CN207498964U - foundation pit bracing device - Google Patents

foundation pit bracing device Download PDF

Info

Publication number
CN207498964U
CN207498964U CN201721539668.9U CN201721539668U CN207498964U CN 207498964 U CN207498964 U CN 207498964U CN 201721539668 U CN201721539668 U CN 201721539668U CN 207498964 U CN207498964 U CN 207498964U
Authority
CN
China
Prior art keywords
tube body
foundation pit
zhi
bracing device
blind end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721539668.9U
Other languages
Chinese (zh)
Inventor
韩磊
孙旻
王国欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201721539668.9U priority Critical patent/CN207498964U/en
Application granted granted Critical
Publication of CN207498964U publication Critical patent/CN207498964U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a kind of foundation pit bracing device, is equipped with building enclosure in foundation pit, which includes:Tube body, the tube body have an openend and a blind end, and the blind end is anchored in the ground of the foundation pit, and the tube body skewed horizontal load is formed with socket in the building enclosure, the blind end;Zhi Yi is articulated with the madial wall of the blind end;Top hammer, the top hammer have support end, and the support end compresses the Zhi Yi after being inserted in the tube body by the openend so that the Zhi Yi extends to the outside of the tube body by the socket;And slow setting slurries, it is poured into the tube body and flows through the socket to be coated on the Zhi Yi.The utility model solves the problems, such as the construction that the retaining design of traditional campshed+horizontal inner support beam is unfavorable for foundation pit internal structure.

Description

Foundation pit bracing device
Technical field
The utility model is related to technical field of building construction, and in particular to a kind of foundation pit bracing device.
Background technology
As town site day is becoming tight, the exploitation of the underground space is fast-developing, base pit engineering also increasingly by The attention of engineering staff.Traditional retaining design is using campshed+horizontal inner support beam.Traditional retaining design, because horizontal Inner support beam needs are set in foundation pit, and project cost is high, and are unfavorable for the development of the construction of the internal structure in foundation pit, machine The construction space of tool is limited, and construction speed is slow.
Utility model content
The defects of to overcome present in the prior art, now provides a kind of foundation pit bracing device, to solve traditional campshed+water The retaining design of flat inner support beam is unfavorable for the problem of construction of foundation pit internal structure.
To achieve the above object, a kind of foundation pit bracing device is provided, including:
Building enclosure is equipped in foundation pit, foundation pit bracing device includes:
Tube body, the tube body have an openend and a blind end, and the blind end is anchored in the ground of the foundation pit, The tube body skewed horizontal load is formed with socket in the building enclosure, the blind end;
Zhi Yi is articulated with the madial wall of the blind end;
Top hammer, the top hammer have support end, and the support end by the openend after being inserted in the tube body Compress the Zhi Yi so that the Zhi Yi extends to the outside of the tube body by the socket;And
Slow setting slurries are poured into the tube body and flow through the socket to be coated on the Zhi Yi.
Further, the first side of the madial wall towards the tube body of the Zhi Yi is formed with the ridge that breaks ground.
Further, the Zhi Yicheng classes triangular pyramid.
Further, the Zhi Yi is articulated with the madial wall of the blind end by hinged-support.
Further, elasticity is equipped with fastener on the madial wall of the tube body, and the fastener is resisted against the ridge that breaks ground, institute That states that fastener stretches out after the Zhi Yi extends to the outside of the tube body and be limited in the Zhi Yi breaks ground the one of ridge far from described Side.
Further, the both sides of the socket are respectively equipped with the fastener and the slot plugged for the fastener, the card Part is inserted into after the Zhi Yi extends to the outside of the tube body in the slot.
Further, the support end is in coniform.
Further, the slow setting slurries are concrete slurry.
The beneficial effects of the utility model are that the utility model foundation pit bracing device is by tube body skewed horizontal load in foundation pit Building enclosure and foundation pit ground between, the blind end of tube body is overhanged Zhi Yi by top hammer after the ground for being anchored in foundation pit Blind end, injection slow setting slurries in tube body outside the socket effuser for the blind end that slow setting slurries pass through tube body and are coated on Zhi Yi, Be poured into slow setting slurry consolidation in tube body and being coated on Zhi Yi and form slow setting slurry consolidation body, slow setting slurry consolidation body it is outer Portion has tube body to constrain and protect, and there is Zhi Yi in the inside of slow setting slurry consolidation body as skeleton so that the knot of slow setting slurry consolidation body Firm, high capacity that structure is stablized, and then what can be consolidated is supported in building enclosure.The utility model foundation pit bracing device avoids biography The horizontal inner support beam set in the foundation pit of system, on the one hand provides preferable support force for building enclosure, on the other hand, this practicality Novel foundation pit bracing device low engineering cost, and enough construction spaces are provided for foundation pit internal structure, facilitate mechanical execution, Accelerate construction speed.
Description of the drawings
Fig. 1 is the schematic diagram of the utility model foundation pit bracing device.
Fig. 2 is the schematic diagram in the cross section at A-A in Fig. 1.
Fig. 3 is that the branch wing of the utility model foundation pit bracing device stretches out status diagram.
Fig. 4 is the schematic diagram in the cross section at B-B in Fig. 3.
Fig. 5 is the schematic diagram of the tube body of the utility model foundation pit bracing device.
Fig. 6 is the schematic diagram of the Zhi Yi of the utility model foundation pit bracing device.
Fig. 7 is the schematic diagram of the perfusion state of the utility model foundation pit bracing device.
Specific embodiment
Illustrate the embodiment of the utility model below by way of specific specific example, those skilled in the art can be by this theory Content disclosed by bright book understands other advantages and effect of the utility model easily.The utility model can also be by addition Different specific embodiments are embodied or practiced, and the various details in this specification can also be based on different viewpoints with answering With carrying out various modifications or alterations under the spirit without departing from the utility model.
Fig. 1 is the schematic diagram of the utility model foundation pit bracing device, Fig. 2 is cross section in Fig. 1 at A-A schematic diagram, Fig. 3 is that the branch wing of the utility model foundation pit bracing device stretches out status diagram, the signal that Fig. 4 is the cross section in Fig. 3 at B-B Scheme, schematic diagram, Fig. 6 of the tube body that Fig. 5 is the utility model foundation pit bracing device are the branch of the utility model foundation pit bracing device The schematic diagram of the schematic diagram of the wing, the perfusion state that Fig. 7 is the utility model foundation pit bracing device.
In the present embodiment, building enclosure is equipped in foundation pit.Specifically, building enclosure is campshed.The utility model foundation pit Bracing device is for skewed horizontal load between the soil body of building enclosure and the ground of foundation pit.
Referring to figs. 1 to shown in Fig. 7, the utility model provides a kind of foundation pit bracing device, including:Tube body 1, the branch wing 2, top Hammer 3 and slow setting slurries 4.Tube body 1 has an openend and a blind end.The blind end of tube body 1 is anchored in the soil of the ground of foundation pit In vivo.1 skewed horizontal load of tube body is in building enclosure.Socket 11 is formed on the blind end of tube body 1.The branch wing 2 is articulated with the envelope of tube body 1 The madial wall of closed end.Top hammer 3 has support end 31.After top hammer 3 is inserted in by the openend of tube body 1 in tube body 1, support end 31 compress the branch wing 2 so that the branch wing 2 extends to the outside of tube body 1 by socket 11.Slow setting slurries 4 are passed through into tube body using perfusion equipment 1 openend is poured into tube body 1.After tube body 1 is poured into, slow setting slurries 4 flow through socket 1 and are coated on the branch wing 2.
The slow setting slurry consolidation being poured into tube body forms a solid column induration.It is coated on around Zhi Yi Slow setting slurry consolidation forms a solid spheroidal or pie induration, and Zhi Yi is as the spheroidal or pie induration Skeleton, it is ensured that the stabilization of spheroidal or the structure of pie induration and it is solid securely.The spheroidal or pie consolidation Body is connected to column induration and forms a similar inversion umbrella induration.One end of the inversion umbrella induration is anchored in foundation pit Ground the soil body in, the other end of the inversion umbrella induration is supported in the building enclosure of foundation pit.Further, in the inversion The outside of umbrella induration also has tube body to go along with sb. to guard him the stable structure and fixing for ensuring column induration, so that it is guaranteed that this practicality is new The stable structure of type foundation pit bracing device.
The utility model foundation pit bracing device by tube body skewed horizontal load in foundation pit building enclosure and foundation pit ground it Between, Zhi Yi is overhanged blind end by the blind end of tube body after the ground for being anchored in foundation pit by top hammer, and injection slow setting is starched in tube body Liquid outside the socket effuser for the blind end that slow setting slurries pass through tube body and is coated on Zhi Yi, is poured into tube body and is coated on The slow setting slurry consolidation of Zhi Yi forms slow setting slurry consolidation body, and the outside of slow setting slurry consolidation body has tube body to constrain and protect, delays There is Zhi Yi in the inside of solidifying slurry consolidation body as skeleton so that and the stable structure of slow setting slurry consolidation body is firm, high capacity, into And what can be consolidated is supported in building enclosure.The utility model foundation pit bracing device is avoided in the level set in traditional foundation pit On the one hand supporting beam provides preferable support force for building enclosure, on the other hand, the utility model foundation pit bracing device engineering is made Valency is low, and enough construction spaces are provided for foundation pit internal structure, facilitates mechanical execution, accelerates construction speed.
In the present embodiment, tube body 1 is hollow steel pipe.The bottom of tube body 1 is blind end, and the top of tube body is openend. The blind end of tube body 1 is conducive in cone in the soil body of blind end press-in ground of tube body 1.
With reference to Fig. 2 and Fig. 4, in the present embodiment, the quantity of the branch wing 2 is 8, correspondingly, the socket of the blind end of tube body 1 11 quantity is 8.82 spaced sets of the branch wing are symmetrical arranged.
The branch wing 2 is connected to by hinged-support 22 on the madial wall of the blind end of tube body 1.In the present embodiment, hinged-support 22 For universal coupling.
Specifically, it is branch wing structure that Fig. 6, which is shown, in conjunction with Fig. 1, the first side shape of the side wall towards tube body 1 of the branch wing 2 Into the ridge 21 that breaks ground.Ridge 21 break ground after the branch wing 2 is compressed by top hammer, cuts the blind end of tube body 1 outward by socket 11 Outside the soil body and stretch out the blind end of tube body 1.
The branch wing 2 is in class triangular pyramid.The lower part of Zhi Yi is in triangular pyramid, and the top of Zhi Yi is in triangular prism shape.
With reference to Fig. 2, as a kind of preferable embodiment, elasticity is equipped with fastener 5,5 edge of fastener on the madial wall of tube body 1 The circumferencial direction setting of tube body 1.Fastener 5 is in compressive state and is resisted against the side for the ridge 21 that breaks ground.The first end of 8 branch wings 2 The inside of the blind end of tube body 1 is connected to by hinged-support 22, the second end stuck part 5 of 8 branch wings 2 compresses, 8 branch wings 2 Second end is arranged in a ring, and what one support end 31 for top hammer of formation plugged compresses space, compresses space in inverted conical.Top After hammer 3 is inserted by the openends of tube body 1 in tube body 1, the top bottom of top hammer is inserted into compresses space and gradual in inverted conical Press outward to the branch wing 2 by socket stretch out tube body 1 outside.
In conjunction with Fig. 4, in the compressing after end 31 compresses and stretch out the outside of tube body 1 by top hammer of the branch wing 2, fastener 5 pops up simultaneously It is limited in the side far from the ridge 21 that breaks ground of the branch wing 2.
Specifically, the madial wall of tube body 1 is equipped with the slot plugged for fastener 5, fastener 5 and slot are located at socket 11 respectively Opposite sides.Fastener 5 is inserted into after the branch wing 2 stretches out the outside of tube body 1 in slot so that the branch wing 2 cannot return to tube body 1 In.
Fastener 5 is the inserted sheet of strip, and the first end of inserted sheet is connected with elastic component, and elastic component is connected to the inside of tube body 1 Wall, the second end of plug are pressed against the side for the ridge 21 that breaks ground.Elastic component is compressed spring.
Socket 11 is in strip and sets in the vertical direction.Fastener 5 is set to the middle part of socket 11, in 4 note of slow setting slurries After entering in tube body 1, slow setting slurries 4 are not influenced and flow out tube body 1 from socket 11.
Top hammer 3 is in the form of a column, and its outer diameter is less than the internal diameter of tube body 1.Top hammer 3 have a support end 31 and with 31 phase of support end To hammering end.The support end 31 of top hammer 3 is in coniform, and the end face at the hammering end of top hammer 3 is smooth so that press hammers.Top Hammer 3 is inserted into tube bodies by the openend of tube body 1, and behind the hammering end of press hammering top hammer 3, support end 31 is to the four of tube body 1 Compress 8 branch wings 2 week so that the branch wing 2 stretches out the outside of tube body 1 by socket.
As a kind of preferable embodiment, slow setting slurries 4 are concrete slurry.Perfusion equipment can be delivery pump. After the branch wing 2 is fully extended and stretches out the outside of tube body 1, top hammer 3 from tube body 1 is extracted, slow setting slurries 4 are passed through into tube body 1 Openend injection.The slow setting slurries 4 for injecting tube body 1 flow out the blind end of tube body 1 by socket 11 and are coated on the branch wing 2, together When ensure that slow setting slurries 4 are filled up completely tube body 1.
After the completion of the openend slip casting of tube body 1, the openend of tube body 1 can be blocked with a capping.
The utility model also provides a kind of foundation pit diagonal brace construction method using above-mentioned foundation pit bracing device, including following Step:
S1:It will be in the soil body of the ground of the blind end press-in foundation pit of tube body 1 using press so that the closing of tube body 1 End is anchored in ground, and 1 skewed horizontal load of tube body is in the building enclosure of foundation pit.Press is vibration pile press machine.
S2:Top hammer 3 is inserted in by the openend of tube body 1 in tube body 1.
S3:The hammering end of top hammer 3 is pressed down on using press, the surrounding of support end 31 to the tube body 1 of top hammer 3 compresses The branch wing 2 on the madial wall of the blind end of tube body 1 so that the branch wing 2 stretches out the blind end of tube body 1 by the socket 11 of blind end Outside.Press is vibration pile press machine.
S4:After the branch wing 2 is fully extended and stretches out the outside of tube body 1, top hammer 3 is extracted from tube body 1.
S5:Slow setting slurries 4 are poured by the openend of tube body 1 in tube body 1 by perfusion equipment so that be poured into pipe Slow setting slurries 4 in body 1 flow through socket 11 and are coated on the branch wing 2, while ensure that slow setting slurries 4 are filled up completely tube body 1.
After the completion of the openend slip casting of tube body 1, the openend of tube body 1 can be blocked with a capping.
The slow setting slurries 4 for being coated on the branch wing 2 are consolidated and are anchored in the soil body of ground.The slow setting slurries being poured into tube body Consolidation forms a solid column induration.Be coated on slow setting slurry consolidation around Zhi Yi formed one it is solid similar Spherical or pie induration, Zhi Yi is as the spheroidal or the skeleton of pie induration, it is ensured that spheroidal or pie are consolidated The stabilization of the structure of knot body and it is solid securely.It is similar that the spheroidal or pie induration are connected to column induration formation one It is inverted umbrella induration.In the soil body of ground that one end of the inversion umbrella induration is anchored in foundation pit, inversion umbrella consolidation The other end of body is supported in the building enclosure of foundation pit.Further, tube body goes along with sb. to guard him in the outside of the inversion umbrella induration The stable structure and fixing of column induration are ensured, so that it is guaranteed that the stable structure of the utility model foundation pit bracing device.
The utility model foundation pit bracing device by tube body skewed horizontal load in foundation pit building enclosure and foundation pit ground it Between, Zhi Yi is overhanged blind end by the blind end of tube body after the ground for being anchored in foundation pit by top hammer, and injection slow setting is starched in tube body Liquid outside the socket effuser for the blind end that slow setting slurries pass through tube body and is coated on Zhi Yi, is poured into tube body and is coated on The slow setting slurry consolidation of Zhi Yi forms slow setting slurry consolidation body, and the outside of slow setting slurry consolidation body has tube body to constrain and protect, delays There is Zhi Yi in the inside of solidifying slurry consolidation body as skeleton so that and the stable structure of slow setting slurry consolidation body is firm, high capacity, into And what can be consolidated is supported in building enclosure.
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., only coordinating The bright revealed content of book, so that those skilled in the art understands and reads, being not limited to the utility model can implement Qualifications, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, In the case where not influencing the effect of the utility model can be generated and the purpose that can reach, should all still fall disclosed in the utility model Technology contents obtain and can cover in the range of.Meanwhile in this specification it is cited as " on ", " under ", "left", "right", " in Between " and " one " etc. term, be merely convenient to understanding rather than to limit the enforceable range of the utility model for narration, Relativeness is altered or modified, in the case where changing technology contents without essence, when being also considered as the enforceable scope of the utility model.
The utility model is described in detail above in association with attached drawing embodiment, those skilled in the art can root Many variations example is made to the utility model according to above description.Thus, certain details in embodiment should not be formed to this practicality Novel restriction, the utility model will be using the ranges that the appended claims define as protection domain.

Claims (8)

1. a kind of foundation pit bracing device, which is characterized in that building enclosure is equipped in foundation pit, foundation pit bracing device includes:
Tube body, the tube body have an openend and a blind end, and the blind end is anchored in the ground of the foundation pit, described Tube body skewed horizontal load is formed with socket in the building enclosure, the blind end;
Zhi Yi is articulated with the madial wall of the blind end;
Top hammer, the top hammer have support end, and the support end compresses after being inserted in the tube body by the openend The Zhi Yi so that the Zhi Yi extends to the outside of the tube body by the socket;And
Slow setting slurries are poured into the tube body and flow through the socket to be coated on the Zhi Yi.
2. foundation pit bracing device according to claim 1, which is characterized in that the inside towards the tube body of the Zhi Yi First side of wall is formed with the ridge that breaks ground.
3. foundation pit bracing device according to claim 2, which is characterized in that the Zhi Yicheng classes triangular pyramid.
4. foundation pit bracing device according to claim 2, which is characterized in that the Zhi Yi is articulated with described by hinged-support The madial wall of blind end.
5. foundation pit bracing device according to claim 2, which is characterized in that elasticity is equipped on the madial wall of the tube body Fastener, the fastener are resisted against the ridge that breaks ground, and the fastener is stretched out and limited after the Zhi Yi extends to the outside of the tube body Positioned at the side far from the ridge that breaks ground of the Zhi Yi.
6. foundation pit bracing device according to claim 5, which is characterized in that the both sides of the socket are respectively equipped with the card Part and the slot plugged for the fastener, the fastener are inserted into the slot after the Zhi Yi extends to the outside of the tube body In.
7. foundation pit bracing device according to claim 1, which is characterized in that the support end is in coniform.
8. foundation pit bracing device according to claim 1, which is characterized in that the slow setting slurries are concrete slurry.
CN201721539668.9U 2017-11-17 2017-11-17 foundation pit bracing device Active CN207498964U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721539668.9U CN207498964U (en) 2017-11-17 2017-11-17 foundation pit bracing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721539668.9U CN207498964U (en) 2017-11-17 2017-11-17 foundation pit bracing device

Publications (1)

Publication Number Publication Date
CN207498964U true CN207498964U (en) 2018-06-15

Family

ID=62505242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721539668.9U Active CN207498964U (en) 2017-11-17 2017-11-17 foundation pit bracing device

Country Status (1)

Country Link
CN (1) CN207498964U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104134A (en) * 2017-11-17 2018-06-01 中国建筑第八工程局有限公司 Foundation pit bracing device and foundation pit diagonal brace construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104134A (en) * 2017-11-17 2018-06-01 中国建筑第八工程局有限公司 Foundation pit bracing device and foundation pit diagonal brace construction method

Similar Documents

Publication Publication Date Title
CN208023947U (en) A kind of wallboard template is connected and fixed device
CN207498964U (en) foundation pit bracing device
CN107938640A (en) A kind of microorganism fixing the handles device and its construction technology for sand-layer foundation
CN202073095U (en) Combination anchor structure
CN104652408B (en) The stake of bar shaped sand pocket and construction method thereof
CN108104134A (en) Foundation pit bracing device and foundation pit diagonal brace construction method
CN206916765U (en) A kind of Novel chuck
CN206707763U (en) A kind of pre-buried channel flow component for subway tunnel
CN207538054U (en) A kind of combined type cofferdam
CN110004946A (en) The pile top and its soil-slope rapid rescue ruggedized construction, construction method of grouting behind shaft or drift lining miniature steel pipe pile
CN204456059U (en) The stake of bar shaped sand pocket
CN205576946U (en) Ecological bank protection is with planting bag
CN209308047U (en) A kind of slope reinforcement device for foundation construction engineering
CN204370484U (en) Cone expansion formula anchor pole
CN201190288Y (en) Pile foundation of building foundation length composite pile
CN204199277U (en) The spiral building stake of filling concrete
CN209636881U (en) A kind of engineering structure test counter-force anchor structure
CN205677633U (en) A kind of roadway grouting ruggedized construction
CN202990418U (en) Slurry-leaking protection device preventing cast-in-place concrete column root from rotting
CN206707030U (en) A kind of eccentric joint of cross steel concrete column and steel framed concrete beam
CN207080000U (en) Antidetonation log cabin
CN205617365U (en) Novel stake of reinforced concrete spiral
CN216275626U (en) Concrete pipe pile with fixed knot constructs
CN205382465U (en) Board -like mud -rock flow of ge bin - stake structure of blocking
CN106877018B (en) A kind of digging-free formula lightning protection earthing stick