CN207404693U - Hanging ring and the prefabricated components with the hanging ring - Google Patents
Hanging ring and the prefabricated components with the hanging ring Download PDFInfo
- Publication number
- CN207404693U CN207404693U CN201721309585.0U CN201721309585U CN207404693U CN 207404693 U CN207404693 U CN 207404693U CN 201721309585 U CN201721309585 U CN 201721309585U CN 207404693 U CN207404693 U CN 207404693U
- Authority
- CN
- China
- Prior art keywords
- hanging ring
- connecting portion
- lifting portion
- lifting
- plane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model is related to a kind of hanging ring and with the hanging ring prefabricated components, including lifting portion, in arc-shaped and including opposite first end and second end;First connecting portion, first end is to away from the extension of lifting portion direction and the first support turning, the one end of vertical connection first connecting portion away from lifting portion from lifting portion;The first supporting plane is collectively formed with first connecting portion in first support turning, and the first supporting plane intersects with plane where lifting portion.In the utility model hanging ring and prefabricated components with the hanging ring, the first supporting plane is bent to form in lifting portion one side, from standing in steel bar girder, without fixed forms such as traditional welding or tied silks, to reduce the time bound manually.
Description
Technical field
The utility model is related to assembled architecture field, more particularly to a kind of hanging ring for prefabricated part hanging and have
The prefabricated components of the hanging ring.
Background technology
Floor as horizontal member important in building structure and unique horizontally-supported, structural form and technology should
Have a significant impact with degree for the safety, cost and duration of engineering.At present, factory will first wind up reinforcing bar, lower edge reinforcing bar and
Oblique bar bending is welded to form steel bar girder, and then casting concrete makes preformed layer and conserves shaping precast concrete floor
(i.e. PC components floor).
The hanging ring that uses of truss floor lifting of traditional PC components floor, when being installed to steel bar girder due to can not be upright
Be placed in truss floor, therefore need in work progress to be vertically fixed to reinforcing bar purlin using welding or a large amount of tied silk
On frame, and pour smash after in order to ensure its with respect to preformed layer verticality still need carry out verticality adjustment.However, manually into
Row welding or tied silk and later stage manually adjust, and labor intensity is larger and influences production efficiency.
Utility model content
Based on this, it is necessary to provide a kind of hanging ring that can be stood on certainly in steel bar girder.
It there is a need to and a kind of prefabricated components with the hanging ring are provided.
A kind of hanging ring, including:
Lifting portion, in arc-shaped and including opposite first end and second end;
First connecting portion, first connecting portion first end described in the lifting portion is to away from lifting portion direction
Extend and
First support turning, it is described first support turning vertical connection described in first connecting portion away from the lifting portion one
End;
Wherein, the first supporting plane, and described first is collectively formed with the first connecting portion in the first support turning
Supporting plane intersects with plane where the lifting portion.
In one of the embodiments, the hanging ring includes second connecting portion, and the second connecting portion is by the lifting portion
Described in second end extend to away from lifting portion direction, and the first connecting portion with the second connecting portion positioned at same
On straight line.
In one of the embodiments, the hanging ring includes the second support turning, the second support turning vertical connection
The one end of the second connecting portion away from the lifting portion, and the second support turning is collectively formed with the second connecting portion
Second supporting plane vertical with plane where the lifting portion, and first supporting plane is total to second supporting plane
Face.
In one of the embodiments, the first support turning and the second support turning are located at the described first connection
The same side of straight line or opposite both sides where portion and the second connecting portion.
In one of the embodiments, the lifting portion, the first connecting portion, the second connecting portion, described first
Support turning and the second support turning are integrally bent to form.
In one of the embodiments, the lifting portion is the semicircle arcuation of the vertical first connecting portion, described first
Support turning vertically plane where the lifting portion.
In one of the embodiments, the hanging ring is integrally machined by reinforcing bar forms.
A kind of prefabricated components including preformed layer, are embedded in truss and hanging ring described above in the preformed layer, institute in advance
Lifting portion is stated at least partly to protrude outside the preformed layer.
In one of the embodiments, part outside the preformed layer is protruded vertically where the preformed layer in the lifting portion
Plane.
In one of the embodiments, the prefabricated components are Prefabricated stacking floor.
The utility model hanging ring and with the hanging ring prefabricated components in, be bent to form the first support in lifting portion one side and turn
Foot makes hanging ring itself form the first supporting plane, from standing in steel bar girder, to be fixed without traditional welding or tied silk etc.
Mode reduces the time bound manually.Wherein, specifically, the installation effectiveness of the utility model hanging ring is compared to traditional manual
Improving bud grafting saves the binding of 4 minutes and pours the adjustment time after smashing, and one block of prefabricated component saves 15 minute working time, subtracts
Few recruitment time and offer production efficiency.
Description of the drawings
Fig. 1 is the structure diagram of hanging ring in the utility model first embodiment;
Fig. 2 is the structure diagram of hanging ring in the utility model second embodiment;
Fig. 3 is the structure diagram of hanging ring in the utility model 3rd embodiment;
Fig. 4 is the structure diagram of hanging ring in the utility model fourth embodiment.
Specific embodiment
For the ease of understanding the utility model, the utility model is more fully retouched below with reference to relevant drawings
It states.The preferred embodiment of the utility model is given in attached drawing.But the utility model can come in many different forms
It realizes, however it is not limited to embodiment described herein.On the contrary, the purpose for providing these embodiments makes to the utility model
The understanding of disclosure more thorough and comprehensive.
It should be noted that when element is referred to as " being fixed on " another element, it can be directly on another element
Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it can be directly connected to
To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ",
" right side " and similar statement are for illustrative purposes only.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with belonging to the technology of the utility model
The normally understood meaning of technical staff in domain is identical.It is simply in the term used in the description of the utility model herein
The purpose of description specific embodiment, it is not intended that in limitation the utility model.Term as used herein " and/or " include
The arbitrary and all combination of one or more relevant Listed Items.
As shown in Figs 1-4, in the utility model preferred embodiment, hanging ring 100a/b/c/d is embedded in prefabricated components in advance, and (figure is not
Show) in, in order to the lifting and transport (for example, transport between pre-fabricated factory and site operation field) of prefabricated components.In this tool
In body embodiment, prefabricated components are laminated floor slab, be prefabricated in the factory construction when, the reinforcing bar that will first wind up, lower edge reinforcing bar and tiltedly it is curved
Reinforcement welding forms steel bar girder, and then casting concrete makes preformed layer and conserves shaping.To reinforcing bar purlin when constructing at the scene
Concrete cast-in-situ is carried out in frame, to be molded the cast-in-place concrete layer being located on preformed layer.Hanging ring 100a/b/c/d is fixed and from directly
It stands in steel bar girder, to be partly embedded in advance in preformed layer, and is lifted outside the protrusion preformed layer of other part.Wherein, it is above-mentioned
What is referred to refers to that hanging ring 100a/b/c/d is stood on by itself functional independence in steel bar girder " from upright ", without traditional pre-
Welding and tied silk in component production process processed are fixed.
It is to be appreciated that in some other embodiment, prefabricated components can be other components for needing to be lifted, such as folded
Zygostyle, composite beam etc., are not limited thereto.
In order to distinguish as it can be seen that distinguished respectively with a, b, c, d in four embodiments of the utility model, but not to this reality
It is formed and limited with new technical solution.
It refer to Fig. 1, in the utility model first embodiment, hanging ring 100a includes lifting portion 10a, first connecting portion 30a
And the first support turning 50a.Lifting portion 10a is in the arc-shaped convenient for lifting, and including opposite first end 11a and second end
13a.First connecting portion 30a is extended by first end 11a in lifting portion 10a away from lifting portion 10a directions.First support turning 50a
The one end of vertical connection first connecting portion 30a away from lifting portion 10a, and the first supporting plane is collectively formed with first connecting portion 30
S1.Wherein, the first supporting plane S1 intersects with plane where lifting portion 10a, i.e. the first supporting plane S1 and lifting portion 10a is non-
It is arranged in parallel.
The first support turning 50a is vertically bent to form the first support with respect to first connecting portion 30a and puts down in above-mentioned hanging ring 100a
Face S1, so when carrying out prefabricated components shaping, hanging ring 100a is directly supported by the first supporting plane S1 and (is equivalent to standing)
In in truss, without being welded or the fixed forms such as tied silk;Meanwhile the lifting portion 10a of hanging ring 100a is protruded from outside truss,
To expose to outside preformed layer, convenient for lifting.
It refer to Fig. 2, in the utility model second embodiment, hanging ring 100b includes and hanging ring 100a phases in first embodiment
Same lifting portion 10b, the first connecting portion 30b and the first support turning 50b with first end 11b and second end 13b.
In addition, hanging ring 100b further includes second connecting portion 40b, second connecting portion compared to hanging ring 100a in first embodiment
40b extends from second end 13b in lifting portion 10b to away from lifting portion 10b directions, and first connecting portion 30b and second connecting portion
40b is located along the same line.That is, lifting portion 10b is connected between first connecting portion 30b and second connecting portion 40b, the
One connecting portion 30b and second connecting portion 40b extends along the relatively intermediate lifting portion 10b of same straight line to opposite both direction respectively.
In this way, in prefabricated formable layer in carrying out prefabricated components, hanging ring 100b formed by first connecting portion 30b first
Supporting plane S1 supports (standings) in steel bar girder, and second connecting portion 40b can be also pressed in steel bar girder, with reinforcement
Hanging ring 200b is supported in the stability in steel bar girder.Wherein, in moulding prefabricated layer, first connecting portion 30b is connected with second
Portion 40b is fixed on by pre-buried in preformed layer, and lifting portion 10b is at least partly exposed to outside preformed layer, to be lifted.
It refer to Fig. 3, in the utility model 3rd embodiment, hanging ring 100c includes and hanging ring 100a phases in first embodiment
Same lifting portion 10c, the first connecting portion 30c and the first support turning 50c with first end 11c and second end 13c.
In addition, hanging ring 100c further includes the second support turning 60c, the second support compared to hanging ring 100b in second embodiment
The one end of turning 60c vertical connection second connecting portion 40b away from lifting portion 10c, and the second support turning 60c and second connecting portion
The second supporting plane S2 vertical with plane where lifting portion 10c is collectively formed in 40b.Wherein, the first supporting plane S1 and second
Supporting plane S2 is coplanar.In this way, increase the bearing area for being used to support entire hanging ring 200c so that hanging ring 200c is more preferably and more
It is stably supported in steel bar girder.
In this embodiment, first support turning 50c and second support turning 60c be located at first connecting portion 30c with
The same side of straight line where second connecting portion 40c.
It refer to Fig. 4, in the utility model fourth embodiment, hanging ring 100d includes and hanging ring 100a phases in first embodiment
Same lifting portion 10d, the first connecting portion 30d and the first support turning 50d with first end 11d and second end 13d.
In addition, hanging ring 100d applies hanging ring 100c in example, the first support turning 50d and the second support turning compared to the 3rd
The opposite both sides of straight line where 60d is located at first connecting portion 30d and second connecting portion 40d.That is, the first support turning
The opposite sides of straight line where the support turnings of 50d and second 60d is located at first connecting portion 30d and second connecting portion 40d respectively, with
Preferably ensure that hanging ring 100d is supported in the balance in steel bar girder.
Further, in the utility model first embodiment into fourth embodiment, lifting portion 10a/b/c/d and first connects
Socket part 30a/b/c/d, second connecting portion 40b/c/d, the first support turning 50a/b/c/d and the second support turning 60c/d are equal
It is integrated and is bent to form, to strengthen the intensity of hanging ring 100a/b/c/d.
Further, in the utility model first embodiment into fourth embodiment, lifting portion 10a/b/c/d is vertical the
The semicircle arcuation of one connecting portion 30a/b/c/d, plane where the first support turning 50a/b/c/d vertical liftings portion 10a/b/c/d.
In this way, when carrying out construction and installation, above-mentioned first supporting plane S1 and/or the second supporting plane S2 are supported in steel in the horizontal direction
In muscle truss, the vertical direction in lifting portion 10a/b/c/d along vertical-horizontal direction is protruded and exposed to outside preformed layer, convenient for hanging
Dress.
It is to be appreciated that in some other embodiment, in order to match different lifting angles, hung in hanging ring 100a/b/c/d
Dress portion 10a/b/c/d can tilt certain with respect to first connecting portion 30a/b/c/d and/or second connecting portion 40b/c/d as needed
Angle, such as 45 degree are tilted, in order to which the prefabricated components lifted to needs carry out 45 degree of liftings etc., it is not limited thereto.
Further, hanging ring 100a/b/c/d is integrally machined by reinforcing bar forms, and a diameter of 14mm of reinforcing bar, first
The supports of support turning 50a/b/c/d and second turning 60c/d corresponds to first connecting portion 30a/b/c/d and second connecting portion relatively
The bending length of 40b/c/d is 55-60cm.
The utility model further relates to a kind of prefabricated components, including preformed layer, the pre- truss being embedded in preformed layer and above-mentioned hangs
In ring 100a/b/c/d, hanging ring 100a/b/c/d outside lifting portion 10a/b/c/d at least partly protrusion preformed layers.
In the utility model hanging ring 100a/b/c/d, the first support turning is bent to form in lifting portion 10a/b/c/d one sides
The support turning 60c/d of 50a/b/c/d and/or second, make hanging ring 100a/b/c/d itself form the first supporting plane S1 and/or the
Two supporting plane S2, from standing in steel bar girder, without fixed forms such as traditional welding or tied silks, to reduce and tie up manually
The time of bundle.Wherein, specifically, the installation effectiveness of the utility model hanging ring 100a/b/c/d is compared to traditional manual improving bud grafting
It saves the binding of 4 minutes and pours the adjustment time after smashing, one block of prefabricated component saves 15 minute working time, and man-hour is used in reduction
Between and provide production efficiency.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the utility model, and description is more specific and detailed,
But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that the common skill for this field
For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to
The scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (10)
1. a kind of hanging ring, which is characterized in that including:
Lifting portion, in arc-shaped and including opposite first end and second end;
First connecting portion, first connecting portion first end described in the lifting portion are prolonged to away from lifting portion direction
It is long and
First support turning, the one end of first connecting portion away from the lifting portion described in the first support turning vertical connection;
Wherein, the first supporting plane, and first support is collectively formed with the first connecting portion in the first support turning
Plane intersects with plane where the lifting portion.
2. hanging ring according to claim 1, which is characterized in that the hanging ring includes second connecting portion, second connection
Portion's second end described in the lifting portion extends to away from lifting portion direction, and the first connecting portion and described second
Connecting portion is located along the same line.
3. hanging ring according to claim 2, which is characterized in that the hanging ring include second support turning, described second
Support the one end of second connecting portion away from the lifting portion described in turning vertical connection, and the second support turning and described second
Connecting portion be collectively formed with vertical the second supporting plane of plane where the lifting portion, and first supporting plane with it is described
Second supporting plane is coplanar.
4. hanging ring according to claim 3, which is characterized in that the first support turning and the second support turning position
The same side of straight line or opposite both sides where the first connecting portion and the second connecting portion.
5. hanging ring according to claim 4, which is characterized in that the lifting portion, the first connecting portion, described second connect
Socket part, the first support turning and the second support turning are integrally bent to form.
6. according to the hanging ring described in claim 1-5 any one, which is characterized in that the lifting portion connects for vertical described first
The semicircle arcuation of socket part, described first supports turning vertically plane where the lifting portion.
7. hanging ring according to claim 1, which is characterized in that the hanging ring is integrally machined by reinforcing bar to be formed.
8. prefabricated components, which is characterized in that including preformed layer, be embedded in truss and the claims 1- in the preformed layer in advance
Hanging ring any one of 7, the lifting portion are at least partly protruded outside the preformed layer.
9. prefabricated components according to claim 8, which is characterized in that protrude the part outside the preformed layer in the lifting portion
Plane where the vertical preformed layer.
10. prefabricated components according to claim 8, which is characterized in that the prefabricated components are Prefabricated stacking floor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721309585.0U CN207404693U (en) | 2017-10-11 | 2017-10-11 | Hanging ring and the prefabricated components with the hanging ring |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721309585.0U CN207404693U (en) | 2017-10-11 | 2017-10-11 | Hanging ring and the prefabricated components with the hanging ring |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207404693U true CN207404693U (en) | 2018-05-25 |
Family
ID=62319560
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721309585.0U Active CN207404693U (en) | 2017-10-11 | 2017-10-11 | Hanging ring and the prefabricated components with the hanging ring |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207404693U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111993569A (en) * | 2020-08-26 | 2020-11-27 | 广东博智林机器人有限公司 | Lifting hook, automatic lifting hook erecting method and forming equipment |
-
2017
- 2017-10-11 CN CN201721309585.0U patent/CN207404693U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111993569A (en) * | 2020-08-26 | 2020-11-27 | 广东博智林机器人有限公司 | Lifting hook, automatic lifting hook erecting method and forming equipment |
CN111993569B (en) * | 2020-08-26 | 2021-12-10 | 广东博智林机器人有限公司 | Method for automatically erecting lifting hook and forming equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Shapira et al. | Cranes for building construction projects | |
CN211689943U (en) | Assembled pier stud template upset buffer | |
CN206692235U (en) | A kind of steel structure dome lifts by crane erecting device | |
US11459217B2 (en) | Rotary tower crane | |
CN207469441U (en) | A kind of prefabricated assembled overlapping beam column connecting portion presstressed reinforcing steel strengthens joint structure | |
CN104847102A (en) | Wall attaching method and device of attached self-lifting scaffold on retraction section of building outer wall | |
CN207277541U (en) | Prefabricated component and cast-in-place column assembled integral concrete frame structure | |
CN207404693U (en) | Hanging ring and the prefabricated components with the hanging ring | |
CN109505368A (en) | Wallboard connecting node for assembled architecture | |
CN103552911B (en) | A kind of movable boom hoisting and the construction installation method of use thereof | |
CN107882328A (en) | The construction method of large span steel truss overhung construction | |
CN103132702A (en) | Longspan pipe truss pulling bar lifting and overhead rotating emplacing construction method | |
CN210313110U (en) | Hoisting structure | |
CN109736179B (en) | Assembled construction method for tied arch bridge | |
CN207672745U (en) | A kind of node structure of precast prestressed assembled composite beam-prefabricated post | |
JP2002281624A (en) | Derrick apparatus for use in working at summit of transmission steel tower | |
CN207891904U (en) | A kind of prefabricated basic component of additional elevator of existing building | |
CN206784406U (en) | A kind of prefabricated assembling type reinforced concrete side slope protection modular assembly | |
CN115448138A (en) | Concrete prefabricated part hoisting device capable of rotating with load and construction method thereof | |
CN211813046U (en) | Hoisting device of pi shaped steel mixes combination bridge girder steel | |
CN108086695A (en) | A kind of attached shell type promotes frock and construction method | |
CN209924407U (en) | Combined working platform for steel structure high-altitude installation | |
CN209397781U (en) | Wallboard connecting node for assembled architecture | |
CN108797795A (en) | A kind of overlapping precast beam part and cast-in-place column combination assembling structure and construction technology | |
CN209974169U (en) | Swing arm tower machine beam climbing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |