CN207395894U - A kind of green construction dust noise real-time monitoring device - Google Patents

A kind of green construction dust noise real-time monitoring device Download PDF

Info

Publication number
CN207395894U
CN207395894U CN201721447603.1U CN201721447603U CN207395894U CN 207395894 U CN207395894 U CN 207395894U CN 201721447603 U CN201721447603 U CN 201721447603U CN 207395894 U CN207395894 U CN 207395894U
Authority
CN
China
Prior art keywords
fixed link
supporting rod
pedestal
display screen
monitoring device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721447603.1U
Other languages
Chinese (zh)
Inventor
王天利
陈辉
王飞宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721447603.1U priority Critical patent/CN207395894U/en
Application granted granted Critical
Publication of CN207395894U publication Critical patent/CN207395894U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of green construction dust noise real-time monitoring devices, it is with pedestal, pedestal lower end sets idler wheel, and pedestal upper end is vertically arranged supporting rod, and supporting rod sets gradually antenna, the first fixed link, the second fixed link, display screen and switch cabinet from top to bottom;First fixed link is horizontally set on supporting rod, setting several noise transducers in one side in the first fixed link, and opposite side sets several PM2.5 sensors in the first fixed link;Second fixed link is horizontally set on supporting rod, if the second fixed link one side setting dry temperature sensor, opposite side sets several humidity sensors in the second fixed link;Display screen back is fixed at by anchor ear on supporting rod, and switch cabinet is antenna, display screen, noise transducer, PM2.5 sensors, temperature sensor and humidity sensor provide power supply.The installation area is small, convenient to use, ensures the safe construction environment of construction site, improves the construction efficiency of construction site.

Description

A kind of green construction dust noise real-time monitoring device
Technical field
The utility model is related to the technical field of monitoring device, especially a kind of green construction dust noise monitors dress in real time It puts.
Background technology
City noise dust pollution becomes a big public hazards of urban environment already.It is external that early there have been " noise koniosises " One word, the whole world noise dust pollution investigation that the World Health Organization carries out recently think that noise dust pollution has become shadow Ring the serious problems of people's health and quality of life.However, in city, public utility such as underground railway, high speed are built The construction sites such as highway, bridge and the construction site for being engaged in industry and civil buildings, it is all largely different using road roller etc. Big machinery causes substantial amounts of noise dust to influence urban environment, make originally more quiet environment become noise dust pollution Serious place causes construction surrounding area seriously to be polluted be subject to noise dust.Later people are by constantly research, research and development Dust noise real-time monitoring device, is monitored the dust and noise of construction site;But the device is usually fixed setting , the data monitored can only also be monitored according to the position that sensor is set, and floor space is very big during normal use, It regular can collide with construction equipment, its normal use of serious influence.
In conclusion existing construction site also exists for the monitoring device of dust and noise in structure and design The defects of very big, it is impossible to meet the needs of people's reality.
Utility model content
The technical problems to be solved in the utility model is:In order to which solve in above-mentioned background technology existing in the prior art asks Topic, provides a kind of green construction dust noise real-time monitoring device, and simple in structure, floor space is small, can mobile monitoring at any time The dust and noise in each place, it is convenient to use, ensure the safe construction environment of construction site, improve applying for construction site Work efficiency rate.
Technical solution is used by the utility model solves its technical problem:A kind of green construction dust noise is supervised in real time Device is surveyed, there is pedestal, the pedestal lower end sets idler wheel, and the upper end of the pedestal is vertically arranged supporting rod, described Supporting rod sets gradually antenna, the first fixed link, the second fixed link, display screen and switch cabinet from top to bottom;The antenna is Arc curve structure, first fixed link are horizontally set on supporting rod, if one side is set in first fixed link Dry noise transducer, opposite side sets several PM2.5 sensors in first fixed link;Second fixed link is horizontal It is arranged on supporting rod, it is another in second fixed link if the second fixed link one side setting dry temperature sensor Side sets several humidity sensors;The display screen back is fixed at by anchor ear on supporting rod, the switch cabinet External power supply, switch cabinet carry for antenna, display screen, noise transducer, PM2.5 sensors, temperature sensor and humidity sensor Power supply source.
It further illustrates, universal joint is set on the supporting rod that the switch cabinet is connected with pedestal;Can realize pedestal with On supporting rod optional turning, the collision of construction equipment is avoided to damage monitoring device, improves its operation stability.
It further illustrates, universal joint is set on the supporting rod connected between the switch cabinet and display screen;It so can be with Ensure the rotation of any direction of display screen, prevent the collision of construction equipment from being damaged to monitoring device, it is steady to improve its operation It is qualitative.
It further illustrates, universal joint is set on the supporting rod between the antenna and the first fixed link;It so can be real The random rotation of existing antenna, convenient for the wireless transmission of signal.
It further illustrates, also sets up protective plate on the outside of the pedestal lower end idler wheel, the protective plate end is hinged On pedestal lower face;Idler wheel can effectively be protected not to be subject to big shock in the process of running by protective plate, improved whole The operation stability of body monitoring device.
The beneficial effects of the utility model are:The utility model proposes a kind of green construction dust noise monitor dress in real time Put, simple in structure, floor space is small, can each place of mobile monitoring at any time dust and noise, it is convenient to use, ensure The safe construction environment of construction site improves the construction efficiency of construction site.
Description of the drawings
It in order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments described in the application, for those of ordinary skill in the art, before not making the creative labor It puts, can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the structure diagram of the utility model.
In attached drawing marked as:1st, pedestal, 2, idler wheel, 3, supporting rod, 4, antenna, the 5, first fixed link, 6, second fixes Bar, 7, display screen, 8, switch cabinet, 9, noise transducer, 10, PM2.5 sensors, 11, temperature sensor, 12, humidity sensor, 13rd, universal joint, 14, protective plate.
Specific embodiment
The technical issues of in order to solve the utility model, technical solution and advantageous effect are more clearly understood, below With reference to accompanying drawings and embodiments, the utility model is further elaborated.It should be appreciated that specific implementation described herein Example is only used to explain the utility model, is not used to limit the utility model.
In the description of the utility model, it is to be understood that term " one side ", " opposite side ", " both sides ", " between ", The orientation or position relationship of the instructions such as " middle part ", " upper end ", " lower end " are based on orientation shown in the drawings or position relationship, are only The utility model must have specific with the device or element for simplifying description rather than instruction or hint meaning for ease of description Orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to the utility model.
, it is necessary to which explanation, unless otherwise clearly defined and limited, term " is set in the description of the utility model Put ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or be integrally connected;It can To be to be connected directly, can also be indirectly connected by intermediary.It for the ordinary skill in the art, can be specific Situation understands concrete meaning of the above-mentioned term in the utility model.
As shown in Fig. 1 a kind of green construction dust noise real-time monitoring device, has pedestal 1, and 1 lower end of pedestal is set Idler wheel 2, the upper end of pedestal 1 are vertically arranged supporting rod 3, and supporting rod 3 sets gradually antenna 4, the first fixed link 5, from top to bottom Two fixed links 6, display screen 7 and switch cabinet 8;Antenna 4 is arc curve structure, and the first fixed link 5 is horizontally set on supporting rod 3 On, one side sets several noise transducers 9 in the first fixed link 5, and opposite side sets several PM2.5 sensings in the first fixed link 5 Device 10;Second fixed link 6 is horizontally set on supporting rod 3, if 6 one side of the second fixed link setting dry temperature sensor 11, second Opposite side sets several humidity sensors 12 in fixed link 6;7 back of display screen is fixed at by anchor ear on supporting rod 3, electricity 8 external power supply of cabinet case, switch cabinet 8 for antenna 4, display screen 7, noise transducer 9, PM2.5 sensors 10, temperature sensor 11 with Humidity sensor 12 provides power supply.
Wherein, universal joint 13 is set on the supporting rod 3 that switch cabinet 8 is connected with pedestal 1.Connect between switch cabinet 8 and display screen 7 Universal joint 13 is set on the supporting rod 3 connect.Universal joint 13 is set on the supporting rod 3 between 4 and first fixed link 5 of antenna.Pedestal 1 The outside of lower end idler wheel 2 also sets up protective plate 14, and 14 end of protective plate is hinged on 1 lower face of pedestal.
The use principle of the green construction dust noise real-time monitoring device is as follows:
The monitoring device can be pushed to any required place being monitored by construction personnel, pass through noise transducer 9 The noise of surrounding can effectively be monitored;Periphery dust situation can effectively be monitored by PM2.5 sensors;Pass through temperature sensor 11 can effectively monitor ambient temperature situation;Ambient humidity, light and temperature situation can effectively be monitored by humidity sensor 12, it is easy to operate It is convenient, it flexibly uses, due to setting multiple universal joints 13 on supporting rod 3, can realize the random rotation of all parts, avoid With the hard collision of construction equipment in monitoring process, floor space is small, can also move and pack up at any time, convenient for making for construction personnel With.
It is above-described, it is only the preferable specific embodiment of the utility model, but the scope of protection of the utility model is simultaneously It is not limited to this, in the technical scope that any one skilled in the art discloses in the utility model, according to this reality It is subject to equivalent substitution or change with new technical solution and its utility model design, should all covers the protection in the utility model Within the scope of.

Claims (5)

1. a kind of green construction dust noise real-time monitoring device, it is characterised in that:With pedestal, the pedestal lower end is set Idler wheel, the upper end of the pedestal are vertically arranged supporting rod, and the supporting rod sets gradually antenna, the first fixation from top to bottom Bar, the second fixed link, display screen and switch cabinet;The antenna is arc curve structure, and the first fixed link level is set It puts on supporting rod, setting several noise transducers in one side in first fixed link, it is another in first fixed link Side sets several PM2.5 sensors;Second fixed link is horizontally set on supporting rod, the second fixed link one side If setting dry temperature sensor, opposite side sets several humidity sensors in second fixed link;The display screen back of the body Portion is fixed at by anchor ear on supporting rod, the switch cabinet external power supply, and switch cabinet is antenna, display screen, noise pass Sensor, PM2.5 sensors, temperature sensor and humidity sensor provide power supply.
2. a kind of green construction dust noise real-time monitoring device according to claim 1, it is characterised in that:The electricity Universal joint is set on the supporting rod that cabinet case is connected with pedestal.
3. a kind of green construction dust noise real-time monitoring device according to claim 1, it is characterised in that:The electricity Universal joint is set on the supporting rod connected between cabinet case and display screen.
4. a kind of green construction dust noise real-time monitoring device according to claim 1, it is characterised in that:The day Universal joint is set on supporting rod between line and the first fixed link.
5. a kind of green construction dust noise real-time monitoring device according to claim 1, it is characterised in that:The bottom Protective plate is also set up on the outside of the idler wheel of seat lower end, the protective plate end is hinged on pedestal lower face.
CN201721447603.1U 2017-11-02 2017-11-02 A kind of green construction dust noise real-time monitoring device Expired - Fee Related CN207395894U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721447603.1U CN207395894U (en) 2017-11-02 2017-11-02 A kind of green construction dust noise real-time monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721447603.1U CN207395894U (en) 2017-11-02 2017-11-02 A kind of green construction dust noise real-time monitoring device

Publications (1)

Publication Number Publication Date
CN207395894U true CN207395894U (en) 2018-05-22

Family

ID=62328234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721447603.1U Expired - Fee Related CN207395894U (en) 2017-11-02 2017-11-02 A kind of green construction dust noise real-time monitoring device

Country Status (1)

Country Link
CN (1) CN207395894U (en)

Similar Documents

Publication Publication Date Title
CN103175565B (en) A kind of height can self-adjusting tunnel-liner Bracket for Inspection with angle
CN209471364U (en) A kind of Architectural Engineering Environment monitoring device
WO2018233336A1 (en) On-site detection method and device for three-dimensional deformation of glass curtain wall
CN103941308A (en) Auxiliary inspection car device for secondary lining quality
CN207395894U (en) A kind of green construction dust noise real-time monitoring device
CN103557437A (en) Urban leakage-listening robot
CN203644177U (en) Novel simple landslide detection device
CN205603067U (en) Portable gallows that overhauls
CN105446276B (en) A kind of foundation ditch axle power monitors compensation method
CN203533119U (en) Rotary liquid crystal displayer
CN209007531U (en) A kind of cable tunnel inspection robot
CN207848614U (en) A kind of line holder of the municipal construction based on screw thread lifting
CN208269883U (en) A kind of civil engineering measuring device
CN115494060B (en) Karst fracture channel surveys device
CN208039328U (en) A kind of architectural engineering static load of pile foundation detection device
CN205619903U (en) Deformation monitoring system
CN216348720U (en) Be used for tunnel construction monitoring devices
CN109217948B (en) Fixing device of mobile internet 5G general signal detector
CN210421397U (en) Anti-seismic reinforced concrete frame structure
CN209098069U (en) A kind of safety of tower crane warning device
CN203672351U (en) Novel portable foundation pit displacement monitor support
CN207259981U (en) A kind of removable assembled wind and rain vestibule
CN112963703A (en) Construction project supervision project measurement system
CN206920884U (en) Intelligent online monitoring system is used in a kind of high-speed railway touching net compensation
CN215803377U (en) Entrance to a cave covers device for civil engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180522

Termination date: 20181102

CF01 Termination of patent right due to non-payment of annual fee