CN207425185U - A kind of multifunctional intelligent Ship Power Station actual training device - Google Patents
A kind of multifunctional intelligent Ship Power Station actual training device Download PDFInfo
- Publication number
- CN207425185U CN207425185U CN201720886382.1U CN201720886382U CN207425185U CN 207425185 U CN207425185 U CN 207425185U CN 201720886382 U CN201720886382 U CN 201720886382U CN 207425185 U CN207425185 U CN 207425185U
- Authority
- CN
- China
- Prior art keywords
- distribution cabinet
- power
- cabinet
- training device
- power station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electrically Operated Instructional Devices (AREA)
Abstract
The purpose of this utility model is to provide a kind of multifunctional intelligent Ship Power Station actual training device, for solving the technical issues of trainee skillfully grasps Ship Power Station operating method.A kind of multifunctional intelligent Ship Power Station actual training device including training operation bench, main distribution cabinet, meet an urgent need power distribution cabinet, shore connection box, divides electronic box, frequency conversion tank and generator;The main distribution cabinet, emergent power distribution cabinet and shore connection box are in parallel, and power input and the power generation mechatronics of main distribution and emergent power distribution cabinet, the power output end of main distribution, emergent power distribution cabinet and shore connection box divide electronic box to be electrically connected with described respectively;The frequency conversion tank is respectively equipped on described point of electronic box.The beneficial effects of the utility model are:Student can be made conveniently to grasp the operating method of Ship Power Station.And the system reliability is high, safe operation.
Description
Technical field
The utility model is related to Ship Power Station actual training device technical field, specifically a kind of multifunctional intelligent ship
Power station actual training device.
Background technology
With increasing of the further deep and China of economic globalization to ocean development dynamics, China is to ship
The demand of engineers and technicians and operating personnel are increasing.But opened from present, school and training organization are more
Using theory teaching mode, lack real training process, good learning effect is not achieved.It, can be with for some conditional mechanisms
Student is served ship to practise, but the number of people allowed is limited.Accordingly, it is desirable to provide a kind of Ship Power Station actual training device practice teaching dress
It puts, to solve deficiency of the prior art.
Utility model content
The purpose of this utility model is to provide a kind of multifunctional intelligent Ship Power Station actual training device, for solving to train
Student skillfully grasps the technical issues of Ship Power Station operating method.
The technical scheme in the invention for solving the technical problem is:A kind of multifunctional intelligent Ship Power Station is real
Training apparatus including training operation bench, main distribution cabinet, emergent power distribution cabinet, shore connection box, divides electronic box, frequency conversion tank and generator, described point
Electronic box and frequency conversion tank are respectively equipped with multiple;The main distribution cabinet, emergent power distribution cabinet and shore connection box are in parallel, main distribution and emergent distribution
The power input of cabinet and the power generation mechatronics, the power output end difference of main distribution, emergent power distribution cabinet and shore connection box
With described electronic box is divided to be electrically connected;The frequency conversion tank is respectively equipped on described point of electronic box;The training operation bench respectively with institute
The main distribution cabinet stated, meet an urgent need power distribution cabinet, shore connection box divide electronic box, frequency conversion tank and power generation mechatronics.
Further, Intelligent power distribution switch is equipped in the main distribution cabinet.
Further, the power output end of the generator is connected with voltage stabilization and current stabilization electricity cabinet, the power supply of voltage stabilization and current stabilization electricity cabinet
Output terminal is connected respectively by switching with the main distribution cabinet and emergent power distribution cabinet.
Further, the power output end of the voltage stabilization and current stabilization electricity cabinet is connected with accumulator, and the accumulator leads to respectively
Switch is crossed to connect with the main distribution cabinet and emergent power distribution cabinet.
Further, the generator includes main generator and stand-by generator.
The beneficial effects of the utility model are:
The technical solution adopted in the utility model can make student conveniently grasp the operating method of Ship Power Station.
And the system reliability is high, safe operation.
Description of the drawings
Fig. 1 is the connection relationship diagram of each equipment in technical solutions of the utility model;
In figure:1. training operation bench;2. main distribution cabinet;3. emergent power distribution cabinet;4. shore connection box;5. point electronic box;6. frequency conversion tank;
7. generator;8. voltage stabilization and current stabilization electricity cabinet;9. accumulator.
Specific embodiment
Technical solutions of the utility model are further illustrated with reference to the accompanying drawings and detailed description.
As shown in Figure 1, a kind of multifunctional intelligent Ship Power Station actual training device, including training operation bench 1, main distribution cabinet 2,
Emergent power distribution cabinet 3, shore connection box 4 divide electronic box 5, frequency conversion tank 6 and generator 7.The training operation bench 1 be equipped with display and
Various control buttons, the display are used for the operating status of display device, and the control button is used for by controlling system
System controls the work of each equipment.
The main distribution cabinet 2 is used to carry out distribution use to each equipment, between main distribution cabinet 2 and each electrical equipment respectively
The connection frequency conversion tank 6 divided electronic box 5, each divide on electronic box 5 described in being connected with, it is described according to the difference of each electrical equipment
Frequency conversion tank 6 power supply of different frequency can be provided, the frequency conversion tank 6 and the control system of the training operation bench 1 are electrically connected
It connects.The a variety of Intelligent power distribution switchs of integrated installation in the main distribution cabinet 2, main distribution cabinet 2 pass through circuit and are grasped with the real training
Make the control system electrical connection in platform 1.The emergent power distribution cabinet 3 is connected in parallel with the main distribution cabinet 2, when main distribution cabinet
2 when breaking down, and is powered by the emergent power distribution cabinet 3 to equipment.
The shore connection box 4 is connected in parallel respectively with the main distribution cabinet 2 and emergent power distribution cabinet 3, works as ship for simulating
When oceangoing ship pulls in shore, land power supply is connected.The shore connection box 4 is equipped with manual shore connection box and automatic shore connection box, and the manual shore connection box is set
There is manual switch, be operated with manual switches and realize shore connection box 4 and the break-make of bank electricity;The automatic shore connection box is equipped with automatic switch, institute
The automatic switch stated is electrically connected with the control system in the training operation bench 1, by the way that control is pressed accordingly on training operation bench 1
Key is the break-make realized with bank electricity.
The generator 7 is used as main power source, and the power intake of the generator 7 is connected with diesel engine, institute
Generator 7 is stated equipped with two, a main generator and a stand-by generator;The power output end of the generator 7 is connected with
Voltage stabilization and current stabilization electricity cabinet 8, the power output end of voltage stabilization and current stabilization electricity cabinet 8 are matched somebody with somebody respectively by switch and the main distribution cabinet 2 and meeting an urgent need
Electric cabinet 3 is connected.Further, the power output end of voltage stabilization and current stabilization electricity cabinet 8 is connected with accumulator 9, and the accumulator 9 leads to respectively
It crosses switch to connect with the main distribution cabinet 2 and emergent power distribution cabinet 3, accumulator 9 uses in emergency circumstances power supply.
The technical solution adopted in the utility model can make student conveniently grasp the operating method of Ship Power Station.
And the system reliability is high, safe operation.
It is the known technology of those skilled in the art in addition to the technical characteristic described in specification.
It is above-mentioned although specific embodiments of the present invention are described with reference to the accompanying drawings, but not to this practicality newly
The limitation of type protection domain, on the basis of technical solutions of the utility model, those skilled in the art need not pay creativeness
The various modifications or changes that can make of work it is still within the protection scope of the present utility model.
Claims (5)
1. a kind of multifunctional intelligent Ship Power Station actual training device, it is characterized in that, including training operation bench, main distribution cabinet, meet an urgent need
Power distribution cabinet, shore connection box divide electronic box, frequency conversion tank and generator, it is described divide electronic box and frequency conversion tank be respectively equipped with it is multiple;The main distribution
Cabinet, emergent power distribution cabinet and shore connection box are in parallel, and power input and the power generation mechatronics of main distribution and emergent power distribution cabinet are main
The power output end of distribution, emergent power distribution cabinet and shore connection box divides electronic box to be electrically connected with described respectively;Divide on described point of electronic box
Frequency conversion tank that She You be not described;The training operation bench respectively with the main distribution cabinet, emergent power distribution cabinet, shore connection box, point electricity
Case, frequency conversion tank and power generation mechatronics.
2. a kind of multifunctional intelligent Ship Power Station actual training device according to claim 1, it is characterized in that, the master matches somebody with somebody
Intelligent power distribution switch is equipped in electric cabinet.
3. a kind of multifunctional intelligent Ship Power Station actual training device according to claim 1, it is characterized in that, the generator
Power output end be connected with voltage stabilization and current stabilization electricity cabinet, the power output end of voltage stabilization and current stabilization electricity cabinet passes through switch and the master respectively
Power distribution cabinet and the series connection of emergent power distribution cabinet.
4. a kind of multifunctional intelligent Ship Power Station actual training device according to claim 3, it is characterized in that, the voltage stabilizing is steady
The power output end of galvanic electricity cabinet is connected with accumulator, and the accumulator by switch and the main distribution cabinet and is met an urgent need respectively
Power distribution cabinet is connected.
5. a kind of multifunctional intelligent Ship Power Station actual training device according to claim 1, it is characterized in that, the generator
Including main generator and stand-by generator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720886382.1U CN207425185U (en) | 2017-07-20 | 2017-07-20 | A kind of multifunctional intelligent Ship Power Station actual training device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720886382.1U CN207425185U (en) | 2017-07-20 | 2017-07-20 | A kind of multifunctional intelligent Ship Power Station actual training device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207425185U true CN207425185U (en) | 2018-05-29 |
Family
ID=62399266
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720886382.1U Expired - Fee Related CN207425185U (en) | 2017-07-20 | 2017-07-20 | A kind of multifunctional intelligent Ship Power Station actual training device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207425185U (en) |
-
2017
- 2017-07-20 CN CN201720886382.1U patent/CN207425185U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106057005B (en) | A kind of building power supply and distribution teaching processing simulation experience system | |
CN203365563U (en) | Intelligent simulated circuit breaker | |
CN203490884U (en) | Relay matrix fault simulation device | |
CN207425185U (en) | A kind of multifunctional intelligent Ship Power Station actual training device | |
CN204440698U (en) | Portable track switch control module experimental box | |
CN203607007U (en) | Ship power station simulation practical training device | |
CN104464430A (en) | Portable switch control unit experimental box | |
CN204215638U (en) | Intelligent numerical control student power source | |
CN202523281U (en) | Experimental device made up of analog electric power system | |
CN201616204U (en) | Wiring analog device for electric energy meter | |
CN204028155U (en) | A kind of current signal generator | |
CN204391780U (en) | A kind of Portable English teaching special dais power supply box | |
CN202389561U (en) | Electrical system special for seagoing tender FMEA (failure mode and effects analysis) | |
CN207318697U (en) | A kind of intermediate frequency low-voltage high-current test device | |
CN202276189U (en) | Control power supply dual-channel power supplying device for high voltage inverter | |
CN206023597U (en) | Finger-print type classroom power control | |
CN205541525U (en) | Ship electric power plant overhauls real standard system | |
CN208819480U (en) | A kind of one-and-half breaker bus grid switching operation experimental provision | |
CN211207725U (en) | Application teaching experiment simulation device | |
CN201699423U (en) | Three-phase power voltage stabilizer with three-phase simultaneous output function and three-single-phase independent output function | |
CN201332196Y (en) | Intelligent power converter based on Ethernet | |
CN208284123U (en) | A kind of simulation unit discharge system | |
CN203300112U (en) | Electricity measurement and electricity distribution demonstration board | |
CN203521233U (en) | Relay-based power switch | |
CN209230971U (en) | A kind of test equipment for STDR-G type melting snow on turnout junction equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180529 Termination date: 20190720 |