CN207401788U - A kind of workbench amount electric system - Google Patents
A kind of workbench amount electric system Download PDFInfo
- Publication number
- CN207401788U CN207401788U CN201721253013.5U CN201721253013U CN207401788U CN 207401788 U CN207401788 U CN 207401788U CN 201721253013 U CN201721253013 U CN 201721253013U CN 207401788 U CN207401788 U CN 207401788U
- Authority
- CN
- China
- Prior art keywords
- battery
- workbench
- measurement
- amount
- chieftain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model provides a kind of workbench amount electric system, belongs to battery electrical measuring technical field.It solves the problems, such as that existing artificial survey electricity is time-consuming and laborious.The utility model includes:Workbench;Battery balance, is placed with multiple rows of battery thereon, and battery balance can the displacement along the longitudinal direction on workbench;Measure electrical actuators, it is placed in battery balance top position, measuring electrical actuators can be on workbench along left and right and vertical direction displacement, it measures electrical actuators displacement and voltage measurement is carried out to the battery that quantity is preset in battery balance afterwards in place, measuring electrical actuators includes at least row measurement chieftain, the voltage of row's battery of often row's measurement chieftain's single measurement corresponding number;Measured motor structure, including with measuring the one-to-one voltmeter of chieftain.Using this workbench amount electric system, the electric topology layout of survey is compact, high degree of automation, and can automate rejecting when voltage measurement is unqualified or manually reject and supplement new battery, and work efficiency is high.
Description
Technical field
The utility model belongs to battery electrical measuring technical field, is related to a kind of workbench amount electric system.
Background technology
, it is necessary to which square shaped battery carries out voltage measurement in rectangular cell production line, ensure finished battery quality, and
General battery voltage measurement is so single using manual hand manipulation or simple measured motor structure measurement method in the prior art
Secondary normally only to measure single battery, work efficiency is relatively low.
In summary, it is necessary to design a kind of high degree of automation, the workbench amount electric system for improving work efficiency.
The content of the invention
The purpose of this utility model is that there are the above problems for existing technology, it is proposed that a kind of high degree of automation,
Improve the workbench amount electric system of work efficiency.
The purpose of this utility model can be realized by following technical proposal:A kind of workbench amount electric system, including:
Workbench;
Battery balance, is placed with multiple rows of battery thereon, and the battery balance can the displacement along the longitudinal direction on workbench;
Electrical actuators are measured, are placed in battery balance top position, the amount electrical actuators can be on workbench along a left side
Right and vertical direction displacement, the amount electrical actuators displacement carry out voltage to the battery that quantity is preset in battery balance afterwards in place
Measurement, the amount electrical actuators include an at least row and measure chieftain, a row of often row's measurement chieftain's single measurement corresponding number
The voltage of battery;
Measured motor structure, including with measuring the one-to-one voltmeter of chieftain, the voltmeter and corresponding measurement chieftain are electrical
Connection.
Further,
The voltmeter analyzes the battery voltage data of corresponding measurement chieftain measurement, and chooses peak value and preset value
It is compared, and judges battery for certified products or defective products.
Further,
Upward, length direction and the battery of the battery put in the battery balance are put for the anode of the battery, cathode
Disk deformation trace is parallel, and the measurement chieftain has a pair of of the amount electric device being adapted to battery plus-negative plate.
Further,
The amount electrical actuators include installing plate, and the amount electric device is removably mounted on installing plate and court divides into
It puts, is arranged with spring outside the amount electric device, the spring is connected to end and the installation that corresponding amount electric device is docked with battery
Between plate.
Further,
It is provided with above amount electrical actuators with measuring chieftain's at least row's laser indicator lamp correspondingly, it is described to swash
Light indicator light is electrically connected respectively with corresponding measurement chieftain, voltmeter.
Further,
The laser indicator lamp is used for laser projection in corresponding battery.
Further,
Be equipped on a mounting board with the one-to-one through hole of laser indicator lamp, the light that the laser indicator lamp projects through pair
Through hole is answered to be incident upon again on corresponding battery, the through hole is located between corresponding two amounts electric device.
Based on above-mentioned technical proposal, the utility model embodiment can at least generate following technique effect:This workbench
It is compact to measure electric system integral structure layout, high degree of automation can be with automatic measurement cell voltage, and passes through voltmeter to measurement
Voltage analyzed compared with preset value, can be automated when voltage measurement is unqualified rejecting or manually reject and supplement
New battery, work efficiency are high, and during work, battery is sent by preamble process, is first moved to battery balance along the longitudinal direction pre-
If surveying electric position, then measure electrical actuators and move left and right and is placed in place above battery balance, then drive its to bottom offset simultaneously
With the battery contact of corresponding measurement position, voltage measurement operation is carried out;After default quantity battery electrical measuring, electric execution machine is measured
Structure moves up, and battery balance continues to move forward and backward, and amount electrical actuators move down and carry out voltage measurement to further battery again;This work
Platform amount electric system has automation three direction displacement system, after the completion for the treatment of all battery voltage measurements, is each repositioned to initial bit
It puts, after next balance battery is waited to be put into, equipment starts, and restarts voltage measurement, overall work is reliable.
Description of the drawings
Specific embodiment of the present utility model is described in further detail below in conjunction with the accompanying drawings, wherein:
Fig. 1 is the structure diagram of one preferred embodiment of the utility model.
Fig. 2 is the structure diagram at another visual angles of Fig. 1.
In figure, 10, battery balance;20th, electrical actuators are measured;21st, chieftain is measured;211st, electric device is measured;212nd, spring;
22nd, installing plate;221st, through hole;30th, laser indicator lamp;40th, touch-screen;50th, equipment indicating lamp;60th, workbench;100th, it is electric
Pond.
Specific embodiment
It is specific embodiment of the utility model and with reference to attached drawing below, the technical solution of the utility model is made further
Description, but the utility model is not limited to these embodiments.
Technical solution provided by the utility model is illustrated in more detail with reference to Fig. 1 to Fig. 2.
As shown in Figure 1 to Figure 2, this workbench amount electric system includes:
Workbench;
Battery balance 10, is placed with battery 100 thereon, the battery balance 10 can on workbench position along the longitudinal direction
It moves;
Electrical actuators 20 are measured, are placed in 10 top position of battery balance, the amount electrical actuators 20 can be in workbench
Along left and right and vertical direction displacement on 60,20 displacement of amount electrical actuators is in place afterwards to presetting quantity in battery balance 10
Battery 100 carries out voltage measurement.The amount electrical actuators 20 include an at least row and measure chieftain 21, and often row's measurement chieftain 21 is single
The voltage of one row's battery of secondary measurement corresponding number;
Measured motor structure, including with measuring the one-to-one voltmeter of chieftain, the voltmeter and corresponding measurement chieftain are electrical
Connection.
The utility model protects a kind of workbench amount electric system, can realize the voltage measurement operation of rectangular cell and incite somebody to action
Defective work is rejected, this workbench amount electric system integral structure layout is compact, high degree of automation, can pass through measured motor structure
On voltmeter automatic measurement cell voltage, the voltmeter divides the battery voltage data of corresponding measurement chieftain measurement
Analysis, and by the cell voltage peak value of measurement compared with preset value, and analyze and determine that the measurement cell voltage is for qualification
Either defective products can automate rejecting when voltage measurement is unqualified or manually reject and supplement new battery product, work
Efficient, during work, battery 100 is sent by preamble process, is first moved to battery balance 10 along the longitudinal direction and default is surveyed current potential
It puts, then amount electrical actuators 20 move left and right is placed on 10 top of battery balance in place, then drives it simultaneously and right to bottom offset
The battery 100 that position should be measured contacts, and carries out voltage measurement operation;After default number of batteries 100 surveys electricity, measure electricity and perform
Mechanism 20 moves up, and battery balance 10 continues to move forward and backward, and amount electrical actuators 20 move down and carry out voltage to further battery 100 again
Measurement;This workbench amount electric system has automation three direction displacement system, after the completion for the treatment of all 100 voltage measurements of battery, respectively
From initial position is repositioned to, after next balance battery 100 is waited to be put into, equipment starts, and restarts voltage measurement, overall work
Reliably.
Further, multiple rows of battery 100 is placed in battery balance 10, the amount electrical actuators 20 include an at least row
Chieftain 21 is measured, the voltage of row's battery 100 of often row's measurement 21 single measurement corresponding number of chieftain.
At this during single survey electricity, the battery 100 on an entire row battery balance 10 can be measured, row's battery can also be measured
Default quantity part in 100, row's battery 100 can be completed to measure several times, so measure the setting of electrical actuators 20 and compare
Flexibly, occupancy is small, is adapted to various specifications battery balance 10 and surveys electric work, and electric quantity is surveyed in distribution according to need, and flexibility is strong,
Also ensure work efficiency.
Further, single 100 quantity of battery is single more than or equal on amount electrical actuators 20 in battery balance 10
Measure 21 quantity of chieftain;So amount electrical actuators 20 can be docked with the battery balance 10 of various specifications, greater number of
When battery 100 needs to survey electricity, 20 stroke of incrementss electrical actuators also ensures that work is smooth and work efficiency.
In the utility model, measure and row measurement chieftain 21 is preferably arranged on electrical actuators 20, operation is flexible, work
Reliably, reducing component interference influences.
In the utility model, battery 100 is rectangular cell, further, the anode of battery 100, cathode upward, institute
It is parallel with 10 deformation trace of battery balance to state the length direction for the battery 100 put in battery balance 10, the measurement chieftain 21
With a pair of of the amount electric device 211 being adapted to 100 positive and negative anodes of battery.
Topology layout is ingenious so that measures the width that 20 or so translation direction of electrical actuators is battery 100, measurement head
21 layout of son can be compacter, reduces equipment volume, also reduces the width of battery balance 10.
Preferably, measuring electrical actuators 20 includes installing plate 22, and the amount electric device 211 is removably mounted at installing plate 22
It sets above and downward, is arranged with spring 212 outside the amount electric device 211, the spring 212 is connected to corresponding amount electric device 211
Between the end docked with battery 100 and installing plate 22.
After amount electric device is contacted with corresponding battery and pushes preset time in place, amount electric device moves up, during this period, right
Voltmeter is answered to analyze the battery voltage data of corresponding measurement chieftain measurement.
Specifically, for 100 closed butt joint of guaranteed discharge electric device 211 and corresponding battery, ensure measurement accuracy and reliability,
After amount electric device 211 touches the correspondence anode/cathode of battery 100, amount electrical actuators 20 continue to move down pre-determined distance, in bullet
Under spring 212 acts on, lower pressure is persistently generated to amount 211 lower end of electric device so that amount electric device 211 and corresponding battery 100
Anode/cathode reliable contacts by passing through one section of squeeze time, just begins through the voltmeter on measured motor structure, gathers battery
Voltage data, and then ensure the reliability and accuracy of work entirety.
Further, it is provided with above amount electrical actuators 20 and the one-to-one at least row's laser of measurement chieftain 21
Indicator light 30, the laser indicator lamp 30 are electrically connected with corresponding measurement chieftain 21.
Each 21 top of measurement chieftain is both provided with laser indicator lamp 30, is used to indicate the battery of bad voltage, facilitates people
When battery or automation rejecting are rejected and supplemented to work, operating personnel observe convenient.
Further, to cause indicating effect more preferably, it is directed toward clearly, preferably laser indicator lamp 30 is used for laser projection
On corresponding battery 100.
To promote the compactness of the compactedness of integral layout and all parts cooperation, it is preferable that be equipped on installing plate 22
With 30 one-to-one through hole 221 of laser indicator lamp, the light that the laser indicator lamp 30 projects passes through corresponding through hole 221 to project again
On corresponding battery 100, the through hole 221 is located between corresponding two amounts electric devices 211, and such laser indicator lamp 30 can be with
It is fitted close with entire amount electrical actuators 20.
Further to promote entire roboticized work demand, it is also equipped with electrically connecting with amount electrical actuators 20 on workbench
The touch-screen 40 connect, touch-screen 40 can also be electrically connected with battery balance 10;Touch-screen 40 can control all parts to generate
Corresponding displacement, can also show battery status.
Further to indicate measurement working condition, it is provided with what is be electrically connected with amount electrical actuators 20 on workbench
Equipment indicating lamp 50.
In normal operation, preferred equipment indicator light 50 is shown in green (also can be replaced other colors of adaptability or dynamic
Effect), when measuring defective work, equipment indicating lamp 50 it is shown in red or flicker (similarly, herein red can also replace
It is changed to other colors of adaptability or dynamic effect), facilitate observation or manually reject, replace battery 100, and the electricity to newly filling into
Pond 100 remeasures.
Further, the utility model be also disclosed above-mentioned workbench amount electric system the automatically controlled process of amount electricity it is as follows:
Mobile battery balance is to first row battery measurement position, downlink amount electrical actuators;Battery is contacted by measuring chieftain
Positive and negative anodes;
The first row battery plus-negative plate of the measurement chieftain contact is measured by the voltmeter being arranged on measured motor structure, is passed through
The precompressed of preset time gathers the voltage data of the first row battery;
Each battery voltage data of the first row battery is analyzed, records the voltage peak of each battery of the first row battery,
And by the voltage peak compared with preset voltage value;
If the voltage peak of each battery is more than preset voltage value in first row battery, it is determined that the first row battery of measurement is conjunction
Lattice product battery continues to measure second row battery, if there is cell voltage peak value to be less than or equal to predeterminated voltage in the first row battery
The battery of value, it is determined that the battery less than or equal to preset voltage value is defective products battery;
Light beam is projected by laser indicator lamp, marks the corresponding defective products battery, amount electrical actuators move up, equipment
Pause;
The defective products battery that the laser indicator lamp marks is picked to the battery of unmeasured mistake in simultaneously replacement.
Further, continue to measure the first row battery that defective products is crossed in replacement, until each battery electricity of the first row battery
Voltage crest value is both greater than preset voltage value, continues to measure second row battery.
In conclusion in the utility model, battery balance 10 is moved to first row battery 100 and measures position, measures electricity and performs
20 downlink of mechanism;After measurement chieftain 21 touches 100 positive and negative anodes of battery, by one section of squeeze time, wherein in measured motor structure with
The measurement one-to-one voltmeter of chieftain starts to gather battery voltage data;
The voltmeter analyzes the battery voltage data of acquisition, chooses peak value and the locking of each cell voltage,
By the peak value of each cell voltage compared with predetermined voltage value (acceptance value);
If the peak value of the cell voltage of acquisition is more than acceptance value, i.e. battery is qualified, then corresponds to laser indicator lamp 30 and be failure to actuate,
Battery status can be shown as green on touch-screen 40, and equipment continues to carry out voltage measurement to next row battery 100;
If the peak value of the cell voltage of acquisition is less than or equal to acceptance value, it is determined that include unqualified battery, it is corresponding
Laser indicator lamp 30 projects light, and corresponding defective products battery 100 is marked by the light beam, and battery status display is on touch-screen 40
Red, amount electrical actuators 20 move up, and 20 uplink of electrical actuators is measured in equipment pause, and measurement chieftain 21 is disconnected with battery 100 just
The contact of cathode, the voltmeter show value return 0, manual or automated can reject at this time, replace battery 100;Battery 100
After supplement, voltage measurement is re-started to front-seat battery 100, until all 100 voltages of battery are qualified;Treat all 100 electricity of battery
After pressure is measured, each component is repositioned to initial position, and after next balance battery 100 is waited to be put into, equipment starts, and restarts
Voltage measurement.
The specific embodiments described herein are merely examples of the spirit of the present invention.The utility model institute
Described specific embodiment can be done various modifications or additions or using similar by belonging to those skilled in the art
Mode substitute, but without departing from the spirit of the present application or beyond the scope of the appended claims.
Claims (7)
1. a kind of workbench amount electric system, including:
Workbench;
It is characterized in that:
Battery balance, is placed with multiple rows of battery thereon, and the battery balance can the displacement along the longitudinal direction on workbench;
Measure electrical actuators, be placed in battery balance top position, the amount electrical actuators can on workbench along left and right and
Vertical direction displacement, the amount electrical actuators displacement carry out voltage survey to the battery that quantity is preset in battery balance afterwards in place
Amount, the amount electrical actuators include an at least row and measure chieftain, the row electricity of often row's measurement chieftain's single measurement corresponding number
The voltage in pond;
Measured motor structure, including with measuring the one-to-one voltmeter of chieftain.
2. a kind of workbench amount electric system according to claim 1, which is characterized in that
The voltmeter analyzes the battery voltage data of corresponding measurement chieftain measurement, and chooses peak value and carried out with preset value
It compares, and judges battery for certified products or defective products.
3. a kind of workbench amount electric system according to claim 2, it is characterised in that:Anode, the cathode of the battery
Upward, the length direction for the battery put in the battery balance is parallel with battery balance deformation trace, the measurement chieftain
With a pair of of the amount electric device being adapted to battery plus-negative plate.
4. a kind of workbench amount electric system according to claim 2, it is characterised in that:The amount electrical actuators include
Installing plate, the amount electric device are removably mounted on installing plate and set downward, are arranged with spring outside the amount electric device, institute
Spring is stated to be connected between the end and installing plate that corresponding amount electric device docks with battery.
5. a kind of workbench amount electric system according to claim 4, it is characterised in that:It is set above amount electrical actuators
It is equipped with measuring chieftain's at least row's laser indicator lamp correspondingly, the laser indicator lamp and corresponding measurement chieftain, voltage
Table is electrically connected respectively.
6. a kind of workbench amount electric system according to claim 5, it is characterised in that:The laser indicator lamp is used for will
Laser projection is on corresponding battery.
7. a kind of workbench amount electric system according to claim 6, it is characterised in that:It is equipped on a mounting board and laser
The one-to-one through hole of indicator light, the light that the laser indicator lamp projects pass through corresponding through hole to be incident upon again on corresponding battery, institute
Through hole is stated to be located between corresponding two amounts electric device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721253013.5U CN207401788U (en) | 2017-09-27 | 2017-09-27 | A kind of workbench amount electric system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721253013.5U CN207401788U (en) | 2017-09-27 | 2017-09-27 | A kind of workbench amount electric system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207401788U true CN207401788U (en) | 2018-05-25 |
Family
ID=62406627
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721253013.5U Expired - Fee Related CN207401788U (en) | 2017-09-27 | 2017-09-27 | A kind of workbench amount electric system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207401788U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107639045A (en) * | 2017-09-27 | 2018-01-30 | 中银(宁波)电池有限公司 | A kind of workbench amount electric system and its electric electric-control method of amount |
-
2017
- 2017-09-27 CN CN201721253013.5U patent/CN207401788U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107639045A (en) * | 2017-09-27 | 2018-01-30 | 中银(宁波)电池有限公司 | A kind of workbench amount electric system and its electric electric-control method of amount |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201773892U (en) | Lithium ion battery pole group reshaping and detection device | |
CN205210214U (en) | Automatic test system of block terminal | |
CN208643342U (en) | A kind of button lithium cell intelligence test sorting thickness-measuring equipment | |
CN103713221A (en) | Low-frequency transformer automatic comprehensive test machine based on GROOVY data collecting and analyzing system controlled by PLC | |
CN208937683U (en) | A kind of photovoltaic junction box diode characteristic detection device | |
CN203658550U (en) | A battery test apparatus | |
CN207401788U (en) | A kind of workbench amount electric system | |
CN111781515A (en) | Test all-in-one machine of battery module | |
CN105842609A (en) | Hardware circuit detecting device for control unit of diesel engine SCR system | |
CN108957281A (en) | A kind of photovoltaic junction box diode characteristic detection device | |
CN114325488A (en) | Wire harness fault inspection bench and wire harness fault detection method | |
CN110153042A (en) | A kind of device of the automatic sorting based on resistance value detection | |
CN107639045A (en) | A kind of workbench amount electric system and its electric electric-control method of amount | |
CN206348626U (en) | Intelligent radio sweeping robot automatic testing stand | |
CN207541233U (en) | A kind of automatic measured motor of rectangular cell | |
CN209326607U (en) | A kind of intelligence mistake proofing thickness measuring gasket library | |
CN207832960U (en) | A kind of circuit board testing system | |
CN207675911U (en) | Switching Power Supply whitepack limit Auto-Test System | |
CN103278221A (en) | Detection equipment used for finished intelligent meter | |
CN106168655A (en) | The high efficiency of a kind of photovoltaic charged luminaire, automatic test fixture | |
CN212808514U (en) | Electronic watch movement current detection frame | |
CN107728069A (en) | A kind of automatic measured motor of rectangular cell | |
CN211856855U (en) | Detection apparatus for battery management system gathers pencil | |
CN206431249U (en) | The remote controlled automatic testing jig of massage armchair control panel | |
CN209460366U (en) | A kind of electric energy meter PCBA test fixture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180525 |