CN207431631U - A kind of steel construction is put with temporary be fixedly mounted with - Google Patents

A kind of steel construction is put with temporary be fixedly mounted with Download PDF

Info

Publication number
CN207431631U
CN207431631U CN201721606965.0U CN201721606965U CN207431631U CN 207431631 U CN207431631 U CN 207431631U CN 201721606965 U CN201721606965 U CN 201721606965U CN 207431631 U CN207431631 U CN 207431631U
Authority
CN
China
Prior art keywords
steel
clamp base
sliding block
leading screw
fixed pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721606965.0U
Other languages
Chinese (zh)
Inventor
郭都城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jiaotong University
Original Assignee
Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiaotong University filed Critical Chongqing Jiaotong University
Priority to CN201721606965.0U priority Critical patent/CN207431631U/en
Application granted granted Critical
Publication of CN207431631U publication Critical patent/CN207431631U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of are temporarily fixedly mounted with to put,In particular it is that a kind of steel construction is put with temporary be fixedly mounted with including sliding fixed pedestal,Slide fixed pedestal slideway,Slide clamp base,Slide clamp base sliding block,Leading screw I,Slide fixed rotary handle,Support arm,Pulley,Stress support plate,Steel base,Steel are fixedly clamped case,Steel are fixedly clamped case slideway,Steel clamp base,Steel clamp base sliding block,Leading screw II,Steel clamp swing handle,I-steel,Can solve the problems, such as existing steel building be all precasting yard by the welding of steel substantially go out big frame transport to construction site carry out erect welding,It can also solve the problems, such as that needs are substantial amounts of artificial when welding is erect and lifting appliance could be directed at welding position and precision is not very high,The air environment with the work influence of large scale equipment,Worker works under lifting appliance also the problem of very big danger.

Description

A kind of steel construction is put with temporary be fixedly mounted with
Technical field
The utility model is related to a kind of are temporarily fixedly mounted with to put, and is in particular that a kind of steel construction is put with temporary be fixedly mounted with.
Background technology
Steel building is the most important construction method of industrial building, and the antidetonation tensile property of steel building is than building Build it is much higher, existing steel building be all precasting yard by the welding of steel substantially go out big frame transport to construction site into Row, which is erect, to be welded, and needs substantial amounts of artificial and lifting appliance that could be directed at welding position, and precision when erectting and welding It is not very high, the work influence of large scale equipment air environment, worker works under lifting appliance also very big danger.
The content of the invention
The utility model is related to a kind of are temporarily fixedly mounted with to put, and is in particular that a kind of steel construction is put with temporary be fixedly mounted with.It can solve Existing steel building is all that the welding of steel substantially is gone out big frame in precasting yard to carry out setting welding transporting construction site to The problem of, moreover it is possible to it solves to need substantial amounts of artificial and lifting appliance that could be directed at welding position and essence when erectting and welding The work influence of degree the problem of being not very high and large scale equipment air environment, worker work under lifting appliance also have it is very big Danger the problem of.
The utility model is related to a kind of are temporarily fixedly mounted with to put, and is in particular that a kind of steel construction is put with temporary be fixedly mounted with including sliding admittedly Determine pedestal, slide fixed pedestal slideway, slide clamp base, slide clamp base sliding block, leading screw I, slide fixed rotary handle, support Be fixedly clamped case, steel of arm, pulley, stress support plate, steel base, steel are fixedly clamped case slideway, steel clamp base, steel Material clamp base sliding block, leading screw II, steel clamp swing handle, I-steel, and it is all prefabricated that can solve existing steel building The welding of steel substantially is gone out big frame and is transporting the problem of construction site carries out erectting welding to by field, moreover it is possible to solve erectting welding When need it is substantial amounts of manually and lifting appliance could be directed at welding position and the problem of precision is not very high and large scale equipment Work influence air environment, worker works under lifting appliance also the problem of very big danger.
The upper end for sliding fixed pedestal is provided with slip fixed pedestal slideway, and the upper end slip for sliding fixed pedestal slideway has Clamp base is slided, the upper end for sliding clamp base is welded with slip clamp base sliding block, slides the upper end of clamp base sliding block Threaded hole is provided with, the upper end rotation for sliding clamp base sliding block has leading screw I, and the upper end of leading screw I is welded with slip fixed rotary handle, The upper end for sliding fixed pedestal is welded with support arm, and the upper end of support arm, which rotates, pulley, slides the upper end welding of fixed pedestal There are steel to be fixedly clamped case, slide the be fixedly clamped upper end of case of fixed pedestal and steel and be welded with stress support plate, steel clamp The upper end of fixed case is provided with steel base, and the be fixedly clamped upper end of case of steel is provided with steel and is fixedly clamped case slideway, steel The be fixedly clamped upper end of case slideway is slided and has a steel clamp base, and the upper end of steel clamp base is welded with steel clamp base cunning Block, the upper end of steel clamp base sliding block are provided with threaded hole, and the upper end of steel clamp base sliding block, which rotates, leading screw II, leading screw II upper end is welded with steel and clamps swing handle, and the upper end of pulley, which is slided, I-steel.
As the further optimization of the technical program, a kind of steel construction of the utility model is put the slip and is consolidated with being temporarily fixedly mounted with Determine pedestal, slide clamp base, slide clamp base sliding block, support arm, stress supporting plate material using stainless steel.
As the further optimization of the technical program, a kind of steel construction of the utility model puts the support with being temporarily fixedly mounted with Arm, pulley are disposed as three.
As the further optimization of the technical program, a kind of steel construction of the utility model puts the slip clamp with being temporarily fixedly mounted with Tight pedestal slides clamp base sliding block, leading screw I, slides fixed rotary handle concentrically line.
A kind of steel construction of the utility model is with being temporarily fixedly mounted with to put and have the beneficial effect that:
The utility model is related to a kind of are temporarily fixedly mounted with to put, and is in particular that a kind of steel construction is put with temporary be fixedly mounted with.It can solve Existing steel building is all that the welding of steel substantially is gone out big frame in precasting yard to carry out setting welding transporting construction site to The problem of, moreover it is possible to it solves to need substantial amounts of artificial and lifting appliance that could be directed at welding position and essence when erectting and welding The work influence of degree the problem of being not very high and large scale equipment air environment, worker work under lifting appliance also have it is very big Danger the problem of.
Description of the drawings
The utility model is described in more detail with specific implementation method below in conjunction with the accompanying drawings.
Fig. 1 is a kind of steel construction of the utility model with being temporarily fixedly mounted with the overall structure diagram put.
In figure:Slide fixed pedestal 1;Slide fixed pedestal slideway 2;Slide clamp base 3;Slide clamp base sliding block 4; Leading screw I 5;Slide fixed rotary handle 6;Support arm 7;Pulley 8;Stress support plate 9;Steel base 10;Steel are fixedly clamped case 11;Steel Material is fixedly clamped case slideway 12;Steel clamp base 13;Steel clamp base sliding block 14;Leading screw II 15;Steel clamp swing handle 16; I-steel 17.
Specific embodiment
Specific embodiment one:
Illustrate present embodiment with reference to Fig. 1, the utility model is mainly solving the technical problems that provide a kind of steel knot Structure is put with temporary be fixedly mounted with, including sliding fixed pedestal 1, sliding fixed pedestal slideway 2, slip clamp base 3, slip clamp base cunning Block 4, leading screw I 5, slide fixed rotary handle 6, support arm 7, pulley 8, stress support plate 9, steel base 10, steel are fixedly clamped case 11st, steel be fixedly clamped case slideway 12, steel clamp base 13, steel clamp base sliding block 14, leading screw II 15, steel clamp rotation Handle 16, I-steel 17, it is all that the welding of steel substantially is gone out big frame in precasting yard to transport that can solve existing steel building It carries out erectting the problem of welding toward construction site, moreover it is possible to solve to need substantial amounts of artificial and lifting appliance when erectting and welding Welding position could be directed at and the problem of precision is not very high and the work influence of large scale equipment air environment, Gong Ren Working under lifting appliance also has the problem of very big danger.
The upper end for sliding fixed pedestal 1 is provided with slip fixed pedestal slideway 2, and the upper end for sliding fixed pedestal slideway 2 is slided Dynamic to have slip clamp base 3, the upper end for sliding clamp base 3 is welded with slip clamp base sliding block 4, slides clamp base sliding block 4 upper end is provided with threaded hole, and the upper end rotation for sliding clamp base sliding block 4 has leading screw I 5, and the upper end of leading screw I 5 is welded with cunning Dynamic fixed rotary handle 6, the upper end for sliding fixed pedestal 1 are welded with support arm 7, and the upper end of support arm 7, which rotates, pulley 8, slides solid The upper end for determining pedestal 1 is welded with steel and is fixedly clamped case 11, slides the be fixedly clamped upper end of case 11 of fixed pedestal 1 and steel and welds There is a stress support plate 9, the be fixedly clamped upper end of case 11 of steel is provided with steel base 10, and the be fixedly clamped upper end of case 11 of steel is set It is equipped with steel to be fixedly clamped case slideway 12, the be fixedly clamped upper end of case slideway 12 of steel is slided and has steel clamp base 13, steel The upper end of clamp base 13 is welded with steel clamp base sliding block 14, and the upper end of steel clamp base sliding block 14 is provided with screw thread Hole, the upper end of steel clamp base sliding block 14, which rotates, leading screw II 15, and the upper end of leading screw II 15 is welded with steel and clamps swing handle 16, The upper end of pulley 8, which is slided, I-steel 17.
Specific embodiment two:
Bright present embodiment is had a talk about with reference to Fig. 1, present embodiment is described further embodiment one, described Fixed pedestal 1 is slided, clamp base 3 is slided, slides clamp base sliding block 4, support arm 7,9 material of stress support plate using not Rust steel material.
Specific embodiment three:
Bright present embodiment is had a talk about with reference to Fig. 1, present embodiment is described further embodiment one, described Support arm 7, pulley 8 are disposed as three.
Specific embodiment four:
Bright present embodiment is had a talk about with reference to Fig. 1, present embodiment is described further embodiment one, described Clamp base 3 is slided, clamp base sliding block 4, leading screw I 5 is slided, slides the concentrically line of fixed rotary handle 6.
The operation principle of the utility model is:
A kind of steel construction is that temporarily will be fixedly mounted with to put to be sleeved on 17 upper end of I-steel and then slide into the operation principle put temporarily is fixedly mounted with Rotational slide fixed rotary handle 6 behind the position needed, the rotation for sliding fixed rotary handle 6 drive leading screw I 5 to rotate, are clamped due to sliding Pedestal 3 is to slide sliding the upper end of fixed pedestal slideway 2, and so as to limit the rotation for sliding clamp base 3, leading screw I 5 turns Dynamic drive slides 4 transverse shifting of clamp base sliding block, and clamp base 3 is slided in the transverse shifting drive for sliding clamp base sliding block 4 I-steel 17 is clamped in pulley 8 with sliding completion among clamp base 3 by transverse shifting, the transverse shifting for sliding clamp base 3 It is fixed, it would be desirable to which that the steel of welding, which are placed on the upper end of steel base 10 and then rotate steel, clamps swing handle 16, and steel clamp rotation The rotation of handle 16 drives leading screw II 15 to rotate, since steel clamp base 13 is to slide to be fixedly clamped the upper of case slideway 12 in steel End, so as to limit the rotation of steel clamp base 13, the rotation of leading screw II 15 drives steel clamp base sliding block 14 to moving down Dynamic, moving down for steel clamp base sliding block 14 drives steel clamp base 13 to move down, steel clamp base 13 to Lower movement is clamped the steel for needing to weld, and can complete butt welding work, and can carry out subtle adjustment so as to protect The precision of welding position is demonstrate,proved, it is all that the welding of steel substantially is gone out big frame in precasting yard to exist to solve existing steel building Transport the problem of construction site carries out setting welding to, moreover it is possible to solve to need largely manually to set with lifting when erectting and welding It is standby to be directed at welding position and the problem of precision is not very high and the work influence of large scale equipment air environment, worker Working under lifting appliance also has the problem of very big danger.
Certainly, above description is not limitation of the utility model, and the utility model is also not limited to the example above, this skill The variations, modifications, additions or substitutions that the those of ordinary skill in art field is made in the essential scope of the utility model, also belong to In the scope of protection of the utility model.

Claims (4)

1. a kind of steel construction is put with temporary be fixedly mounted with, including sliding fixed pedestal (1), sliding fixed pedestal slideway (2), slip clamping base Seat (3) slides clamp base sliding block (4), leading screw I (5), slides fixed rotary handle (6), support arm (7), pulley (8), stress support Be fixedly clamped case (11), steel of plate (9), steel base (10), steel are fixedly clamped case slideway (12), steel clamp base (13), steel clamp base sliding block (14), leading screw II (15), steel clamp swing handle (16), I-steel (17), it is characterised in that: The upper end of the slip fixed pedestal (1), which is provided with, slides fixed pedestal slideway (2), slides the upper of fixed pedestal slideway (2) End, which is slided, slip clamp base (3), and the upper end for sliding clamp base (3) is welded with slip clamp base sliding block (4), slip clamp The upper end of tight pedestal sliding block (4) is provided with threaded hole, and the upper end rotation for sliding clamp base sliding block (4) has leading screw I (5), leading screw I (5) upper end, which is welded with, slides fixed rotary handle (6), and the upper end for sliding fixed pedestal (1) is welded with support arm (7), support arm (7) Upper end rotate and have a pulley (8), the upper end for sliding fixed pedestal (1) is welded with steel and is fixedly clamped case (11), slides fixed base The be fixedly clamped upper end of case (11) of seat (1) and steel is welded with stress support plate (9), and the be fixedly clamped upper end of case (11) of steel is set It is equipped with steel base (10), the be fixedly clamped upper end of case (11) of steel is provided with steel and is fixedly clamped case slideway (12), steel folder The upper end slip for fastening case slideway (12) has steel clamp base (13), and the upper end of steel clamp base (13) is welded with steel Clamp base sliding block (14), the upper end of steel clamp base sliding block (14) are provided with threaded hole, steel clamp base sliding block (14) Upper end rotate and have a leading screw II (15), the upper end of leading screw II (15) is welded with steel and clamps swing handle (16), and the upper end of pulley (8) is slided It is dynamic to have I-steel (17).
2. a kind of steel construction according to claim 1 is put with temporary be fixedly mounted with, it is characterised in that:The slip fixed pedestal (1), slide clamp base (3), slide clamp base sliding block (4), support arm (7), stress support plate (9) material using stainless Steel material.
3. a kind of steel construction according to claim 1 is put with temporary be fixedly mounted with, it is characterised in that:The support arm (7), pulley (8) three are disposed as.
4. a kind of steel construction according to claim 1 is put with temporary be fixedly mounted with, it is characterised in that:The slip clamp base (3), clamp base sliding block (4), leading screw I (5) are slided, slides fixed rotary handle (6) concentrically line.
CN201721606965.0U 2017-11-27 2017-11-27 A kind of steel construction is put with temporary be fixedly mounted with Expired - Fee Related CN207431631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721606965.0U CN207431631U (en) 2017-11-27 2017-11-27 A kind of steel construction is put with temporary be fixedly mounted with

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721606965.0U CN207431631U (en) 2017-11-27 2017-11-27 A kind of steel construction is put with temporary be fixedly mounted with

Publications (1)

Publication Number Publication Date
CN207431631U true CN207431631U (en) 2018-06-01

Family

ID=62288003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721606965.0U Expired - Fee Related CN207431631U (en) 2017-11-27 2017-11-27 A kind of steel construction is put with temporary be fixedly mounted with

Country Status (1)

Country Link
CN (1) CN207431631U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725484A (en) * 2019-10-29 2020-01-24 向怀轶 Inside-pressing low-tile rapid construction equipment for large-span structure factory building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725484A (en) * 2019-10-29 2020-01-24 向怀轶 Inside-pressing low-tile rapid construction equipment for large-span structure factory building

Similar Documents

Publication Publication Date Title
CN203804429U (en) Welding device for spiral drill rod
CN206702315U (en) A kind of construction site steel tube cutting machine with clamping function
CN207431631U (en) A kind of steel construction is put with temporary be fixedly mounted with
CN102294565B (en) Jack bracket welding device
CN108555515A (en) Scraper bowl welding tooling device
CN208117056U (en) NC heavy H profile steel automated exchanged cutter welding production line
CN205967749U (en) Industry oxygen cutting robotic arm
CN204524680U (en) For the revolution fitting device welded
CN203712043U (en) Curved steel plate welding and cutting device
CN207128097U (en) A kind of dimensional measurement positioning-cutting device for lithotome cutting
CN203712058U (en) Fixing device used for welding pipe flange
CN206144456U (en) Novel overhaul of equipments is with ladder
CN205555950U (en) Portable architectural equipment hoist device that can rotate
CN104889838B (en) Cutting machine tool and cutting method for precast concrete tower section
CN203903251U (en) Hinge type barreling and transporting clamp
CN208528583U (en) A kind of machine components positioning clamping device
CN208788628U (en) A kind of manipulator hand grabs rotating device
CN203863210U (en) Rocker type holding mechanism for positioning electric pole steel reinforcement framework erecting rings
CN208468168U (en) A kind of pipeline connection intersection positioning device
CN209578569U (en) Scraper bowl welding tooling device
CN209272526U (en) A kind of steel tube drilling machine index dial
CN203448913U (en) Welding tool of loader tipping hopper jar base
CN208788399U (en) A kind of photoelectric device turnable jig
CN206643384U (en) A kind of middle platform processing device of excavating machine
CN207309780U (en) A kind of portable fastening clamp device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180601

Termination date: 20181127