CN207440234U - A kind of main transformer surveys the instrument of insulation - Google Patents
A kind of main transformer surveys the instrument of insulation Download PDFInfo
- Publication number
- CN207440234U CN207440234U CN201721501246.2U CN201721501246U CN207440234U CN 207440234 U CN207440234 U CN 207440234U CN 201721501246 U CN201721501246 U CN 201721501246U CN 207440234 U CN207440234 U CN 207440234U
- Authority
- CN
- China
- Prior art keywords
- wire clamp
- main transformer
- insulation
- survey
- surveys
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009413 insulation Methods 0.000 title claims abstract description 22
- 239000002184 metal Substances 0.000 claims description 8
- 229920003023 plastic Polymers 0.000 claims description 2
- 239000004033 plastic Substances 0.000 claims description 2
- 238000005259 measurement Methods 0.000 abstract description 15
- 238000000034 method Methods 0.000 description 11
- 206010017577 Gait disturbance Diseases 0.000 description 4
- 230000004888 barrier function Effects 0.000 description 4
- 230000009194 climbing Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 102000018361 Contactin Human genes 0.000 description 1
- 108060003955 Contactin Proteins 0.000 description 1
- 241000282326 Felis catus Species 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Landscapes
- Testing Relating To Insulation (AREA)
Abstract
The instrument to insulate is surveyed this application discloses a kind of main transformer, including:Wire clamp (1), measure traverse line (2), insulating bar (3), survey insulating megger (4), wire clamp (1) is mounted on one end of measure traverse line (2), survey the other end that insulating megger (4) is connected to measure traverse line (2), measure traverse line (2) is placed on insulating bar (3), and wire clamp is hung at main transformer outlet when surveying insulation.In this way, measurement end is connected to the survey insulating megger on ground through wire clamp, conducting wire, survey crew can carry out survey insulated working on the ground at station.
Description
Technical field
The utility model is related to the works that the technical field of power plant production O&M more particularly to a kind of main transformer survey insulation
Tool.
Background technology
The mode that power plant main transformer surveys insulation now is that staff carries measuring appliance and reaches transformer through walking ladder
Top carries out insulation measurement, and there are many security risks for this method.There is more than 5m on main transformer distance from top ground, and space is narrow
It is small, it is unfavorable for using of seat belts and safety rope, survey crew will also face survey not only it is noted that Equilibrium prevents from falling
Amount Work tool is nowhere put, avoids the unrelated position of touching transformer, turns round the problems such as difficulty, difficulty in walking.And up to one minute
Time of measuring, limited by human body patience, it is difficult to ensure that the cmpletely contact of measuring point, if happening sleety weather,
Ponding on cat ladder falls snow or icing or even to climb up transformer top all highly difficult.
The content of the invention
The defects of to overcome the prior art, the technical problem to be solved by the present invention is to provide a kind of surveys of main transformer
The instrument of insulation, can make measurement end be connected to the survey insulating megger on ground through wire clamp, conducting wire, and survey crew can stand
Survey insulated working is carried out on the ground.
The technical solution of the utility model is:This main transformer surveys the instrument of insulation, including:Wire clamp (1), measurement are led
Line (2), insulating bar (3) survey insulating megger (4), and wire clamp (1) is mounted on one end of measure traverse line (2), survey insulating megger (4) even
The other end of measure traverse line (2) is connected on, measure traverse line (2) is placed on insulating bar (3), and wire clamp hangs over main transformer and goes out when surveying insulation
At mouthful.
In this way, measurement end is connected to the survey insulating megger on ground through wire clamp, conducting wire, survey crew can be at station on ground
On carry out survey insulated working.Because without climbing up transformer, the danger of falling from high altitude is prevented.Ground space is sufficient,
It nowhere put there is no previous measurement Work tool, touch the unrelated position of transformer, turn round the problems such as difficulty, difficulty in walking.Cause
It is that direct folder hangs over high (low) the pressure side outlet measured place of transformer for wire clamp, need not artificially for a long time withstands on measure traverse line
Transformer measured place, therefore limited from human body patience, it can be ensured that it is abundant, firm that measurement portion tap is touched.Along with this method
It is easy to operate, so as to overcome this technical barrier.This new survey insulating method, coordinates corresponding tool innovation, evades
The risk of working at height, simplifies work difficulty, eliminates and surveys the person, equipment safety hidden danger present in insulation process, it is ensured that
Personal safety and equipment safety have the value promoted the use of.
Description of the drawings
Fig. 1 is the structure diagram for the instrument that main transformer according to the present invention surveys insulation.
Specific embodiment
As shown in Figure 1, this main transformer surveys the instrument of insulation, including:Wire clamp 1, measure traverse line 2, insulating bar 3, survey
Insulating megger 4, wire clamp 1 are mounted on one end of measure traverse line 2, survey the other end that insulating megger 4 is connected to measure traverse line 2, measurement
Conducting wire 2 is placed on insulating bar 3, and wire clamp is hung at main transformer outlet when surveying insulation.
In this way, measurement end is connected to the survey insulating megger on ground through wire clamp, conducting wire, survey crew can be at station on ground
On carry out survey insulated working.Because without climbing up transformer, the danger of falling from high altitude is prevented.Ground space is sufficient,
It nowhere put there is no previous measurement Work tool, touch the unrelated position of transformer, turn round the problems such as difficulty, difficulty in walking.Cause
It is that direct folder hangs over high (low) the pressure side outlet measured place of transformer for wire clamp, need not artificially for a long time withstands on measure traverse line
Transformer measured place, therefore limited from human body patience, it can be ensured that it is abundant, firm that measurement portion tap is touched.Along with this method
It is easy to operate, so as to overcome this technical barrier.This new survey insulating method, coordinates corresponding tool innovation, evades
The risk of working at height, simplifies work difficulty, eliminates and surveys the person, equipment safety hidden danger present in insulation process, it is ensured that
Personal safety and equipment safety have the value promoted the use of.
Preferably, the first half of the wire clamp is inverted U, and wire clamp is more easily made to hang over the measured place of transformer.
Preferably, the lower half of the wire clamp 1 is cylindrical type handle, more easily can operate wire clamp with insulating bar.
Preferably, there is the sheet metal of two panels band elasticity inside the first half of the wire clamp 1, be more convenient wire clamp and transformer
Measured place is fixed.
Preferably, the two panels sheet metal is into splayed configuration, the two panels sheet metal it is close to each other in the bottom of the inverted U and
It is located remotely from each other on the top of the inverted U, when the inverted U is hung at main transformer outlet, which blocks master
Cable at transformer outlet.So ensure that measurement portion tap is touched fully, it is firm.
Preferably, the wire clamp is metal, and the insulating bar is plastics.
The utility model is for practice in factory, through repeatedly testing and summarizing relevant historical experience, proposes to survey exhausted
The place of edge is changed to this innovation idea of ground by transformer top.It is such to change the peace for fundamentally having evaded working at height
Full hidden danger, but new technical barrier is also brought simultaneously:Transformer is not climbed up, how to allow high (low) pressure of measure traverse line and transformer
Side outlet measured place keeps contactIn order to solve this problem, a large amount of field conditions are carried out and have reconnoitred, research is determined using as follows
Method:Wire clamp is installed in one end of measure traverse line, one end that measure traverse line has wire clamp on ground using insulating bar is pressed from both sides and hung by people station
In the measured place of transformer, the conducting wire other end is connected to survey insulating megger.In this way, measurement end is connected to ground through wire clamp, conducting wire
Survey insulating megger, survey crew can station carry out survey insulated working on the ground.Because without climbing up transformer,
The danger of falling from high altitude is prevented.Ground space is sufficient, will not have previous measurement Work tool and nowhere put, touches transformer
The problems such as difficulty, difficulty in walking, is turned round at unrelated position.High (low) the pressure side outlet measurement of transformer is hung over because wire clamp is direct folder
Place, need not measure traverse line artificially be withstood on into transformer measured place for a long time, therefore be limited from human body patience, it can be ensured that surveyed
It is abundant, firm that amount part contacts.Along with this method is easy to operate, so as to overcome this technical barrier.This new survey
Insulating method coordinates corresponding tool innovation, has evaded the risk of working at height, has simplified work difficulty, eliminates survey insulation
The existing person, equipment safety hidden danger in the process, it is ensured that personal safety and equipment safety have the value promoted the use of.
The above is only the preferred embodiment of the utility model, not makees limit in any form to the utility model
System, every any simple modification, equivalent change and modification made according to the technical essence of the utility model to above example,
Still belong to the protection domain of technical solutions of the utility model.
Claims (6)
1. a kind of main transformer surveys the instrument of insulation, it is characterised in that:It includes:Wire clamp (1), measure traverse line (2), insulating bar
(3), insulating megger (4) is surveyed, wire clamp (1) is mounted on one end of measure traverse line (2), surveys insulating megger (4) and is connected to measure traverse line
(2) the other end, measure traverse line (2) are placed on insulating bar (3), and wire clamp is hung at main transformer outlet when surveying insulation.
2. main transformer according to claim 1 surveys the instrument of insulation, it is characterised in that:The first half of the wire clamp (1)
For inverted U.
3. main transformer according to claim 2 surveys the instrument of insulation, it is characterised in that:The lower half of the wire clamp (1)
For cylindrical handle.
4. main transformer according to claim 3 surveys the instrument of insulation, it is characterised in that:The first half of the wire clamp (1)
There is the sheet metal of two panels band elasticity in inside.
5. main transformer according to claim 4 surveys the instrument of insulation, it is characterised in that:The two panels sheet metal is into eight words
Type, the two panels sheet metal is close to each other in the bottom of the inverted U and is located remotely from each other on the top of the inverted U, as the U
When type is hung at main transformer outlet, which blocks the cable at main transformer outlet.
6. main transformer according to claim 1 surveys the instrument of insulation, it is characterised in that:The wire clamp is metal, institute
It is plastics to state insulating bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721501246.2U CN207440234U (en) | 2017-11-13 | 2017-11-13 | A kind of main transformer surveys the instrument of insulation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721501246.2U CN207440234U (en) | 2017-11-13 | 2017-11-13 | A kind of main transformer surveys the instrument of insulation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207440234U true CN207440234U (en) | 2018-06-01 |
Family
ID=62288893
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721501246.2U Active CN207440234U (en) | 2017-11-13 | 2017-11-13 | A kind of main transformer surveys the instrument of insulation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207440234U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109541417A (en) * | 2019-01-16 | 2019-03-29 | 国网江苏省电力有限公司扬州供电分公司 | A kind of Work tool detection platform |
-
2017
- 2017-11-13 CN CN201721501246.2U patent/CN207440234U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109541417A (en) * | 2019-01-16 | 2019-03-29 | 国网江苏省电力有限公司扬州供电分公司 | A kind of Work tool detection platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MX2021000569A (en) | Remote tower monitoring system. | |
CN105448035A (en) | High-voltage line proximity early warning method and device | |
CN202001063U (en) | System for pre-warning water disaster of mine bottom plate | |
CN103592501A (en) | Low-voltage current measuring bar | |
US10175273B2 (en) | Method of using power grid as large antenna for geophysical imaging | |
CN207440234U (en) | A kind of main transformer surveys the instrument of insulation | |
CN106225637A (en) | A kind of sag observation bar and observation procedure thereof | |
CN104792371A (en) | Novel bridge safety detection device | |
CN205809177U (en) | A kind of rock complex resistivity measurement apparatus under the conditions of oil-water displacement | |
CN204046740U (en) | LCD meter reading instrument | |
CN205580790U (en) | On --spot filthy degree acquisition device of substation equipment | |
CN203706362U (en) | Spatial three-dimensional geological disaster monitoring system for overhead-type high-voltage transmission line | |
CN203931132U (en) | The testing tool of warming and smoke alarm | |
CN108168452A (en) | A kind of digital surface Crack Monitoring device and its detection method | |
CN104792370A (en) | Bridge safety situation analyzer | |
CN201222287Y (en) | Thunderbolt warning apparatus | |
KR101417795B1 (en) | Instrumentation device for remote telemeter using power line communication | |
CN204947478U (en) | Underground survey polygon control survey point fast threading device | |
CN105676059B (en) | Earth-fault detecting method and device | |
CN202757989U (en) | Anti-electric-shock probe rod | |
CN205333785U (en) | Insulating monitoring measurement appearance of insulation ropes | |
CN209927936U (en) | Wireless grounding resistance on-line monitoring system | |
CN208236464U (en) | Extremely frigid zones Mine Geological Disasters warning device | |
CN207636073U (en) | A kind of power construction fence nest point integration positioning device | |
CN203875876U (en) | Appliance box for detecting leakage currents of end screen ground wire of current transformer in charging mode |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |