CN207487114U - A kind of wall-hung boiler for facilitating suspension - Google Patents

A kind of wall-hung boiler for facilitating suspension Download PDF

Info

Publication number
CN207487114U
CN207487114U CN201721436731.6U CN201721436731U CN207487114U CN 207487114 U CN207487114 U CN 207487114U CN 201721436731 U CN201721436731 U CN 201721436731U CN 207487114 U CN207487114 U CN 207487114U
Authority
CN
China
Prior art keywords
wall
blow
hung boiler
down panel
open
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721436731.6U
Other languages
Chinese (zh)
Inventor
刘锐铭
刘方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tangshan King Horse Technology Co Ltd
Original Assignee
Tangshan King Horse Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tangshan King Horse Technology Co Ltd filed Critical Tangshan King Horse Technology Co Ltd
Priority to CN201721436731.6U priority Critical patent/CN207487114U/en
Application granted granted Critical
Publication of CN207487114U publication Critical patent/CN207487114U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of wall-hung boilers for facilitating suspension,The utility model has the advantages of simple structure,It is cheap,It is and highly practical,Including wall-hung boiler,The wall-hung boiler top is provided with nozzle,The wall-hung boiler surface is provided with switch,The nozzle side is provided with the first blow-down panel,The wall-hung boiler opposite side is connected with acrylic emulsion box,The acrylic emulsion box surface is provided with open-work,The open-work side is provided with sprue,The open-work side is provided with pasting boards,The acrylic emulsion box side is provided with the first hook,The first hook side is provided with the second hook,The wall-hung boiler bottom end is connected with motor,The motor side is provided with wind turbine,The wall-hung boiler is also provided with the second blow-down panel on one side,First blow-down panel is provided with blowing mouth with the second blow-down panel side,The blow-down panel is connect in orbit with second blow-down panel,The blowing mouth side is provided with guide wheel.

Description

A kind of wall-hung boiler for facilitating suspension
Technical field
The utility model is related to a kind of wall-hung boiler, more particularly to a kind of wall-hung boiler for facilitating suspension belongs to machine applications skill Art field.
Background technology
Burnt gas wall hanging furnace has powerful Domestic central heating function, and each room can arbitrarily be set comfortably according to demand Temperature, and big flow constant temperature health hot water is capable of providing, it is used for Household shower bath, kitchen place, and wall-hung boiler is when mounted It is very troublesome, it needs to fix by many screw and nuts, and when unloading, and will appear and unload a large amount of screw and nut, It wastes time, therefore, a kind of wall-hung boiler for facilitating suspension will possess good market prospects.
Utility model content
The technical problems to be solved in the utility model is the defects of overcoming the prior art, provides a kind of wall hanging for facilitating suspension Stove, it is easy to use, save a large amount of cost.
In order to solve the above-mentioned technical problem, the utility model provides following technical solution:
The utility model provides a kind of wall-hung boiler for facilitating suspension, and including wall-hung boiler, the wall-hung boiler top is provided with pipe Mouthful, the wall-hung boiler surface is provided with switch, and the nozzle side is provided with the first blow-down panel, the wall-hung boiler opposite side connection There is acrylic emulsion box, the acrylic emulsion box surface is provided with open-work, and the quantity of the open-work is three, and three open-works It is set for equilateral triangle, the open-work side is provided with sprue, and the open-work side is provided with pasting boards, the acrylic acid Lotion box side is provided with the first hook, and the first hook side is provided with the second hook, and the wall-hung boiler bottom end is connected with Motor, the motor side are provided with wind turbine, and the wall-hung boiler is also provided with the second blow-down panel on one side, the wind turbine with it is described First blow-down panel, second blow-down panel communicate, and the first blow-down panel is provided with blowing mouth, the blowing with the second blow-down panel side Mouth is connect in orbit with second blow-down panel, and the quantity of the track is two, is arranged in parallel in the two of wall-hung boiler respectively Side, the blowing mouth side are provided with guide wheel, and the quantity of the guide wheel is four, is connected to the first blow-down panel and is blown with second Aerofoil side, each blow-down panel setting are propylene yogurt with the length that the second blow-down panel is stretched out there are two guide wheel, the first blow-down panel The thickness of liquid box.
As a kind of optimal technical scheme of the utility model, the switch is electrical connected with the motor, the wind turbine.
As a kind of optimal technical scheme of the utility model, first blow-down panel, second blow-down panel pass through institute State guide wheel, the track is connected with the wall-hung boiler.
As a kind of optimal technical scheme of the utility model, the pasting boards pass through screw with the acrylic emulsion box Nut is connected.
As a kind of optimal technical scheme of the utility model, the motor is connected with the guide wheel by shaft coupling.
The advantageous effect that the utility model is reached is:The utility model has the advantages of simple structure, cheap, and practicability By force, when hanging wall-hung boiler, the first hook is linked up with into the mounting hole being aligned on wall with second, there are two, is greatly reduced The amount of labour, then injects acrylic emulsion into acrylic emulsion box, at this moment acrylic emulsion can be by saturating by sprue Hole flows out to pasting boards, and when acrylic emulsion is paved with pasting boards, wall-hung boiler is fixed, and wants to unload wall-hung boiler When, it only need to be by lower switch, at this moment guide wheel can release the first blow-down panel and the second blow-down panel, and the wind of wind turbine blowout can be by blowing Air port blows to pasting boards, and acrylic emulsion can be detached wall-hung boiler with wall, and leave no trace automatically by after wind, at this moment again First hook and the second hook are unloaded, wall-hung boiler is removed, has saved a large amount of cost, it is easy to use, have good Economic benefit and social benefit, be suitble to promote the use of.
Description of the drawings
Attached drawing is used to provide a further understanding of the present invention, and a part for constitution instruction, with this practicality Novel embodiment for explaining the utility model, does not form the limitation to the utility model together.In the accompanying drawings:
Fig. 1 is the subjective structure diagram of the utility model;
Fig. 2 is the structure schematic diagram of the utility model;
Fig. 3 is the side structure schematic diagram of the utility model;
Fig. 4 is the blowing plate structure schematic diagram of the utility model;
In figure:1st, wall-hung boiler;2nd, nozzle;3rd, the first blow-down panel;4th, acrylic emulsion box;5th, open-work;6th, sprue;7、 First hook;8th, the second hook;9th, motor;10th, track;11st, wind turbine;12nd, the second blow-down panel;13rd, blowing mouth;14th, guide wheel; 15th, it switchs;16th, pasting boards.
Specific embodiment
The preferred embodiment of the utility model is illustrated below in conjunction with attached drawing, it should be understood that described herein excellent Embodiment is selected to be only used for describing and explaining the present invention, is not used to limit the utility model.
Embodiment:As shown in Figs 1-4, the utility model provides a kind of wall-hung boiler for facilitating suspension, including wall-hung boiler 1, institute It states 1 top of wall-hung boiler and is provided with nozzle 2,1 surface of wall-hung boiler is provided with switch 15, and 2 side of nozzle is provided with first Blow-down panel 3,1 opposite side of wall-hung boiler are connected with acrylic emulsion box 4, and 4 surface of acrylic emulsion box is provided with open-work 5, the quantity of the open-work 5 is three, and three open-works 5 are set for equilateral triangle, and 5 side of open-work is provided with material feeding Mouthfuls 6,5 side of open-work is provided with pasting boards 16, and 4 side of acrylic emulsion box is provided with the first hook 7, and described first It links up with 7 sides and is provided with the second hook 8,1 bottom end of wall-hung boiler is connected with motor 9, and 9 side of motor is provided with wind turbine 11, the wall-hung boiler 1 is also provided with the second blow-down panel 12, the wind turbine 11 and first blow-down panel 3, described second on one side Blow-down panel 12 communicates, and the first blow-down panel 3 and 12 side of the second blow-down panel are provided with blowing mouth 13, the blowing mouth 13 and described the Two blow-down panels 12 are connected on track 10, and the quantity of the track 10 is two, is arranged in parallel in the both sides of wall-hung boiler 1 respectively, 13 side of blowing mouth is provided with guide wheel 14, and the quantity of the guide wheel 14 is four, be connected to the first blow-down panel 3 with Second blow-down panel, 12 side, there are two the length that guide wheel 14, the first blow-down panel 3 and the second blow-down panel 12 are stretched out for each blow-down panel setting Spend the thickness for acrylic emulsion box 4.
Easy to use in order to which this kind is made to facilitate the wall-hung boiler of suspension, working efficiency is high, the switch 15 and the motor 9, The wind turbine 11 is electrical connected, and first blow-down panel 3, second blow-down panel 12 pass through the guide wheel 14, the track 10 It is connected with the wall-hung boiler 1, the pasting boards 16 are connected with the acrylic emulsion box 4 by screw and nut, the motor 9 It is connected with the guide wheel 14 by shaft coupling.
When the utility model is used, during suspension wall-hung boiler, the first hook 7 is directed at consolidating on wall with the second hook 8 Determine hole, there are two, greatly reduce the amount of labour, acrylic acid is then injected into acrylic emulsion box 4 by sprue 6 Lotion, at this moment acrylic emulsion can pasting boards 16 be flowed out to by open-work 5, when acrylic emulsion is paved with pasting boards 16, by wall , only need to be by lower switch 15 when hanging stove 1 to be fixed, and wanting to unload wall-hung boiler 1, at this moment guide wheel 14 can be by the first blow-down panel 3 Released with the second blow-down panel 12, and the wind that wind turbine 11 is blown out can blow to pasting boards 16 by blowing mouth 13, acrylic emulsion by Wall-hung boiler 1 with wall can be detached automatically, and leaves no trace after wind, at this moment again unload the first hook 7 and the second hook 8, Remove wall-hung boiler 1.
Finally it should be noted that:The above descriptions are merely preferred embodiments of the present invention, is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it can still modify to the technical solution recorded in foregoing embodiments or to which part technical characteristic Carry out equivalent replacement.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (5)

1. a kind of wall-hung boiler for facilitating suspension, including wall-hung boiler (1), which is characterized in that wall-hung boiler (1) top is provided with pipe Mouth (2), wall-hung boiler (1) surface are provided with switch (15), and nozzle (2) side is provided with the first blow-down panel (3), described Wall-hung boiler (1) opposite side is connected with acrylic emulsion box (4), and acrylic emulsion box (4) surface is provided with open-work (5), institute The quantity for stating open-work (5) is three, and three open-works (5) are set for equilateral triangle, and open-work (5) side is provided with material feeding Mouth (6), open-work (5) side are provided with pasting boards (16), and acrylic emulsion box (4) side is provided with the first hook (7), described first hook (7) side is provided with the second hook (8), and wall-hung boiler (1) bottom end is connected with motor (9), described Motor (9) side is provided with wind turbine (11), and the wall-hung boiler (1) also has is provided with the second blow-down panel (12), the wind turbine on one side (11) it is communicated with first blow-down panel (3), second blow-down panel (12), the first blow-down panel (3) and the second blow-down panel (12) Side is provided with blowing mouth (13), and the blowing mouth (13) is connected to second blow-down panel (12) on track (10), described The quantity of track (10) is two, is arranged in parallel in the both sides of wall-hung boiler (1) respectively, blowing mouth (13) side, which is provided with, leads It takes turns (14), the quantity of the guide wheel (14) is four, is connected to the first blow-down panel (3) and the second blow-down panel (12) side, Each blow-down panel setting is acrylic acid with the length that the second blow-down panel (12) is stretched out there are two guide wheel (14), the first blow-down panel (3) The thickness of lotion box (4).
2. a kind of wall-hung boiler for facilitating suspension according to claim 1, which is characterized in that the switch (15) and the electricity Machine (9), the wind turbine (11) are electrical connected.
3. a kind of wall-hung boiler for facilitating suspension according to claim 1, which is characterized in that first blow-down panel (3), institute The second blow-down panel (12) is stated by the guide wheel (14), the track (10) with the wall-hung boiler (1) to be connected.
4. a kind of wall-hung boiler for facilitating suspension according to claim 1, which is characterized in that the pasting boards (16) with it is described Acrylic emulsion box (4) is connected by screw and nut.
5. a kind of wall-hung boiler for facilitating suspension according to claim 1, which is characterized in that the motor (9) is led with described Wheel (14) is connected by shaft coupling.
CN201721436731.6U 2017-11-01 2017-11-01 A kind of wall-hung boiler for facilitating suspension Active CN207487114U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721436731.6U CN207487114U (en) 2017-11-01 2017-11-01 A kind of wall-hung boiler for facilitating suspension

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721436731.6U CN207487114U (en) 2017-11-01 2017-11-01 A kind of wall-hung boiler for facilitating suspension

Publications (1)

Publication Number Publication Date
CN207487114U true CN207487114U (en) 2018-06-12

Family

ID=62478511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721436731.6U Active CN207487114U (en) 2017-11-01 2017-11-01 A kind of wall-hung boiler for facilitating suspension

Country Status (1)

Country Link
CN (1) CN207487114U (en)

Similar Documents

Publication Publication Date Title
CN203765774U (en) Winter maintenance device for small component
CN207487114U (en) A kind of wall-hung boiler for facilitating suspension
CN205250334U (en) Waste heat recovery's solar energy tobacco flue -curing house
CN205119712U (en) Online oven of high -efficient steel wire
CN208296330U (en) A kind of mounting device for water heater
CN208661829U (en) A kind of electronic display fast dust-removing equipment
CN108421738A (en) A kind of electronic display fast dust-removing equipment
CN205037602U (en) Hot water intelligent control equipment
CN207797818U (en) A kind of flue gas waste heat recovery heating plant
CN202066062U (en) Multipurpose energy-saving stove
CN201866846U (en) Solar air conditioner
CN204854024U (en) Dull and stereotyped air heating device of solar drive vortex
CN208635468U (en) Cladding Full-automatic wet production line combustion gas drying equipment
CN207501243U (en) A kind of supplying hot water energy-saving equipment
CN205619359U (en) Device is recycled to tail gas of boiler
CN204626102U (en) Clothes-drying chest blowing device
CN216281659U (en) New energy-saving and efficiency-increasing heating system
CN204630330U (en) A kind of solar energy-heat pump associating dryer
CN208967967U (en) A kind of room humidifier with solar power generation function
CN2839932Y (en) Hot-air calcinating fluidized bed apparatus
CN203123714U (en) Improved type automatic dust removal device applicable to boiler dust collector
CN207515562U (en) A kind of energy-saving cooling water tank
CN208567118U (en) A kind of novel energy-conserving duct insert heater
CN203011219U (en) Heat exchanger for boiler
CN214892756U (en) Waste heat recovery device of steam heater

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Wall hanging furnace convenient for hanging

Effective date of registration: 20211015

Granted publication date: 20180612

Pledgee: China Construction Bank Corporation Tangshan Tanglong sub branch

Pledgor: TANGSHAN DIMA SCIENCE AND TECHNOLOGY Co.,Ltd.

Registration number: Y2021990000966

PE01 Entry into force of the registration of the contract for pledge of patent right