CN207497882U - The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway - Google Patents

The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway Download PDF

Info

Publication number
CN207497882U
CN207497882U CN201721349636.2U CN201721349636U CN207497882U CN 207497882 U CN207497882 U CN 207497882U CN 201721349636 U CN201721349636 U CN 201721349636U CN 207497882 U CN207497882 U CN 207497882U
Authority
CN
China
Prior art keywords
construction
pollutant
dirty
elevator
cutting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721349636.2U
Other languages
Chinese (zh)
Inventor
杨泓斌
刘灿团
焦鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zengcheng Bi Gui Garden Property Development Co Ltd
Original Assignee
Zengcheng Bi Gui Garden Property Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zengcheng Bi Gui Garden Property Development Co Ltd filed Critical Zengcheng Bi Gui Garden Property Development Co Ltd
Priority to CN201721349636.2U priority Critical patent/CN207497882U/en
Application granted granted Critical
Publication of CN207497882U publication Critical patent/CN207497882U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of pollution cutting device of floor construction building elevator shaft, including cutting dirty housing and delivery pipe.Dirty housing is cut for being installed in construction elevator well headroom madial wall.Pollutant receives oral area and is set for corresponding to construction elevator hoistway oral area, and pollutant receives the side wall of oral area for fitting with construction elevator hoistway madial wall.Delivery pipe one end is connected with pollutant emission hole, and the delivery pipe other end is used to lead to staircase catchment or elevator pit.The above-mentioned pollution cutting device of floor construction building elevator shaft and construction elevator hoistway, the pollutants such as cement mortar, construction water and rainwater can be avoided to continue on, and elevator shaft side wall is past to flow down, also the pollutants such as cement mortar, construction water and rainwater can be avoided to flow into the indoor environment of floor construction building, dry operation can be carried out below such elevator shaft, the dry operation of the indoor environment of floor construction building will not be affected, and can shorten construction period.

Description

The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway
Technical field
The utility model is related to floor construction building technical field, more particularly to a kind of floor construction building elevator shaft Pollution cutting device and construction elevator hoistway.
Background technology
Traditional operation floor is built, during concrete pouring construction, the pollutants such as construction water, cement mortar, rainwater It can from top to bottom be flowed along the hoistway wall of elevator shaft.The pollutants such as cement mortar, construction water and rainwater will be attached to elevator In the hoistway wall of hoistway, so as to pollute elevator shaft side wall.In addition, the pollutants such as cement mortar, construction water and rainwater also can It is flowed into along the hole on elevator shaft side wall in the indoor environment of floor construction building, to the indoor dress of floor construction building It repaiies operation to affect greatly, influences floor construction building and complete the duration.
Utility model content
Based on this, it is necessary to which the defects of overcoming the prior art, provide a kind of floor construction building elevator shaft cuts dirty dress It puts and construction elevator hoistway, it can avoid the pollutants such as cement mortar, construction water and rainwater from causing dirt to elevator shaft side wall Dye, also can avoid the pollutants such as cement mortar, construction water and rainwater from flowing into the indoor environment of floor construction building.
Its technical solution is as follows:A kind of pollution cutting device of floor construction building elevator shaft, including cutting dirty housing and discharge Pipe, for described section of dirty housing for being installed in construction elevator well headroom madial wall, described section of dirty housing has pollutant receiving port Portion and pollutant emission hole, the pollutant receive oral area and are set for corresponding to the construction elevator hoistway oral area, the dirt Dye object receives the side wall of oral area for fitting with the construction elevator hoistway madial wall, described delivery pipe one end and the pollution Object discharge orifice is connected, and the delivery pipe other end is used to lead to staircase catchment or elevator pit.
A kind of construction elevator hoistway, including construction elevator hoistway main body, N-1 layers of the construction elevator hoistway main body and N-2 The pollution cutting device of the floor construction building elevator shaft is equipped on the madial wall of layer, wherein, structure construction based on N Layer.
The above-mentioned pollution cutting device of floor construction building elevator shaft and construction elevator hoistway, can be installed in construction elevator Well headroom madial wall, such as it is installed in the madial wall of N-1 layers and N-2 layers of construction elevator hoistway, such floor construction building top The pollutants such as cement mortar, construction water and the rainwater that portion's work progress generates receive oral area along elevator shaft side wall through pollutant Flow into and cut in dirty housing, after by discharged to staircase catchment, so as to avoid cement mortar, construction water and The pollutants such as rainwater continue on elevator shaft side wall toward flowing down, and can also avoid the pollutions such as cement mortar, construction water and rainwater Object is flowed into the indoor environment of floor construction building, and dry operation can be carried out below such elevator shaft, and floor construction is built The dry operation for the indoor environment built will not be affected, and can shorten construction period.
The pollutant of described section of dirty housing, which receives, in one of the embodiments, is equipped with the first installation of two or more at oral area Plate, first installing plate are installed up to the construction elevator well headroom madial wall for fixation.It can be compared in this way, cutting dirty housing To be firmly installed on construction elevator well headroom madial wall.
The pollutant receives the side wall of oral area for being bonded in the construction elevator hoistway in one of the embodiments, On madial wall, and the side wall of pollutant reception oral area is used for and the construction elevator hoistway madial wall is sealed and coordinated.In this way, Cutting dirty housing more can firmly be installed on construction elevator well headroom madial wall, and a section dirty housing can end elevator The pollutants such as cement mortar, construction water and the rainwater of well headroom side wall avoid cement mortar, the construction of elevator shaft top sidewall It is flowed through with pollutants such as water and rainwater from cutting in the gap between dirty housing and elevator shaft side wall.
Described section of dirty housing is section dirty iron-clad or cut dirty steel that thickness is 0.5mm to 1.5mm in one of the embodiments, Shell.In this way, it is enough using the intensity that dirty housing is cut made of ferrous material or steel material, it is not easy to damage.In addition, due to cutting Dirty thickness of shell is relatively thin, mounts to construction elevator well headroom madial wall, can be convenient for the dirts such as cement mortar, construction water and rainwater Dye object receives oral area by pollutant and enters in section dirty housing.
Described section of dirty housing is in bucket-shaped in one of the embodiments, and the pollutant emission hole is arranged on described section of dirt The bottom of housing.It is entered in section dirty housing in this way, the pollutants such as cement mortar, construction water and rainwater receive oral area through pollutant Afterwards, the bottom for cutting dirty housing is converged in, and passes through discharged to staircase catchment.
The pollution cutting device of the floor construction building elevator shaft further includes mounting head in one of the embodiments, The mounting head includes the connection shell being detachably connected with pollutant reception oral area and is installed on the connection shell Soft band, the soft band is circumferentially disposed around the connection shell, and the soft band is used to be installed on the construction elevator well On road inside top wall.In this way, first mounting head can be installed up on construction elevator well headroom madial wall, dirty shell then will be cut Body is installed up in mounting head, and cutting dirty housing in this way can be convenient for being installed up on construction elevator well headroom madial wall, in addition, soft Band can adapt to, in construction elevator well headroom madial wall shape, preferably be sticked on elevator shaft inside top wall, so as to Soft band and construction elevator well headroom madial wall sealing fitness are preferable.
More than two second installing plates of the soft band connection, second installing plate are used in one of the embodiments, The construction elevator well headroom madial wall is installed up in fixation.In this way, cutting dirty housing more can firmly be installed in construction On elevator shaft inside top wall.
The connection shell receives oral area sealing with the pollutant and coordinates in one of the embodiments, the soft band Coordinate with the connection shell, construction elevator well headroom madial wall sealing.In this way, leakproofness is preferable, cutting dirty housing can End the pollutants such as the cement mortar, construction water and rainwater of elevator shaft top sidewall.
In one of the embodiments, the pollution cutting device of the floor construction building elevator shaft further include mounting bracket with Auxiliary fixing plate, the mounting bracket, which is installed in, cuts dirty shell lateral wall, and the auxiliary fixing plate is installed on the mounting bracket, described Auxiliary fixing plate is installed up to the construction elevator hoistway madial wall for fixation.In this way, by mounting bracket, auxiliary fixing plate to cutting Dirty shell carries out Auxiliary support and fixes, and a section dirty shell is enabled to more firmly to be installed on construction elevator well headroom madial wall.
Description of the drawings
Fig. 1 is the knot of the pollution cutting device of the floor construction building elevator shaft described in the one of embodiment of the utility model Structure schematic diagram;
Fig. 2 is the structure of the pollution cutting device of the floor construction building elevator shaft described in the utility model another embodiment Schematic diagram;
Fig. 3 is the structure diagram of the floor construction building elevator shaft described in the one of embodiment of the utility model;
Fig. 4 is the structure diagram of the floor construction building elevator shaft described in the utility model another embodiment.
Reference numeral:
10th, cut dirty housing, 11, pollutant receive oral area, 12, pollutant emission hole, 20, delivery pipe, the 30, first installation Plate, 40, mounting head, 41, connection shell, 42, soft band, the 43, second installing plate, 50, mounting bracket, 60, auxiliary fixing plate, 100, apply Work elevator shaft.
Specific embodiment
Above-mentioned purpose, feature and advantage to enable the utility model are more obvious understandable, below in conjunction with the accompanying drawings to this The specific embodiment of utility model is described in detail.Elaborate many details in order to abundant in the following description Understand the utility model.But the utility model can be much to implement different from other manner described here, this field Technical staff can do similar improvement in the case of without prejudice to the utility model connotation, therefore the utility model is not by following public affairs The limitation for the specific embodiment opened.
In the description of the present invention, it is to be appreciated that term " first ", " second " are only used for description purpose, and It is not intended that instruction or hint relative importance or the implicit quantity for indicating indicated technical characteristic.It defines as a result, At least one this feature can be expressed or be implicitly included to the feature of " first ", " second ".In the description of the present invention, " multiple " are meant that at least two, such as two, three etc., unless otherwise specifically defined.
In the description of the present invention, it is to be appreciated that when an element is considered as " connection " another element, It can be directly to another element or may be simultaneously present intermediary element.On the contrary, when element for be referred to as " direct " and During another element connection, there is no intermediary elements.
As shown in Figures 1 and 3, a kind of pollution cutting device of floor construction building elevator shaft, including cutting dirty housing 10 and row Put pipe 20.For described section of dirty housing 10 for being installed in 100 inside top wall of construction elevator hoistway, described section of dirty housing 10 has dirt It contaminates object and receives oral area 11 and pollutant emission hole 12.The pollutant receives oral area 11 and is used for and the construction elevator hoistway 100 Oral area is accordingly set, and the pollutant receives the side wall of oral area 11 for fitting with 100 madial wall of construction elevator hoistway. Described 20 one end of delivery pipe is connected with the pollutant emission hole 12, and 20 other end of delivery pipe is used to lead to staircase Catchment or elevator pit.
The pollution cutting device of above-mentioned floor construction building elevator shaft can be installed in 100 top of construction elevator hoistway Side wall, such as the N-1 layers and N-2 layers of madial wall of construction elevator hoistway 100 are installed in, it constructs at the top of such floor construction building The pollutants such as cement mortar, construction water and the rainwater that process generates receive oral area 11 through pollutant along elevator shaft side wall and flow into To cutting in dirty housing 10, after by delivery pipe 20 be emitted into staircase catchment, so as to avoid cement mortar, construction water and The pollutants such as rainwater continue on elevator shaft side wall toward flowing down, and can also avoid the pollutions such as cement mortar, construction water and rainwater Object is flowed into the indoor environment of floor construction building, and dry operation can be carried out below such elevator shaft, and floor construction is built The dry operation for the indoor environment built will not be affected, and can shorten construction period.
In the present embodiment, the pollutant of described section of dirty housing 10, which receives, is equipped with more than two first installing plates at oral area 11 30.First installing plate 30 is installed up to the 100 inside top wall of construction elevator hoistway for fixation.In this way, cut dirty housing 10 more can firmly be installed on 100 inside top wall of construction elevator hoistway.
In addition, referring again to Fig. 3, the pollutant receives the side wall of oral area 11 for being bonded in the construction elevator hoistway On 100 madial walls, and the pollutant receives the side wall of oral area 11 for matching with 100 madial wall of construction elevator hoistway sealing It closes.In this way, cutting dirty housing 10 more can firmly be installed on 100 inside top wall of construction elevator hoistway, and cut dirty housing 10 can end the pollutants such as the cement mortar, construction water and rainwater of elevator shaft top sidewall, avoid at the top of elevator shaft The pollutants such as cement mortar, construction water and the rainwater of side wall are flowed through from cutting in the gap between dirty housing 10 and elevator shaft side wall. Specifically, the side wall of the pollutant reception oral area 11 is bonded in by glass cement on 100 madial wall of construction elevator hoistway.
Specifically, described section of dirty housing 10 is section dirty iron-clad or cut dirty box hat that thickness is 0.2mm to 0.5mm.In this way, it adopts The intensity that dirty housing 10 is cut made of ferrous material or steel material is enough, is not easy to damage.In addition, due to cutting dirty housing 10 Thinner thickness is mounted to 100 inside top wall of construction elevator hoistway, can be convenient for the pollutions such as cement mortar, construction water and rainwater Object receives oral area 11 by pollutant and enters in section dirty housing 10.In other embodiments, described section of dirty housing 10 is thickness May be 0.5mm to 3mm.In other embodiments, described section of dirty housing 10 is cuts dirt PVC shells or cuts dirty aluminum hull.
In addition, described section of dirty housing 10 is in bucket-shaped, the pollutant emission hole 12 is arranged on the bottom for cutting dirty housing 10 Portion.In this way, the pollutants such as cement mortar, construction water and rainwater are received through pollutant after oral area 11 enters and cut in dirty housing 10, The bottom for cutting dirty housing 10 is converged in, and passes through delivery pipe 20 and is emitted into staircase catchment.
Further, referring to Fig. 2, the pollution cutting device of the floor construction building elevator shaft further includes mounting head 40.The mounting head 40 includes the connection shell 41 being detachably connected with pollutant reception oral area 11 and is installed in described Connect the soft band 42 on shell 41.The soft band 42 is circumferentially disposed around the connection shell 41, and the soft band 42 is used to fix It is installed on the 100 inside top wall of construction elevator hoistway.In this way, can mounting head 40 be first installed up to construction elevator hoistway On 100 inside top walls, it then will cut dirty housing 10 and be installed up in mounting head 40, cutting dirty housing 10 in this way can be convenient for being installed up to On 100 inside top wall of construction elevator hoistway.In addition, soft band 42 can adapt in 100 inside top wall of construction elevator hoistway Shape is preferably sticked on elevator shaft inside top wall, so as to soft band 42 and 100 inside top wall of construction elevator hoistway It is preferable to seal fitness.
Further, the soft band 42 connects more than two second installing plates 43.Second installing plate 43 is used for Fixation is installed up to the 100 inside top wall of construction elevator hoistway.It is applied in this way, cutting dirty housing 10 and more can firmly be installed in On 100 inside top wall of work elevator shaft.
Specifically, connection shell 41 and the pollutant receive the sealing of oral area 11 and coordinate, the soft band 42 with it is described Connect shell 41, the sealing cooperation of 100 inside top wall of the construction elevator hoistway.In this way, leakproofness is preferable, cutting dirty housing 10 can End the pollutants such as the cement mortar, construction water and rainwater of elevator shaft top sidewall.
Also referring to Fig. 4, the pollution cutting device of the floor construction building elevator shaft further include mounting bracket 50 with it is auxiliary Help fixed plate 60.The mounting bracket 50, which is installed in, cuts dirty shell lateral wall.The auxiliary fixing plate 60 is installed in the mounting bracket 50 On, the auxiliary fixing plate 60 is installed up to 100 madial wall of construction elevator hoistway for fixation.In this way, by mounting bracket 50, Auxiliary fixing plate 60 is fixed to cutting dirty shell progress Auxiliary support, and a section dirty shell is enabled to more firmly to be installed in construction elevator well On 100 inside top wall of road.
Referring again to Fig. 3 or Fig. 4, a kind of construction elevator hoistway, including 100 main body of construction elevator hoistway.The construction electricity The floor construction building elevator shaft is equipped on the madial wall of N-1 layers and N-2 layers of 100 main body of stair shaft road cuts dirty dress It puts, wherein, structure construction layer based on N.
Above-mentioned construction elevator hoistway, due to the pollution cutting device of above-mentioned floor construction building elevator shaft, technology effect Fruit includes the technique effect of the pollution cutting device of above-mentioned floor construction building elevator shaft;In addition, due in construction elevator hoistway The pollution cutting device of the floor construction building elevator shaft is equipped in 100 N-1 layers of main bodys and N-2 layers of madial wall, in this way, It cuts dirty processing twice by pollution cutting device, can ensure that N-3 layers of 100 main body of construction elevator hoistway is following for dry operating environment.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, it is all considered to be the range of this specification record.
Embodiment described above only expresses the several embodiments of the utility model, and description is more specific and detailed, But therefore it can not be interpreted as the limitation to utility model patent range.It should be pointed out that the common skill for this field For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to The scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (10)

1. a kind of pollution cutting device of floor construction building elevator shaft, which is characterized in that described including cutting dirty housing and delivery pipe Dirty housing is cut for being installed in construction elevator hoistway madial wall, described section of dirty housing receives oral area with pollutant and arranged with pollutant Discharge hole, the pollutant receive oral area and are set for corresponding to the construction elevator hoistway oral area, and the pollutant receives oral area Side wall for fitting with the construction elevator hoistway madial wall, described delivery pipe one end is connected with the pollutant emission hole Logical, the delivery pipe other end is used to lead to staircase catchment or elevator pit.
2. the pollution cutting device of floor construction building elevator shaft according to claim 1, which is characterized in that described section of dirty shell The pollutant of body receives and more than two first installing plates is equipped at oral area, and first installing plate is installed up to described apply for fixed Work elevator shaft inside top wall.
3. the pollution cutting device of floor construction building elevator shaft according to claim 1, which is characterized in that the pollutant The side wall of oral area is received for being bonded in the construction elevator hoistway madial wall, and the pollutant receives the side wall use of oral area Coordinate in being sealed with the construction elevator hoistway madial wall.
4. the pollution cutting device of floor construction building elevator shaft according to claim 3, which is characterized in that described section of dirty shell Body is section dirty iron-clad or cut dirty box hat that thickness is 0.2mm to 0.5mm.
5. the pollution cutting device of floor construction building elevator shaft according to claim 1, which is characterized in that described section of dirty shell Body is in bucket-shaped, and the pollutant emission hole is arranged on the bottom for cutting dirty housing.
6. the pollution cutting device of floor construction building elevator shaft according to claim 1, which is characterized in that further include installation Head, the mounting head include the connection shell being detachably connected with pollutant reception oral area and are installed in the connection shell On soft band, the soft band around it is described connection shell it is circumferentially disposed, the soft band for be installed on it is described construction electricity On stair shaft road inside top wall.
7. the pollution cutting device of floor construction building elevator shaft according to claim 6, which is characterized in that the soft band More than two second installing plates of connection, second installing plate are installed up to for fixed on the inside of the construction elevator well headroom Wall.
8. the pollution cutting device of floor construction building elevator shaft according to claim 6, which is characterized in that the connection shell Oral area sealing is received with the pollutant to coordinate, on the inside of the soft band and the connection shell, the construction elevator well headroom Wall sealing cooperation.
9. the pollution cutting device of the floor construction building elevator shaft according to claim 6 to 8 any one, feature exist In further including mounting bracket and auxiliary fixing plate, the mounting bracket, which is installed in, cuts a dirty shell lateral wall, and the auxiliary fixing plate is installed in On the mounting bracket, the auxiliary fixing plate is installed up to the construction elevator hoistway madial wall for fixation.
10. a kind of construction elevator hoistway, which is characterized in that including construction elevator hoistway main body, the construction elevator hoistway main body It is all provided on N-1 layers and N-2 layers of madial wall just like the floor construction building elevator shaft described in claim 1 to 9 any one Pollution cutting device, wherein, structure construction layer based on N.
CN201721349636.2U 2017-10-18 2017-10-18 The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway Expired - Fee Related CN207497882U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721349636.2U CN207497882U (en) 2017-10-18 2017-10-18 The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721349636.2U CN207497882U (en) 2017-10-18 2017-10-18 The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway

Publications (1)

Publication Number Publication Date
CN207497882U true CN207497882U (en) 2018-06-15

Family

ID=62500990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721349636.2U Expired - Fee Related CN207497882U (en) 2017-10-18 2017-10-18 The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway

Country Status (1)

Country Link
CN (1) CN207497882U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114837445A (en) * 2022-05-09 2022-08-02 中国葛洲坝集团三峡建设工程有限公司 Sewage intercepting device for elevator shaft construction of floor construction building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114837445A (en) * 2022-05-09 2022-08-02 中国葛洲坝集团三峡建设工程有限公司 Sewage intercepting device for elevator shaft construction of floor construction building

Similar Documents

Publication Publication Date Title
CN204386650U (en) A kind of mounted gutter for the treatment of technology for tunnel seepage water cure
CN206681041U (en) A kind of improved municipal well lid
CN207497882U (en) The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway
CN104652670A (en) Glass curtain wall system capable of being installed indoors
CN207499485U (en) The pollution cutting device of floor construction building elevator shaft and construction elevator hoistway
CN207499484U (en) Exterior wall cuts dirty floor construction building
CN105386486B (en) Automatically taking water irrigation rig by a kind of waters
CN201433404Y (en) Anti-falling device of screwing-in type inspection well lid
CN203144894U (en) Bridge draining device
CN208277144U (en) A kind of transfer device of concrete test block cured under same condition
CN207891737U (en) A kind of prefabricated anti-collision wall with water storage greening function
CN209352411U (en) Staircase water-proof protection device
CN106193121A (en) A kind of immersed tube tunnel tube coupling antipriming
CN203547039U (en) Combined exhaust device for roof
CN205276463U (en) Steel construction unit -installment building body and peripheral protective structure thereof
CN206233391U (en) T-shaped rubber water bar
CN207499275U (en) Intercept water device and the construction stair of floor construction building stair
CN202937993U (en) Composite pipe made of anisotropic material
CN206070577U (en) A kind of immersed tube tunnel tube coupling antipriming
CN216810408U (en) Prefabricated ALC outer wall antiseep structure
CN210246280U (en) Visual cable trench cover plate
CN209557804U (en) A kind of water pump cast pipe protection washer through walls
CN107701060A (en) A kind of BRT bus rapid transits safety door door body waterproof construction
CN211871409U (en) Novel assembled sewage treatment device
CN206752647U (en) Double-layer floor drain mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180615

Termination date: 20201018