CN207469570U - It is a kind of to use building brick made of building waste discarded slurry - Google Patents

It is a kind of to use building brick made of building waste discarded slurry Download PDF

Info

Publication number
CN207469570U
CN207469570U CN201721427257.0U CN201721427257U CN207469570U CN 207469570 U CN207469570 U CN 207469570U CN 201721427257 U CN201721427257 U CN 201721427257U CN 207469570 U CN207469570 U CN 207469570U
Authority
CN
China
Prior art keywords
brick body
groove
brick
hole
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721427257.0U
Other languages
Chinese (zh)
Inventor
周鹏
刘学仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ezhou Polytechnic
Original Assignee
Ezhou Polytechnic
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ezhou Polytechnic filed Critical Ezhou Polytechnic
Priority to CN201721427257.0U priority Critical patent/CN207469570U/en
Application granted granted Critical
Publication of CN207469570U publication Critical patent/CN207469570U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

Building brick made of building waste discarded slurry is used the utility model discloses a kind of, including brick body, the both sides outer wall of brick body offers the first groove equidistantly distributed, the both sides outer wall of brick body, which is outwardly convex, is formed with tapered strip, and tapered strip is between the first adjacent groove, the top outer wall outwardly convex of brick body forms convex body, the top outer wall and bottom outer wall of brick body offer the second groove and third groove, and there are gaps between two grooves and third groove.The design that the utility model passes through the first groove, the second groove and third groove, increase brick body and the contact area of mud, the viscous stickiness of brick body can be increased, the raw material of brick body is discarded slurry, it will not cause to waste, reduce building cost, pass through the design of the first reinforcing rib, the second reinforcing rib and third reinforcing rib, so that the load-bearing capacity of brick body in itself greatly increases, so as to improve the fastness of the wall after building up.

Description

It is a kind of to use building brick made of building waste discarded slurry
Technical field
The utility model is related to made of building brick technical field more particularly to a kind of use building waste discarded slurry Building brick.
Background technology
Artificial small-sized bulk for building, divides fired brick(Refer mainly to clay brick)And no-firing brick(Dinas brickes, flyash brick Deng), brick is commonly called as, clay brick is with clay(Including powders such as shale, gangues)For primary raw material, handle, be molded, do through pug It is dry and roast.China has formulated rectangular and elongated brick, the technology of Qin Han dynasty brickmaking and life in the Spring and Autumn and the Warring States Periods successively Production scale, quality and pattern variety all take shape, and be referred in the world " Qin brick and Han tile ", and a large amount of building can be used in architectural engineering Use brick.But the discarded slurry in building waste cannot be utilized, and cause to waste, and also result in the increase of building cost, separately Outside, existing building brick is simple in structure, and the load-bearing capacity of brick is poor, and the wall fastness after building up is poor.
Utility model content
The purpose of this utility model is to solve shortcoming in the prior art, and is proposed a kind of using building rubbish Building brick made of rubbish discarded slurry.
To achieve these goals, the utility model employs following technical solution:
A kind of to use building brick made of building waste discarded slurry, including brick body, the both sides outer wall of brick body is opened Equipped with the first groove equidistantly distributed, the both sides outer wall of brick body, which is outwardly convex, is formed with tapered strip, and tapered strip position Between the first adjacent groove, the top outer wall outwardly convex of brick body forms convex body, the top outer wall of brick body and Bottom outer wall offers the second groove and third groove, and there are gap, brick bodies between the second groove and third groove Bottom end outer wall be recessed inwardly and be formed with slot, the inside of brick body is filled with stone block, one side both ends point of brick body First hole and second hole are not offered, and the inside of brick body is placed with horizontally disposed bar dowel, and bar dowel is located at Between first hole and second hole, the bosom of brick body is placed with the third reinforcing rib being vertically arranged, and described first The first reinforcing rib for having and being vertically arranged is run through in the inside of square hole, and the inside of the second hole, which is run through, has be vertically arranged second to add Strengthening tendons.
Preferably, the slot internal structure and convex body structure are adapted, and between slot and the second groove, third groove There are gaps.
Preferably, the length of the third reinforcing rib and the thickness of brick body are adapted, and third reinforcing rib and bar dowel it Between there are gap, the quantity of third reinforcing rib is four to eight.
Preferably, the length of the first hole and second hole, width and height respectively correspond to identical, and first The length of square hole and second hole is equal to the width of brick body.
Preferably, the quantity of first reinforcing rib is three to six, and the length of the first reinforcing rib is more than first hole Height.
Preferably, the length of first groove and brick body are of same size.
The beneficial effects of the utility model are:The utility model passes through the first groove, the second groove and third groove Design increases brick body and the contact area of mud, can increase the viscous stickiness of brick body, the raw material of brick body is discarded slurry, will not It causes to waste, reduces building cost, pass through the design of the first reinforcing rib, the second reinforcing rib and third reinforcing rib so that brick body The load-bearing capacity of itself greatly increases, so as to improve the fastness of the wall after building up.
Description of the drawings
Fig. 1 be the utility model proposes a kind of structural representation using building brick made of building waste discarded slurry Figure;
Fig. 2 be the utility model proposes a kind of partial structurtes using building brick made of building waste discarded slurry Schematic diagram.
In figure:1 first groove, 2 tapered items, 4 stone blocks, 5 convex bodys, 6 first reinforcing ribs, 7 first holes, 8 second grooves, 9 brick bodies, 10 second holes, 11 second reinforcing ribs, 12 third grooves, 13 third reinforcing ribs, 14 bar dowels, 15 slots.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.
It is a kind of using building brick made of building waste discarded slurry with reference to Fig. 1-2, including brick body 9, the two of brick body 9 Side outer wall offers the first groove 1 equidistantly distributed, and the both sides outer wall of brick body 9, which is outwardly convex, is formed with tapered strip 2, and bores For shape item 2 between the first adjacent groove 1, the top outer wall outwardly convex of brick body 9 forms convex body 5, the top outer wall of brick body 9 Offer the second groove 8 and third groove 12 with bottom outer wall, and there are gap between the second groove 8 and third groove 12, The bottom end outer wall of brick body 9, which is recessed inwardly, is formed with slot 15, and the inside of brick body 9 is filled with stone block 4, one side both ends of brick body 9 First hole 7 and second hole 10 are offered respectively, and the inside of brick body 9 is placed with horizontally disposed bar dowel 14, and bar dowel 14 between first hole 7 and second hole 10, and the bosom of brick body 9 is placed with the third reinforcing rib 13 being vertically arranged, The inside of first hole 7, which is run through, the first reinforcing rib 6 for being vertically arranged, and for having and being vertically arranged is run through in the inside of second hole 10 Two reinforcing ribs 11.
In the utility model, 15 internal structure of slot and 5 structure of convex body are adapted, and 15 and second groove 8 of slot, third There are gap, the length of third reinforcing rib 13 and the thickness of brick body 9 between groove 12 to be adapted, and third reinforcing rib 13 and short There are gaps between reinforcing bar 14, and the quantity of third reinforcing rib 13 is four to eight, the length of first hole 7 and second hole 10, Width and height respectively correspond to it is identical, and the length of first hole 7 and second hole 10 equal to brick body 9 width, first The quantity of reinforcing rib 6 is three to six, and the length of the first reinforcing rib 6 is more than the height of first hole 7, the length of the first groove 1 Degree and brick body 9 are of same size.
Operation principle:By the design of the first groove 1, the second groove 8 and third groove 12, increase brick body 9 and mud Contact area, the viscous stickiness of brick body 9 can be increased, the raw material of brick body is discarded slurry, will not cause to waste, reduction is built into This, passes through the design of the first reinforcing rib 6, the second reinforcing rib 11 and third reinforcing rib 13 so that the load-bearing capacity of of brick body 9 itself It greatly increases.
The preferable specific embodiment of the above, only the utility model, but the scope of protection of the utility model is not This is confined to, in the technical scope that any one skilled in the art discloses in the utility model, according to this practicality Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. it is a kind of using building brick made of building waste discarded slurry, including brick body(9), which is characterized in that brick body (9)Both sides outer wall offer the first groove equidistantly distributed(1), brick body(9)Both sides outer wall be outwardly convex shape Into there is tapered strip(2), and tapered strip(2)Positioned at the first adjacent groove(1)Between, brick body(9)Top outer wall it is outside Convex to form convex body(5), brick body(9)Top outer wall and bottom outer wall offer the second groove(8)With third groove (12), and the second groove(8)With third groove(12)Between there are gap, brick bodies(9)Bottom end outer wall be recessed inwardly shape Into there is slot(15), brick body(9)Inside be filled with stone block(4), brick body(9)One side both ends offer respectively First hole(7)And second hole(10), brick body(9)Inside be placed with horizontally disposed bar dowel(14), and short steel Muscle(14)Positioned at first hole(7)And second hole(10)Between, brick body(9)Bosom be placed with what is be vertically arranged Third reinforcing rib(13), the first hole(7)Inside run through and have the first reinforcing rib for being vertically arranged(6), the second party Hole(10)Inside run through and have the second reinforcing rib for being vertically arranged(11).
2. building brick made of a kind of use building waste discarded slurry according to claim 1, which is characterized in that institute State slot(15)Internal structure and convex body(5)Structure is adapted, and slot(15)With the second groove(8), third groove(12)It Between there are gaps.
3. building brick made of a kind of use building waste discarded slurry according to claim 1, which is characterized in that institute State third reinforcing rib(13)Length and brick body(9)Thickness be adapted, and third reinforcing rib(13)And bar dowel(14)Between There are gap, third reinforcing ribs(13)Quantity be four to eight.
4. building brick made of a kind of use building waste discarded slurry according to claim 1, which is characterized in that institute State first hole(7)And second hole(10)Length, width and height respectively correspond to identical, and first hole(7)With Second hole(10)Length be equal to brick body(9)Width.
5. building brick made of a kind of use building waste discarded slurry according to claim 1, which is characterized in that institute State the first reinforcing rib(6)Quantity for three to six, and the first reinforcing rib(6)Length be more than first hole(7)Height.
6. building brick made of a kind of use building waste discarded slurry according to claim 1, which is characterized in that institute State the first groove(1)Length and brick body(9)It is of same size.
CN201721427257.0U 2017-10-31 2017-10-31 It is a kind of to use building brick made of building waste discarded slurry Expired - Fee Related CN207469570U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721427257.0U CN207469570U (en) 2017-10-31 2017-10-31 It is a kind of to use building brick made of building waste discarded slurry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721427257.0U CN207469570U (en) 2017-10-31 2017-10-31 It is a kind of to use building brick made of building waste discarded slurry

Publications (1)

Publication Number Publication Date
CN207469570U true CN207469570U (en) 2018-06-08

Family

ID=62265915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721427257.0U Expired - Fee Related CN207469570U (en) 2017-10-31 2017-10-31 It is a kind of to use building brick made of building waste discarded slurry

Country Status (1)

Country Link
CN (1) CN207469570U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057134A (en) * 2018-10-06 2018-12-21 曹昌仪 A kind of hollow brick of bamboo emptying aperture
CN111004012A (en) * 2019-11-28 2020-04-14 上海智平基础工程有限公司 Sintering method brick making process for building waste slurry
CN112794679A (en) * 2021-04-15 2021-05-14 中山市星宙环保技术有限公司 Novel brick manufactured by using waste liquid cement paste and preparation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057134A (en) * 2018-10-06 2018-12-21 曹昌仪 A kind of hollow brick of bamboo emptying aperture
CN111004012A (en) * 2019-11-28 2020-04-14 上海智平基础工程有限公司 Sintering method brick making process for building waste slurry
CN112794679A (en) * 2021-04-15 2021-05-14 中山市星宙环保技术有限公司 Novel brick manufactured by using waste liquid cement paste and preparation method thereof

Similar Documents

Publication Publication Date Title
CN207469570U (en) It is a kind of to use building brick made of building waste discarded slurry
CN107859340A (en) A kind of construction site ceramic tile conveying arrangement
CN107902209A (en) A kind of ceramic tile anticollision tote box
CN204919955U (en) Embedded building block of slotting reaches damping infilled wall that contains this building block
CN202390999U (en) Regeneration building waste concrete heat preservation porous brick
CN206319476U (en) A kind of novel hollow building block
CN203174854U (en) Load-bearing shock-resistant waterproof impervious anti-freezing crack-resistant cross-bore sound-proof self-heat-insulating air brick
CN105178498A (en) Groove built-in building block and damp filling wall containing building blocks
CN201972300U (en) Self-heat-insulation composite building block
CN103015615B (en) Hollow environmentally-friendly cut block
CN201865232U (en) Concave-convex type hollow bifunctional building block
CN203129403U (en) Self-clamping type building-free concrete building block
CN209509356U (en) A kind of UHPC dalle with incubation and thermal insulation function
CN201762867U (en) Concrete energy-saving hollow brick
CN207211485U (en) A kind of porous high-strength light sintered hollow block
CN207525972U (en) A kind of novel lightweight presser for hollow sand-lime
CN208009740U (en) A kind of high sound insulation aerated bricks of high temperature resistant
CN206256605U (en) One kind sintering resistance to compression insulation blocks
CN204059729U (en) A kind of sintering self-insulating brick with wire casing
CN203145288U (en) Hollow environment-friendly cutting block
CN207048166U (en) A kind of new compact-type building block brick
CN208501415U (en) A kind of cracking resistance Dinas brickes
CN103015564B (en) Building wall body with high-strength sand pulp and self-insulation building blocks
CN203113610U (en) Heat insulating cement brick
CN202954475U (en) Interlocked hollow block

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180608

Termination date: 20181031

CF01 Termination of patent right due to non-payment of annual fee