CN207437937U - A kind of water conservancy construction pipeline fixing device - Google Patents

A kind of water conservancy construction pipeline fixing device Download PDF

Info

Publication number
CN207437937U
CN207437937U CN201721631957.1U CN201721631957U CN207437937U CN 207437937 U CN207437937 U CN 207437937U CN 201721631957 U CN201721631957 U CN 201721631957U CN 207437937 U CN207437937 U CN 207437937U
Authority
CN
China
Prior art keywords
gear
spring
lower clamping
water conservancy
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721631957.1U
Other languages
Chinese (zh)
Inventor
郑仕康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721631957.1U priority Critical patent/CN207437937U/en
Application granted granted Critical
Publication of CN207437937U publication Critical patent/CN207437937U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of water conservancy construction pipeline fixing devices, are related to water conservancy construction technical field.The water conservancy construction pipeline fixing device, including pedestal, fixing sleeve is fixedly connected at the top of the pedestal, and the first spring is provided in fixing sleeve, the bottom of first spring at the top of pedestal with being fixedly connected, and first spring top through fixing sleeve top and be fixedly connected with lower clamping, the both sides of the fixing sleeve are both provided with fixing piece.The water conservancy construction pipeline fixing device, by setting fixing sleeve and the first spring, and fixing piece, second spring and cushion are equipped with, it can play the role of buffering to pipeline, by setting first gear, second gear and ball, and fixed link, bull stick and Anti-slip cover are equipped with, and staff can be made the device will to be fixed in threaded rod insertion soil or clitter by way of shaking Anti-slip cover.

Description

A kind of water conservancy construction pipeline fixing device
Technical field
The utility model is related to water conservancy construction technical fields, are specially a kind of water conservancy construction pipeline fixing device.
Background technology
Pipeline be with pipe, pipe connector and valve etc. be connected into for conveying gas, liquid or with solid particle Fluid device.Usual fluid flows to low pressure after the superchargings such as air blower, compressor, pump and boiler at the high pressure of pipeline The pressure of fluid itself or gravity conveying can also be used in place.Having many uses for pipeline is general, be used primarily in feedwater, draining, heat supply, It gives gas, in long distance delivery oil and natural gas, agricultural irrigation, hydraulic engineering and various commercial plants.
Pipeline is an indispensable part during water conservancy construction, and current are to inner-walls of duct during pipe drainage Certain impact force is caused, this impact force can cause the vibrations of pipeline generation certain amplitude, after pipeline long-time service easily There is pipeline cracking or situation about loosening.
The construction of majority current is poor with pipeline fixing device fixed effect at present, can not effectively reduce the vibration width of pipeline Degree.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of water conservancy construction pipeline fixing device, solves Most water conservancy constructions with pipeline fixing device fixed effect it is poor the problem of.
(2) technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs:A kind of water conservancy construction pipeline Fixing device including pedestal, is fixedly connected with fixing sleeve, and the first spring is provided in fixing sleeve at the top of the pedestal, institute The bottom of the first spring is stated with being fixedly connected at the top of pedestal, and the top of the first spring is through the top of fixing sleeve and fixed company Lower clamping is connected to, the both sides of the fixing sleeve are both provided with fixing piece, and the top of two fixing pieces is embedded with second spring, and The top of two fixing pieces is extended through at the top of two second springs and is fixedly connected on the bottom of lower clamping, the lower clamping Top be overlapped with clamp ring, and the upper clamp ring one side opposite with lower clamping has been fixedly connected with cushion, the upper clamp ring and under The both sides of clamp ring are respectively fixedly connected with there are two the first connector and two the second connectors, and upper clamp ring and lower clamping both sides Screw is interspersed between first connector and the second connector.
The both sides of the base top are both provided with drilling equipment, and drilling equipment includes housing and threaded rod, the spiral shell Rasp bar is located in housing, and first gear is socketed on threaded rod, and the first gear is embedded in the inner wall of housing, and first Ball is provided with below gear, the one side of the first gear is engaged with the one side of second gear, and second gear runs through shell The one side of body is simultaneously fixedly connected with bull stick, fixed link is socketed on the bull stick, and the bottom of fixed link and the top of pedestal are consolidated Fixed connection, the one end of the bull stick away from second gear is socketed with Anti-slip cover.
Preferably, the top of first spring in the middle part of lower clamping bottom with being fixedly connected, and the elastic force of the first spring More than the pressure of lower clamping.
Preferably, the top of the second spring and the bottom of lower clamping are vertical, and the elastic force of two second springs is small In the elastic force of the first spring.
Preferably, the bottom of first connector is overlapped on the top of the second connector, the both ends difference of the screw Through the top of the first connector and the bottom of the second connector.
Preferably, the ball is embedded in the inner wall one side of housing, and the top of ball and the one of first gear bottom Slideslip connects.
Preferably, the threaded hole to match with threaded rod is offered in the first gear, the one side of the housing opens up There is the opening to match with second gear.
(3) advantageous effect
The utility model provides a kind of water conservancy construction pipeline fixing device.Possesses following advantageous effect:
(1), water conservancy construction pipeline fixing device, by the way that lower clamping, upper clamp ring, the first connector, second is set to connect Fitting and screw and threaded rod, first gear and second gear are equipped with, and have reached the spy of the device good fixing effect Point so as to effectively improve the overall stability of pipeline, while can effectively improve the service life of pipeline, so as to effectively drop The low maintenance cost of pipeline.
(2), water conservancy construction pipeline fixing device, by setting fixing sleeve and the first spring and fixing piece, second Being equipped with for spring and cushion, can play the role of buffering to pipeline, be produced so as to effectively reduce during pipe drainage Raw vibrations so as to effectively extend the service life of pipeline, while can greatly ensure the normal work of pipeline.
(3), water conservancy construction pipeline fixing device, by setting first gear, second gear and ball and fixing Bar, bull stick and Anti-slip cover are equipped with, and can make staff that threaded rod are inserted into soil by way of shaking Anti-slip cover Or the device is fixed in clitter, so as to the effective guarantee structural stability of the device.
Description of the drawings
Fig. 1 is the sectional view of the utility model structure;
Fig. 2 is the sectional view of the utility model drilling equipment.
In figure:1 pedestal, 2 fixing sleeves, 3 first springs, 4 lower clampings, 5 fixing pieces, 6 second springs, clamp ring on 7,8 cushions, 9 first connectors, 10 second connectors, 11 screws, 12 drilling equipments, 13 threaded rods, 14 first gears, 15 balls, 16 second Gear, 17 bull sticks, 18 fixed links, 19 Anti-slip covers, 20 housings.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 2 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of water conservancy construction pipeline fixing device, bag Pedestal 1 is included, the top of pedestal 1 is fixedly connected with fixing sleeve 2, and the first spring 3 is provided in fixing sleeve 2, the bottom of the first spring 3 Portion is fixedly connected with the top of pedestal 1, and the top of the first spring 3 through the top of fixing sleeve 2 and is fixedly connected with lower clamping 4, the top of the first spring 3 in the middle part of 4 bottom of lower clamping with being fixedly connected, and the elastic force of the first spring 3 is more than the pressure of lower clamping 4 Power, through this structure design can make lower clamping 4 play a supporting role pipeline, effectively prevent pipeline by lower clamping 4 The situation that bottom is depressed into 2 top of fixing sleeve occurs, and so as to which the normal work of the first spring 3 is effectively ensured, has reached reduction The effect of pipe vibration, the both sides of fixing sleeve 2 are both provided with fixing piece 5, and the top of two fixing pieces 5 is embedded with second spring 6, and the top of two second springs 6 extends through the top of two fixing pieces 5 and is fixedly connected on the bottom of lower clamping 4, the The top of two springs 6 is vertical with the bottom of lower clamping 4, and the elastic force of two second springs 6 is respectively less than the elastic force of the first spring 3, It is the buffer system advocated peace supplemented by second spring 6 that design can be formed the device with the first spring 3 through this structure, pole The earth reduces the vibrations generated during pipe drainage, so as to which the device is effectively avoided structural unstable situation occur, under The top of clamp ring 4 is overlapped with clamp ring 7, and the one side opposite with lower clamping 4 of upper clamp ring 7 has been fixedly connected with cushion 8, by setting The frictional force of pipeline and 4 contact surface of upper clamp ring 7 and lower clamping can effectively be reduced by putting cushion 8, so as to effectively prevent long-term There is situation about being seriously worn using rear pipeline, by setting 2 and first spring 3 of fixing sleeve and fixing piece 5, second spring 6 With being equipped with for cushion 8, buffering can be played the role of to pipeline, so as to effectively reduce what is generated during pipe drainage Vibrations so as to effectively extend the service life of pipeline, while can greatly ensure the normal work of pipeline, upper 7 He of clamp ring The both sides of lower clamping 4 are respectively fixedly connected with there are two the first connector 9 and two the second connectors 10, and upper clamp ring 7 and lower folder Screw 11 is interspersed between the first connector 9 and the second connector 10 of 4 both sides of ring, the bottom of the first connector 9 is overlapped on The top of second connector 10, the both ends of screw 11 extend through the top of the first connector 9 and the bottom of the second connector 10, Design can effectively fix clamp ring 7 and lower lower clamping 4 through this structure, so as to which pipeline be fixed.
The both sides at 1 top of pedestal are both provided with drilling equipment 12, and drilling equipment 12 includes housing 20 and threaded rod 13, spiral shell Rasp bar 13 is located in housing 20, and the bottom of threaded rod 13 is covered through the bottom of housing 20 and the bottom of pedestal 1 on threaded rod 13 First gear 14 is connected to, first gear 14 is embedded in the inner wall of housing 20, and the lower section of first gear 14 is provided with ball 15, Ball 15 is embedded in the inner wall one side of housing 20, and the top of ball 15 and the one side of 14 bottom of first gear are slidably connected, Design can effectively reduce the frictional force generated when first gear 14 rotates through this structure, so as to drastically increase spiral shell The flexible efficiency of rasp bar 13, while the installation time to be spent can be effectively reduced, the one side of first gear 14 and the second tooth The one side engagement of wheel 16, and second gear 16 through the one side of housing 20 and is fixedly connected with bull stick 17, the shape of bull stick 17 is Bending shape, by setting lower clamping 4, upper clamp ring 7, the first connector 9, the second connector 10 and screw 11 and threaded rod 13rd, first gear 14 and the characteristics of being equipped with, reached the device good fixing effect of second gear 16, so as to effective The overall stability of pipeline is improved, while the service life of pipeline can be effectively improved, so as to effectively reduce the maintenance of pipeline Expense offers the threaded hole to match with threaded rod 13 in first gear 14, and the one side of housing 20 offers and second gear 16 openings to match, through this structure design can make second gear 16 when rotating first gear 14 be driven to rotate, from And the threaded rod 13 that 14 internal thread of first gear is enable to connect moves up and down, and fixed link 18 is socketed on bull stick 17, and it is fixed The bottom of bar 18 is fixedly connected with the top of pedestal 1, is located at shell by setting fixed link 18 that can effectively limit second gear 16 Position on body 20, while can play a supporting role to bull stick 17, it ensure that the property reasonable in design of the device, bull stick 17 One end away from second gear 16 is socketed with Anti-slip cover 19, by setting Anti-slip cover 19 that can effectively improve user's hand with turning The contact surface degree of roughness of bar 17, so as to effectively increase the rotational efficienty of bull stick 17, by setting first gear 14, the second tooth Wheel 16 and ball 15 and fixed link 18, bull stick 17 and Anti-slip cover 19 are equipped with, and staff can be made anti-by shaking Threaded rod 13 is inserted into soil or clitter and the device is fixed by the mode of sliding sleeve 19, so as to the effective guarantee device Structural stability.
The water conservancy construction pipeline fixing device by rotating Anti-slip cover 19 in use, rotate bull stick 17, so that Two gears 16 rotate and first gear 14 are driven to rotate, so that the bottom of threaded rod 13 is inserted into through pedestal 1 in soil, pass through Intert screw 11 in the first connector 9 and the second connector 10, so that upper clamp ring 7 is fixed pipeline with lower clamping 4, The vibration amplitude of pipeline is reduced by the first spring 3 and second spring 6, dress is fixed with pipeline so as to reach the water conservancy construction The characteristics of putting good fixing effect.
It can to sum up obtain, the water conservancy construction pipeline fixing device, by setting lower clamping 4, upper clamp ring 7, the first connector 9th, the second connector 10 and screw 11 and threaded rod 13, first gear 14 and second gear 16 are equipped with, and have reached this The characteristics of device good fixing effect, the overall stability of pipeline is effectively increased, while improve the service life of pipeline, effectively Reduce the maintenance cost of pipeline.
Meanwhile by the way that 2 and first spring 3 of fixing sleeve and fixing piece 5, the cooperation of second spring 6 and cushion 8 is set to set It puts, buffering can be played the role of to pipeline, effectively reduce the vibrations generated during pipe drainage, effectively extend pipeline Service life, while greatly ensure that the normal work of pipeline.
Meanwhile by setting first gear 14, second gear 16 and ball 15 and fixed link 18, bull stick 17 and anti-skidding Being equipped with for set 19, can make staff that threaded rod 13 is inserted into soil or clitter by way of shaking Anti-slip cover 19 The device is fixed, the effective guarantee structural stability of the device.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Non-exclusive inclusion, so that process, method, article or equipment including a series of elements not only will including those Element, but also including other elements that are not explicitly listed or further include as this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that in the case where not departing from the principle of the utility model and spirit can these embodiments be carried out with a variety of variations, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of water conservancy construction pipeline fixing device, including pedestal (1), it is characterised in that:The top of the pedestal (1) is fixed Fixing sleeve (2) is connected with, and the first spring (3) is provided in fixing sleeve (2), bottom and the pedestal (1) of first spring (3) Top be fixedly connected, and the top of the first spring (3) through fixing sleeve (2) top and be fixedly connected with lower clamping (4), institute The both sides for stating fixing sleeve (2) are both provided with fixing piece (5), and the top of two fixing pieces (5) is embedded with second spring (6), and The top of two fixing pieces (5) is extended through at the top of two second springs (6) and is fixedly connected on the bottom of lower clamping (4), It is overlapped with clamp ring (7) at the top of the lower clamping (4), and upper clamp ring (7) one side opposite with lower clamping (4) is fixedly connected with There is a cushion (8), the both sides of the upper clamp ring (7) and lower clamping (4) are respectively fixedly connected with that there are two the first connector (9) and two Second connector (10), and between upper clamp ring (7) and first connector (9) of lower clamping (4) both sides and the second connector (10) It is interspersed with screw (11);
Both sides at the top of the pedestal (1) are both provided with drilling equipment (12), and drilling equipment (12) includes housing (20) and spiral shell Rasp bar (13), the threaded rod (13) is located in housing (20), and first gear (14) is socketed on threaded rod (13), and described the One gear (14) is embedded in the inner wall of housing (20), and ball (15) is provided with below first gear (14), and described first The one side of gear (14) is engaged with the one side of second gear (16), and second gear (16) is through the one side of housing (20) and fixation Bull stick (17) is connected with, fixed link (18), and the bottom of fixed link (18) and the top of pedestal (1) are socketed on the bull stick (17) Portion is fixedly connected, and the one end of the bull stick (17) away from second gear (16) is socketed with Anti-slip cover (19).
2. a kind of water conservancy construction pipeline fixing device according to claim 1, it is characterised in that:First spring (3) top in the middle part of lower clamping (4) bottom with being fixedly connected, and the elastic force of the first spring (3) is more than the pressure of lower clamping (4) Power.
3. a kind of water conservancy construction pipeline fixing device according to claim 1, it is characterised in that:The second spring (6) top is vertical with the bottom of lower clamping (4), and the elastic force of two second springs (6) is respectively less than the bullet of the first spring (3) Power.
4. a kind of water conservancy construction pipeline fixing device according to claim 1, it is characterised in that:First connector (9) bottom is overlapped on the top of the second connector (10), and the both ends of the screw (11) extend through the first connector (9) Top and the bottom of the second connector (10).
5. a kind of water conservancy construction pipeline fixing device according to claim 1, it is characterised in that:Ball (15) edge In the inner wall one side of housing (20), and the top of ball (15) and the one side of first gear (14) bottom are slidably connected.
6. a kind of water conservancy construction pipeline fixing device according to claim 1, it is characterised in that:The first gear (14) threaded hole to match with threaded rod (13) is offered in, the one side of the housing (20) offers and second gear (16) The opening to match.
CN201721631957.1U 2017-11-30 2017-11-30 A kind of water conservancy construction pipeline fixing device Expired - Fee Related CN207437937U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721631957.1U CN207437937U (en) 2017-11-30 2017-11-30 A kind of water conservancy construction pipeline fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721631957.1U CN207437937U (en) 2017-11-30 2017-11-30 A kind of water conservancy construction pipeline fixing device

Publications (1)

Publication Number Publication Date
CN207437937U true CN207437937U (en) 2018-06-01

Family

ID=62285294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721631957.1U Expired - Fee Related CN207437937U (en) 2017-11-30 2017-11-30 A kind of water conservancy construction pipeline fixing device

Country Status (1)

Country Link
CN (1) CN207437937U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108758141A (en) * 2018-06-06 2018-11-06 繁昌县倍思生产力促进中心有限公司 A kind of electricapparatus tee pipe fitting
CN110254953A (en) * 2019-05-25 2019-09-20 湖南达道新能源开发有限公司 A kind of fixation device for heat distribution pipeline transport
CN110571732A (en) * 2019-09-11 2019-12-13 张伊蒙 Fixable cable with maintenance function
CN111706711A (en) * 2020-06-24 2020-09-25 本源海绵建投(深圳)工程有限公司 Building connecting pipeline

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108758141A (en) * 2018-06-06 2018-11-06 繁昌县倍思生产力促进中心有限公司 A kind of electricapparatus tee pipe fitting
CN110254953A (en) * 2019-05-25 2019-09-20 湖南达道新能源开发有限公司 A kind of fixation device for heat distribution pipeline transport
CN110571732A (en) * 2019-09-11 2019-12-13 张伊蒙 Fixable cable with maintenance function
CN110571732B (en) * 2019-09-11 2020-12-11 江苏超诚智能科技有限公司 Fixable cable with maintenance function
CN111706711A (en) * 2020-06-24 2020-09-25 本源海绵建投(深圳)工程有限公司 Building connecting pipeline

Similar Documents

Publication Publication Date Title
CN207437937U (en) A kind of water conservancy construction pipeline fixing device
CN208535325U (en) A kind of offshore oil pipeline support vibration absorber
CN205842107U (en) A kind of mine equipment damping base
CN206034564U (en) Municipal administration pipe -network water supply device
CN207750588U (en) A kind of pipeline fixing device of good damping effect
CN206034585U (en) Mechanical type device of slipping for sewer pipe
CN107775473A (en) A kind of pipeline sanding apparatus
CN205552129U (en) Pipeline punch
CN209501186U (en) A kind of thermal power generation station-service fugitive dust cleaning plant
CN204985810U (en) Hard -sealing and high -temperature ball valve
CN108167534A (en) A kind of efficient locking branch device for hoisting adjusted convenient for Pipe installing
CN207393663U (en) A kind of photovoltaic bracket connects accessory
CN201187263Y (en) Horizontal well stationary type pipe column centralizer
CN208380891U (en) A kind of protective device of easy-to-dismount multifunction pump
CN207369546U (en) A kind of portable farmland loosenning tiller
CN207333952U (en) A kind of pipeline fixing device for building
CN207485849U (en) Point contact ball bearing with fastening compressing structure
CN205329588U (en) Elasticity isolated column is used in road surface construction
CN110778901A (en) Equipment for supplementing oil to rock hydraulic press by using working temperature
CN209494656U (en) A kind of anti-jamming drainage pipeline power generation runner
CN205560187U (en) Dedicated support frame of portable shock attenuation household electrical appliances
CN204344478U (en) Chemical centrifugal pump
CN207454948U (en) Sliding support in a kind of anti-wear direct-buried pipe
CN204827856U (en) Compressor foot pad and air conditioner with same
CN207421529U (en) A kind of water supply network interface fixing protector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180601

Termination date: 20181130

CF01 Termination of patent right due to non-payment of annual fee