CN108086695A - A kind of attached shell type promotes frock and construction method - Google Patents

A kind of attached shell type promotes frock and construction method Download PDF

Info

Publication number
CN108086695A
CN108086695A CN201711345270.6A CN201711345270A CN108086695A CN 108086695 A CN108086695 A CN 108086695A CN 201711345270 A CN201711345270 A CN 201711345270A CN 108086695 A CN108086695 A CN 108086695A
Authority
CN
China
Prior art keywords
hoisting frame
frock
bearing
stage
shell type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711345270.6A
Other languages
Chinese (zh)
Other versions
CN108086695B (en
Inventor
覃祚威
赵文雁
娄峰
陈忠
柳跃强
张坚洪
马滔
何照然
李迪
王欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinggong Steel Structure Group Co Ltd
Original Assignee
Zhejiang Jinggong Steel Structure Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinggong Steel Structure Group Co Ltd filed Critical Zhejiang Jinggong Steel Structure Group Co Ltd
Priority to CN201711345270.6A priority Critical patent/CN108086695B/en
Publication of CN108086695A publication Critical patent/CN108086695A/en
Application granted granted Critical
Publication of CN108086695B publication Critical patent/CN108086695B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The invention belongs to steel building fields, and in particular to a kind of attached shell type promotes frock and construction method, and the promotion frock includes hoisting frame bearing, hoisting frame and hoisting frame crossbeam;The key step of method for improving:(1)The setting-out stage;(2)The mechanical analysis stage;(3)The layout design stage;(4)The component process segment;(5)Frock erection stage;(6)The lifting construction stage;(7)Promote frock teardown phase;(8)It promotes frock reinforcement and recycles the stage.It is of the invention effectively to solve the problems, such as that construction risk is high, less economical when ground or flooring set independent lift frame height big;The effective lifting construction for solving the problems, such as structural column built-in fitting can not be under condition of construction.

Description

A kind of attached shell type promotes frock and construction method
Technical field
The invention belongs to steel building fields, and in particular to a kind of attached shell type promotes frock and construction method.
Background technology
With the development of national comprehensive strength, the improvement of people's living standards, to airport, stadiums and entertainment field The demand of the large-span space structures such as shop is more and more stronger, and span ability and comprehensive stress index are fabulous, assembly rate is high, assembling Rate is high, environmentally protective Long-Span Steel Space Structures come into being.
Lifting construction scheme application general condition:1)Construction site is narrow, and assembly can not be carried out outside place or can not be gone Walk Large-scale Hoisting equipment.2)Steel structural roof area is big, is not suitable for carrying out lifting construction using Large-scale Hoisting equipment outside the venue.3)Steel Civil engineering structure is complicated below structure roof, is not suitable for using hanging device into lifting in admission.4)Steel structural roof is from flooring height Degree is big, and the high-altitude construction risk of high altitude bulk or piecemeal lifting is larger.5)The stress form of structure is not suitable for applying using sliding Work.Therefore under the conditions described above, pay the utmost attention to using lifting scheme.
In the construction of steel structural roof conventional lift, several hoisting frame setting methods below generally use:1)In ground or building Face sets independent lift frame.2)Column where structural bearings sets rigid connection bracket(As reinforced column sets embedded part and steel corbel, steel Column welds steel corbel).3)Temperature pier is carried out to pivoting support, by the use of structure in itself as hoisting frame.
The shortcomings that steel structural roof conventional lift frame is set:1)It is applied when ground or flooring set independent lift frame height big Work risk is high, less economical.2)The lifting scheme design schedule of steel structural roof restricts reinforced column construction speed, otherwise Cause built-in fitting below hoisting frame that can not construct.3)When design side does not allow to pivoting support temperature pier, structure can not be utilized Column is as hoisting frame.
The content of the invention
It is an object of the invention to provide a kind of attached shell types to promote frock and construction method, effective to solve in ground or building Construction risk is high when face sets independent lift frame height big, less economical problem.The effective structural column built-in fitting that solves can not be applied Lifting construction problem in the case of work.
To achieve the above object, the specifically disclosed technical solution of the present invention is:
A kind of attached shell type promotes frock, which is installed on structural column, horizontal including hoisting frame bearing, hoisting frame and hoisting frame Beam;The hoisting frame bearing includes bearing outer ring plate and positioned at bearing outer ring plate inner ring and the branch cover for seat that is fixed on structural column Cylinder is fixed on the bearing bracket of bearing outer ring plate;The hoisting frame includes the hoisting frame upright bar being fixed on the bearing bracket, It is connected between hoisting frame upright bar by hoisting frame web member;Hoisting frame crossbeam is fixed at the top of hoisting frame.
A kind of attached shell type lifting construction method, includes the following steps:
(1)The setting-out stage:By three-dimensional lofting, determine to promote the support base sleeve barrel of frock, hoisting frame, bearing bracket, promotion erection Column and hoisting frame web member and hoisting frame crossbeam position and section form;
(2)The mechanical analysis stage:The three-dimensional modeling of computation model, whole mechanical analysis;Hoisting frame bearing carries out finite element fraction Analysis;Determine member section size;
(3)The layout design stage:According to member section size and setting-out, layout design is processed;
(4)The component process segment:The bearing of promotion frock is whole in factory process;The hoisting frame of frock is promoted in factory process For truss;
(5)Frock erection stage:Structural bearings is first installed, and hoisting frame bearing is attached to be placed on the outside of structural bearings, and the two is connectionless;It carries Erection column is risen to be welded on bearing bracket;
(6)The lifting construction stage:Hoisting frame internal force reaches hoisting frame bearing, then reaches structural column, structure branch by capital embedded part Seat is not subject to promote the load that frock transmits;
(7)Promote frock teardown phase:After the completion of structural member is connected with structural bearings, lifter progressively unloads, finally to carrying After frock is risen as no external load state, it can start to remove;
(8)It promotes frock reinforcement and recycles the stage:Reinforcement is carried out to the cutting hole of hoisting frame support base sleeve barrel side, to carrying It rises frame support base sleeve barrel lower end and hoisting frame column cutting hole polishes flat.
A kind of attached shell type lifting construction method is further set, the step(1)In three-dimensional lofting:Consideration is elevated The assembled state of structure, the situation for promoting to designed elevation state, mending bar state, carry out full-scale three-dimensional lofting.
A kind of attached shell type lifting construction method is further set, the step(2)In computation model three-dimensional modeling: Computation model should include hoisting frame bearing, hoisting frame, hoisting frame crossbeam and structural column, consider structural column, bearing to promoting frock Influence.
A kind of attached shell type lifting construction method is further set, the step(4)In hoisting frame bearing add in factory Work is whole:The support base sleeve barrel, outer ring plate and bracket that frock will be promoted are welded as entirety, transport to building site.
A kind of attached shell type lifting construction method is further set, the step(4)In hoisting frame be in factory process Truss:Hoisting frame is quadrangle lattice column, is plane girder in factory process, assembled shaping after transporting to building site.
A kind of attached shell type lifting construction method is further set, the step(7)In promotion frock teardown phase:Afterwards Rod piece is filled all after installation is complete, on the basis of the promotion load of calculating, all suspension centres simultaneously decline unloading 10%;In this process In some suspension centre load be more than unloading before load 10% or suspension centre displacement it is asynchronous reach 10mm, then stop immediately other Point unloading, and individually unload these abnormal points;And so on, until steel strand wires thoroughly relax;Steel strand wires thoroughly after relaxation, are promoted Frame acts on from external load, can carry out promoting frock dismounting work.
A kind of attached shell type lifting construction method is further set, the step(7)In promotion frock teardown phase:By After in structure, installation is complete, since structural member interts in hoisting frame, therefore partial hoisting frame web member need to be cut and disassembled, and Hoisting frame upright bar can be hung after the cut-out of bearing bracket;Hoisting frame support base sleeve barrel also needs to hang after being cut into two semicircles From.
The present invention has the following advantages compared to the prior art:
First, structural column is made full use of;It is effective solve the construction risk when ground or flooring set independent lift frame height big it is high, Less economical problem.
It 2nd, need to be in the pre-buried bracket for promoting frock of reinforced concrete structure column;The promotion side of steel structural roof is evaded Case design schedule restricts reinforced column construction speed problem;Evade reinforced column to have constructed or armored concrete Column has the complicated structures such as prestressing force, causes the Upgrade Problem that built-in fitting can not be under condition of construction.
3rd, the bearing of this frock is attached is placed on the outside of structural bearings, and the two is connectionless;Hoisting frame upright bar is installed on frock bearing Bracket on, structural bearings is not welded with hoisting frame bracket, prevents from welding destruction to structural bearings;And structural bearings is not subject to The load that hoisting frame transmits avoids to be promoted when counter-force is more than design load and structural bearings is destroyed.
4th, attached shell type of the invention promotes frock, using factory process, site assembly mounting and repeatable utilization.Tool Have reasonable stress, convenient construction, it is environmentally protective the features such as.
Description of the drawings
Fig. 1 is hoisting frame bearing three-dimensional axonometric drawing;Fig. 2 is that attached shell type promotes the whole three-dimensional axonometric drawing of frock;Fig. 3 is attached set Formula promotes frock and structural column assembling figure;Fig. 4 is that attached shell type promotion frock is connected drawing with structural column;Fig. 5 is that steel construction carries It is raised to the whole three-dimensional axonometric drawing of designed elevation state.
Label declaration:Support base sleeve barrel 1;Bearing outer ring plate 2;Bearing bracket 3;Hoisting frame upright bar 4;Hoisting frame web member 5;It is promoted Frame crossbeam 6;Structural column 7;Structural bearings 8;Attachment weld 9;Capital buried plate 10;Steel construction 11;Hoisting frame bearing 12;Hoisting frame 13。
Specific embodiment
It is with reference to attached drawing 1-5 below, attached shell type a kind of to the present invention promotes the specific embodiment of frock and construction method It is described in further detail:
A kind of attached shell type promotes frock, which is installed on structural column 7, including hoisting frame bearing 12, hoisting frame 13 and is promoted Frame crossbeam 6;The hoisting frame bearing 12 is including bearing outer ring plate 2 and positioned at 2 inner ring of bearing outer ring plate and is fixed on structural column 7 On support base sleeve barrel 1, be fixed on the bearing bracket 3 of bearing outer ring plate 2;The hoisting frame 13 includes being fixed on the bearing bracket Hoisting frame upright bar 4 on 3, is connected between hoisting frame upright bar 4 by hoisting frame web member 5;Hoisting frame crossbeam 6 is fixed on hoisting frame 13 Top.
A kind of attached shell type lifting construction method, includes the following steps:
First, it is whole in factory process by support base sleeve barrel 1, bearing outer ring plate 2 and the bearing bracket 3 in Fig. 1, transports to construction Scene.
2nd, the components such as hoisting frame upright bar 4, hoisting frame web member 5 and the hoisting frame crossbeam 6 in Fig. 2 are assembled into and added in factory Work is plane girder, assembled shaping after transporting to building site.
3rd, attached shell type promotion frock is lifted to structural column 7 in the way of Fig. 3, it is attached to be placed on the outer of mechanism support 8 Side, and support base sleeve barrel is welded on the capital buried plate 10 of structural column using the attachment weld 9 in Fig. 4.
4th, as shown in figure 5, steel construction 11 is promoted to designed elevation by lifting construction flow, and rod piece and branch are filled by after Seat is attached by design drawing requirement.
5th, dress rod piece is all after installation is complete afterwards, and on the basis of the promotion load of calculating, all suspension centres simultaneously decline unloading 10%;Some suspension centre load are asynchronous more than 10% or suspension centre displacement of load before unloading in the process reaches 10mm, then Stop other point unloadings immediately, and individually unload these abnormal points.And so on, until steel strand wires are thoroughly loose,.
6th, structural member interts in hoisting frame, therefore partial hoisting frame web member 5 need to be cut and disassembled, and by hoisting frame Upright bar 4 can just be hung after the cut-out of bearing bracket 3;Hoisting frame support base sleeve barrel 1 also needs to hang after being cut into two semicircles.
Specific embodiments of the present invention are described above.It is to be appreciated that the invention is not limited in above-mentioned Particular implementation, those skilled in the art can make various changes and modifications within the scope of the claims, this not shadow Ring the substantive content of the present invention.

Claims (8)

1. a kind of attached shell type promotes frock, which is installed on structural column, it is characterised in that:Including hoisting frame bearing, promoted Frame and hoisting frame crossbeam;The hoisting frame bearing is including bearing outer ring plate and positioned at bearing outer ring plate inner ring and is fixed on structure Support base sleeve barrel on column is fixed on the bearing bracket of bearing outer ring plate;The hoisting frame includes being fixed on the bearing bracket Hoisting frame upright bar, connected between hoisting frame upright bar by hoisting frame web member;Hoisting frame crossbeam is fixed at the top of hoisting frame.
A kind of 2. attached shell type lifting construction method, it is characterised in that:
(1)The setting-out stage:By three-dimensional lofting, determine to promote the support base sleeve barrel of frock, hoisting frame, bearing bracket, promotion erection Column and hoisting frame web member and hoisting frame crossbeam position and section form;
(2)The mechanical analysis stage:The three-dimensional modeling of computation model, whole mechanical analysis;Hoisting frame bearing carries out finite element fraction Analysis;Determine member section size;
(3)The layout design stage:According to member section size and setting-out, layout design is processed;
(4)The component process segment:The bearing of promotion frock is whole in factory process;The hoisting frame of frock is promoted in factory process For truss;
(5)Frock erection stage:Structural bearings is first installed, and hoisting frame bearing is attached to be placed on the outside of structural bearings, and the two is connectionless;It carries Erection column is risen to be welded on bearing bracket;
(6)The lifting construction stage:Hoisting frame internal force reaches hoisting frame bearing, then reaches structural column, structure branch by capital embedded part Seat is not subject to promote the load that frock transmits;
(7)Promote frock teardown phase:After the completion of structural member is connected with structural bearings, lifter progressively unloads, finally to carrying After frock is risen as no external load state, it can start to remove;
(8)It promotes frock reinforcement and recycles the stage:Reinforcement is carried out to the cutting hole of hoisting frame support base sleeve barrel side, to carrying It rises frame support base sleeve barrel lower end and hoisting frame column cutting hole polishes flat.
A kind of 3. attached shell type lifting construction method according to claim 2, which is characterized in that the step(1)In Three-dimensional lofting:Consider the situation for being elevated the assembled state of structure, promoting to designed elevation state, mend bar state, carry out full ruler Very little three-dimensional lofting.
A kind of 4. attached shell type lifting construction method according to claim 2, which is characterized in that the step(2)In The three-dimensional modeling of computation model:Computation model should include hoisting frame bearing, hoisting frame, hoisting frame crossbeam and structural column, consider knot The influence of structure column, bearing to promotion frock.
A kind of 5. attached shell type lifting construction method according to claim 2, which is characterized in that the step(4)In Hoisting frame bearing is whole in factory process:The support base sleeve barrel, outer ring plate and bracket that frock will be promoted are welded as entirety, transport To building site.
A kind of 6. attached shell type lifting construction method according to claim 2, which is characterized in that the step(4)In Hoisting frame is truss in factory process:Hoisting frame is quadrangle lattice column, is plane girder in factory process, transports to building site Assembly shaping.
A kind of 7. attached shell type lifting construction method according to claim 2, which is characterized in that the step(7)In Promote frock teardown phase:Rod piece is filled afterwards all after installation is complete, and on the basis of the promotion load of calculating, all suspension centres are the same as at present Drop unloading 10%;Some suspension centre load are more than 10% of load before unloading in the process or suspension centre displacement is asynchronous reaches 10mm then stops other point unloadings immediately, and individually unloads these abnormal points;And so on, until steel strand wires thoroughly relax;Steel Thoroughly after relaxation, hoisting frame acts on twisted wire from external load, can carry out promoting frock dismounting work.
A kind of 8. attached shell type lifting construction method according to claim 2, which is characterized in that the step(7)In Promote frock teardown phase:Since structure is after installation is complete, since structural member interts in hoisting frame, therefore partial hoisting frame abdomen Bar need to be cut and disassembled, and hoisting frame upright bar can be hung after the cut-out of bearing bracket;Hoisting frame support base sleeve barrel also needs to cut It can be hung after being segmented into two semicircles.
CN201711345270.6A 2017-12-15 2017-12-15 Auxiliary sleeve type lifting tool and construction method Active CN108086695B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711345270.6A CN108086695B (en) 2017-12-15 2017-12-15 Auxiliary sleeve type lifting tool and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711345270.6A CN108086695B (en) 2017-12-15 2017-12-15 Auxiliary sleeve type lifting tool and construction method

Publications (2)

Publication Number Publication Date
CN108086695A true CN108086695A (en) 2018-05-29
CN108086695B CN108086695B (en) 2020-08-21

Family

ID=62176250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711345270.6A Active CN108086695B (en) 2017-12-15 2017-12-15 Auxiliary sleeve type lifting tool and construction method

Country Status (1)

Country Link
CN (1) CN108086695B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110005210A (en) * 2019-04-16 2019-07-12 中国建筑第八工程局有限公司 The mounting device and its construction method of steel truss
CN113931078A (en) * 2021-11-26 2022-01-14 中铁宝桥(扬州)有限公司 Design analysis method for transportation tool for manufacturing large steel truss girder segment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080014028A1 (en) * 2005-03-25 2008-01-17 Faires Guy L Bracket assembly for lifting and supporting a lightweight foundation
US7607513B1 (en) * 2007-11-29 2009-10-27 Elmo Rojas Telescoping lifting hand truck with a folding platform
CN102635072A (en) * 2012-04-20 2012-08-15 上海颖川加固工程技术有限公司 Steel clamp hoop support system for bridge lift-up
JP5394334B2 (en) * 2010-06-30 2014-01-22 株式会社奥村組 Construction method of work floor for work at height
CN104265002A (en) * 2014-08-27 2015-01-07 浙江精工钢结构集团有限公司 Hoisting frame design application method of continuous truss column top hinging structure
CN106087707A (en) * 2016-07-27 2016-11-09 清华大学 A kind of accessory configurations preventing existing bridge lateral from toppling and construction method thereof
CN107386658A (en) * 2017-03-20 2017-11-24 广州珠江工程建设监理有限公司 A kind of construction method of large steel net frame integral hoisting platform

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080014028A1 (en) * 2005-03-25 2008-01-17 Faires Guy L Bracket assembly for lifting and supporting a lightweight foundation
US7607513B1 (en) * 2007-11-29 2009-10-27 Elmo Rojas Telescoping lifting hand truck with a folding platform
JP5394334B2 (en) * 2010-06-30 2014-01-22 株式会社奥村組 Construction method of work floor for work at height
CN102635072A (en) * 2012-04-20 2012-08-15 上海颖川加固工程技术有限公司 Steel clamp hoop support system for bridge lift-up
CN104265002A (en) * 2014-08-27 2015-01-07 浙江精工钢结构集团有限公司 Hoisting frame design application method of continuous truss column top hinging structure
CN104265002B (en) * 2014-08-27 2016-09-07 浙江精工钢结构集团有限公司 A kind of hoisting frame design application process of continuous trusse capital articulated structure
CN106087707A (en) * 2016-07-27 2016-11-09 清华大学 A kind of accessory configurations preventing existing bridge lateral from toppling and construction method thereof
CN107386658A (en) * 2017-03-20 2017-11-24 广州珠江工程建设监理有限公司 A kind of construction method of large steel net frame integral hoisting platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110005210A (en) * 2019-04-16 2019-07-12 中国建筑第八工程局有限公司 The mounting device and its construction method of steel truss
CN113931078A (en) * 2021-11-26 2022-01-14 中铁宝桥(扬州)有限公司 Design analysis method for transportation tool for manufacturing large steel truss girder segment
CN113931078B (en) * 2021-11-26 2023-07-21 中铁宝桥(扬州)有限公司 Design analysis method of shipping tool for manufacturing large sections of steel truss girder

Also Published As

Publication number Publication date
CN108086695B (en) 2020-08-21

Similar Documents

Publication Publication Date Title
CN101200916B (en) Construction method of prestressed suspension type building structure
CN106836498A (en) A kind of super-span Stadium roof system steel truss lifting construction engineering method
CN105332452B (en) Cable curtain wall supporting system and its construction method of a kind of top provided with steel truss
CN101446075B (en) Synchronous vertical swing lift construction method for double inclination arc tower
CN104674665B (en) Large-spatial structures vestibule bridge installation method
CN102535845A (en) Construction method of bearing frame of corridor structure
CN106759434B (en) A kind of groined type precast concrete king-post basis and its construction method
CN106812328A (en) The overall two step lifting construction methods of a string prestressed steel structure rack with hanging layer
CN208899886U (en) Cantilever frame platform
CN108086695A (en) A kind of attached shell type promotes frock and construction method
CN111719867A (en) Lower lifting point lifting device and lower lifting point integrated integral lifting method
CN207277541U (en) Prefabricated component and cast-in-place column assembled integral concrete frame structure
CN108842954A (en) A kind of huge different section Honeycomb Beam structural system construction method of installation of aerofoil profile roofing
CN109208915A (en) A kind of cooling tower systems and steel vestibule construction method for lifting whole
CN111779274A (en) Construction method for integrally lifting temporary hoisting point of large-span unequal-height steel structure net rack
CN108166660A (en) A kind of curved surface single-layer latticed shell installation method
CN102767289A (en) Asymmetric and integrated lifting construction method for large scale grid structure
CN110407109A (en) A kind of assembling device and construction method of large space ultra-large type air hose
JP2639361B2 (en) Construction method of steel pipe / concrete composite structure pier
CN108978478A (en) Bridge cast-in-situ box-beam deck-type bearing frame system and its construction method
CN105442756B (en) A kind of combined special-shaped column, the structural system and its construction method for being equipped with the post
CN208249704U (en) A kind of townhouse carrying pole type hoisting frame being mounted laterally based on concrete isolated beam
CN107130624A (en) A kind of round caisson wall steel reinforcement cage overall binding lift-on/lift-off system
CN208884808U (en) Combine prefabricated panel and laminated floor slab structure
CN207244897U (en) A kind of underpinning structure for replacing underproof shear wall concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant