CN207419895U - A kind of New fence of embedded bar note grouting material - Google Patents

A kind of New fence of embedded bar note grouting material Download PDF

Info

Publication number
CN207419895U
CN207419895U CN201721139275.9U CN201721139275U CN207419895U CN 207419895 U CN207419895 U CN 207419895U CN 201721139275 U CN201721139275 U CN 201721139275U CN 207419895 U CN207419895 U CN 207419895U
Authority
CN
China
Prior art keywords
rail post
grouting material
cement
new fence
embedded bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721139275.9U
Other languages
Chinese (zh)
Inventor
胡宝平
黄磊
陈异
陈瑞锋
黄亚东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Vanke Real Estate Co Ltd
Original Assignee
Wuhan Vanke Real Estate Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Vanke Real Estate Co Ltd filed Critical Wuhan Vanke Real Estate Co Ltd
Priority to CN201721139275.9U priority Critical patent/CN207419895U/en
Application granted granted Critical
Publication of CN207419895U publication Critical patent/CN207419895U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of New fence of embedded bar note grouting material of the utility model, including cement substrate, multiple reinforcing bars are installed in the cement substrate, rail post is cased with outside the reinforcing bar, the rail post is in contact with the cement substrate, cement slurry is filled in the rail post, on the rail post circular hole is equipped with close to the one side of the cement substrate, cement slurry can be injected by the circular hole between the reinforcing bar and the rail post, the New fence steel scrap muscle can recycle, structure is without reserved chisel rim of a cup, it is fixed without pre-embedded steel slab and setscrew, installation is succinct, fastness is high and construction efficiency is high.

Description

A kind of New fence of embedded bar note grouting material
Technical field
The utility model is related to family expenses decoration technology field more particularly to a kind of new columns of embedded bar note grouting material Bar.
Background technology
The installation method of railing is usually pre-buried 6 millimeters of the steel plate in cement substrate at this stage, by railing bottom and steel Plate is in contact, and is mutually anchored railing bottom with steel plate by tack inner expansion bolt, this installation method cost is high, i.e., every square metre Cost for 9.21 yuan, and the later stage easily loosens, and security is low.
Utility model content
The purpose of this utility model is that in view of the above shortcomings of the prior art, provide a kind of embedded bar note grouting material New fence, without pre-embedded steel slab and setscrew, at low cost and installation is succinct, work efficiency is high.
To achieve the above object, the utility model employs following technical solution:
The utility model provides a kind of New fence of embedded bar note grouting material, including cement substrate, the cement Multiple reinforcing bars are installed on pedestal, rail post is cased with outside the reinforcing bar, the rail post is in contact with the cement substrate, It fills cement slurry in the rail post, is equipped with circular hole close to the one side of the cement substrate on the rail post, passes through The circular hole can inject cement slurry between the reinforcing bar and the rail post.
Further, the reinforcing bar be higher than 8 centimetres of the cement substrate, a diameter of 12 millimeters of the reinforcing bar.
Further, a diameter of 1 centimetre of the circular hole, the circular hole are higher than 9 centimetres of the cement substrate.
Further, the circular hole is equipped with PVC (polyvinyl chloride) dome.
Further, it is within 5 millimeters that light precision is received on the surface of the cement substrate.
Further, the inside of the rail post is hollow-core construction.
Further, cement slurry is filled in the rail post.
Further, the height of the rail post is more than the height of the reinforcing bar.
Further, the thickness of the rail post is 1.2 millimeters.
Further, in the groove that is surrounded by of the reinforcing bar in the cement substrate, the rail post can insert described In groove.
The beneficial effects of the utility model are:The New fence steel scrap muscle can recycle, and structure digs rim of a cup without reserved, It is fixed without pre-embedded steel slab and setscrew, installation is succinct, fastness is high and construction efficiency is high.
Description of the drawings
Fig. 1 is the structure diagram for the New fence that a kind of embedded bar of the utility model notes grouting material;
Fig. 2 is the structure diagram of New fence;
Wherein, 1, cement substrate;2nd, reinforcing bar;3rd, rail post;4th, circular hole;5th, PVC domes;6th, groove;301st, first Cross bar;302nd, the second cross bar;303rd, the 3rd cross bar;304th, montant;305th, glass plate;306th, circular hole;307th, circular padlock.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with the accompanying drawings and implement Example, is further elaborated the utility model.It should be appreciated that specific embodiment described herein is only explaining this Utility model is not used to limit the utility model.
Referring to Fig. 1, a kind of New fence of embedded bar note grouting material, including cement substrate 1, the cement substrate 1 On be installed with multiple reinforcing bars 2, be cased with rail post 3 outside the reinforcing bar 2, the rail post 3 connects with the cement substrate 1 It touches, fills cement slurry in the rail post 3, circular hole is equipped with close to the one side of the cement substrate 1 on the rail post 3 4, cement slurry can be injected between the reinforcing bar 2 and the rail post 3 by the circular hole 4.Pass through circular hole 4 After injecting cement slurry, after cement slurry solidification, rail post 3 and reinforcing bar 2 can be fixed, fastness is strong.
The reinforcing bar 2 is than 1 high 8 centimetre, a diameter of 12 millimeters of the reinforcing bar 2 of the cement substrate.
A diameter of 1 centimetre of the circular hole 4, the circular hole 4 is than 1 high 9 centimetre of the cement substrate.
The circular hole 4 is equipped with PVC domes 5.
It is within 5 millimeters that light precision is received on the surface of the cement substrate 1.
The inside of the rail post 3 is hollow-core construction.
Cement slurry is filled in the rail post 3.
The height of the rail post 3 is more than the height of the reinforcing bar 2.
The thickness of the rail post 3 is 1.2 millimeters.
Groove 6 is surrounded by the reinforcing bar 2 in the cement substrate 1, the rail post 3 can insert the groove In 6, on the one hand further groove 6 can be conducive to the positioning of rail post 3, on the other hand prevent mud from flowing out, be not easy to clear up.
The fastness test of the New fence of embedded bar note grouting material:Using three guarantees mortar, i.e., totally 75 kilograms, carry out Single upright bar single-point impact experiment.
Impact resistance is 1000N/m to the New fence in the horizontal direction, main under the impact resistance operating mode higher than code requirement Upright bar root has no cracking, it was demonstrated that fixed form is solid and reliable.The cost of every square metre of the New fence is 5 yuan.Reduce Cost.The New fence than conventional railings low cost 30%, through live hand push without rocking in terms of degree of firmly installing.New process More traditional installation speed is fast, succinct.
Wherein, referring to Fig. 2, the structure of the New fence is:Multiple rail posts 3, adjacent two intervals of rail post 3 are set It puts, the first cross bar 301, the second cross bar 302 and the 3rd cross bar 303, the first cross bar 301 is equipped between adjacent two rail posts 3 Top with adjacent handrails column 3, i.e. one end opposite with cement substrate 1 are set, and the lower section of the first cross bar 301 is equipped with the second horizontal stroke Bar 302, the first cross bar 301 are arranged at intervals with the second cross bar 302, and the lower section of the second cross bar 302 is equipped with the 3rd cross bar 303, the The distance between the second cross bar 302 and the 3rd cross bar 303 are smaller than between one cross bar 301 and the second cross bar 302.Second is horizontal Multiple montants 304 are equipped between 302 and the 3rd cross bar 303 of bar, montant 304 is vertical with the second cross bar 302 and the 3rd cross bar 303 It sets, and spaced set between multiple montants 304, glass plate 305 is equipped between the second cross bar 302 and the 3rd cross bar 303, In addition glass plate 305 is equipped with multiple circular holes 306, wherein, the second cross bar 302 and the 3rd cross bar 303 pass through with glass plate 305 Circular 307 phase of padlock is fixed.
Second cross bar 302, the 3rd cross bar 303 and montant 304 can be by 305 fixations of glass plate, glass plate 305 in addition Multiple circular holes 306 are equipped with, can be breathed freely and security;Circular padlock 307 can be further by glass plate 305 It is fixedly secured.
Embodiment described above only expresses the embodiment of the utility model, and description is more specific and detailed, but simultaneously Cannot the limitation to the utility model patent scope therefore be interpreted as.It should be pointed out that the ordinary skill for this field For personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these belong to this The protection domain of utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (10)

1. a kind of New fence of embedded bar note grouting material, it is characterised in that:Including cement substrate (1), the cement substrate (1) multiple reinforcing bars (2) are installed on, rail post (3), the rail post (3) and the cement are cased with outside the reinforcing bar (2) Pedestal (1) is in contact, and fills cement slurry in the rail post (3), close to the cement substrate (1) on the rail post (3) One side be equipped with circular hole (4), cement slurry can be injected by the circular hole (4) by the reinforcing bar (2) and described Between rail post (3).
2. a kind of New fence of embedded bar note grouting material according to claim 1, it is characterised in that:The reinforcing bar (2) higher than (1) 8 centimetre of the cement substrate, a diameter of 12 millimeters of the reinforcing bar (2).
3. a kind of New fence of embedded bar note grouting material according to claim 1, it is characterised in that:The round hole A diameter of 1 centimetre of hole (4), the circular hole (4) are higher than (1) 9 centimetre of the cement substrate.
4. a kind of New fence of embedded bar note grouting material according to claim 1, it is characterised in that:The round hole Hole (4) is equipped with PVC domes (5).
5. a kind of New fence of embedded bar note grouting material according to claim 1, it is characterised in that:The cement base It is within 5 millimeters that light precision is received on the surface of seat (1).
6. a kind of New fence of embedded bar note grouting material according to claim 1, it is characterised in that:The rail post (3) inside is hollow-core construction.
7. a kind of New fence of embedded bar note grouting material according to claim 1, it is characterised in that:The rail post (3) cement slurry is filled in.
8. a kind of New fence of embedded bar note grouting material according to claim 1, it is characterised in that:The rail post (3) height is more than the height of the reinforcing bar (2).
9. a kind of New fence of embedded bar note grouting material according to claim 1, it is characterised in that:The rail post (3) thickness is 1.2 millimeters.
10. a kind of New fence of embedded bar note grouting material according to claim 1, it is characterised in that:The cement Groove (6) is surrounded by the reinforcing bar (2) on pedestal (1), the rail post (3) can be inserted in the groove (6).
CN201721139275.9U 2017-09-07 2017-09-07 A kind of New fence of embedded bar note grouting material Expired - Fee Related CN207419895U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721139275.9U CN207419895U (en) 2017-09-07 2017-09-07 A kind of New fence of embedded bar note grouting material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721139275.9U CN207419895U (en) 2017-09-07 2017-09-07 A kind of New fence of embedded bar note grouting material

Publications (1)

Publication Number Publication Date
CN207419895U true CN207419895U (en) 2018-05-29

Family

ID=62315550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721139275.9U Expired - Fee Related CN207419895U (en) 2017-09-07 2017-09-07 A kind of New fence of embedded bar note grouting material

Country Status (1)

Country Link
CN (1) CN207419895U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847043A (en) * 2019-11-08 2020-02-28 东南大学 Construction process of cast iron railing of bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847043A (en) * 2019-11-08 2020-02-28 东南大学 Construction process of cast iron railing of bridge

Similar Documents

Publication Publication Date Title
CN108119144B (en) A kind of different restoring and fastening methods based on shaft wall fracture degree classification
CN102864943B (en) Shock isolating pedestal brick is mixed fixing structure and installs support and change method
CN103233751A (en) Double-layer anchoring and balancing arch supporting system for coal roadway with extremely-weak top plates
CN207419895U (en) A kind of New fence of embedded bar note grouting material
CN104481166A (en) Additionally assembled type balcony structure for old community and construction method of additionally assembled type balcony structure
CN203716046U (en) Steel trestle for earthwork transportation of foundation pit
CN205712143U (en) Concrete spraying floating platform structure for mine environment recovery treatment
CN102605765B (en) Prestressed concrete supporting piling wall
CN201016239Y (en) Gymnasium safety guards
CN203452091U (en) Micro-pile and retaining wall combined type restricted embankment protection structure
CN205529843U (en) Landing stage anchor structure
CN102493819B (en) Method for controlling stability of surrounding rocks of laneway in coal seam
CN205348963U (en) A security fence for building site
CN202610659U (en) Subway turnout area plate-type ballastless track composite structure
CN204001705U (en) Outer wall of basement single surface formwork constructing structure based on earth anchor truss
CN202323774U (en) Thin-walled hollow high-pier cantilever grouting continuous beam bracket support
CN108978705A (en) Precast concrete retaining wall system
CN205676918U (en) A kind of underlying structure of tower crane steel Platform pipe column foundation
CN202194144U (en) Ground pit inclined tension pile
CN203359805U (en) Rail double-door interlocking device for building hoist
CN201649355U (en) Restrained porous coal gangue brick masonry
CN202000463U (en) Prefabricated reinforced concrete drainage inspection well
CN205874975U (en) Bridge face plate
CN111075217A (en) Masonry structure reinforced by longitudinal drilling steel-penetrating pull rods and end plates and construction method thereof
CN1920254A (en) Small pilot hole penetrated construction method when small pilot hole entering big pilot hole in two holes crossing in tunnel construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180529

Termination date: 20190907

CF01 Termination of patent right due to non-payment of annual fee