CN207436336U - A kind of two chamber curtain wall of energy saving building aluminium Bao Musan glass - Google Patents

A kind of two chamber curtain wall of energy saving building aluminium Bao Musan glass Download PDF

Info

Publication number
CN207436336U
CN207436336U CN201721508096.8U CN201721508096U CN207436336U CN 207436336 U CN207436336 U CN 207436336U CN 201721508096 U CN201721508096 U CN 201721508096U CN 207436336 U CN207436336 U CN 207436336U
Authority
CN
China
Prior art keywords
glass
chamber
pressing plate
plate
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721508096.8U
Other languages
Chinese (zh)
Inventor
吉兴华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Passive Environment Technology Co Ltd
Original Assignee
Qingdao Passive Environment Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Passive Environment Technology Co Ltd filed Critical Qingdao Passive Environment Technology Co Ltd
Priority to CN201721508096.8U priority Critical patent/CN207436336U/en
Application granted granted Critical
Publication of CN207436336U publication Critical patent/CN207436336U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Glass To Other Materials (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Securing Of Glass Panes Or The Like (AREA)

Abstract

The utility model proposes a kind of two chamber curtain walls of energy saving building aluminium Bao Musan glass, including main supporting structure, main supporting structure includes the cross-brace plate and vertical supporting plate that are mutually perpendicular to installation, is equipped with bearing structure on the mounting surface of cross-brace plate, location sealing structure is equipped in vertical supporting plate;Three glass, two chamber glass is installed simultaneously in bearing structure and location sealing structure;The utility model by dry inert gas is filled in the cavity of three glass, two chamber glass, surrounding is bonded using high-strength high-air-tightness composite caking agent and on the outside glass intermediate air layer side coat good in thermal property particulate metal film so that three glass, two chamber hollow glass have optimal heat insulation;Support construction uses horizontal fixed structure and vertical location sealing structure simultaneously so that support construction is more stablized;Furthermore it ensure that the whole leakproofness of three glass, two chamber glass using various sealing structures.

Description

A kind of two chamber curtain wall of energy saving building aluminium Bao Musan glass
Technical field
The utility model is related to the maintenance technologies in passive room, particularly relate to a kind of two chamber curtain of energy saving building aluminium Bao Musan glass Wall.
Background technology
Existing three glass, two chamber glass uses the transparent glass of non-filler, such glass architecture operation energy consumption is high, Installed capacity is big, and then adds additional funding, limits its use scope;Glass heat-proof, the soundproof effect of object filler are poor, Good inhabitation or working environment cannot be built.
Utility model content
The utility model proposes a kind of two chamber curtain walls of energy saving building aluminium Bao Musan glass, pass through the cavity in three glass, two chamber glass The dry inert gas of interior filling bonds surrounding using high-strength high-air-tightness composite caking agent and on the outside among glass Air layer side coats particulate metal film of good in thermal property so that three glass, two chamber hollow glass has optimal heat insulation;Simultaneously Support construction uses horizontal fixed structure and vertical location sealing structure so that support construction is more stablized;Furthermore using various Sealing structure ensure that the whole leakproofness of three glass, two chamber glass.
What the technical solution of the utility model was realized in:
A kind of two chamber curtain wall of energy saving building aluminium Bao Musan glass, including:Main supporting structure, the main supporting structure include mutual Vertically arranged cross-brace plate and vertical supporting plate are equipped with bearing structure on the mounting surface of the cross-brace plate, described Location sealing structure is installed in vertical supporting plate;Three glass, two chamber is installed simultaneously in the bearing structure and location sealing structure Glass.
Further, the bearing structure includes carrying the glass holder of three glass, the two chamber glass and fixed three glass The horizontal pressing plate of two chamber glass, the glass holder are fixedly installed on the cross-brace plate, and the transverse direction pressing plate is fixed on institute It states on glass holder.
Further, vertical pressing plate is installed, the vertical pressing plate peripheral side is equipped with vertically in the location sealing structure Buckle closure;The vertical pressing plate fixes three glass, the two chamber glass simultaneously with the horizontal pressing plate.
Further, crack-resistant layer is scribbled between three glass, the two chamber glass and the horizontal pressing plate or vertical pressing plate;
The broken strip with partition disagglutinating action is installed in groove on the outside of the transverse direction pressing plate;
The transverse direction pressing plate or vertical pressing plate and the joint place of three glass, the two chamber glass pass through pressing plate adhesive tape sealing;
The transverse direction pressing plate peripheral side is equipped with the horizontal buckle closure with decoration and sealing function;
Red glass gasket is installed at the top of the both sides vertical with the cross-brace plate on the glass holder;
The both sides vertical with the cross-brace plate are equipped with crossbeam sealing on the glass holder;
System item with cushioning effect is installed between the glass holder and the main supporting structure;
Gap between the transverse direction pressing plate and the glass holder is blocked by fluid sealant.
Further, the vertical pressing plate peripheral side is equipped with column sealing structure, the column sealing structure and vertical pressure The peripheral side of plate is coated with the vertical buckle closure with decoration and sealing function simultaneously.
Further, the location sealing structure is fixed on by plum blossom self threading pin in coiled hair in the vertical supporting plate.
Further, the horizontal pressing plate is fixed on by plum blossom self threading pin in column cap on the glass holder.
Further, the cross-brace plate and vertical supporting plate are timber major ingredient plate.
The utility model in the cavity of three glass, two chamber glass by filling dry inert gas, airtight using high-strength height Property composite caking agent surrounding is bonded and on the outside glass intermediate air layer side coating good in thermal property particulate metal film, make Obtaining three glass, two chamber hollow glass has optimal heat insulation;Support construction is positioned using horizontal fixed structure and vertically close simultaneously Seal structure so that support construction is more stablized;Furthermore it ensure that the close of the entirety of three glass, two chamber glass using various sealing structures Feng Xing.
Description of the drawings
It in order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, before not making the creative labor property It puts, can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is that a kind of structure of two chamber curtain wall of energy saving building aluminium Bao Musan glass in the utility model specific embodiment is overlooked Figure.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without creative efforts All other embodiments obtained shall fall within the protection scope of the present invention.
In specific embodiment of the utility model, Fig. 1 is seen, a kind of two chamber curtain wall of energy saving building aluminium Bao Musan glass, including:
Main supporting structure 1, main supporting structure 1 include bottom frame plate, the first side frame plate, top frame plate and the second side of head and the tail connection Deckle board, bottom frame plate, the first side frame plate, top frame plate and the second side deckle board are used to the not strong glass of three glass, two chamber being fixed on wall;
Orthogonal transverse direction is installed in the space that bottom frame plate, the first side frame plate, top frame plate and the second side deckle board are formed Support plate 11 and vertical supporting plate 12, cross-brace plate 11 and vertical supporting plate 12 mainly play three glass, two chamber glass 3 support and make With;Bearing structure 2 on the mounting surface of cross-brace plate 11 is installed, location sealing structure 4 in vertical supporting plate 12 is installed, is held It carries structure 2 and location sealing structure is used to three glass, two chamber glass being fixed on cross-brace plate 11, vertical supporting plate 12, bottom frame On plate, the first side frame plate, top frame plate and the second side deckle board.
In specific embodiment of the utility model, Fig. 1 is seen, bearing structure 2 includes carrying three glass, two chamber glass 3 Glass holder 204 and the horizontal pressing plate 206 for fixing three glass, two chamber glass 3, glass holder 204 are fixedly installed on cross-brace plate 11, Horizontal pressing plate 206 is fixed on glass holder 204;Wherein glass holder 204 ensures the stability of three glass, two chamber glass, that is, improves The safety coefficient of three glass, the two chamber glass curtain wall of structure;Horizontal pressing plate 206 plays fixation to glass holder 204, prevents three glass two Chamber glass rotates.
In specific embodiment of the utility model, Fig. 1 is seen, location sealing structure 4 includes vertical pressing plate 43, vertical pressing plate Vertical upright column 42 is installed, 42 peripheral side of vertical upright column is equipped with vertical buckle closure 44 on 43;Vertical pressing plate 43 and horizontal pressing plate 206 Fix three glass, two chamber glass 3 simultaneously;Vertical buckle closure 44 has sealing function, while vertical pressing plate 43 and vertical upright column 42 are included Inside, appearance has been beautified.
In specific embodiment of the utility model, Fig. 1, three glass, two chamber glass 3 and horizontal pressing plate 206 or vertical pressing plate are seen Crack-resistant layer SYT100 (209) is scribbled between 43, crack-resistant layer 209 is coated with expansion antimitotic agent, can be prevented because expanding with heat and contract with cold And generate slight crack;
The broken strip 1-5 (208) with partition disagglutinating action is installed in the groove in horizontal 206 outside of pressing plate;
Horizontal pressing plate 206 or vertical pressing plate 43 and the joint place of three glass, two chamber glass 3 are sealed by pressing plate adhesive tape 205, Pressing plate adhesive tape 205 has sealing function, effectively enhances the wind and water preventing function of building, adds mechanical stability and safety Property;
Horizontal 206 peripheral side of pressing plate is equipped with the horizontal buckle closure 60-16 (207) with decoration and sealing function;
Red glass gasket 203, red glass are installed on glass holder 204 at the top of the both sides vertical with cross-brace plate 11 Glass gasket 203 can effectively prevent the frictional noise of the connecting portion generation of structure, effectively rigidity be avoided to contact;
The both sides vertical with cross-brace plate 11 are equipped with crossbeam sealing 60E2 (202) on glass holder 204, can effectively prevent The only junction gas leakage of glass holder 204 and cross-brace plate 11;
System 55-56 (201) with cushioning effect, system item are installed between glass holder 204 and cross-brace plate 11 201 can effectively buffer the extraneous pressure applied suddenly;
Gap between horizontal pressing plate 206 and glass holder 204 is blocked by fluid sealant 210, uses 210 envelope of fluid sealant It is stifled, it can insulate against sound, is heat-insulated, shock insulation.
In specific embodiment of the utility model, Fig. 1 is seen, location sealing structure 4 passes through plum blossom self threading pin 41 in coiled hair It is fixed in vertical supporting plate 12, for plum blossom self threading pin 41 convenient for recycling, packaging efficiency is high, connection is reliable, solves horizontal stroke in coiled hair To support plate 11 and location sealing structure 4, packaging efficiency is low and the problem of connection reliability is poor in use.
In specific embodiment of the utility model, Fig. 1 is seen, horizontal pressing plate 206 is solid by plum blossom self threading pin 211 in column cap Due on glass holder 204, plum blossom self threading pin 211 has the function of to aid in stress in column cap.
In specific embodiment of the utility model, Fig. 1 is seen, cross-brace plate 11 and vertical supporting plate 12 are timber master Flitch;Cross-brace plate 11 and vertical supporting plate 12 mainly play a supportive role, and wood surface is handled through paint, have uvioresistant The advantages that line, waterproof, corrosion resistance are good, environmentally protective.
In specific embodiment of the utility model, Fig. 1 is seen, the installation steps of three glass, two chamber cladding glass include:
Step 1:Bottom frame plate is installed, is first placed on the bottom plate of framework under the hole for the wall for needing to install cladding glass Side after leveling, is fixed inside and outside corner fittings and bottom frame plate with wood screw;
Step 2:Side frame plate and upper deckle board after bottom frame plate fixes, are passed through special card slot by installation side deckle board and upper deckle board Part is attached fixation;
Step 3:Cross-brace plate 11 and vertical supporting plate 12, bottom frame plate, side frame plate, upper deckle board and cross-brace plate are installed After installation is complete, cross-brace plate 11 and vertical supporting plate 12 are also secured to by bottom frame plate and upper deckle board using special connecting piece On;
Step 4:To cross-brace plate 11 and vertical supporting plate 12 and bottom frame plate, side frame plate, upper deckle board and cross-brace plate 11 junction is handled using shinjuker silicone construction sealants, ensure sealing effect, and using aluminium system item into Then upper system item 201 is pressed in row docking;Cross-brace plate 11 and vertical supporting plate 12 and the junction of bottom frame plate and upper deckle board are glued BOSIG aluminium foil butyl rubber belts are posted, aluminium foil butyl rubber belt is mainly used for the position more demanding to waterproof sealing and is sealed place Reason has long-term uvioresistant, the easy to operate, characteristic that can voluntarily be shunk at nailing;
Step 5:Bottom frame plate and the junction of upper deckle board and wall are used into the preferable polyurethane foam filler of the winter property applied It is closed.
Through experiment, pass through the installation method in the application, in the installation of three glass, two chamber curtain wall, construction cost saving 15%, the duration saves 12 days, and solid and reliable, by being met the requirements of the standard after phi air tightness tests.
In specific embodiment of the utility model, Fig. 1 is seen, three glass, two chamber glass 3 is made of three layer flat plate glass, four Week using high-strength high-air-tightness composite caking agent by three sheet glass and sealing strip, glass bar is Nian Jie, seals, centre is filled with dry gas Body is filled with drier in frame, to ensure the aridity of air between sheet glass;The pyroconductivity of glass is 27 times of air, as long as Hollow glass is sealing, which will have optimal heat insulation;
High performance hollow glass is different from common hollow glass simultaneously, except the enclosed dry air among layer glass Outside, glass intermediate air layer one side, particulate metal film of painting last layer good in thermal property, particulate metal film can also cut on the outside Only by shining upon indoor comparable energy, play an important role of completely heat-insulated.
In specific embodiment of the utility model, see Fig. 1, while using the structure proposed in the utility model, have Not the advantages of following existing structure does not have:
(1) visible light transmittance is high, permeability is good, Indoor Natural daylighting effect is good;
(2) winter allows substantial amounts of sun heat radiation to get in, for increasing indoor thermal energy;
(3) one layer of air layer more than ordinary insulating glass, heat-insulating property is opposite to be improved, and is substantially reduced due to heating or empty Energy consumption caused by tune;
(4) one layer of air layer, sound insulation and noise reducing performance greatly improve more than ordinary insulating glass, as hollow layer selects inertia Gas is filled, and performance will have further raising, and be conducive to build quiet comfortable live and work environment, be to be located in downtown area The optimal selection of region building;
(5) there is good energy-saving effect, constructing operation energy consumption can be substantially reduced, reduce the installed capacity of air-conditioning, after Continuous infusion of financial resources is more favorable for environmental protection compared to greatly reducing with transparent cavity glass;
(6) moderate product price, use scope are wider.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modifications, equivalent replacements and improvements are made should be included in the utility model Protection domain within.

Claims (8)

1. a kind of two chamber curtain wall of energy saving building aluminium Bao Musan glass, it is characterised in that:Including main supporting structure, the main supporting structure Including the cross-brace plate for being mutually perpendicular to install and vertical supporting plate, carrying knot is installed on the mounting surface of the cross-brace plate Structure is equipped with location sealing structure in the vertical supporting plate;It is equipped with simultaneously in the bearing structure and location sealing structure Three glass, two chamber glass.
2. two chamber curtain wall of energy saving building aluminium Bao Musan glass as described in claim 1, it is characterised in that:The bearing structure includes For carrying the horizontal pressing plate of the glass holder of three glass, the two chamber glass and fixed three glass, the two chamber glass, the glass holder is consolidated Loaded on the cross-brace plate, the transverse direction pressing plate is fixed on the glass holder for Dingan County.
3. two chamber curtain wall of energy saving building aluminium Bao Musan glass as claimed in claim 2, it is characterised in that:The location sealing structure On vertical pressing plate is installed, the vertical pressing plate peripheral side is equipped with vertical buckle closure;The vertical pressing plate and the horizontal pressing plate Fixed three glass, the two chamber glass simultaneously.
4. two chamber curtain wall of energy saving building aluminium Bao Musan glass as claimed in claim 3, it is characterised in that:Three glass, the two chamber glass Crack-resistant layer is scribbled between the horizontal pressing plate or vertical pressing plate;
The broken strip with partition disagglutinating action is installed in groove on the outside of the transverse direction pressing plate;
The transverse direction pressing plate or vertical pressing plate and the joint place of three glass, the two chamber glass pass through pressing plate adhesive tape sealing;
The transverse direction pressing plate peripheral side is equipped with the horizontal buckle closure with decoration and sealing function;
Red glass gasket is installed at the top of the both sides vertical with the cross-brace plate on the glass holder;
The both sides vertical with the cross-brace plate are equipped with crossbeam sealing on the glass holder;
System item with cushioning effect is installed between the glass holder and the main supporting structure;
Gap between the transverse direction pressing plate and the glass holder is blocked by fluid sealant.
5. two chamber curtain wall of energy saving building aluminium Bao Musan glass as claimed in claim 4, it is characterised in that:The vertical pressing plate periphery Side is equipped with column sealing structure, and the peripheral side of the column sealing structure and vertical pressing plate is coated with simultaneously with decoration and close The vertical buckle closure of envelope effect.
6. two chamber curtain wall of energy saving building aluminium Bao Musan glass as claimed in claim 5, it is characterised in that:The location sealing structure It is fixed on by plum blossom self threading pin in coiled hair in the vertical supporting plate.
7. two chamber curtain wall of energy saving building aluminium Bao Musan glass as claimed in claim 6, it is characterised in that:The transverse direction pressing plate passes through Plum blossom self threading pin is fixed on the glass holder in column cap.
8. two chamber curtain wall of energy saving building aluminium Bao Musan glass as claimed in claim 7, it is characterised in that:The cross-brace plate and Vertical supporting plate is timber major ingredient plate.
CN201721508096.8U 2017-11-13 2017-11-13 A kind of two chamber curtain wall of energy saving building aluminium Bao Musan glass Expired - Fee Related CN207436336U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721508096.8U CN207436336U (en) 2017-11-13 2017-11-13 A kind of two chamber curtain wall of energy saving building aluminium Bao Musan glass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721508096.8U CN207436336U (en) 2017-11-13 2017-11-13 A kind of two chamber curtain wall of energy saving building aluminium Bao Musan glass

Publications (1)

Publication Number Publication Date
CN207436336U true CN207436336U (en) 2018-06-01

Family

ID=62288977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721508096.8U Expired - Fee Related CN207436336U (en) 2017-11-13 2017-11-13 A kind of two chamber curtain wall of energy saving building aluminium Bao Musan glass

Country Status (1)

Country Link
CN (1) CN207436336U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112411839A (en) * 2020-12-14 2021-02-26 浙江经典建筑装饰有限公司 Building glass curtain wall and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112411839A (en) * 2020-12-14 2021-02-26 浙江经典建筑装饰有限公司 Building glass curtain wall and construction method thereof
CN112411839B (en) * 2020-12-14 2021-07-30 浙江经典建筑装饰有限公司 Building glass curtain wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN203891277U (en) Steel structure solar glass curtain wall
CN202969629U (en) Connecting system for indoor partition wall and curtain wall stand column
CN207436336U (en) A kind of two chamber curtain wall of energy saving building aluminium Bao Musan glass
CN210507942U (en) Energy-saving building glass curtain wall
CN203891278U (en) Solar steel structure glass curtain wall
CN202913541U (en) Semi-unit open aluminum panel curtain wall structure
CN207405839U (en) A kind of glass curtain wall
CN207660145U (en) A kind of sealing structure of glass curtain wall and indoor top beam
CN206289814U (en) A kind of concealed frame type frame curtain wall
CN202544181U (en) Novel waterproof structure for glass curtain walls
CN204940567U (en) Metal gas warming plate
CN211369194U (en) Latent frame curtain attaches frame structure
CN208202252U (en) A kind of heat insulation glass curtain wall and its mounting structure
CN207934347U (en) A kind of sound-insulating and heat-insulating curtain wall with skylight
CN208830479U (en) A kind of tarpaulin composite plate and its connection structure
CN206888284U (en) A kind of fixed connection apparatus for being used for complete concealed and half hidden glass curtain wall
CN207453218U (en) The node structure of frame concealed curtain wall bottom plate and frame concealed curtain wall
CN106337636A (en) Environmental-friendly heat preservation door
CN110965680A (en) Heat preservation integral type presss from both sides core aluminum plate unit curtain mounting structure
CN214835804U (en) Energy-saving heat-insulating hollow glass
CN211735850U (en) Heat insulation board for cold storage room and cold storage room
CN113944263B (en) Outer wall waterproof structure for gap between curtain wall top and roof steel beam and construction method of outer wall waterproof structure
CN219672482U (en) Sound-insulation and heat-insulation anti-fog hollow glass
CN203783382U (en) Aluminum-clad wood hidden sash
CN211397223U (en) Toughened glass

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180601

Termination date: 20191113

CF01 Termination of patent right due to non-payment of annual fee