CN207461349U - A kind of Fu tea floating drying chamber - Google Patents

A kind of Fu tea floating drying chamber Download PDF

Info

Publication number
CN207461349U
CN207461349U CN201720991265.1U CN201720991265U CN207461349U CN 207461349 U CN207461349 U CN 207461349U CN 201720991265 U CN201720991265 U CN 201720991265U CN 207461349 U CN207461349 U CN 207461349U
Authority
CN
China
Prior art keywords
hot
drying chamber
blast
blast pipe
biomass thermal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720991265.1U
Other languages
Chinese (zh)
Inventor
李巧
贺鹏
俞志红
李年喜
李亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Qingshanyue Tea Co ltd
Original Assignee
Anhua Qing Shan Yuan Tea Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhua Qing Shan Yuan Tea Co Ltd filed Critical Anhua Qing Shan Yuan Tea Co Ltd
Priority to CN201720991265.1U priority Critical patent/CN207461349U/en
Application granted granted Critical
Publication of CN207461349U publication Critical patent/CN207461349U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drying Of Solid Materials (AREA)

Abstract

A kind of Fu tea floating drying chamber is related to Fu tea processing facility.Including drying chamber wall, the exhaust tube of drying chamber inner top is incited, is located in the exhaust for being located at drying chamber wall top, it is located at the heat pipe being connected with heating stove of bottom in drying chamber, heating stove uses biomass thermal wind furnace, its blast pipe enters pipe equipped with fresh air, exhaust tube is connect with the blast pipe of biomass thermal wind furnace, and the heating tube connection of hot blast pipe and hot-blast stove, hot blast pipe is equipped with hot-blast outlet.Due to electrical heating, coal-burning boiler being replaced to heat using biomass thermal wind furnace, unit cost energy consumption is reduced, avoids the exhaust emission of coal-fired generation;Fresh air is added in using Hot-blast Heating and in hot wind and solves the problems, such as drying chamber floating anoxic, is made floating luxuriant uniformly, is improved Fu tea quality;It is utilized using hot air circulation, significantly reduces energy consumption;Hot wind dispersion cover is set in hot-blast outlet, makes drying chamber even heat, improves the uniformity of Fu brick floatings.

Description

A kind of Fu tea floating drying chamber
Technical field
The utility model is related to a kind of Fu tea to process facility.
Background technology
Fu tea is a kind of tealeaves for growing and having bandit to dash forward bulk bacteria.This bandit on tealeaves dashes forward bulk bacteria only in special temperature It could be grown under degree, humidity and Oxygen Condition.Under field conditions (factors), the only Jingyang in Shaanxi could allow tealeaves nature floating.Fu The appearance of tea, about 1368 Christian eras, Anhua black tea is transported to Shaanxi Jingyang by tea quotient, and the system of building by hand is formed through natural floating, when Just claimed " diameter sun brick ", because being processed on the hot summer days, therefore also known as " volt tea ".Scientific research is passed through by nineteen fifty-three, white sand small stream tea processing factory of Hunan Province, Artificial induction's floating method is taken, has produced first piece of Fu-brick tea in Hunan.Finishing centuries can only add in Shaanxi Jingyang The history of work Fu-brick tea.Artificial induction's floating is carried out in floating room, by manual control temperature humidity, bandit is promoted to dash forward scattered capsule Bacterium grows, the floating for completing Fu-brick tea in about one month or so.Original floating room is the temperature that floating room is improved with charcoal fire, On the one hand support control will be entirely with the experience of people;Second is that easily causing anthracemia, there are security risks;Third, charcoal fire burning disappears A large amount of oxygen are consumed, the oxygen for causing Fu brick floatings is insufficient.It develops to and is heated with electrical heating or boiler steam pipe now, to effective Control is brought conveniently, but cannot all floating room be given to increase oxygen, is brought adverse effect to the floating of Fu-brick tea, is caused floating not , the phenomenon that floating fails often occurs.It is due to nearly 30 days of Fu-brick tea production cycle, either electrical heating or boiler again Heat supply, energy consumption is all quite big, if small-scale enterprise, specific yield energy consumption higher considerably increases production cost.
Invention content
The purpose of the utility model is to overcome prior art defects, disclose a kind of energy and provide sufficient oxygen to the floating of Fu bricks , a kind of Fu bricks floating uniformly luxuriant, energy-saving and environment-friendly Fu tea floating drying chamber can be made.
The technical solution of the utility model is:A kind of Fu tea floating drying chamber, including drying chamber wall, is located at drying chamber wall The exhaust tube of drying chamber inner top is incited, is located in the exhaust on top, is located at the heat pipe being connected with heating stove of bottom in drying chamber, special Part is:The heating stove uses biomass thermal wind furnace, and the blast pipe of biomass thermal wind furnace enters pipe equipped with fresh air, Exhaust tube is connect with the blast pipe of biomass thermal wind furnace, and heating tube is connect with the hot blast pipe of biomass thermal wind furnace, is set on heating tube There is hot-blast outlet.
Further, hot wind dispersion bag is cased on the hot-blast outlet.
The utility model can give the floating of Fu bricks to provide sufficient oxygen as a result of above technical scheme while heat supply Gas, it can be ensured that Fu-brick tea floating is uniformly luxuriant, and hot air circulation utilizes, and energy conservation and environmental protection reduces production cost.
Description of the drawings:
Fig. 1 is the schematic front view of the utility model;
Fig. 2 is the utility model left view schematic diagram;
Fig. 3 is the utility model schematic top plan view.
Specific embodiment
1-3 below in conjunction with the accompanying drawings is further described the utility model by specific embodiment.
Embodiment 1:A kind of Fu tea floating drying chamber, including drying chamber wall 1, the exhaust for being located at 1 top of drying chamber wall is incited 8, is set In the exhaust tube 2 of drying chamber inner top, the hot blast pipe 6 being connected with heating stove of bottom in drying chamber is located at, the heating stove is using life Substance hot-blast stove 13, the blast pipe 11 of biomass thermal wind furnace 13 enter pipe 14, exhaust tube 2 and biomass thermal equipped with fresh air The blast pipe 11 of wind furnace 13 connects, and hot blast pipe 6 is connect with the heating tube 12 of biomass thermal wind furnace 13, and hot blast pipe 6 is equipped with hot wind Outlet 16.
Embodiment 2:A kind of Fu tea floating drying chamber including drying chamber wall 1, exhaust is equipped on 1 top of drying chamber wall and incites 8, drop It is opened when wet.Top in drying chamber is equipped with the temperature and humidity sensing being electrically connected with being located at the controller 18 in 1 outside of drying chamber wall Device 17.Scavenging air valve 9 is equipped in the bottom of drying chamber wall 1, automatically opens when 8 unlatching is incited in exhaust, is usually automatically closed.Drying chamber wall One side lower part of body 1 is equipped with door 4, is equipped with exhaust tube 2 in the medium position of drying chamber inner top, bottom is equipped with and heat supply in drying chamber The hot blast pipe 6 that stove is connected, the heating stove use biomass thermal wind furnace 13, and the blast pipe 11 of biomass thermal wind furnace 13 is equipped with newly Fresh air enters pipe 14.Exhaust tube 2 is connect with the blast pipe 11 of biomass thermal wind furnace 13, hot blast pipe 6 and biomass thermal wind furnace 13 Heating tube 12 connect, in 6 drying chamber of hot blast pipe bottom into U-shaped arrange, two-port be equipped with encapsulation header 10, in U-shaped hot blast pipe 6 Both sides are evenly equipped with several hot-blast outlets 16, and each hot-blast outlet 16 is separated by 1-2m, general 1.5m.The hot-blast outlet 16 on both sides Be staggered inside setting, is equivalent to for the longitudinal direction of drying chamber and sets a hot-blast outlet every 75cm.Particular number drying chamber size and Determine, such as the drying chamber of 6m long sets 4 per side, sets 7 altogether.Hot wind dispersion bag 5, hot wind dispersion bag are arranged on hot-blast outlet 16 5 can be constructed to the flexible cloth bag uniformly breathed freely, such as gauze bag.When sending hot wind gauze bag rise hot wind peptizaiton, hot wind from It is blown out in the cloth hole of gauze, uniform diffusion can be reached, make the purpose of tea base thermally equivalent.Dirt that simultaneously also can be in overanxious hot wind Angstrom.The blast pipe 11 of biomass thermal wind furnace 13 is connected with being located at the exhaust tube 2 of drying chamber inner top, hot wind from the bottom of drying chamber into, Go out above from drying chamber, be sent into drying chamber again through hot wind pump 19 after the heating of hot-blast stove 13, form hot air circulation, be to reduce Thermal loss reduces energy consumption.Fu bricks shelf 3 is put on hot blast pipe 6.Biomass thermal wind furnace 13 uses market product, this implementation The super benevolence energy hot-blast stove that example is produced using Zhejiang Ren Gong Machinery Co., Ltd.s.
The utility model embodiment due to electrical heating, coal-burning boiler being replaced to heat using biomass thermal wind furnace, substantially reduces Unit cost energy consumption, while avoid the exhaust emission of coal-fired generation;Fresh sky is added in using Hot-blast Heating and in hot wind Gas solves the problems, such as drying chamber floating anoxic, makes floating luxuriant uniformly, improves Fu tea quality;It is utilized, shown using hot air circulation Work reduces energy consumption;Hot wind dispersion bag is set in hot-blast outlet, the uniformity of drying chamber heat is improved, improves the equal of Fu brick floatings Evenness.
The utility model is not limited to above example, and every technical solution according to the present utility model is expanded, changed Change to a new form, belong to the scope of protection of the utility model.

Claims (6)

1. a kind of Fu tea floating drying chamber, including drying chamber wall(1), it is located at drying chamber wall(1)The exhaust on top is incited(8), be located at baking The exhaust tube of the top of the room(2), it is located at the hot blast pipe being connected with heating stove of bottom in drying chamber(6), it is characterised in that:The confession Hot stove uses biomass thermal wind furnace(13), biomass thermal wind furnace(13)Blast pipe(11)Enter pipe equipped with fresh air (14), exhaust tube(2)With biomass thermal wind furnace(13)Blast pipe(11)Connection, hot blast pipe(6)With biomass thermal wind furnace(13) Heating tube(12)Connection, hot blast pipe(6)It is equipped with hot-blast outlet(16).
2. a kind of Fu tea floating drying chamber according to claim 1, it is characterised in that:Hot blast pipe(6)In drying chamber bottom into U-shaped is arranged, 1-2m is often separated by both sides and sets a hot-blast outlet(16), hot-blast outlet(16)It sets inwardly.
3. a kind of Fu tea floating drying chamber according to claim 2, it is characterised in that:Each hot-blast outlet(16)Between It is separated by 1.5m.
4. a kind of Fu tea floating drying chamber according to claim 1-3 any one, it is characterised in that:Go out in the hot wind Mouthful(16)On be cased with hot wind dispersion bag(5).
5. a kind of Fu tea floating drying chamber according to claim 4, it is characterised in that:The hot wind disperses bag(5)It is constructed to Uniformly ventilative gauze bag.
6. a kind of Fu tea floating drying chamber according to claim 1, it is characterised in that:The biomass thermal wind furnace(13)Into Air hose(11)Exhaust tube with being located at drying chamber inner top(2)Be connected, hot wind from the bottom of drying chamber into, go out at the top of drying chamber, pass through Cross biomass thermal wind furnace(13)It is pumped after heating through hot wind(19)It is sent into drying chamber again, forms hot air circulation.
CN201720991265.1U 2017-08-09 2017-08-09 A kind of Fu tea floating drying chamber Active CN207461349U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720991265.1U CN207461349U (en) 2017-08-09 2017-08-09 A kind of Fu tea floating drying chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720991265.1U CN207461349U (en) 2017-08-09 2017-08-09 A kind of Fu tea floating drying chamber

Publications (1)

Publication Number Publication Date
CN207461349U true CN207461349U (en) 2018-06-08

Family

ID=62256612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720991265.1U Active CN207461349U (en) 2017-08-09 2017-08-09 A kind of Fu tea floating drying chamber

Country Status (1)

Country Link
CN (1) CN207461349U (en)

Similar Documents

Publication Publication Date Title
CN105627721B (en) A kind of environmentally friendly grain-drying system
CN207674851U (en) Pepper drying unit
CN206300425U (en) A kind of plate dryer
CN106766717A (en) A kind of two-way drying machine of plank coarse fodder
CN103637393A (en) Tobacco flue-curing room adopting multiple heat sources
CN204444020U (en) A kind of tea leaf fermentation curing range
CN207519554U (en) A kind of heated air circulation type floating drying chamber
CN207461349U (en) A kind of Fu tea floating drying chamber
CN107258966A (en) A kind of Fu tea grows dim drying room and its application method
CN107467212A (en) A kind of heated air circulation type grows dim drying room and its application method
CN206182255U (en) Gas -type machine of baking and banking up with earth
CN206055744U (en) The electric fireplace of medicated clothing can be dried
CN107957137A (en) A kind of fuel gas hot-blast stove
CN205547191U (en) Mushroom drying device
CN204797490U (en) Heating carpet
CN204888706U (en) Roast room of tobacco leaf gets damp again device fast
CN206540369U (en) Tunnel type intelligence heat pump drying plant
CN205584849U (en) Domestic fungus mushroom humidification device that heats
CN205284972U (en) Numerical control automatic air can tobacco flue -curing complete sets
CN208736103U (en) A kind of prepared slices of Chinese crude drugs raw material fast-drying device
CN207118560U (en) A kind of simple energy-efficient tea drier
CN206160638U (en) Superhard grinding wheel drying device
CN205784315U (en) A kind of closed loop heater temperature control drying room
CN207151340U (en) Flower planting greenhouse
CN205403435U (en) A electric heater for tealeaves is dried

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 413515 Yiyang City, Hunan province Anhua County small Yan Zhen Lu.

Patentee after: Hunan qingshanyue Tea Co.,Ltd.

Address before: 413515 Yiyang City, Hunan province Anhua County small Yan Zhen Lu.

Patentee before: ANHUA QINGSHANYUAN TEA Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A kind of Fu tea baking room

Effective date of registration: 20201125

Granted publication date: 20180608

Pledgee: Hunan Anhua Rural Commercial Bank Co.,Ltd.

Pledgor: Hunan qingshanyue Tea Co.,Ltd.

Registration number: Y2020430000036

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20180608

Pledgee: Hunan Anhua Rural Commercial Bank Co.,Ltd.

Pledgor: Hunan qingshanyue Tea Co.,Ltd.

Registration number: Y2020430000036