CN207484564U - A kind of Novel water conservancy project Accrete clearing device - Google Patents
A kind of Novel water conservancy project Accrete clearing device Download PDFInfo
- Publication number
- CN207484564U CN207484564U CN201721469539.7U CN201721469539U CN207484564U CN 207484564 U CN207484564 U CN 207484564U CN 201721469539 U CN201721469539 U CN 201721469539U CN 207484564 U CN207484564 U CN 207484564U
- Authority
- CN
- China
- Prior art keywords
- strut
- center
- buckle
- bearing box
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/108—Rainwater harvesting
Landscapes
- Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
Abstract
The utility model discloses a kind of Novel water conservancy project Accrete clearing devices, including bearing box, lateral mass is mounted at the outer wall left and right ends center of the bearing box, air cushion is installed at the bottom center of the lateral mass, bearing is installed on the inside of first buckle, the outer exterior wall upper and lower ends of the bottom bar are mounted on the second strut, threaded rod is installed at the bottom center of the bottom bar, described interior piece of the left and right sides is connected with the second buckle, third strut is mounted at left and right sides of the bottom end of second buckle, the second buckle bottom is connected by third strut with the top of bearing box.When needing to carry out dredging to small-sized river, by the cooperation of loop bar and baffle, dredging work can be carried out by the device to small-sized river for the Novel water conservancy project Accrete clearing device, and it is convenient and efficient to operate the device, reduces manpower and occupies, makes dredging time saving and energy saving.
Description
Technical field
The utility model is related to desilting equipment technical field, specially a kind of Novel water conservancy project Accrete clearing device.
Background technology
Hydraulic engineering is the surface water and groundwater for controlling and allocating nature, reaches and removes the evil emerging sharp purpose and build
Engineering, also referred to as Hydraulic Projects, water is human being's production and essential precious resources of living, but the state of its naturally occurring is simultaneously
Not in full conformity with the needs of the mankind, hydraulic engineering is only built, flow could be controlled, prevents flood, and carry out water
It adjusts and distributes, to meet the needs of people's lives and production to water resource, however ditch net river easily blocks up due to the sand silt
Plug generally needs to waste a large amount of manpower, financial resources when staff clears up all using spade, in this way dredging very trouble, and
And dredging efficiency it is very low, in the prior art, such as application No. is 201620322982.0 utility model patent, including rotate
Motor and hull, hull top side are provided with device for separating mud and water, and draining is provided on the right side of device for separating mud and water
Pipe, the left bottom of the device for separating mud and water are provided with storage mud box, and device for separating mud and water is connected with storage mud box by sludge pipe
It connects, sludge pump is provided with above the device for separating mud and water, and high-pressure pump is provided with above sludge pump, the high pressure gas
The side of pump is provided with high-pressure hydraulic pump, and the side of the hull is provided with dredging arm, silt-sucking tube is provided in the dredging arm, should
Although device can carry out dredging work, since device is excessive, dredging work can not be carried out, and to small in small-sized river
It is time-consuming and laborious during type channel cleanout, many manpowers can be occupied.
Utility model content
The purpose of this utility model is to provide a kind of Novel water conservancy project Accrete clearing device, to solve in above-mentioned background technology
The problem of proposition.
To achieve the above object, the utility model provides following technical solution:A kind of Novel water conservancy project Accrete clearing device, packet
Bearing box is included, lateral mass is mounted at the outer wall left and right ends center of the bearing box, is installed at the bottom center of the lateral mass
There is air cushion, the first strut, the inside installation of first strut are mounted at the inner wall left and right ends center of the bearing box
There is the first buckle, bearing is installed on the inside of first buckle, loop bar is socketed at the center of the bearing, the loop bar
Bottom end is equipped with bottom bar, and the outer exterior wall upper and lower ends of the bottom bar are mounted on the second strut, and the bottom bar passes through second
Bar is connected with baffle, and threaded rod, the top mandril of the loop bar, the top of the mandril are equipped at the bottom center of the bottom bar
End is equipped with crank, and outer wall is socketed with interior piece at the center of the mandril, and the mandril passes through the first block and about interior piece
Both sides are connected, and described interior piece of the left and right sides is connected with the second buckle, are mounted at left and right sides of the bottom end of second buckle
Third strut, the second buckle bottom are connected by third strut with the top of bearing box.
Preferably, connecting rod is mounted at left and right sides of the bottom end of the bearing box, the bottom end of the connecting rod is equipped with
Runner block, the inner wall of the runner block are equipped with bull stick, runner, the runner are socketed at the outer wall center of the bull stick
Both sides up and down be mounted on the second block, be connected at the center of second block with bull stick, the inside of the runner and set
Bar is connected.
Preferably, it is connected at the outer side center of the runner block by fixed link with bearing box.
Preferably, the outer wall of the air cushion is socketed with silicagel pad.
Preferably, the top left side socket rubber sleeve of the crank.
Compared with prior art, the beneficial effects of the utility model are:The Novel water conservancy project Accrete clearing device, when needs pair
When small-sized river carries out dredging, by the cooperation of loop bar and baffle, bearing box swims in the water surface by the air cushion of both sides, in air cushion
Bearing box is swum in the water surface by portion's gassy, and first strut loop bar the first buckle fixing bearing covers female connector by Bearing inner
Bar, by loop bar side fixed mandril, interior piece is fixed by the second buckle of both sides, and mandril is fixed on by the first block
Interior piece of inside prevents from coming off, and the second buckle is fixed on bearing box surface by third strut, is used for connecting crank by mandril, shake
Loop bar being driven to be rotated, bottom bar is driven to be rotated by loop bar opposite side, bottom bar by the second strut fixed baffle,
Baffle can drive rotation during by rotating loop bar, outflow be combined with flow by stirring underwater mud, bottom bar passes through threaded rod
Mud is stirred, dredging work can be carried out to small-sized river, and it is convenient and efficient to operate the device by the device, reduce people
Power occupies, and makes dredging time saving and energy saving.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the second buckle section view figure structure schematic representation of the utility model;
Fig. 3 is the bearing box section view figure structure schematic representation of the utility model;
Fig. 4 is the runner block section view figure structure schematic representation of the utility model.
In figure:1st, bearing box, 2, lateral mass, 3, air cushion, 4, bearing, the 5, first buckle, the 6, first strut, 7, loop bar, 8, bottom
Bar, the 9, second strut, 10, baffle, 11, threaded rod, 12, mandril, 13, third strut, the 14, second buckle, 15, interior piece, 16, shake
, the 17, first block, 18, runner block, 19, connecting rod, 20, bull stick, 21, runner, the 22, second block, 23, fixed link, 24,
Silicagel pad, 25, rubber sleeve.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained shall fall within the protection scope of the present invention.
- 4 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of Novel water conservancy project Accrete clearing device, including
Bearing box 1 is mounted on lateral mass 2 at the outer wall left and right ends center of bearing box 1, and lateral mass 2 is fixed in 1 both sides of bearing box, lateral mass 2
Air cushion 3 is installed, lateral mass 2 is used for fixing air cushion 3, and bearing box 1 is swum in water by 3 inside gassy of air cushion at bottom center
Face, the outer wall of air cushion 3 are socketed with silicagel pad 24, and silicagel pad 24 is used for protecting air cushion 3, and there is silicagel pad 24 elasticity to be used for preventing from mixing
The handstone closed in flow scratches air cushion 3, and the first strut 6, bearing are mounted at the inner wall left and right ends center of bearing box 1
The first strut 6 is fixed inside box 1, the inside of the first strut 6 is equipped with the first buckle 5, and the first strut 6 is used for fixing the first buckle
5, the inside of the first buckle 5 is equipped with bearing 4, and the first strut 6 is socketed at the center of bearing 4 by 5 fixing bearing 4 of the first buckle
There is loop bar 7, the bottom end of loop bar 7 is equipped with bottom bar 8, and 7 opposite side of loop bar drives bottom bar 8 to be rotated, in the outer exterior wall of bottom bar 8
Lower both ends are mounted on the second strut 9, and bottom bar 8 is connected by the second strut 9 with baffle 10, and bottom bar 8 fixes gear by the second strut 9
Plate 10, baffle 10 can drive rotation when rotating loop bar 7, underwater mud is stirred, outflow is combined with flow, the bottom center of bottom bar 8
Place is equipped with threaded rod 11, and bottom bar 8 is stirred mud by threaded rod 11, the top mandril 12 of loop bar 7, and top is fixed in 7 side of loop bar
Bar 12, the top of mandril 12 are equipped with crank 16, and mandril 12 is used for connecting crank 16, and when shaking crank 16, crank 16 can drive
Loop bar 7 is rotated, the top left side of crank 16 socket rubber sleeve 25, and the material of rubber sleeve 25 is rubber, the quality of rubber
Softness has the effect for increasing friction well, and the frictional force of crank 16 is made to become larger and preferably shakes crank 16, in mandril 12
Outer wall is socketed with interior piece 15 at the heart, and mandril 12 is connected by the first block 17 with interior piece 15 of both sides up and down, and mandril 12 is by first
Block 17 is fixed on inside interior piece 15 and prevents from coming off, and interior piece 15 of the left and right sides is connected with the second buckle 14, and interior piece 15 by both sides
The second buckle 14 be fixed, be mounted on third strut 13,14 bottom of the second buckle at left and right sides of the bottom end of the second buckle 14
Portion is connected by third strut 13 with the top of bearing box 1, and the second buckle 14 is fixed on 1 surface of bearing box by third strut 13,
Connecting rod 19 is mounted at left and right sides of the bottom end of bearing box 1, connecting rod 19 is used for runner block 18 being connected to 1 bottom of bearing box
Portion, the bottom end of connecting rod 19 are equipped with runner block 18, and runner block 18 is used for fixing bull stick 20, lead at the outer side center of runner block 18
It crosses fixed link 23 with bearing box 1 to be connected, the reinforcing runner block 18 of fixed link 23 and the connection of bearing box 1, in the inner wall of runner block 18
Side is equipped with bull stick 20, and runner 21 is socketed at the outer wall center of bull stick 20, and the both sides up and down of runner 21 are mounted on second gear
Block 22, the second block 22 are used for fixing runner 21, and the second block 22 is used for preventing 21 play of runner, at the center of the second block 22
It is connected with bull stick 20, the inside of runner 21 is connected with loop bar 7, and runner 21 is bonded with loop bar 7, and runner 21 is rotated loop bar 7
When it is more smooth.
Lateral mass 2 is fixed in 1 both sides of bearing box, and lateral mass 2 is used for fixing air cushion 3, and 3 inside gassy of air cushion floats bearing box 1
It keeps afloat, the first strut 6 is fixed inside bearing box 1, the first strut 6 is used for fixing the first buckle 5, and the first strut 6 is by first
5 fixing bearing 4 of buckle, 4 internal sleeve connecting sleeve lever 7 of bearing, 7 side fixed mandril 12 of loop bar, mandril run through interior piece 15, interior piece 15 by
Second buckle 14 of both sides is fixed, and mandril 12 is fixed on inside interior piece 15 by the first block 17 and prevents from coming off, the second buckle
14 are fixed on 1 surface of bearing box by third strut 13, and mandril 12 is used for connecting crank 16, and when shaking crank 16, crank 16 can band
Dynamic loop bar 7 is rotated, and 7 opposite side of loop bar drives bottom bar 8 to be rotated, and bottom bar 8 is by 9 fixed baffle 10 of the second strut, rotation
Baffle 10 can drive rotation during loop bar 7, underwater mud is stirred, outflow is combined with flow, and bottom bar 8 is stirred mud by threaded rod 11
It rises.
In the description of the present invention, it is to be appreciated that term " coaxial ", " bottom ", " one end ", " top ", " in
Portion ", " other end ", " on ", " side ", " top ", " interior ", " forepart ", " center ", the orientation of the instructions such as " both ends " or position close
Be for based on orientation shown in the drawings or position relationship, be for only for ease of description the utility model and simplify description rather than
Indicate or imply that signified device or element there must be specific orientation, with specific azimuth configuration and operation, therefore cannot
It is construed as a limitation of the present invention.
In the utility model unless specifically defined or limited otherwise, term " installation ", " setting ", " connection ", " Gu
It is fixed ", the terms such as " being screwed on " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or integral;
Can be mechanical connection or electrical connection;It can be directly connected, can also be indirectly connected by intermediary, it can be with
It is the interaction relationship of connection inside two elements or two elements, unless otherwise restricted clearly, for this field
For those of ordinary skill, concrete meaning of the above-mentioned term in the utility model can be understood as the case may be.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art,
It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of Novel water conservancy project Accrete clearing device, including bearing box (1), it is characterised in that:The outer wall of the bearing box (1) is left
Lateral mass (2) is mounted at right both ends center, air cushion (3), the bearing box are installed at the bottom center of the lateral mass (2)
(1) the first strut (6) is mounted at inner wall left and right ends center, the first button is installed on the inside of first strut (6)
Plate (5) is equipped with bearing (4) on the inside of first buckle (5), loop bar (7), institute is socketed at the center of the bearing (4)
The bottom end for stating loop bar (7) is equipped with bottom bar (8), and the outer exterior wall upper and lower ends of the bottom bar (8) are mounted on the second strut
(9), the bottom bar (8) is connected by the second strut (9) with baffle (10), and spiral shell is equipped at the bottom center of the bottom bar (8)
Rasp bar (11), the top mandril (12) of the loop bar (7), the top of the mandril (12) are equipped with crank (16), the mandril
(12) outer wall is socketed with interior piece (15) at center, the mandril (12) pass through the first block (17) and interior piece (15) up and down two
Side is connected, and the left and right sides of interior piece (15) is connected with the second buckle (14), bottom end of second buckle (14) or so two
Side is mounted on third strut (13), the top that the second buckle (14) bottom passes through third strut (13) and bearing box (1)
It is connected.
2. a kind of Novel water conservancy project Accrete clearing device according to claim 1, it is characterised in that:The bearing box (1)
Connecting rod (19) is mounted at left and right sides of bottom end, the bottom end of the connecting rod (19) is equipped with runner block (18), the runner
The inner wall of block (18) is equipped with bull stick (20), is socketed with runner (21) at the outer wall center of the bull stick (20), described turn
The both sides up and down of wheel (21) are mounted on the second block (22), are connected at the center of second block (22) with bull stick (20),
The inside of the runner (21) is connected with loop bar (7).
3. a kind of Novel water conservancy project Accrete clearing device according to claim 2, it is characterised in that:The runner block (18)
It is connected at outer side center by fixed link (23) with bearing box (1).
4. a kind of Novel water conservancy project Accrete clearing device according to claim 1, it is characterised in that:Outside the air cushion (3)
Wall is socketed with silicagel pad (24).
5. a kind of Novel water conservancy project Accrete clearing device according to claim 1, it is characterised in that:The top of the crank (16)
Socket rubber sleeve (25) on the left of portion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721469539.7U CN207484564U (en) | 2017-11-06 | 2017-11-06 | A kind of Novel water conservancy project Accrete clearing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721469539.7U CN207484564U (en) | 2017-11-06 | 2017-11-06 | A kind of Novel water conservancy project Accrete clearing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207484564U true CN207484564U (en) | 2018-06-12 |
Family
ID=62475571
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721469539.7U Expired - Fee Related CN207484564U (en) | 2017-11-06 | 2017-11-06 | A kind of Novel water conservancy project Accrete clearing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207484564U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108951550A (en) * | 2018-08-07 | 2018-12-07 | 霍山别他山电子商务有限公司 | A kind of Boat Rafting Tours quickwater safety device |
-
2017
- 2017-11-06 CN CN201721469539.7U patent/CN207484564U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108951550A (en) * | 2018-08-07 | 2018-12-07 | 霍山别他山电子商务有限公司 | A kind of Boat Rafting Tours quickwater safety device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108360596A (en) | A kind of hydraulic engineering channel cleanout device | |
CN211202436U (en) | Filter cover for submersible pump | |
CN206418533U (en) | A kind of dredging device for water conservancy projects | |
CN205577003U (en) | Dredging device for water conservancy project | |
CN108978608A (en) | A kind of executing agency of water-surface rubbish salving device | |
CN207484564U (en) | A kind of Novel water conservancy project Accrete clearing device | |
CN209556009U (en) | A kind of hydraulic engineering construction riverway sludge cleaning plant | |
CN108755874A (en) | Sewage removal device inside a kind of curved pipeline of floor drain dredging | |
CN207538100U (en) | A kind of Novel water conservancy project Accrete clearing device | |
CN209653008U (en) | A kind of novel hydraulic engineering desilting equipment | |
CN208947548U (en) | A kind of unpowered waters floating material fishing device | |
CN208604665U (en) | A kind of hydraulic engineering high-efficient dredging device | |
CN105756024B (en) | Rubbish salvages collection system in water body | |
CN108442437A (en) | A kind of hydraulic engineering that can collect oil slick channel cleanout device | |
CN206570855U (en) | A kind of cities and towns dredging device for water conservancy projects | |
CN208395785U (en) | A kind of checkdam panel of active blocking dam | |
CN213926441U (en) | Water conservancy water and electricity is ditch desilting device for construction | |
CN210066620U (en) | Hydraulic pipeline for hydraulic engineering | |
CN209429089U (en) | A kind of hydraulic dam for agricultural irrigation | |
CN113322910B (en) | Unpowered energy-saving water delivery device for hydraulic engineering | |
CN213805565U (en) | Dredging device for hydraulic engineering | |
CN108361206A (en) | A kind of feed pump convenient for launching | |
CN212494380U (en) | Novel water conservancy pipeline mediation device | |
CN213709681U (en) | Sediment removal device is used in hydraulic engineering construction | |
CN110316320B (en) | Solar energy type harbor area navigation mark capable of collecting water sample |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180612 Termination date: 20181106 |
|
CF01 | Termination of patent right due to non-payment of annual fee |