CN207419502U - Precast dewatering pile pile in a kind of building foundation pit - Google Patents

Precast dewatering pile pile in a kind of building foundation pit Download PDF

Info

Publication number
CN207419502U
CN207419502U CN201721541337.9U CN201721541337U CN207419502U CN 207419502 U CN207419502 U CN 207419502U CN 201721541337 U CN201721541337 U CN 201721541337U CN 207419502 U CN207419502 U CN 207419502U
Authority
CN
China
Prior art keywords
pile
pile body
filter screen
cartridge filter
intake antrum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721541337.9U
Other languages
Chinese (zh)
Inventor
张德光
姜焕胜
郑洪云
刘欢珲
崔宝勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO HAIFA REAL ESTATE Co Ltd
Original Assignee
QINGDAO HAIFA REAL ESTATE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO HAIFA REAL ESTATE Co Ltd filed Critical QINGDAO HAIFA REAL ESTATE Co Ltd
Priority to CN201721541337.9U priority Critical patent/CN207419502U/en
Application granted granted Critical
Publication of CN207419502U publication Critical patent/CN207419502U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

Precast dewatering pile pile in a kind of building foundation pit,Pile body including being in hollow tube-shape,It is arranged on the pile top of pile body bottom and the cartridge filter being arranged on inside pile body,Multiple permeable holes are provided on the pile body,Multiple filtering through holes are provided on the cartridge filter,The filtering through hole includes the intake antrum set gradually along pile body to cartridge filter direction,Cushion chamber and water chamber,The cushion chamber is in cylindrical,Intake antrum and water chamber in cone shape and are symmetricly set on cushion chamber both sides,The axis of the cushion chamber is vertical setting with the axis of intake antrum and water chamber,The cross-sectional area of the intake antrum is gradually reduced along pile body to cartridge filter direction,The cross-sectional area of the water chamber gradually increases along pile body to cartridge filter direction,The first filter screen is provided in the intake antrum,The second filter screen is provided in water chamber,The mesh diameter of first filter screen is more than the mesh diameter of the second filter screen.

Description

Precast dewatering pile pile in a kind of building foundation pit
Technical field
The utility model is related to technical field of building construction, and in particular to precast dewatering pile pile in a kind of building foundation pit.
Background technology
In construction, the enlargement of stake diameter becomes trend.Existing large size pile work method has bored concrete pile, prefabricated pile, major diameter The main stake method processed of three kinds of thin-wall cast-in-situ tubular pile, bored concrete pile stake are the directly perforates on designed stake position, and section is circle, Steel reinforcement cage is placed after pore-forming in hole, concrete perfusion forms, and due to this pore-creating filling pile, usually there are dregs, mud in hole The problems such as slurry pollutes and is susceptible to collapse hole;Prefabricated pile is in a variety of materials made of factory or construction site, various forms of Stake is squeezed into, be pressed into or shaken with sinking apparatus in burying by stake, such as concrete square pile, pile for prestressed pipe, piling bar;Major diameter book wall For cast-in-situ tubular pile since cylinder end seal is closed, end resistance is big and soil compaction, can not if in pan soil in terms of being generally used for reinforced soft soil ground Sinking construction.
Prefabricated tubular pile is since the quality of itself is easily guaranteed that, the high capacity of single pile, and is widely used in construction work Cheng Zhong is often used in Foundation Treatment, in Clayey Soil Ground during construction pile pile, super quiet hole can be generated in ground Water pressure causes lateral displacement or land upheaval, is likely to result in the engineering accidents such as broken pile, pile body inclining, to engineering construction matter Amount has a huge impact influence or even causes irretrievable loss.Prefabricated tubular pile composite foundation inter-pile soil undertake load it is larger when Or foundation soil is when owing consolidation, there are excess pore water pressure between stake, if not setting vertical drainage body between stake, after ground work The possibility of sedimentation is larger.In order to avoid or reduce above-mentioned adverse effect, it usually needs first vertical drainage body is set in ground, And take and jump the measures such as pile constructing process, it is relatively complicated to jump pile constructing process so that constructing operation is complicated, construction cost It is high.
The patent document of Patent No. " CN201520781757.9 " discloses precast dewatering pile pile in a kind of building foundation pit, The precast dewatering pile pile on engineering pile basis is inserted directly into foundation pit, well casing is installed while forming pipe well, is save in foundation pit Drilling carries out the construction procedure of well casing installation again, shortens the tube well construction duration.The tube wall of precast dewatering pile pile is equipped with permeable Hole, precast dewatering pile pile are internally provided with cartridge filter, enter water in cartridge filter by diving pumped by permeable hole.The right prefabricated drop In use there are still following technical problem, the filter hole of the cartridge filter of the precast dewatering pile pile easily blocks for water pipe stake, So that its filter effect is deteriorated, seriously affects draining and make the reduction of cartridge filter service life, imitate the draining of precast dewatering pile pile Rate reduces.
Utility model content
In order to solve the above-mentioned technical problem, the purpose of this utility model is to provide precast dewatering pipe in a kind of building foundation pit Stake.
Technical solution is used by the utility model:Precast dewatering pile pile in a kind of building foundation pit, including being in hollow The pile body of shape, the pile top for being arranged on pile body bottom and the cartridge filter being arranged on inside pile body are provided on the pile body multiple Water hole, multiple filtering through holes are provided on the cartridge filter, and the filtering through hole includes setting successively along pile body to cartridge filter direction Intake antrum, cushion chamber and the water chamber put, the cushion chamber are in cylindrical, and intake antrum and water chamber are in cone shape and right Title be arranged on cushion chamber both sides, the axis of the cushion chamber is vertical setting with the axis of intake antrum and water chamber, it is described into The cross-sectional area of water cavity is gradually reduced along pile body to cartridge filter direction, and the cross-sectional area of the water chamber is along pile body to filtering Cylinder direction gradually increases, and the first filter screen is provided in the intake antrum, is provided with the second filter screen in water chamber, and described first The mesh diameter of filter screen is more than the mesh diameter of the second filter screen.
First filter screen and the second filter screen are set in parallel.
First filter screen tilts upward setting along pile body to cartridge filter direction.
Second filter screen tilts upward setting along pile body to cartridge filter direction.
Compared with prior art, the utility model has the advantages that:A kind of building base described in the utility model Precast dewatering pile pile in hole, good filtration effect are not easy to plug, and drainage efficiency greatly improves, and the first filter screen is larger by particle Mud and sand filtration, for the second filter screen by the smaller mud of particle and sand filtration, filtering is more abundant, and effectively prevents Cartridge filter blocks, and improves the service life of cartridge filter;Intake antrum is in cone shape, reduces into water and the first filter screen is rushed It hits power and ensure that effective water inlet water speed, intake after being buffered in cushion chamber into water chamber, reduce into water to the second mistake The impact force of strainer so that although the second filter screen mesh diameter is smaller, water inlet is soft, ensure that making for the second filter screen With the service life, and then improve the service life of precast dewatering pile pile.
Description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the schematic cross-sectional view for filtering through hole.
Specific embodiment
It elaborates in the following with reference to the drawings and specific embodiments to the utility model, the present embodiment is with the utility model skill Premised on art scheme, detailed embodiment and specific operating process are given, but the scope of protection of the utility model is unlimited In following embodiments.
As shown in the figure, precast dewatering pile pile in a kind of building foundation pit, including be vertically arranged the pile body 1 in hollow tube-shape, The pile top 2 of 1 bottom of pile body and the cartridge filter 3 being arranged on inside pile body 1 are arranged on, multiple permeable holes are provided on the pile body 1 4, water is entered by permeable hole 4 in cartridge filter 3, and passes through diving pumped.
Multiple filtering through holes 301 are provided on the cartridge filter 3, the filtering through hole 301 includes arriving cartridge filter along pile body 1 Intake antrum 3011, cushion chamber 3012 and the water chamber 3013 that 3 directions are set gradually, the cushion chamber 3012 are in cylindrical, into Water cavity 3011 and water chamber 3013 in cone shape and are symmetricly set on 3012 both sides of cushion chamber, the axis of the cushion chamber 3012 Line is vertical setting with the axis of intake antrum 3011 and water chamber 3013, and the cross-sectional area of the intake antrum 3011 is along pile body 1 is gradually reduced to 3 direction of cartridge filter, and the cross-sectional area of the water chamber 3013 gradually increases along pile body 1 to 3 direction of cartridge filter Greatly, the first filter screen 302 is provided in the intake antrum 3011, is provided with the second filter screen 303 in water chamber 3013, described The mesh diameter of one filter screen 302 is more than the mesh diameter of the second filter screen 303.
First filter screen, 302 and second filter screen 303 is set in parallel.
First filter screen 302 tilts upward setting along pile body 1 to 3 direction of cartridge filter so that filtrate is tilted along it Direction tumbles, and does not influence water inlet and water outlet.
Second filter screen 303 tilts upward setting to 3 direction of cartridge filter along pile body 1 and causes filtrate along its inclination side To tumbling, water inlet and water outlet are not influenced.

Claims (4)

1. a kind of precast dewatering pile pile in building foundation pit, including being in the pile body (1) of hollow tube-shape, being arranged on pile body (1) bottom Pile top (2) and the internal cartridge filter (3) of pile body (1) is arranged on, multiple permeable holes (4), feature are provided on the pile body (1) It is:Multiple filtering through holes (301) are provided on the cartridge filter (3), the filtering through hole (301) includes arriving along pile body (1) Intake antrum (3011), cushion chamber (3012) and the water chamber (3013) that cartridge filter (3) direction is set gradually, the cushion chamber (3012) in cone shape and it is symmetricly set on cushion chamber in cylindrical, intake antrum (3011) and water chamber (3013) (3012) both sides, the axis of the cushion chamber (3012) with the axis of intake antrum (3011) and water chamber (3013) is perpendicular sets It puts, the cross-sectional area of the intake antrum (3011) is gradually reduced along pile body (1) to cartridge filter (3) direction, the water chamber (3013) cross-sectional area gradually increases along pile body (1) to cartridge filter (3) direction, and the is provided in the intake antrum (3011) One filter screen (302), water chamber (3013) is interior to be provided with the second filter screen (303), and the mesh of first filter screen (302) is straight Footpath is more than the mesh diameter of the second filter screen (303).
2. precast dewatering pile pile in a kind of building foundation pit as described in claim 1, it is characterised in that:First filter screen (302) it is set in parallel with the second filter screen (303).
3. precast dewatering pile pile in a kind of building foundation pit as described in claim 1, it is characterised in that:First filter screen (302) setting is tilted upward along pile body (1) to cartridge filter (3) direction.
4. precast dewatering pile pile in a kind of building foundation pit as described in claim 1, it is characterised in that:Second filter screen (303) setting is tilted upward along pile body (1) to cartridge filter (3) direction.
CN201721541337.9U 2017-11-17 2017-11-17 Precast dewatering pile pile in a kind of building foundation pit Expired - Fee Related CN207419502U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721541337.9U CN207419502U (en) 2017-11-17 2017-11-17 Precast dewatering pile pile in a kind of building foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721541337.9U CN207419502U (en) 2017-11-17 2017-11-17 Precast dewatering pile pile in a kind of building foundation pit

Publications (1)

Publication Number Publication Date
CN207419502U true CN207419502U (en) 2018-05-29

Family

ID=62305272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721541337.9U Expired - Fee Related CN207419502U (en) 2017-11-17 2017-11-17 Precast dewatering pile pile in a kind of building foundation pit

Country Status (1)

Country Link
CN (1) CN207419502U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797764A (en) * 2019-01-28 2019-05-24 东北大学 A kind of anti-liquefaction pile foundation suitable for easy liquefaction soil layers

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797764A (en) * 2019-01-28 2019-05-24 东北大学 A kind of anti-liquefaction pile foundation suitable for easy liquefaction soil layers

Similar Documents

Publication Publication Date Title
CN107119691B (en) Square deep foundation pit suitable for high bearing pressure of water-rich sand egg layer and excavation method thereof
CN105178289B (en) Precast dewatering pile tube and its application method in building foundation pit
CN205152968U (en) Precipitation tubular well structure
JP2005256603A (en) Underwater foundation structure
CN110939137A (en) Vibration drainage anchor rod supporting structure for sand soil layer and construction method thereof
CN211816200U (en) Interior precast concrete drainage stake that permeates water
CN104695879B (en) A kind of stake holes is rinsed and takes out sand hole method
CN207419502U (en) Precast dewatering pile pile in a kind of building foundation pit
CN206721904U (en) A kind of integrated precipitation pumping system
CN211773581U (en) Precast concrete drainage pile
CN110925018B (en) Pump room construction method and pump room construction dewatering system in tunnel connection channel
CN112359856A (en) Gravity flow method hydraulic filling type foundation treatment construction process
CN106939610A (en) A kind of integrated precipitation pumping system
CN208763042U (en) Pebble layer dewatering well
CN106836201A (en) Immersed tube is into mould draining cast-in-situ steel reinforced concrete stake machine and soft soil foundation reinforcing method
CN116537236A (en) Civil engineering foundation pit drainage structure and construction method thereof
CN213508424U (en) Water-rich stratum gravel filtering pile tip drilling cast-in-place pile
CN214530735U (en) Deep foundation pit plugging device
CN214993978U (en) Quick drainage system of deep foundation pit
CN202023185U (en) Concrete tubular pile
CN215290207U (en) Portable water collecting and draining device
JP3969269B2 (en) Deep well method
CN212104106U (en) A vibration drainage stock supporting construction for sand type soil layer
CN212670162U (en) Subgrade is consolidated to weak soil
CN211143104U (en) Precipitation well arranged at bottom of underground diaphragm wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180529

Termination date: 20181117

CF01 Termination of patent right due to non-payment of annual fee