CN207469078U - A kind of pavement expansion gap device of temporary construction suspension bridge - Google Patents

A kind of pavement expansion gap device of temporary construction suspension bridge Download PDF

Info

Publication number
CN207469078U
CN207469078U CN201721533182.4U CN201721533182U CN207469078U CN 207469078 U CN207469078 U CN 207469078U CN 201721533182 U CN201721533182 U CN 201721533182U CN 207469078 U CN207469078 U CN 207469078U
Authority
CN
China
Prior art keywords
expansion joint
pavement
aluminium sheet
suspension bridge
expansion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721533182.4U
Other languages
Chinese (zh)
Inventor
王澍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721533182.4U priority Critical patent/CN207469078U/en
Application granted granted Critical
Publication of CN207469078U publication Critical patent/CN207469078U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of pavement expansion gap devices of temporary construction suspension bridge, pavement is followed successively by prefabricated side walk slab, cement sand bed and colorful surface layer from top to bottom, expansion joint is provided among pavement, expansion joint interior bottom portion is provided with aluminium sheet, aluminium sheet extends to expansion joint opposite side from expansion joint side, the both ends of aluminium sheet are fixed by screws in build-in in the pre-buried wooden unit in prefabricated side walk slab respectively, it is filled in aluminium sheet in expansion joint with pitch loose hemp fiber, pitch loose hemp fiber top is blocked with galvanized iron sheet, then blocks expansion joint with mortar;The utility model is simple in structure, and filler is not easily to fall off, sound construction, while structure Free Transform is met, it can prevent rainwater and rubbish soil from penetrating into and stopping up, be easily installed, overhaul, conserve, remove sundries, cost is relatively low simultaneously, meets the use demand of temporary structure.

Description

A kind of pavement expansion gap device of temporary construction suspension bridge
Technical field
The utility model is related to building engineering field, the pavement expansion joint dress of more particularly to a kind of temporary construction suspension bridge It puts.
Background technology
With the continuous development of urbanization progress, city incity space is less and less, and urbanization process then loses and slows down, In particular with being on the increase for various skyscrapers and underground rail engineering, need to be constructed accordingly in the underground space It builds, but is limited by the limitation of surrounding ambient, road equipment various aspects, it has to set up corresponding temporary construction suspension bridge To meet the life requirement of resident and garage's various aspects.To ensure suspension bridge structure in temperature Change, live loading, concrete shrinkage With creep etc. under the influence of can Free Transform, then need to set corresponding expansion joint on the pavement of suspension bridge and driveway.Traditional The problems such as pavement deformation joint easily comes off there are filler, structure cracky.
Utility model content
The purpose of the utility model is to overcome the defects of the prior art, provide a kind of pavement of temporary construction suspension bridge to stretch Contracting seam device, what the technical solution of the pavement expansion gap device of the temporary construction suspension bridge was realized in:
A kind of pavement expansion gap device of temporary construction suspension bridge, pavement be followed successively by from top to bottom prefabricated side walk slab, Cement sand bed and colorful surface layer are provided with expansion joint among the pavement, and the expansion joint interior bottom portion is provided with aluminium sheet, The aluminium sheet extends to expansion joint opposite side from expansion joint side, the both ends of the aluminium sheet be fixed by screws in respectively build-in in It in pre-buried wooden unit in prefabricated side walk slab, is filled in the aluminium sheet in the expansion joint with pitch loose hemp fiber, on the pitch loose hemp fiber Portion is blocked with zinc-iron skin, then blocks expansion joint with mortar.
Further, the pre-buried wooden unit is disposed on expansion joint both sides.
Further, the cement sand bed uses M10 cement mortar.
Further, institute's expansion joint width is 8~10m.
The pavement expansion gap device of the utility model is simple in structure, and filler is not easily to fall off, sound construction, is tied meeting While structure Free Transform, it can prevent rainwater and rubbish soil from penetrating into and stopping up, be easily installed, overhaul, conserve, remove sundries, Cost is relatively low simultaneously, meets the use demand of temporary structure.
Description of the drawings
Fig. 1 is the utility model expansion gap device overall structure diagram.
Reference numeral:The prefabricated side walk slabs of 1-, 2- cement sand beds, 3- colorful surface layers, 4- expansion joints, 5- aluminium sheets, 6- are pre- Wooden unit processed, 7- pegs, 8- mortars, 9- zinc-iron skins, 10- pitch loose hemp fibers.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments.
As shown in Figure 1, a kind of pavement expansion gap device of temporary construction suspension bridge, pavement is followed successively by prefabricated from top to bottom Side walk slab 1, cement sand bed 2 and colorful surface layer 3, are provided with expansion joint 4 among the pavement, inside the expansion joint 4 Bottom is provided with aluminium sheet 5, and the aluminium sheet 5 extends to 4 opposite side of expansion joint, the both ends difference of the aluminium sheet 5 from 4 side of expansion joint Build-in is fixed in the pre-buried wooden unit 6 in prefabricated side walk slab 1 by screw 5, the interior drip of aluminium sheet 5 in the expansion joint 4 10 filling of piemarker wadding, the 10 top zinc-iron skin 9 of pitch loose hemp fiber blocks, then blocks expansion joint 4 with mortar 8.
When it is implemented, the pre-buried wooden unit 6 is disposed on 4 both sides of expansion joint.
When it is implemented, the cement sand bed 2 uses M10 cement mortar.
When it is implemented, 4 width of institute expansion joint is 8~10m.
The technology contents and technical characteristic of the utility model have revealed that as above those skilled in the art still may base The replacement and modification without departing substantially from the utility model in essence are made in the teaching of the utility model, therefore, the utility model protection Range is not limited to the revealed content of embodiment, also including various replacements and modification without departing substantially from the utility model in essence.

Claims (4)

1. a kind of pavement expansion gap device of temporary construction suspension bridge, it is characterised in that:Pavement is followed successively by prefabricated from top to bottom Side walk slab, cement sand bed and colorful surface layer are provided with expansion joint among the pavement, and the expansion joint interior bottom portion is set Aluminium sheet is equipped with, the aluminium sheet extends to expansion joint opposite side from expansion joint side, and the both ends of the aluminium sheet are consolidated respectively by screw Build-in is scheduled in the pre-buried wooden unit in prefabricated side walk slab, is filled in the aluminium sheet in the expansion joint with pitch loose hemp fiber, it is described Pitch loose hemp fiber top is blocked with zinc-iron skin, then blocks expansion joint with mortar.
2. the pavement expansion gap device of temporary construction suspension bridge according to claim 1, it is characterised in that:The pre-buried wood Block gap is arranged on expansion joint both sides.
3. the pavement expansion gap device of temporary construction suspension bridge according to claim 1, it is characterised in that:The cement bonded sand Pulp layer uses M10 cement mortar.
4. the pavement expansion gap device of temporary construction suspension bridge according to claim 1, it is characterised in that:The flexible slit width of institute It spends for 8~10m.
CN201721533182.4U 2017-11-16 2017-11-16 A kind of pavement expansion gap device of temporary construction suspension bridge Expired - Fee Related CN207469078U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721533182.4U CN207469078U (en) 2017-11-16 2017-11-16 A kind of pavement expansion gap device of temporary construction suspension bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721533182.4U CN207469078U (en) 2017-11-16 2017-11-16 A kind of pavement expansion gap device of temporary construction suspension bridge

Publications (1)

Publication Number Publication Date
CN207469078U true CN207469078U (en) 2018-06-08

Family

ID=62260894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721533182.4U Expired - Fee Related CN207469078U (en) 2017-11-16 2017-11-16 A kind of pavement expansion gap device of temporary construction suspension bridge

Country Status (1)

Country Link
CN (1) CN207469078U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110388023A (en) * 2019-08-15 2019-10-29 四川天宜石油化工工程有限公司 Antiseepage terrace expansion joint joint filling structure, expansion joint structure and expansion joint construction technology
CN113846552A (en) * 2021-09-30 2021-12-28 福建第一公路工程集团有限公司 Construction method for temporary passage of bridge expansion joint

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110388023A (en) * 2019-08-15 2019-10-29 四川天宜石油化工工程有限公司 Antiseepage terrace expansion joint joint filling structure, expansion joint structure and expansion joint construction technology
CN113846552A (en) * 2021-09-30 2021-12-28 福建第一公路工程集团有限公司 Construction method for temporary passage of bridge expansion joint

Similar Documents

Publication Publication Date Title
CN106677440A (en) Roofing parapet water-floating structure and construction method thereof
CN106801517A (en) A kind of schoolhouse surface consolidation of Prefabricated porous plate brick mixed structure strengthens method
CN207469078U (en) A kind of pavement expansion gap device of temporary construction suspension bridge
CN111877596B (en) Miscellaneous-masonry antique wall structure and construction method thereof
CN106988440A (en) A kind of waterproof construction and its construction method at subway station main body and accessory interface
CN103343503B (en) Bridge-type prefabricated reinforced concrete trough slab wear resistant road surface structural system and construction method
CN205077753U (en) Waterproof construction at roofing expansion joint
CN102367735B (en) Back-to-back waterstop installation equipment for tunnel construction joint
CN207144012U (en) A kind of post-cast strip prefabricated board barricade
CN206616711U (en) A kind of waterproof construction at subway station main body and accessory interface
CN103669746B (en) The construction method of inverted roof heat-insulation system
CN204238264U (en) A kind of sole plate post-poured strip structure
CN101469559B (en) Composite heat insulating walling and mounting method thereof
CN104389360A (en) Externally suspended insulation board type reinforcement brickwork shear wall system and construction method thereof
CN101761187A (en) Construction separating device for concrete of vertical structure in same wall body with different labels as well as pouring and tamping method thereof
CN105369991B (en) A kind of construction method of zero stress seam self-adapting type roofing preset slot waterproof system wide
CN204311432U (en) Draining waterproofing protection assembly
CN207672616U (en) A kind of outdoor cable penetration pipe is passed by one's way laying structure
CN206205166U (en) It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure
CN201850565U (en) Deformation joint structure
CN205024733U (en) Fixing device of leading waterstop
CN204039864U (en) Concrete structure above a kind of gap be applied in bridge or road
CN209011307U (en) A kind of wall is equipped with the node structure of deformation joint with floorboard junction
CN203429528U (en) Bridge-type precast-reinforced-concrete-trough-plate wear-resistant pavement structure system
CN207646979U (en) A kind of composite floor structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180608

Termination date: 20181116

CF01 Termination of patent right due to non-payment of annual fee