistway madial wall, described The angle steel other end is used to be fixed at the opposite side of the construction elevator hoistway madial wall.
The pollution cutting device of the floor construction building elevator shaft, which further includes, in one of the embodiments, is arranged on institute The funnel shell cut between dirty baffle and the delivery pipe is stated, the feed inlet of the funnel shell is connected with the pollutant emission mouth Logical, the funnel shell bottom discharge mouth is connected with the delivery pipe.In this way, the pollutant that funnel shell can will be cut on dirty baffle The pollutants such as cement mortar, external wall construction water and rainwater at floss hole concentration is emitted into delivery pipe, can be convenient for pollution in this way Object emissions operation.
The side wall of described section of dirty baffle is used to seal with the construction elevator hoistway madial wall in one of the embodiments, Cooperation.It so, it is possible to avoid the pollutants such as cement mortar, external wall construction water and rainwater by cutting the side wall of dirty baffle and construction electricity It is past dirty that gap between stair shaft road madial wall continues on elevator shaft side wall.
The side wall of described section of dirty baffle is used for by viscose glue and the construction elevator hoistway in one of the embodiments, Side wall bonding cooperation.In this way, cutting dirty baffle can more be firmly placed on construction elevator hoistway madial wall.
Described section of dirty baffle cuts dirty iron plate or section dirty stainless steel for thickness in more than 1mm in one of the embodiments, Steel plate cuts dirty plank for thickness in more than 1.2cm.In this way, cutting dirty baffle has sufficient intensity to support staff, work It may stand in as personnel and cut dirty baffle progress constructing operation.
Description of the drawings
Fig. 1 is the knot of the pollution cutting device of the floor construction building elevator shaft described in the one of embodiment of the utility model Structure schematic diagram;
Fig. 2 is the structure of the pollution cutting device of the floor construction building elevator shaft described in the utility model another embodiment Schematic diagram;
Fig. 3 is facing upward for the pollution cutting device of the floor construction building elevator shaft described in the one of embodiment of the utility model View;
Fig. 4 is looking up for the pollution cutting device of the floor construction building elevator shaft described in the utility model another embodiment Figure;
Fig. 5 is the structure diagram of the floor construction building elevator shaft described in the one of embodiment of the utility model.
Reference numeral:
10th, sub-truss, 11, angle steel, 20, cut dirty baffle, 21, pollutant emission mouth, 30, delivery pipe, 40, waterproof cloth, 41st, sewage draining exit, 50, funnel shell, 51, discharge port, 60, iron wire, 100, construction elevator hoistway.
Specific embodiment
Above-mentioned purpose, feature and advantage to enable the utility model are more obvious understandable, below in conjunction with the accompanying drawings to this The specific embodiment of utility model is described in detail.Elaborate many details in order to abundant in the following description Understand the utility model.But the utility model can be much to implement different from other manner described here, this field Technical staff can do similar improvement in the case of without prejudice to the utility model connotation, therefore the utility model is not by following public affairs The limitation for the specific embodiment opened.
In the description of the present invention, it is to be appreciated that term " first ", " second " are only used for description purpose, and It is not intended that instruction or hint relative importance or the implicit quantity for indicating indicated technical characteristic.It defines as a result, At least one this feature can be expressed or be implicitly included to the feature of " first ", " second ".In the description of the present invention, " multiple " are meant that at least two, such as two, three etc., unless otherwise specifically defined.
In the description of the present invention, it is to be appreciated that when an element is considered as " connection " another element, It can be directly to another element or may be simultaneously present intermediary element.On the contrary, when element for be referred to as " direct " and During another element connection, there is no intermediary elements.
As shown in Figure 1, a kind of pollution cutting device of floor construction building elevator shaft, including sub-truss 10, cuts dirty baffle 20 with delivery pipe 30.The sub-truss 10 is used to be installed in 100 inside top wall of construction elevator hoistway.Described section of dirty baffle 20 It is installed on the sub-truss 10, the side wall of described section of dirty baffle 20 is used for and 100 inside top of construction elevator hoistway Wall is engaged, and pollutant emission mouth 21 is offered on described section of dirty baffle 20.Described 30 one end of delivery pipe and the pollutant Floss hole 21 is connected, and 30 other end of delivery pipe is used to lead to staircase catchment or elevator pit.
The pollution cutting device of above-mentioned floor construction building elevator shaft can be installed in 100 top of construction elevator hoistway Side wall, such as N-1 and N-2 layers of madial wall of construction elevator hoistway 100 is installed in, it constructed at the top of such floor construction building The pollutants such as cement mortar, external wall construction water and the rainwater that journey generates stop through cutting dirty baffle 20, are flowed from pollutant emission mouth 21 Enter into delivery pipe 30, staircase catchment be emitted into through delivery pipe 30, so as to avoid cement mortar, external wall construction water and The pollutants such as rainwater continue on elevator shaft side wall toward flowing down, and can also avoid cement mortar, external wall construction water and rainwater etc. Pollutant is flowed into the indoor environment of floor construction building.Dry operation can be carried out below such elevator shaft, floor is applied The dry operation of the indoor environment of work building will not be affected, and can shorten construction period.
In one embodiment, referring to Fig. 2, the pollution cutting device of the floor construction building elevator shaft is further included and set Put the waterproof cloth 40 on described section of dirty baffle 20.The waterproof cloth 40 is equipped with sewage draining exit 41, the sewage draining exit 41 and the dirt It is corresponding to contaminate 21 positions of object floss hole.In this way, waterproof cloth 40 can enhance the water resistance for cutting dirty baffle 20, cement mortar, exterior wall are kept away The pollutants such as construction water and rainwater make cement mortar, external wall construction water and rain from cutting the hole of dirty baffle 20, stitching continuation toward flowing down The pollutants such as water are emitted by floss hole, pollutant emission mouth 21 in delivery pipe 30.Optionally, waterproof cloth 40 is colour bar cloth.
Further, the upper surface of the waterproof cloth 40 is the inclined-plane for being inclined relative to horizontal setting, and the inclined-plane is used In pollutant is directed to the sewage draining exit 41.In this way, waterproof cloth 40 can be convenient for cement mortar, external wall construction water and rainwater Pollutants guiding is waited to be emitted into delivery pipe 30.
Specifically, also referring to Fig. 3 and Fig. 4, the sub-truss 10 is disposed on described side by side including several Cut the angle steel 11 on dirty 20 downside of baffle.Described 11 one end of angle steel is used to be fixed in the construction elevator hoistway 100 The wherein side of side wall, 11 other end of angle steel are used to be fixed at the another of 100 madial wall of construction elevator hoistway Side.
Further, the pollution cutting device of the floor construction building elevator shaft, which further includes, is arranged on described section of dirty baffle Funnel shell 50 between 20 and the delivery pipe 30.The feed inlet of the funnel shell 50 is connected with the pollutant emission mouth 21 Logical, the 50 bottom discharge mouth 51 of funnel shell is connected with the delivery pipe 30.In this way, funnel shell 50 can will cut dirty baffle 20 On pollutant emission mouth 21 at the pollutants such as cement mortar, external wall construction water and rainwater concentration be emitted into delivery pipe 30, Pollutant emission can be convenient for operate in this way.
In one embodiment, the side wall of described section of dirty baffle 20 is used for close with 100 madial wall of construction elevator hoistway Envelope cooperation.It so, it is possible to avoid the pollutants such as cement mortar, external wall construction water and rainwater by cutting the side wall of dirty baffle 20 with applying It is past dirty that gap between 100 madial wall of work elevator shaft continues on elevator shaft side wall.
Further, the side wall of described section of dirty baffle 20 is used for through viscose glue and 100 madial wall of construction elevator hoistway Bonding cooperation.In this way, cutting dirty baffle 20 can more be firmly placed on 100 madial wall of construction elevator hoistway.
In one embodiment, described section of dirty baffle 20 cuts dirty iron plate or section dirty stainless steel steel for thickness in more than 1mm Plate cuts dirty plank for thickness in more than 1.2cm.In this way, cutting dirty baffle 20 has sufficient intensity to support staff, work It may stand in as personnel and cut the dirty progress of baffle 20 constructing operation.
Specifically, delivery pipe 30, such as iron wire 60, can be fixed on sub-truss 10 or cut dirty baffle 20 by drawing piece On.
Referring again to Fig. 5, a kind of construction elevator hoistway 100, including 100 main body of construction elevator hoistway.The construction elevator The pollution cutting device of the floor construction building elevator shaft is equipped on the madial wall of N-1 layers and N-2 layers of 100 main body of hoistway, Wherein, N is the structure construction layer The Highest Tower number of plies.
Above-mentioned construction elevator hoistway, due to the pollution cutting device of above-mentioned floor construction building elevator shaft, technology effect Fruit includes the technique effect of the pollution cutting device of above-mentioned floor construction building elevator shaft;In addition, due in construction elevator hoistway The pollution cutting device of the floor construction building elevator shaft is equipped in 100 N-1 layers of main bodys and N-2 layers of madial wall, in this way, It cuts dirty processing twice by pollution cutting device, can ensure that N-3 layers of 100 main body of construction elevator hoistway is following for dry operating environment.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, it is all considered to be the range of this specification record.
Embodiment described above only expresses the several embodiments of the utility model, and description is more specific and detailed, But therefore it can not be interpreted as the limitation to utility model patent range.It should be pointed out that the common skill for this field For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to The scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (9)

1. a kind of pollution cutting device of floor construction building elevator shaft, which is characterized in that including sub-truss, cut dirty baffle and row Pipe is put, the sub-truss is used to be installed in construction elevator well headroom madial wall;Described section of dirty baffle is installed in the support On truss, the side wall of described section of dirty baffle with the construction elevator well headroom madial wall for being engaged, described section of dirty gear Pollutant emission mouth is offered on plate;Described delivery pipe one end is connected with the pollutant emission mouth, and the delivery pipe is another It holds to lead to staircase catchment or elevator pit.
2. the pollution cutting device of floor construction building elevator shaft according to claim 1, which is characterized in that further include setting Waterproof cloth on described section of dirty baffle, the waterproof cloth are equipped with sewage draining exit, the sewage draining exit and the pollutant emission mouth position It puts corresponding.
3. the pollution cutting device of floor construction building elevator shaft according to claim 2, which is characterized in that the waterproof cloth Upper surface be the inclined-plane for being inclined relative to horizontal setting, the inclined-plane is used to pollutant being directed to the sewage draining exit.
4. the pollution cutting device of floor construction building elevator shaft according to claim 1, which is characterized in that the support purlin Frame includes several and is disposed on the angle steel cut on dirty baffle downside side by side;Described angle steel one end is used to be fixedly installed In the wherein side of the construction elevator hoistway madial wall, the angle steel other end is used to be fixed at the construction elevator well The opposite side of road madial wall.
5. the pollution cutting device of floor construction building elevator shaft according to claim 1, which is characterized in that further include setting Funnel shell between described section of dirty baffle and the delivery pipe, the feed inlet of the funnel shell and the pollutant emission mouth phase Connection, the funnel shell bottom discharge mouth are connected with the delivery pipe.
6. the pollution cutting device of floor construction building elevator shaft according to claim 1, which is characterized in that described section of dirty gear The side wall of plate, which is used to seal with the construction elevator hoistway madial wall, to be coordinated.
7. the pollution cutting device of floor construction building elevator shaft according to claim 6, which is characterized in that described section of dirty gear The side wall of plate is used for through viscose glue cooperation Nian Jie with the construction elevator hoistway madial wall.
8. the pollution cutting device of the floor construction building elevator shaft according to claim 1 to 7 any one, feature exist In, described section of dirty baffle be thickness more than 1mm cut dirty iron plate or cut dirt stainless-steel sheet or be thickness 1.2cm with On cut dirty plank.
9. a kind of construction elevator hoistway, which is characterized in that including construction elevator hoistway main body, the construction elevator hoistway main body N- It is all provided on 1 layer and N-2 layers of madial wall just like the floor construction building elevator shaft described in claim 1 to 8 any one Pollution cutting device, wherein, structure construction layer based on N.
CN201721352861.1U 2017-10-18 2017-10-18 The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway Expired - Fee Related CN207499485U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721352861.1U CN207499485U (en) 2017-10-18 2017-10-18 The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721352861.1U CN207499485U (en) 2017-10-18 2017-10-18 The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway

Publications (1)

Publication Number Publication Date
CN207499485U true CN207499485U (en) 2018-06-15

Family

ID=62501153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721352861.1U Expired - Fee Related CN207499485U (en) 2017-10-18 2017-10-18 The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway

Country Status (1)

Country Link
CN (1) CN207499485U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681778A (en) * 2020-11-18 2021-04-20 中国一冶集团有限公司 Interlayer water-proof and drainage system
CN112681779A (en) * 2020-11-24 2021-04-20 中国一冶集团有限公司 Water-stopping and drainage device for elevator shaft opening

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681778A (en) * 2020-11-18 2021-04-20 中国一冶集团有限公司 Interlayer water-proof and drainage system
CN112681779A (en) * 2020-11-24 2021-04-20 中国一冶集团有限公司 Water-stopping and drainage device for elevator shaft opening

Similar Documents

Publication Publication Date Title
CN207499485U (en) The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway
CN206442762U (en) Vertical greening wall
CN208267002U (en) A kind of floor intercepts water device
CN101798879A (en) Building with integrated green construction technologies
CN207499484U (en) Exterior wall cuts dirty floor construction building
CN207497882U (en) The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway
CN106759810A (en) The horizontally-arranged water seal floor drain of big flow
CN207959447U (en) A kind of bathroom water-proof chassis and integral bathroom
CN206090971U (en) Bilayer structure new trend circulation energy -saving curtain wall
CN205046611U (en) Roof rainwater catch basin
CN210828607U (en) Railing structure for landscape site
CN208049550U (en) A kind of sewage primary filter
CN201486108U (en) Residence discharge flue funnel cap
CN206319508U (en) Multifunction balcony
CN206376458U (en) A kind of house skylight of recyclable water
CN206782038U (en) Water proof type straight barrel type ventilation duct peculiar to vessel
CN205688494U (en) Height is guaranteed the quality No clean water tank
CN201411613Y (en) Chute for road
CN206409272U (en) A kind of air shaft water harnessing device
CN206376456U (en) A kind of improved house skylight of structure
CN105839709A (en) High-quality no-clean water tank
CN101338644A (en) Water curtain glass and uses thereof
CN101481987A (en) Living room decoration structure and mounting method
CN212836905U (en) Integral container house
CN205284602U (en) Prevent rainwater infiltration's bird room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180615

Termination date: 20201018