CN207469033U - Ecological footpath - Google Patents
Ecological footpath Download PDFInfo
- Publication number
- CN207469033U CN207469033U CN201721570394.XU CN201721570394U CN207469033U CN 207469033 U CN207469033 U CN 207469033U CN 201721570394 U CN201721570394 U CN 201721570394U CN 207469033 U CN207469033 U CN 207469033U
- Authority
- CN
- China
- Prior art keywords
- pedestal
- cushion socket
- protrusion
- cavity
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model is related to a kind of ecological footpaths, belong to urban landscaping technical field, including being arranged on wooden pavement parallel with meadow surface above meadow, wooden pavement is supported and fixed on by several support columns on meadow, support column includes the pedestal being arranged on meadow, the cavity of top end opening is provided in pedestal, cushion socket is provided between pedestal and wooden pavement, cushion socket is fixedly linked with wooden pavement, the one end of cushion socket far from wooden pavement is extended with protrusion, protrusion and cavity grafting, it is slidably connected between protrusion and cavity, support protrusion is provided in cavity, and so as to make between protrusion and the bottom end of cavity, there are the elastic parts for the mobile surplus of protrusion, elastic parts is fixedly connected on pedestal, it is bolted and is connected between cushion socket and pedestal.During with can slow down on ground or ecological footpath compared with strong motion, shaking force that ecological footpath is subject to, so as to reduce the probability of ecological footpath damage.
Description
Technical field
The utility model is related to urban landscaping technical field, more particularly to a kind of ecological footpath.
Background technology
Afforestation is to provide a good rest for people, entertainment, Our Nature, meet people's recurrence certainly
The place of right hope is the important measures of urban life environment of preserving the ecological environment, improve, due to the continuous development in city, city
The Urban Landscape Construction in city is also constantly improving.
In garden landscape, ecological footpath is widely applied in ecological garden, Ecological Park, and ecological footpath is mostly wooden takes
It connects or blue bricks is laid with, unique style and reform of nature environment make walking feel oneself when people above is in ornamental landscape
It has incorporated in the Nature.
Wooden ecological footpath is mostly to be supported by pile, so as to which there are spacing, to reach, can use up can between ground
The ground structure in destruction gardens that can be few.But when having on the shake of ground spot or pavement compared with strong motion, due to wooden
Ecological footpath between be all by rigid connection, when shaking force is larger, be easy to cause in wooden ecological footpath structure
Damage, make the surface plank or pile fracture damage on ecological footpath.
Utility model content
The purpose of this utility model is to provide a kind of ecological footpaths, and having can slow down on ground or ecological footpath
During compared with strong motion, shaking force that ecological footpath is subject to, so as to reduce the probability of ecological footpath damage.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of ecological footpath, including being arranged on wooden pavement parallel with meadow surface above meadow, wooden pavement passes through
Several support columns are supported and fixed on meadow, and support column includes the pedestal being arranged on meadow, and top end opening is provided in pedestal
Cavity, cushion socket is provided between pedestal and wooden pavement, cushion socket is fixedly linked with wooden pavement, and cushion socket is far from wooden
One end of pavement is extended with protrusion, protrusion and cavity grafting, is slidably connected between protrusion and cavity, and it is convex that support is provided in cavity
Play that there are the elastic parts for the mobile surplus of protrusion, elastic parts to be fixedly connected on so as to make between protrusion and the bottom end of cavity
It is bolted and is connected on pedestal, between cushion socket and pedestal.
By using above-mentioned technical proposal, the shaking force that wooden pavement receives is buffered by elastic parts, so as to reduce
Wooden pavement damages caused by vibrations, increases the service life of wooden pavement.
The utility model is further arranged to:Protrusion is trapezoidal, and the larger one end of convex cross section is located at close to cushion socket
One end, the shape of the shape of cavity and protrusion matches.
By using above-mentioned technical proposal, by trapezoidal protrusion and cavity with matching, so as to increase pedestal
To the endurance of cushion socket, the forced area between cushion socket and pedestal is increased, strengthens the intensity of the endurance of pedestal.
The utility model is further arranged to:Cavity with respect to offering opposite sliding slot on the both sides side wall of convex slope,
Sliding slot is horizontally disposed with, and elastic parts is fixed in sliding slot, and elastic parts includes the wedge block being slidably connected in sliding slot, wedge block
Inclined-plane towards protrusion direction, be connected between wedge block and sliding slot by elastic component, elastic component is consolidated respectively with sliding slot and wedge block
It is fixed to be connected.
By using above-mentioned technical proposal, by the cooperation between protrusion and wedge block, thus by raised support, work as vibrations
When power is larger, protrusion pushes wedge block to be moved in sliding slot, by elastic component to the elastic force of wedge block, so as to slow down cushion socket to
The power of pedestal direction movement, reduce shaking force that wooden pavement is subject to it is excessive caused by damage.
The utility model is further arranged to:Flexible rubber pad is set between cushion socket and pedestal.
By using above-mentioned technical proposal, by setting the rubber pad of elasticity between cushion socket and pedestal, further increase
Add damping effect, while prevent between cushion socket and pedestal that there are spacing, rainwater is made to be flowed into pedestal by spacing, causes water
Accumulation, the service life of pedestal is caused to shorten.
The utility model is further arranged to:Wooden pile is provided between cushion socket and wooden pavement, cushion socket is close
One end of wooden pavement is provided with the mounting groove being inserted into for pile, grafting and is bolted between pile and mounting groove.
By using above-mentioned technical proposal, wooden pavement is propped up by wooden pile, increases U.S. of wooden pavement
The property seen, makes it more fit in landscape.
The utility model is further arranged to:Pile is provided with the connector for being inserted into mounting groove close to one end of cushion socket,
The cross section of connector is less than the cross section of pile, and the cross section of the pile is more than the cross section of mounting groove shape.
By using above-mentioned technical proposal, the cross section of pile is more than the cross section of mounting groove shape, so as to when rainwater day
During gas, when rainwater is flowed down along pile, rainwater will not be entered through the gap between pile and mounting groove in mounting groove, to pile
It is impregnated, so as to be impacted to the life of pile.
The utility model is further arranged to:Pile offers the siding insertion for mounting groove close to one end end face of connector
Slot.
By using above-mentioned technical proposal, the side wall of mounting groove is inserted by slot, further prevents rainwater through pile
Gap between mounting groove is entered in mounting groove, and pile is impregnated, so as to be impacted to the life of pile.
The utility model is further arranged to:Cushion socket is made of steel or concreting forms.
By using above-mentioned technical proposal, the cushion socket formed by steel or concreting increases cushion socket
Service life.
The utility model is further arranged to:Pedestal is formed by concreting.
By using above-mentioned technical proposal, pedestal has concreting to form, and since pedestal contacts for a long time with meadow, mixes
Pedestal made of solidifying soil will not be because of the moist corrosion on meadow, so that it is guaranteed that the service life of pedestal.
Comprehensive described, the utility model has the advantages that:
1st, the shaking force that wooden pavement receives is buffered by elastic parts, so as to reduce wooden pavement caused by vibrations
Damage increases the service life of wooden pavement;
2nd, the slot that the cross section of pile is more than the cross section of mounting groove shape and setting mounting groove is inserted into, so as to work as rain
During water weather, when rainwater is flowed down along pile, rainwater will not be entered through the gap between pile and mounting groove in mounting groove, right
Pile is impregnated, so as to be impacted to the life of pile.
Description of the drawings
Fig. 1 is the structure diagram of ecological footpath;
Fig. 2 is the sectional view of ecological footpath;
Fig. 3 is the partial enlarged view at A positions in Fig. 2;
Fig. 4 is the configuration schematic diagram at the support column position of ecological footpath;
Fig. 5 is the structure diagram of pile.
In figure, 1, meadow;2nd, wooden pavement;21st, pile;211st, connector;212nd, slot;3rd, guardrail;4th, cushion socket;41、
Protrusion;42nd, mounting groove;5th, pedestal;51st, cavity;52nd, sliding slot;6th, wedge block;7th, elastic component;8th, rubber pad.
Specific embodiment
The present invention is described in further detail below in conjunction with attached drawing.
A kind of ecological footpath, as shown in Figure 1, the wooden pavement 2 including being arranged on the top of meadow 1, if wooden pavement 2 by
The support of Heavenly Stems and Earthly Branches dagger is set so as to the parallel surface with meadow 1.The both ends of support column are fixed respectively with wooden pavement 2 and meadow 1
It is connected.In the both sides of the upper surface length direction of wooden pavement 2, wooden guardrail 3 is provided with, between guardrail 3 and wooden pavement 2
It can be fixedly connected by modes such as joggle, rivet or bolts.
As shown in Figure 2 and Figure 3, support column includes the pedestal 5 being arranged on meadow 1 cast of concrete and positioned at pedestal 5
With the cushion socket 4 between wooden pavement 2.Cushion socket 4 is plugged on the inside of pedestal 5 and passes through bolt and nut and is fixedly linked.In wood
The lower face of pavement 2 processed is extended with wooden pile 21, grafting and is bolted between 21 one end of pile and cushion socket 4,
The other end is fixedly linked with wooden pavement 2.Between cushion socket 4 and pedestal 5, flexible rubber pad 8 is set, passes through rubber pad
8 can prevent rigid contact between cushion socket 4 and pedestal 5.
As shown in Figure 3, Figure 4, in one end of the close pedestal of cushion socket 4, trapezoidal protrusion 41, protrusion and damping are provided with
Seat 4 is wholely set.In cushion socket 4 close to one end of wooden pavement 2, it is provided with the mounting groove that upper opening is surrounded by four pieces of sidings
42, mounting groove 42 is fixedly linked or is wholely set with cushion socket 4.Wherein can be made of steel can also be by mixing for cushion socket 4
Solidifying soil pours.
In pedestal 5 close to one end of cushion socket 4, the cavity 51 of top end opening is internally provided with, the shape of cavity 51 is with subtracting
41 shape of protrusion of shake seat 4 matches, and the volume of protrusion 41 compares the small volume with cavity 51, when protrusion 41 is inserted into cavity
When in 51, so as to which protrusion 41 be made to be vertically moved in cavity 51, it is reserved between protrusion 41 and the bottom end of cavity 51 for protrusion
The surplus of 41 movements.
On the opposite side wall with raised 41 both sides inclined-planes of pedestal 5, opposite horizontally disposed sliding slot 52, sliding slot are offered
Wedge block 6, the inclined-plane of the inclined surface direction protrusion 41 of wedge block 6 and the slopes which match with raised 41 are slidably connected in 52.
In the one end of wedge block 6 far from protrusion 41, elastic component 7 is provided with, 7 one end of elastic component is fixed on wedge block 6, and the other end is fixed
In the one end of sliding slot 52 far from protrusion.
Under peacetime state, wedge block 6 is pushed to support cushion socket 4 by elastic component 7, make protrusion 41 and cavity 51 bottom end it
Between there are mobile surpluses.When shaking larger, cushion socket 4 is moved to 5 direction of pedestal, so as to which protrusion be made to push wedge block, makes wedge
The inside movement of shape block phase sliding slot, the power moved by the elastic force of elastic component come the direction of bumper and absorbing shock seat phase pedestal 5.
As shown in Fig. 3, Fig. 5, the one end of pile 21 far from wooden pavement 2 is provided with the connector to match with mounting groove 42
211, the cross section of connector 211 is less than the cross-sectional area of pile 21, and the cross section of pile 21 is more than the transversal of 42 shape of mounting groove
Face.In pile 21 close to one end of connector 211, the siding that end face is offered for mounting groove 42 is inserted into the slot in pile 21
212. when connector is inserted into mounting groove 42, since the cross section of pile 21 is more than the cross section of 42 shape of mounting groove, pile
Ladder platform is formed between 21 and mounting groove 42.When encountering rainwater weather, mounting groove 42 is may not flow into through the stream on pile 21
It is interior.
This specific embodiment is only explanation to the utility model, is not the limitation to the utility model, ability
Field technique personnel can as needed make the present embodiment the modification of no creative contribution after this specification is read, but
As long as it is all protected in the right of the utility model by Patent Law.
Claims (9)
1. a kind of ecological footpath, including being arranged on wooden pavement (2) parallel with meadow (1) surface above meadow (1), the wood
Pavement (2) processed is supported and fixed on by several support columns on meadow (1), it is characterised in that:The support column includes being arranged on grass
Pedestal (5) on ground (1), the interior cavity (51) for being provided with top end opening of the pedestal (5), the pedestal (5) and wooden pavement
(2) cushion socket (4) is provided between, the cushion socket (4) is fixedly linked with wooden pavement (2), and the cushion socket (4) is far from wood
One end of pavement (2) processed is extended with raised (41), the protrusion (41) and cavity (51) grafting, the protrusion (41) and cavity
(51) it is slidably connected between, is provided with support protrusion (41) in the cavity (51) so as to make raised (41) and the bottom of cavity (51)
There are the elastic parts for raised (41) mobile surplus between end, the elastic parts is fixedly connected on pedestal (5), described
It is bolted and is connected between cushion socket (4) and pedestal (5).
2. ecological footpath according to claim 1, it is characterised in that:The protrusion (41) is trapezoidal, the protrusion (41)
The larger one end in cross section is located at close to one end of cushion socket (4), the shape of the cavity (51) and the shape phase of raised (41)
Matching.
3. ecological footpath according to claim 2, it is characterised in that:Relatively raised (41) inclined-plane of the cavity (51)
Opposite sliding slot (52) is offered on the side wall of both sides, the sliding slot (52) is horizontally disposed, and the elastic parts is fixed on sliding slot
(52) in, the elastic parts includes the wedge block (6) being slidably connected in sliding slot (52), the inclined-plane court of the wedge block (6)
To raised (41) direction, it is connected between the wedge block (6) and sliding slot (52) by elastic component (7), the elastic component (7) is respectively
It is fixedly linked with sliding slot (52) and wedge block (6).
4. ecological footpath according to claim 1, it is characterised in that:It is provided between the cushion socket (4) and pedestal (5)
The rubber pad (8) of elasticity.
5. ecological footpath according to claim 1, it is characterised in that:It is set between the cushion socket (4) and wooden pavement (2)
Wooden pile (21) is equipped with, the cushion socket (4) is provided with the installation being inserted into for pile (21) close to one end of wooden pavement (2)
Slot (42) grafting and is bolted between the pile (21) and mounting groove (42).
6. ecological footpath according to claim 5, it is characterised in that:The pile (21) is close to one end of cushion socket (4)
The connector (211) for being inserted into mounting groove (42) is provided with, the cross section of the connector (211) is less than the cross section of pile (21),
The cross section of the pile (21) is more than the cross section of mounting groove (42) shape.
7. ecological footpath according to claim 6, it is characterised in that:The pile (21) is close to one end of connector (211)
End face offers the slot (212) of the siding insertion for mounting groove (42).
8. ecological footpath according to claim 1, it is characterised in that:The cushion socket (4) is made of steel or coagulation
Soil pours.
9. ecological footpath according to claim 1, it is characterised in that:The pedestal (5) is formed by concreting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721570394.XU CN207469033U (en) | 2017-11-21 | 2017-11-21 | Ecological footpath |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721570394.XU CN207469033U (en) | 2017-11-21 | 2017-11-21 | Ecological footpath |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207469033U true CN207469033U (en) | 2018-06-08 |
Family
ID=62262093
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721570394.XU Expired - Fee Related CN207469033U (en) | 2017-11-21 | 2017-11-21 | Ecological footpath |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207469033U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797269A (en) * | 2018-06-27 | 2018-11-13 | 合肥草木皆兵环境科技有限公司 | A kind of pavement for preventing from destroying lawn |
CN111894127A (en) * | 2020-08-22 | 2020-11-06 | 吉林建筑大学 | Energy-conserving house of assembled timber structure |
-
2017
- 2017-11-21 CN CN201721570394.XU patent/CN207469033U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797269A (en) * | 2018-06-27 | 2018-11-13 | 合肥草木皆兵环境科技有限公司 | A kind of pavement for preventing from destroying lawn |
CN111894127A (en) * | 2020-08-22 | 2020-11-06 | 吉林建筑大学 | Energy-conserving house of assembled timber structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2549645C2 (en) | Synthetic floor tiles, having partially pliable support structure | |
CN207469033U (en) | Ecological footpath | |
KR101176188B1 (en) | Deck road structures | |
HUT74233A (en) | Structure of a walking surface for horses, in particular for a riding area and a method of producing the same | |
WO1989000625A1 (en) | Frame for laying wooden bricks | |
KR100621678B1 (en) | Method for installing drainage block | |
CN208594451U (en) | A kind of assembly type highway subgrade slope anti-skid device | |
CN104594604B (en) | The compound elastic rubber floor tile of mosaic bonding and laying, the method for replacing | |
KR100535743B1 (en) | Assembly retaining supporter for plant tree | |
CN212801197U (en) | Bridge damping expansion joint with corrugated plates | |
CN215289577U (en) | Supporting structure | |
KR20110051712A (en) | Walking plate assembley for afforestation of artificial ground and construction method using the same | |
CN207878518U (en) | A kind of anti-settling well lid | |
CN114561963B (en) | High-stability road roadbed slope protection structure | |
WO2007096682A3 (en) | Roadway construction | |
CN206646352U (en) | Damping floor tile and road | |
CN207673116U (en) | A kind of gardens bird appreciation platform fence structure | |
KR101442521B1 (en) | The wooddeck sidewalk that is easy to do surface drainage ,and the construction method of this | |
CN207672593U (en) | A kind of gardens bird appreciation platform structure | |
KR100831203B1 (en) | Rubber mat for groun of childrens's playground | |
KR101122412B1 (en) | Lawn Block | |
CN211645815U (en) | Municipal administration paving brick | |
CN207525770U (en) | A kind of waterproof anti-seismic foundation applied to building construction | |
CN209292809U (en) | A kind of anchor formula subgrade structure | |
CN213709792U (en) | Urban construction is with rain flood park water storage device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180608 Termination date: 20181121 |
|
CF01 | Termination of patent right due to non-payment of annual fee |