CN207477456U - A kind of electronic components process station-service frictioning equipment - Google Patents

A kind of electronic components process station-service frictioning equipment Download PDF

Info

Publication number
CN207477456U
CN207477456U CN201720356742.7U CN201720356742U CN207477456U CN 207477456 U CN207477456 U CN 207477456U CN 201720356742 U CN201720356742 U CN 201720356742U CN 207477456 U CN207477456 U CN 207477456U
Authority
CN
China
Prior art keywords
cylinder body
welded
piston
support
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720356742.7U
Other languages
Chinese (zh)
Inventor
赖春林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinfeng Hongye Electronics Co Ltd
Original Assignee
Xinfeng Hongye Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinfeng Hongye Electronics Co Ltd filed Critical Xinfeng Hongye Electronics Co Ltd
Priority to CN201720356742.7U priority Critical patent/CN207477456U/en
Application granted granted Critical
Publication of CN207477456U publication Critical patent/CN207477456U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model belongs to electronic components technical field of processing equipment more particularly to a kind of electronic components processing station-service frictioning equipment.The technical problem to be solved by the present invention is to provide a kind of time saving and energy saving, easy to operate electronic components to process station-service frictioning equipment.In order to solve the above-mentioned technical problem, the utility model provides such a electronic components processing station-service frictioning equipment, includes bottom plate, supporting rod, wheel, strut, gear, oscillating rod, scraper, rack, L-type support, handle, electric pushrod, first piston, top plate etc.;Supporting rod is welded at left and right sides of bottom base plate, two supporting rod bottom ends are equipped with wheel, gear is equipped in the middle part of the leading flank of bottom plate, oscillating rod is welded on the left of gear.The utility model first can soften the glue of solidification by hot gas, then constantly be moved up and down by scraper again, and so the colloid of solidification can be struck off, and achieve the effect that time saving and energy saving, easy to operate.

Description

A kind of electronic components process station-service frictioning equipment
Technical field
The utility model belongs to electronic components technical field of processing equipment more particularly to a kind of electronic components processing station-service is scraped Gluing equipment.
Background technology
Electronics is one of elementary particle of constituting atom, and quality is minimum, tape unit negative electrical charge, the electricity that different atoms possesses Subnumber mesh is different, for example, containing 6 electronics in each carbon atom, 8 electronics are contained in each oxygen atom.Energy is high Farther out, the low freestone of energy is nearer for freestone.Usually by electronics, movement is known as the layering of electronics in the far and near different region of freestone Arrangement.
Since electronic components need to be bonded it during processing, during bonding, the glue of bonding Ground can be inevitably dropped down onto, and the glue after having solidified does not allow easy-clear, ground can remain a large amount of solidification in the course of time Glue so that ground overall image is bad, and manual cleaning then requires a great deal of time, therefore there is an urgent need for research and develop a kind of time saving province Power, easy to operate electronic components processing station-service frictioning equipment.
Utility model content
(1) technical problems to be solved
The utility model is in order to overcome the glue after having solidified not allow easy-clear, and ground can remain greatly in the course of time The solidification glue of amount so that the shortcomings that ground overall image is bad, and manual cleaning then requires a great deal of time, this practicality are new Type technical problems to be solved are to provide a kind of time saving and energy saving, easy to operate electronic components processing station-service frictioning equipment.
(2) technical solution
In order to solve the above-mentioned technical problem, the utility model provides such a electronic components processing station-service frictioning and sets It is standby, include bottom plate, supporting rod, wheel, strut, gear, oscillating rod, scraper, rack, L-type support, handle, electric pushrod, One piston, top plate, the first cylinder body, second piston, the second cylinder body, the first push rod and fixed plate, the bottom base plate left and right sides are welded Supporting rod is connected to, two supporting rod bottom ends are equipped with wheel, gear is equipped in the middle part of the leading flank of bottom plate, swing is welded on the left of gear Bar, the mode that the end of oscillating rod is connected by screw are connected with scraper, and scraper is contacted with ground, and bottom plate top right side is welded with Strut, strut right upper portion are welded with L-type support, and L-type support right side central is welded with handle, and L-type support left upper portion passes through Bolted mode is connected with electric pushrod, is welded with top plate at the top of L-type support, top plate bottom left is bolted Mode is connected with the first cylinder body, the built-in full water of the first cylinder body, movable in the first cylinder body to be connected with first piston, in first piston Circular small grooves are provided with, the push rod end interference of electric pushrod is connected in circular small grooves, and the first cylinder base passes on left bolt The mode of connection is connected with the second cylinder body, and the second cylinder body and the first cylinder body are movable in connection, the second cylinder body to be connected with the Two pistons, second piston bottom are welded with the first push rod, and the other end of the first push rod passes through the second cylinder base, the first push rod bottom End is welded with fixed plate, and rack, rack and pinion engagement are welded among fixed plate bottom.
Preferably, third cylinder body, third piston, the second push rod, the 4th cylinder body, elevating lever, the 4th piston, have been further included One stent, the first hose, the first check valve, the second hose, the second check valve, heater box, heating plate, exhaust fan, second support, Fixing sleeve and nozzle, bottom plate top left side are welded with first support, and first support top is connected with by bolted connection 4th cylinder body, movable in the 4th cylinder body to be connected with the 4th piston, the mode that the 4th cylinder base passes on left flanged joint connects The first hose is connected to, is equipped with the first check valve in the first hose, the right upper portion of Left-side support bar is welded with fixing sleeve, and first is soft The other end of pipe passes through fixing sleeve, and the first hose bottom end is connected with nozzle, the air outlet position of nozzle by way of flanged joint On the left of scraper, second support is welded on the left of bottom plate, second support top is connected with heater box by bolted connection, Heater box left side central portion is equipped with exhaust fan, and heater box inner top and bottom are equipped with heating plate, and the right wall lower part of heater box leads to The mode for crossing flanged joint is connected with the second hose, is equipped with the second check valve in the second hose, the other end of the second hose passes through The mode of flanged joint is connect with the 4th cylinder body left wall lower part, and the first cylinder body passes on left bolted mode and is connected with third Cylinder body, third cylinder body and the first cylinder body are movable in connection, third cylinder body to be connected with third piston, the left side of third piston Middle part is welded with the second push rod, and the other end of the second push rod passes through third cylinder body left wall, and the bottom left of the second push rod is welded with Elevating lever, the other end of elevating lever are connect across the 4th cylinder body with the 4th piston.
Preferably, support plate has been further included, right end is welded with support plate, support plate top and L-type support bottom at the top of bottom plate Portion's welded type connection.
Preferably, the material of elevating lever is Q235 steel.
Preferably, bottom plate material is stainless steel.
Preferably, the material of support plate is Q235 steel.
Operation principle:During using this equipment, worker pushes this equipment then to be controlled electronic to the ground for needing frictioning first Push rod extends, and electric pushrod drives first piston to left movement, so that second piston moves downward under the pressure of water, from And the first push rod is driven to move downward, the first push rod is then moved downward by fixed plate band carry-over bar, rack drives gear up time Needle rotates, and gear then drives scraper to move upwards by oscillating rod, and after the second cylinder body built-in full water, control electric pushrod is received Contracting, electric pushrod drive first piston to move right, and the water in the second cylinder body enters the first cylinder body at this time, and then drive second to live Plug moves upwards, and so as to which the first push rod be driven to move upwards, the first push rod is then moved upwards by fixed plate band carry-over bar, rack Band moving gear rotates counterclockwise, and gear then drives scraper to move downward by oscillating rod, the colloid that scraper solidifies ground at this time It is struck off, after second piston resets, control electric pushrod extends again, and so repeatedly, scraper constantly moves up and down, can The colloid on ground is struck off, while worker and pushes this equipment, after the colloid on ground strikes off, and electric pushrod is in elongation After state, control electric pushrod is stopped.
Because third cylinder body, third piston, the second push rod, the 4th cylinder body, elevating lever, the 4th piston, first are further included Stent, the first check valve, the second hose, the second check valve, heater box, heating plate, exhaust fan, second support, is consolidated the first hose Fixed set and nozzle, bottom plate top left side are welded with first support, and first support top is connected with the by bolted connection Four cylinder bodies, movable in the 4th cylinder body to be connected with the 4th piston, the mode that the 4th cylinder base passes on left flanged joint connects There is the first hose, be equipped with the first check valve in the first hose, the right upper portion of Left-side support bar is welded with fixing sleeve, the first hose The other end pass through fixing sleeve, the first hose bottom end is connected with nozzle by way of flanged joint, and the air outlet of nozzle is located at On the left of scraper, second support is welded on the left of bottom plate, second support top is connected with heater box, adds by bolted connection Hot tank left side central portion is equipped with exhaust fan, and heater box inner top and bottom are equipped with heating plate, and the right wall lower part of heater box passes through The mode of flanged joint is connected with the second hose, is equipped with the second check valve in the second hose, the other end of the second hose passes through method The mode of orchid connection is connect with the 4th cylinder body left wall lower part, and the first cylinder body passes on left bolted mode and is connected with third cylinder Body, third cylinder body and the first cylinder body are movable in third cylinder body to be connected with third piston through connection, in the left side of third piston Portion is welded with the second push rod, and the other end of the second push rod passes through third cylinder body left wall, and the bottom left of the second push rod is welded with liter Bar drops, and the other end of elevating lever is connect across the 4th cylinder body with the 4th piston;When needing to handle ground, and control and add Hot plate heats, then controls exhaust fan exhausting, and extraneous air is pumped into heater box by exhaust fan at this time, under the action of heating plate, Heating plate can heat the air of heater box, make it into hot wind, when electric pushrod extends, electric pushrod and pass through first Piston driving third piston then drives the 4th piston to move downward to left movement, third piston by elevating lever, at this time the 4th cylinder Internal air is discharged by the first hose, and when electric pushrod is shunk, electric pushrod drives third piston by first piston It moves right, third piston then drives the 4th piston upwards by elevating lever, because playing the role of the first check valve, air It cannot be entered in the 4th cylinder body by the first hose, so the hot wind in heater box is entered by the second hose in the 4th cylinder body, Because there is the second check valve, the hot wind in the 4th cylinder body cannot be refunded by the second hose in heater box, pushed away when electronic When bar extends again, the hot wind in the 4th cylinder body enters nozzle by the first hose, and nozzle sprays hot wind, in hot wind action Under, first the colloid of solidification can be softened, so accelerate the speed of scraper frictioning.
Because having further included support plate, right end is welded with support plate at the top of bottom plate, is welded at the top of support plate with L-type support bottom Formula connection is connect, the intensity of L-type support and strut faying face is increased, makes this service life of equipment longer.
Because the material of elevating lever is Q235 steel, Q235 steel hardness is high, and is unlikely to deform, and makes the service life of this equipment more It is long.
Because bottom plate material is stainless steel, stainless steel corrosion resistance and acid resistance are strong, and the service life for making this equipment is longer.
Because the material of support plate is Q235 steel, Q235 steel hardness is high, and is unlikely to deform, and makes the service life of this equipment more It is long.
(3) advantageous effect
The utility model first can soften the glue of solidification by hot gas, then constantly upper and lower by scraper again Movement, can so strike off the colloid of solidification, achieve the effect that time saving and energy saving, easy to operate.
Description of the drawings
Fig. 1 is the first main structure diagram of the utility model.
Fig. 2 is second of main structure diagram of the utility model.
Fig. 3 is the right side structural representation of the utility model nozzle.
Fig. 4 is the third main structure diagram of the utility model.
Label in attached drawing for:1- bottom plates, 2- supporting rods, 3- wheels, 4- struts, 5- gears, 6- oscillating rods, 7- scrapers, 8- racks, 9-L type stents, 10- handles, 11- electric pushrods, 12- first pistons, 13- top plates, the first cylinder bodies of 14-, 15- second Piston, the second cylinder bodies of 16-, the first push rods of 17-, 18- fixed plates, 19- third cylinder bodies, 20- third pistons, the second push rods of 21-, The 4th cylinder bodies of 22-, 23- elevating levers, the 4th pistons of 24-, 25- first supports, the first hoses of 26-, the first check valves of 27-, 28- Two hoses, the second check valves of 29-, 30- heater boxes, 31- heating plates, 32- exhaust fans, 33- second supports, 34- fixing sleeves, 35- Nozzle, 36- support plates.
Specific embodiment
The utility model is further described with reference to the accompanying drawings and examples.
Embodiment 1
A kind of electronic components process station-service frictioning equipment, as shown in Figs 1-4, include bottom plate 1, supporting rod 2, wheel 3, branch Bar 4, gear 5, oscillating rod 6, scraper 7, rack 8, L-type support 9, handle 10, electric pushrod 11, first piston 12, top plate 13, One cylinder body 14, second piston 15, the second cylinder body 16, the first push rod 17 and fixed plate 18,1 bottom of the bottom plate left and right sides are welded with Supporting rod 2, two supporting rods, 2 bottom end are equipped with wheel 3, and gear 5 is equipped in the middle part of the leading flank of bottom plate 1, and 5 left side of gear is welded with pendulum Lever 6, the mode that the end of oscillating rod 6 is connected by screw are connected with scraper 7, and scraper 7 is contacted with ground, 1 top right of bottom plate Side is welded with strut 4, and 4 right upper portion of strut is welded with L-type support 9, and 9 right side central of L-type support is welded with handle 10, L-type branch 9 left upper portion of frame is connected with electric pushrod 11 by bolted connection, and 9 top of L-type support is welded with top plate 13, top plate 13 Bottom left is connected with the first cylinder body 14 by bolted connection, 14 built-in full water of the first cylinder body, living in the first cylinder body 14 Dynamic formula is connected with first piston 12, and circular small grooves are provided in first piston 12, and the push rod end interference of electric pushrod 11 is connected to In circular small grooves, 14 bottom left of the first cylinder body is connected with the second cylinder body 16 by bolted connection, the second cylinder body 16 with First cylinder body 14 is movable in the second cylinder body 16 to be connected with second piston 15 through connection, and 15 bottom of second piston is welded with the One push rod 17, the other end of the first push rod 17 pass through 16 bottom of the second cylinder body, and 17 bottom end of the first push rod is welded with fixed plate 18, Gu Rack 8 is welded among 18 bottom of fixed board, rack 8 is engaged with gear 5.
Third cylinder body 19, third piston 20, the second push rod 21, the 4th cylinder body 22, elevating lever 23, the 4th piston are further included 24th, first support 25, the first hose 26, the first check valve 27, the second hose 28, the second check valve 29, heater box 30, heating plate 31st, exhaust fan 32, second support 33, fixing sleeve 34 and nozzle 35,1 top left side of bottom plate are welded with first support 25, first 25 top of frame is connected with the 4th cylinder body 22 by bolted connection, movable in the 4th cylinder body 22 to be connected with the 4th piston 24,22 bottom left of the 4th cylinder body is connected with the first hose 26 by way of flanged joint, and first is equipped in the first hose 26 Check valve 27, the right upper portion of Left-side support bar 2 are welded with fixing sleeve 34, and the other end of the first hose 26 passes through fixing sleeve 34, First hose, 26 bottom end is connected with nozzle 35 by way of flanged joint, and the air outlet of nozzle 35 is located at 7 left side of scraper, bottom plate 1 left side is welded with second support 33, and 33 top of second support is connected with heater box 30, heater box 30 by bolted connection Left side central portion is equipped with exhaust fan 32, and 30 inner top of heater box and bottom are equipped with heating plate 31, the right wall lower part of heater box 30 The second hose 28 is connected with by way of flanged joint, the second check valve 29 is equipped in the second hose 28, the second hose 28 The other end is connect by way of flanged joint with 22 left wall lower part of the 4th cylinder body, and the first cylinder body 14 passes on left bolted Mode is connected with third cylinder body 19, and 19 and first cylinder body 14 of third cylinder body is movable in connection, third cylinder body 19 to be connected with Third piston 20, the left side central portion of third piston 20 are welded with the second push rod 21, and the other end of the second push rod 21 passes through third cylinder 19 left wall of body, the bottom left of the second push rod 21 are welded with elevating lever 23, the other end of elevating lever 23 pass through the 4th cylinder body 22 with 4th piston 24 connects.
Support plate 36 is further included, 1 top right end of bottom plate is welded with support plate 36,36 top of support plate and 9 bottom of L-type support Portion's welded type connection.
The material of elevating lever 23 is Q235 steel.
1 material of bottom plate is stainless steel.
The material of support plate 36 is Q235 steel.
Operation principle:During using this equipment, worker pushes this equipment then to be controlled electronic to the ground for needing frictioning first Push rod 11 extends, and electric pushrod 11 drives first piston 12 to left movement so that second piston 15 under the pressure of water to Lower movement, so as to which the first push rod 17 be driven to move downward, the first push rod 17 is then moved downward by fixed plate 18 with carry-over bar 8, Rack 8 is rotated clockwise with moving gear 5, and gear 5 then drives scraper 7 to move upwards by oscillating rod 6, when the second cylinder body 16 is built-in After full water, control electric pushrod 11 is shunk, and electric pushrod 11 drives first piston 12 to move right, at this time in the second cylinder body 16 Water enters the first cylinder body 14, and then second piston 15 is driven to move upwards, and so as to which the first push rod 17 be driven to move upwards, first pushes away Bar 17 is then moved upwards by fixed plate 18 with carry-over bar 8, and rack 8 rotates counterclockwise with moving gear 5, and gear 5 then passes through swing Bar 6 drives scraper 7 to move downward, and the colloid that scraper 7 solidifies ground at this time strikes off, after second piston 15 resets, control Electric pushrod 11 processed extends again, and so repeatedly, scraper 7 constantly moves up and down, and can strike off the colloid on ground, while worker And this equipment is pushed, after the colloid on ground strikes off, and after state of the electric pushrod 11 in elongation, control electric pushrod 11 stops Only work.
Because third cylinder body 19, third piston 20, the second push rod 21, the 4th cylinder body 22, elevating lever the 23, the 4th are further included Piston 24, the first hose 26, the first check valve 27, the second hose 28, the second check valve 29, heater box 30, adds first support 25 Hot plate 31, exhaust fan 32, second support 33, fixing sleeve 34 and nozzle 35,1 top left side of bottom plate are welded with first support 25, the One stent, 25 top is connected with the 4th cylinder body 22 by bolted connection, movable in the 4th cylinder body 22 to be connected with the 4th work Plug 24,22 bottom left of the 4th cylinder body are connected with the first hose 26 by way of flanged joint, and the is equipped in the first hose 26 One check valve 27, the right upper portion of Left-side support bar 2 are welded with fixing sleeve 34, and the other end of the first hose 26 passes through fixing sleeve 34,26 bottom end of the first hose is connected with nozzle 35 by way of flanged joint, and the air outlet of nozzle 35 is located at 7 left side of scraper, 1 left side of bottom plate is welded with second support 33, and 33 top of second support is connected with heater box 30 by bolted connection, heating 30 left side central portion of case is equipped with exhaust fan 32, and 30 inner top of heater box and bottom are equipped with heating plate 31, the right wall of heater box 30 Lower part is connected with the second hose 28 by way of flanged joint, and the second check valve 29, the second hose are equipped in the second hose 28 28 other end is connect by way of flanged joint with 22 left wall lower part of the 4th cylinder body, and the first cylinder body 14 passes on left bolt company The mode connect is connected with third cylinder body 19,19 and first cylinder body 14 of third cylinder body movable company in connection, third cylinder body 19 It is connected to third piston 20, the left side central portion of third piston 20 is welded with the second push rod 21, and the other end of the second push rod 21 passes through the Three cylinder bodies, 19 left wall, the bottom left of the second push rod 21 are welded with elevating lever 23, and the other end of elevating lever 23 passes through the 4th cylinder body 22 connect with the 4th piston 24;When needing to handle ground, and heating plate 31 is controlled to heat, then exhaust fan 32 is controlled to take out Wind, at this time exhaust fan 32 extraneous air is pumped into heater box 30, under the action of heating plate 31, heating plate 31 can be to heater box 30 air is heated, and is made it into hot wind, when electric pushrod 11 extends, electric pushrod 11 and is passed through first piston 12 and drive Third piston 20 then drives the 4th piston 24 to move downward to left movement, third piston 20 by elevating lever 23, at this time the 4th cylinder Air in body 22 is discharged by the first hose 26, and when electric pushrod 11 is shunk, electric pushrod 11 passes through 12 band of first piston Dynamic third piston 20 moves right, and third piston 20 then drives the 4th piston 24 to move upwards by elevating lever 23, because having the The effect of one check valve 27, air cannot be entered by the first hose 26 in the 4th cylinder body 22, so the hot wind in heater box 30 Entered in the 4th cylinder body 22 by the second hose 28, because there is the second check valve 29, the hot wind in the 4th cylinder body 22 is not It can be refunded in heater box 30 by the second hose 28, when electric pushrod 11 extends again, the hot wind in the 4th cylinder body 22 passes through First hose 26 enters nozzle 35, and nozzle 35 sprays hot wind, under the action of hot wind, first the colloid of solidification can be carried out soft Change, so accelerate the speed of 7 frictioning of scraper.
Because having further included support plate 36,1 top right end of bottom plate is welded with support plate 36,36 top of support plate and L-type branch 9 bottom welded type connection of frame, increases the intensity of L-type support 9 and 4 faying face of strut, makes this service life of equipment longer.
Because the material of elevating lever 23 is Q235 steel, Q235 steel hardness is high, and is unlikely to deform, and makes the service life of this equipment It is longer.
Because 1 material of bottom plate is stainless steel, stainless steel corrosion resistance and acid resistance are strong, make the service life of this equipment more It is long.
Because the material of support plate 36 is Q235 steel, Q235 steel hardness is high, and is unlikely to deform, and makes the service life of this equipment It is longer.
Embodiment described above only expresses the preferred embodiment of the utility model, and description is more specific and detailed, But it should not be interpreted as limiting the scope of the present invention.It should be pointed out that for the common of this field For technical staff, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these are all Belong to the scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (6)

1. a kind of electronic components process station-service frictioning equipment, which is characterized in that include bottom plate (1), supporting rod (2), wheel (3), strut (4), gear (5), oscillating rod (6), scraper (7), rack (8), L-type support (9), handle (10), electric pushrod (11), first piston (12), top plate (13), the first cylinder body (14), second piston (15), the second cylinder body (16), the first push rod (17) and fixed plate (18), bottom plate (1) bottom left and right sides are welded with supporting rod (2), and two supporting rods (2) bottom end is equipped with wheel Sub (3), the leading flank middle part of bottom plate (1) are equipped with gear (5), oscillating rod (6), the end of oscillating rod (6) are welded on the left of gear (5) The mode being connected by screw is held to be connected with scraper (7), scraper (7) is contacted with ground, and bottom plate (1) top right side is welded with strut (4), strut (4) right upper portion is welded with L-type support (9), and L-type support (9) right side central is welded with handle (10), L-type support (9) left upper portion is connected with electric pushrod (11) by bolted connection, and top plate (13) is welded at the top of L-type support (9), Top plate (13) bottom left is connected with the first cylinder body (14) by bolted connection, the first cylinder body (14) built-in full water, and It is movable in one cylinder body (14) to be connected with first piston (12), it is provided with circular small grooves, electric pushrod (11) in first piston (12) The interference of push rod end be connected in circular small grooves, the first cylinder body (14) bottom left is connected with by bolted connection Two cylinder bodies (16), the second cylinder body (16) and the first cylinder body (14) are movable in the second cylinder body (16) to be connected with second through connecting Piston (15), second piston (15) bottom are welded with the first push rod (17), and the other end of the first push rod (17) passes through the second cylinder body (16) bottom, the first push rod (17) bottom end are welded with fixed plate (18), rack (8), tooth are welded among fixed plate (18) bottom Item (8) is engaged with gear (5).
2. a kind of electronic components processing station-service frictioning equipment according to claim 1, which is characterized in that further included third Cylinder body (19), third piston (20), the second push rod (21), the 4th cylinder body (22), elevating lever (23), the 4th piston (24), first Stent (25), the first hose (26), the first check valve (27), the second hose (28), the second check valve (29), heater box (30), Heating plate (31), exhaust fan (32), second support (33), fixing sleeve (34) and nozzle (35), bottom plate (1) top left side are welded with First support (25), first support (25) top are connected with the 4th cylinder body (22), the 4th cylinder body by bolted connection (22) movable in be connected with the 4th piston (24), the 4th cylinder body (22) bottom left is connected with by way of flanged joint One hose (26), the first hose (26) is interior to be equipped with the first check valve (27), and the right upper portion of Left-side support bar (2) is welded with fixation It covers (34), the other end of the first hose (26) passes through fixing sleeve (34), and the first hose (26) bottom end is by way of flanged joint Nozzle (35) is connected with, the air outlet of nozzle (35) is located on the left of scraper (7), and second support (33) is welded on the left of bottom plate (1), Second support (33) top is connected with heater box (30) by bolted connection, and heater box (30) left side central portion is equipped with pumping Wind turbine (32), heater box (30) inner top and bottom are equipped with heating plate (31), and the right wall lower part of heater box (30) passes through flange The mode of connection is connected with the second hose (28), and the second check valve (29) is equipped in the second hose (28), the second hose (28) The other end is connect by way of flanged joint with the 4th cylinder body (22) left wall lower part, and the first cylinder body (14) passes on left bolt company The mode connect is connected with third cylinder body (19), and for third cylinder body (19) with the first cylinder body (14) through connecting, third cylinder body (19) is interior Movable to be connected with third piston (20), the left side central portion of third piston (20) is welded with the second push rod (21), the second push rod (21) the other end passes through third cylinder body (19) left wall, and the bottom left of the second push rod (21) is welded with elevating lever (23), lifts The other end of bar (23) is connect across the 4th cylinder body (22) with the 4th piston (24).
3. a kind of electronic components processing station-service frictioning equipment according to claim 1, which is characterized in that further included support Plate (36), bottom plate (1) top right end are welded with support plate (36), connect at the top of support plate (36) with L-type support (9) bottom welded type It connects.
4. a kind of electronic components processing station-service frictioning equipment according to claim 2, which is characterized in that elevating lever (23) Material is Q235 steel.
A kind of 5. electronic components processing station-service frictioning equipment according to claim 1, which is characterized in that bottom plate (1) material For stainless steel.
6. a kind of electronic components processing station-service frictioning equipment according to claim 3, which is characterized in that support plate (36) Material is Q235 steel.
CN201720356742.7U 2017-04-07 2017-04-07 A kind of electronic components process station-service frictioning equipment Expired - Fee Related CN207477456U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720356742.7U CN207477456U (en) 2017-04-07 2017-04-07 A kind of electronic components process station-service frictioning equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720356742.7U CN207477456U (en) 2017-04-07 2017-04-07 A kind of electronic components process station-service frictioning equipment

Publications (1)

Publication Number Publication Date
CN207477456U true CN207477456U (en) 2018-06-12

Family

ID=62483642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720356742.7U Expired - Fee Related CN207477456U (en) 2017-04-07 2017-04-07 A kind of electronic components process station-service frictioning equipment

Country Status (1)

Country Link
CN (1) CN207477456U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110811431A (en) * 2019-11-15 2020-02-21 邢明明 Multifunctional cleaning equipment
CN110976352A (en) * 2019-12-17 2020-04-10 叶光明 Residual glue removing device after table top connection

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110811431A (en) * 2019-11-15 2020-02-21 邢明明 Multifunctional cleaning equipment
CN110811431B (en) * 2019-11-15 2021-05-11 深圳市思创力石材护理有限公司 Multifunctional cleaning equipment
CN110976352A (en) * 2019-12-17 2020-04-10 叶光明 Residual glue removing device after table top connection
CN110976352B (en) * 2019-12-17 2021-11-02 山东沂南园区开发建设有限公司 Residual glue removing device after table top connection

Similar Documents

Publication Publication Date Title
CN206046351U (en) A kind of Car Spraying-Paint Room fast sweep removes the wind-borne dust device
CN207477456U (en) A kind of electronic components process station-service frictioning equipment
CN205928090U (en) Carving mills lathe towards chip removal system
CN207804175U (en) A kind of glass curtain wall cleaning device
CN105921471B (en) Cigarette automatic double surface gluer cleaning device
CN204974558U (en) Railway freight car bearing degrease cleaning machine
CN207325141U (en) A kind of efficient spraying equipment of Petroleum Pipehead production
CN203319740U (en) Continuous automatic slag-scraping waste paint tank
CN106935162A (en) A kind of outdoor large advertising equipment
CN207943842U (en) Lifting platform truck device for the cleaning of space shuttle empennage
CN207523076U (en) A kind of efficient waste processing compression set
CN110314796A (en) A kind of scaffold semi-finished product entirety appearance spray equipment
CN202894595U (en) Crystal glass laser sand-blasting machine
CN205308658U (en) Coal dress car logo knows automatic sprinkler
CN204123276U (en) A kind of cleaning plant of swage
CN204412725U (en) Railway freight-car intermediate inner cavity cleaning equipment
CN107716183A (en) A kind of spray-painting plant suitable for slush pump manufacture
CN206240820U (en) A kind of communications and transportation lighting device
CN212223739U (en) Environmental engineering dust collector
CN208470133U (en) Large aircraft washing and disinfection car with a variety of cleaning models
CN204148679U (en) A kind of pcb board welding mechanism
CN208608326U (en) A kind of waste lithium cell electrode material regenerating unit
CN206689240U (en) A kind of simple I-beam apparatus for correcting
CN207786190U (en) A kind of water circle device for dust collection equipment
CN205571819U (en) Automatic frock of welding of reel sprinkling machine chassis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180612

Termination date: 20190407

CF01 Termination of patent right due to non-payment of annual fee