CN207419807U - A kind of pre-buried docking system of the water power of caisson of toilet - Google Patents

A kind of pre-buried docking system of the water power of caisson of toilet Download PDF

Info

Publication number
CN207419807U
CN207419807U CN201721450242.6U CN201721450242U CN207419807U CN 207419807 U CN207419807 U CN 207419807U CN 201721450242 U CN201721450242 U CN 201721450242U CN 207419807 U CN207419807 U CN 207419807U
Authority
CN
China
Prior art keywords
caisson
buried
partition wall
spool
water power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721450242.6U
Other languages
Chinese (zh)
Inventor
章宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN SUNPEAK CONSTRUCTION CO Ltd
Original Assignee
Three Integrated Housing Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Three Integrated Housing Ltd By Share Ltd filed Critical Three Integrated Housing Ltd By Share Ltd
Priority to CN201721450242.6U priority Critical patent/CN207419807U/en
Application granted granted Critical
Publication of CN207419807U publication Critical patent/CN207419807U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of pre-buried docking systems of the water power of caisson of toilet.The caisson of toilet of the pre-buried docking system of water power of the caisson of toilet includes precast beam and bottom plate;The precast beam integrally changes pre-formed structure with sole shape;The top surface of the precast beam is higher than the top surface of bottom plate;The pre-buried docking system of water power includes the spool interface stretched out upwards, the spool interface that side goes out, reserved take over notch, reserved casing, draining built-in joint, pre-buried wire box and pre-buried earth element.Between the utility model solves conventional sanitation there is infiltration, seepy question in bottom, solve that prefabricated integral vacuum toilet water power is precisely pre-buried simultaneously, the problems such as spool docks, docked with lower floor partition wall spool, dock with the spool in the partition wall of caisson top, docked with the partition wall spool in other regions between prefabricated toilet caisson and same floor plate.

Description

A kind of pre-buried docking system of the water power of caisson of toilet
Technical field
The utility model is related to a kind of pre-buried docking systems of the water power of caisson of toilet, belong to building industrialization field.
Background technology
With the continuous improvement of people's quality of life, the quality of toilet has been to be concerned by more and more people.China's tradition Greatest problem existing for wet construction toilet be exactly seep water, seepy question.In order to avoid some common quality defects of traditional wet construction, It is prefabricated by batch production, quality controllable stabilization, standardized production is made to save former material, cost of labor as trend of the times.
Utility model content
The utility model is intended to provide a kind of pre-buried docking system of the water power of caisson of toilet, the pre-buried docking system of the water power Between can solving conventional sanitation there is infiltration, seepy question in bottom, while it is precisely pre- to solve prefabricated integral vacuum toilet water power Bury, between prefabricated toilet caisson and same floor plate spool dock, docked with lower floor partition wall spool, with the line in the partition wall of caisson top Pipe docking, dock with the partition wall spool in other regions, toilet local equal potential connection, disposable draining service sleeve leak, The problems such as standpipe service sleeve precise positioning.
To achieve these goals, technical solution is used by the utility model:
A kind of pre-buried docking system of the water power of caisson of toilet, which is characterized in that the caisson of toilet includes precast beam And bottom plate;The precast beam integrally changes pre-formed structure with sole shape;The top surface of the precast beam is higher than the top surface of bottom plate; The pre-buried docking system of water power includes the spool interface stretched out upwards, the spool interface that side goes out, reserved take over notch, reserved Casing, draining built-in joint, pre-buried wire box and pre-buried earth element;The spool interface stretched out upwards is used for and caisson top The spool docking of partition wall, the spool interface that the side goes out with adjacent floor wire box for docking, the reserved take over notch For being docked with the wire box of the partition wall below caisson and the floor of caisson one side;The reserved casing be arranged on it is reserved take over it is scarce In mouthful, the draining built-in joint is used to dock with the discharge outlet of sanitary ware;The pre-buried wire box be used for below caisson The spool of partition wall and the floor of adjacent room is docked.
Embodiment according to the present utility model can also make the utility model further optimization, below for optimization after The technical solution of formation:
In order to facilitate docking for caisson bottom spool interface directed downwardly and the partition wall below caisson, below the caisson every Wall is equipped with docking hand hole.
Preferably, the reserved casing is pvc pipe.
In order to further improve waterproof effect, leak is avoided, as a kind of specific structure type, the top of the precast beam Face has the high step structure in the low outside in inside, and is formed in the inside portion of the step structure as the recessed of partition wall installation region Mouthful, indent correspondence is equipped with vertically arranged partition wall, and the bottom face of the partition wall and the recess of precast beam are consolidated by Cast-in-Situ Segment Surely link together.Further, the inside portion of the step structure at least 15mm lower than outside portion.
In order to facilitate quick location and installation partition wall is realized, vertically arranged joint bar hole, the recess are provided on the partition wall It is equipped with vertically arranged joint bar hole;The joint bar hole of the partition wall is correspondingly arranged with joint bar hole on recess.
In order to further improve waterproof effect, leak is avoided, as a kind of specific structure type, the top of the precast beam Face has the boss upwardly extended, which is separated to form the anti-bank in inside and the anti-bank in outside by the top surface of precast beam;The boss, The anti-bank of the anti-bank in inside and outside forms the bottom face installation region of partition wall.Further, the bottom face of the partition wall is provided with edge The groove of length direction setting, tenon groove structure is formed between the bottom face groove of the partition wall and the boss of the precast beam.
Compared with prior art, the beneficial effects of the utility model are:
1st, solve the problems, such as that integral vacuum toilet is docked with the wire box spool of floor.
2nd, solve the problems, such as that integral vacuum toilet caisson is docked with the spool of lower floor wall.
3rd, solves the problem of wall below caisson of toilet is with, the spool docking of other dry walls.
4th, solves the problems, such as the butt junction location of toilet drainage casing.
5th, solves the problems, such as hygienic division wall water power docking different above caisson.
In short, water power that the pre-buried docking system of the water power of the utility model solves integral vacuum toilet caisson is pre-buried, spool The problem of docking, connection is reliable, efficient and convenient, carries out caisson of toilet integral prefabricated.
Description of the drawings
Fig. 1 is the top view of the utility model one embodiment;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the bottom view of Fig. 1;
Fig. 4 is the top view of Fig. 1;
Fig. 5 is the structure diagram of the utility model caisson.
In figure
1- reserves spool interface upwards;2- sides spool interface;3- casings;4- spool interfaces downward;5- reserves away pipe and lacks Mouthful;The pre-buried wire box of 6-;7- embedded floor drain drainage joints;The pre-buried closestool drainage joints of 8-;9- docks hand hole;10- reserve take over it is scarce Mouthful;11- bottom plates;12- precast beams;13- recesses;14- top surfaces;15- band steels side out position;16- equipotential boxes;The pre-buried band steels of 17-; 18- steel plates.
Specific embodiment
The utility model is described in detail below with reference to attached drawing and in conjunction with the embodiments.It should be noted that do not conflicting In the case of, the feature in embodiment and embodiment in the utility model can be mutually combined.For sake of convenience, hereinafter such as There are " on ", " under ", "left", "right" printed words, only represent that the upper and lower, left and right direction with attached drawing in itself is consistent, not to structure Play restriction effect.
A kind of pre-buried docking system of the water power of caisson of toilet as shown in Figs 1-4, is divided into electrical spool docking system and row Water built-in joint system.The electrical spool docking system and draining built-in joint system mainly by stretch out upwards spool interface, Side outlet interface tube, reserved take over notch, reserved casing, PVC drainings built-in joint, pre-buried wire box, partition wall reserve docking hand hole, A few part compositions of service sleeve, pre-buried grounding flat steel.
As shown in figure 5, the caisson of toilet includes precast beam 12 and bottom plate 11;The precast beam 12 is formed with bottom plate 11 Integrated prefabricated molding structure;The top surface 14 of the precast beam 12 is higher than the top surface of bottom plate 11.As shown in figure 5, the precast beam 12 top surface has the high step structure in the low outside in inside, and is formed in the inside portion of the step structure as partition wall installation region Recess 13, correspond at the recess 13 and vertically arranged partition wall be installed, the bottom face of the partition wall and the recess 13 of precast beam are logical Cast-in-Situ Segment is crossed to be fixed together.The inside portion of the step structure at least 15mm lower than outside portion.
The caisson side spool interface 2 is used to be connected with adjacent floor deck wire box.
The interface of spool downward 4 docks for wire box in caisson with wire box in partition wall below caisson.
The pipe notch 5 of reserving away is the take over notch reserved of full prefabricated components, for below adjacent floor deck and caisson every Wall docks, and reserves away in pipe notch 5 and makees casing equipped with PVC32.
Pre-buried wire box 6 in precast caisson floor is used to carry out with the partition wall below the floor and caisson in adjacent room region Docking.
Embedded floor drain drainage joint 7 in component for being accurately positioned, and connector is pre-buried, and sanitary ware can be directly right therewith It connects.
Pre-buried closestool drainage joint 8 in component for being accurately positioned, and connector is pre-buried, and sanitary ware can be directly right therewith It connects.
Docking hand hole 9 under caisson on quartered docks for adjacent floor deck with quartered under caisson, convenient for reserving away pipe Position.
When prefabricated toilet caisson produces, pre-embedded pipe interface 1, pipe nozzle upward, meet above precast caisson it is different every The spool connection of wall part.
The spool interface 2 of reserved caisson both sides, the wire box met on caisson floor are connected with the floor wire box in other rooms, Lifting is completed at the scene, can directly be docked by this pipe nozzle spool.It is pre- with lower section due to prefabricated integral vacuum toilet caisson Wall separation processed, causes spool that can not realize docking, reserves the casing 3 of pvc32 in order to which the partition wall below precast caisson sinks with prefabricated Floor wire box docking by case provides spool laying passage.Spool interface 4 directed downwardly is reserved, the line line of precast caisson can be made Box by the reserved hand hole 9 above partition wall, is realized and docked with the wire box realization in the partition wall below caisson.Future insufficiency 5, mesh The partition wall being below precast caisson docked with the floor wire box by precast caisson, spool laying passage is provided, is treated live real After existing spool docking, cast-in-place concrete is smoothed out.The pre-buried wire box 6 on precast caisson floor is accurately positioned.Caisson lower section, partition wall The docking hand hole 9 of top can meet caisson bottom spool interface directed downwardly and be docked with the partition wall below caisson.
Future insufficiency is connected with adjacent floor deck wire box, passes through to walk pipe notch 5 in precast caisson spool insertion PVC32 casings 3 It is connected with the dry wall in other regions.
Partition wall of the reserved take over notch for below precast caisson is docked with the floor wire box by precast caisson, so as to provide Spool lays passage.
The content that above-described embodiment illustrates should be understood to that these embodiments are only used for being illustrated more clearly that the utility model, Rather than limitation the scope of the utility model, after the utility model has been read, those skilled in the art are new to this practicality The modification of the various equivalent forms of type each falls within the application scope as defined in the appended claims.

Claims (8)

1. a kind of pre-buried docking system of the water power of caisson of toilet, which is characterized in that the caisson of toilet include precast beam and Bottom plate;The precast beam integrally changes pre-formed structure with sole shape;The top surface of the precast beam is higher than the top surface of bottom plate;Institute Stating the pre-buried docking system of water power includes the spool interface stretched out upwards, the spool interface that side goes out, reserved take over notch, reserved set Pipe, draining built-in joint, pre-buried wire box and pre-buried earth element;The spool interface stretched out upwards be used for caisson above every The spool docking of wall, the spool interface that the side goes out for being docked with adjacent floor wire box, use by the reserved take over notch It is docked in the wire box with the partition wall below caisson and the floor of caisson one side;The reserved casing is arranged on reserved take over notch Interior, the draining built-in joint is used to dock with the discharge outlet of sanitary ware;The pre-buried wire box be used for below caisson every The spool of wall and the floor of adjacent room is docked.
2. the pre-buried docking system of the water power of caisson of toilet according to claim 1, which is characterized in that below the caisson Partition wall be equipped with docking hand hole.
3. the pre-buried docking system of the water power of caisson of toilet according to claim 1, which is characterized in that the reserved casing For pvc pipe.
4. the pre-buried docking system of the water power of caisson of toilet according to any one of claim 1-3, which is characterized in that institute Stating the top surface of precast beam has the high step structure in the low outside in inside, and is formed in the inside portion of the step structure and pacified as partition wall The recess in region is filled, indent correspondence is equipped with vertically arranged partition wall, and the bottom face of the partition wall and the recess of precast beam lead to Cast-in-Situ Segment is crossed to be fixed together.
5. the pre-buried docking system of the water power of caisson of toilet according to claim 4, which is characterized in that the step structure Inside portion at least 15mm lower than outside portion.
6. the pre-buried docking system of the water power of caisson of toilet according to claim 4, which is characterized in that opened on the partition wall There is vertically arranged joint bar hole, the recess is equipped with vertically arranged joint bar hole;The joint bar hole of the partition wall on recess with inserting Muscle hole is correspondingly arranged.
7. the pre-buried docking system of the water power of caisson of toilet according to any one of claim 1-3, which is characterized in that institute Stating the top surface of precast beam has the boss upwardly extended, which the top surface of precast beam is separated to form the anti-bank in inside and outside is anti- Bank;The boss, the anti-bank of the anti-bank in inside and outside form the bottom face installation region of partition wall.
8. the pre-buried docking system of the water power of caisson of toilet according to claim 7, which is characterized in that the bottom of the partition wall End face is provided with the groove alongst set, is formed between the bottom face groove of the partition wall and the boss of the precast beam Tenon groove structure.
CN201721450242.6U 2017-11-03 2017-11-03 A kind of pre-buried docking system of the water power of caisson of toilet Expired - Fee Related CN207419807U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721450242.6U CN207419807U (en) 2017-11-03 2017-11-03 A kind of pre-buried docking system of the water power of caisson of toilet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721450242.6U CN207419807U (en) 2017-11-03 2017-11-03 A kind of pre-buried docking system of the water power of caisson of toilet

Publications (1)

Publication Number Publication Date
CN207419807U true CN207419807U (en) 2018-05-29

Family

ID=62306923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721450242.6U Expired - Fee Related CN207419807U (en) 2017-11-03 2017-11-03 A kind of pre-buried docking system of the water power of caisson of toilet

Country Status (1)

Country Link
CN (1) CN207419807U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158711A (en) * 2019-05-13 2019-08-23 中天华南建设投资集团有限公司 A kind of toilet precast concrete caisson and the construction method based on this caisson
WO2023044972A1 (en) * 2021-09-25 2023-03-30 长沙洁洁环保科技有限公司 Heavy steel type fabricated toilet and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158711A (en) * 2019-05-13 2019-08-23 中天华南建设投资集团有限公司 A kind of toilet precast concrete caisson and the construction method based on this caisson
WO2023044972A1 (en) * 2021-09-25 2023-03-30 长沙洁洁环保科技有限公司 Heavy steel type fabricated toilet and construction method

Similar Documents

Publication Publication Date Title
CN207419807U (en) A kind of pre-buried docking system of the water power of caisson of toilet
CN202745335U (en) Sunken type toilet water-resistant deodorization settling basin structure
CN103485509A (en) Waterproof structure manufacturing method of caisson-type toilet
CN106088260A (en) A kind of Homofloor drainage system of novel building toilet
CN204875972U (en) Pre -buried seat of drain pipe between kitchen guarding
CN207582659U (en) A kind of assembled caisson of toilet, caisson soil stack pore structure and caisson placing structure
CN107882124A (en) Toilet
CN207145004U (en) A kind of constructing structure of tunnel arch wall pin anti-seep water
CN206941657U (en) A kind of basement post-pouring zone water sealing structure
CN207144128U (en) Shower cabinet Quick drainage structure
CN109162367A (en) A kind of integrated toilet warterproof chassis
CN212323652U (en) Horizontal pipeline separation structure of wall body
CN207749588U (en) A kind of floor built-in type soil stack connector
CN113585406A (en) Building drainage device
CN208950004U (en) A kind of same-floor drainage riser Water-logged draining device
CN206530084U (en) A kind of bathroom bottom plate
CN206530009U (en) A kind of bathroom bottom plate
CN101922180B (en) Multifunctional combined type anti-overflow floor drain
CN113073684B (en) Drainage construction method for basement bottom plate
CN205857311U (en) A kind of Homofloor drainage system of novel building toilet
CN206090736U (en) Secondary drainage structures is maked somebody a mere figurehead to bathroom
CN212176239U (en) Coincide floor prefabricated construction and assembled building drainage structures
CN108678303A (en) The waterproof construction and construction method that anti-row combines at planted roof expansion joint
CN207944540U (en) A kind of pond gully
CN203583928U (en) Hollow type residence toilet bottom-layer structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190724

Address after: 410000 Shaping Business Center, No. 6, Furong North Road, Kaifu District, Changsha City, Hunan Province

Patentee after: HUNAN SUNPEAK CONSTRUCTION Co.,Ltd.

Address before: 410005 Hunan province Changsha Kaifu District, Furong Road Xingang Street Jinpen Hill Community Building Room 618

Patentee before: SANNENG INTEGRATED HOUSING Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180529

CF01 Termination of patent right due to non-payment of annual fee