CN207395820U - High-voltage electromagnetic flowmeter new structure - Google Patents
High-voltage electromagnetic flowmeter new structure Download PDFInfo
- Publication number
- CN207395820U CN207395820U CN201721241264.1U CN201721241264U CN207395820U CN 207395820 U CN207395820 U CN 207395820U CN 201721241264 U CN201721241264 U CN 201721241264U CN 207395820 U CN207395820 U CN 207395820U
- Authority
- CN
- China
- Prior art keywords
- flange
- protrusion
- circle
- electromagnetic flowmeter
- voltage electromagnetic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Measuring Volume Flow (AREA)
Abstract
The utility model is related to oilfield more particularly to high-voltage electromagnetic flowmeter new structures.Gauge outfit comprising flowmeter bodies and top, the flowmeter bodies both sides respectively contain ring flange, it is characterized in that, the protrusion of a circle is included on ring flange, the protrusion surrounds flange center's circle distribution, one layer of rubber layer is coated in the protrusion, also comprising abutted flange, comprising a circle groove on the abutted flange, protrusion and groove can agree with.Advantageous effect:Using the structure at this place, when use, avoid the use of gasket, when operation, ring flange is docked into abutted flange, protrusion and groove agree with, it can mutually squeeze, rubber layer also has the effect of contraposition when installation as the effect for stopping water, and gasket is towards the situation of whereabouts when avoiding installation.
Description
Technical field
The utility model is related to oilfield more particularly to high-voltage electromagnetic flowmeter new structures.
Background technology
Traditional oil well is fetched water in pressurization, it is necessary to remotely fetch water, and equipment is huge, and charging efficiency is low.For cell
Block oil field and outlying wellblock, routinely water flooding regime put into operation, need to dig a well, build a station and pipeline installation.
In the transmission process of high pressure water, flange, which crosses, robs position and is easiest to problem appear to is that leak, and when install,
Circular gasket must allow human hand to hold, and not so gasket can be toward falling, and waterproof effect is bad.
Utility model content
The purpose of utility model:In order to provide a kind of effect better high-voltage electromagnetic flowmeter new structure, specific purposes
See multiple substantial technological effects of specific implementation part.
In order to reach as above purpose, the utility model adopts the following technical scheme that:
High-voltage electromagnetic flowmeter new structure, the gauge outfit comprising flowmeter bodies and top, the flowmeter bodies two
Side respectively contains ring flange, which is characterized in that the protrusion of a circle is included on ring flange, the protrusion is around flange center's circumference point
Cloth is coated with one layer of rubber layer in the protrusion, also comprising abutted flange, comprising a circle groove on the abutted flange, protrusion and
Groove can agree with.
The further technical solution of the utility model is, also comprising upper barrier bed, the upper barrier bed on the ring flange
For the plate of arc, the gap that two flanges dock can be blocked on the top.
The further technical solution of the utility model is that the barrier bed is metal structure.
The further technical solution of the utility model is, a circle rubber layer is included in the hole of the flange.
Using the utility model of as above technical solution, had the advantages that compared with the prior art:Using this place
Structure when use, avoids the use of gasket, and when operation, ring flange is docked abutted flange, protrusion and groove contract
It closes, can mutually squeeze, rubber layer also has the effect of contraposition when installation, avoid installation as the effect for stopping water
When gasket towards whereabouts situation.
Description of the drawings
In order to further illustrate the utility model, it is further illustrated below in conjunction with the accompanying drawings:
Fig. 1 is one structure diagram of utility model embodiment;
Fig. 2 is two structure diagram of embodiment;
Fig. 3 is two positive structure schematic of embodiment;
Wherein:1. gauge outfit;2. flowmeter bodies;3. protrusion;4. rubber layer;5. abutted flange;6. groove;7. butt tube;
8. rendezvous method flange aperture;9. upper barrier bed.
This attached drawing is the schematic diagram of present apparatus critical piece composition, does not represent the appearance and size, connection side of the utility model
Formula, assembling form, position relationship etc., it is illustrated that partially manual valve, pipe fitting etc. is omitted.
Specific embodiment
With reference to the accompanying drawings and detailed description, the utility model is furtherd elucidate, it should be understood that following specific embodiment parties
Formula is merely to illustrate the utility model rather than limitation the scope of the utility model.It should be noted that make below in description
Word "front", "rear", "left", "right", "up" and "down" refer to the direction in attached drawing, and word " interior " and " outer " refer to respectively
Be directed towards or the direction away from particular elements geometric centers.
High-voltage electromagnetic flowmeter new structure, the gauge outfit comprising flowmeter bodies and top, the flowmeter bodies two
Side respectively contains ring flange, which is characterized in that the protrusion of a circle is included on ring flange, the protrusion is around flange center's circumference point
Cloth is coated with one layer of rubber layer in the protrusion, also comprising abutted flange, comprising a circle groove on the abutted flange, protrusion and
Groove can agree with.The technique effect and its realization process for the essence that the technical solution at this place is played are as follows:Using this place
Structure, when use, avoid the use of gasket, when operation, ring flange docked into abutted flange, protrusion and groove
Agree with, can mutually squeeze, rubber layer also has the effect of contraposition when installation, avoid peace as the effect for stopping water
Gasket is towards the situation of whereabouts when dress.
Also comprising upper barrier bed on the ring flange, the upper barrier bed is the plate of arc, can block two on the top
The gap of a flange docking.The technique effect and its realization process for the essence that the technical solution at this place is played are as follows:With reference to
Fig. 2 and Fig. 3, barrier bed can stop rainwater, rainwater avoided to fall in gap.
The barrier bed is metal structure.The technique effect for the essence that the technical solution at this place is played and its realization process
To be as follows:The preferred stainless steel of metal structure can play the effect of anti-corrosion rain-proof.
A circle rubber layer is included in the hole of the flange.The technical solution at this place played essence technique effect and its
Realization process is as follows:The rubber layer can squeeze bolt so that its fix stably avoids getting rusty, also avoid into water.
In a creative way, each effect is individually present more than, moreover it is possible to the combination of the above results is completed with a nested structure.
It is clear that the technique effect that more than structure is realized is realized, discounting for additional technical solution, this patent title is also
It can be a kind of flowmeter.It is not shown in figure part details.
It should be noted that multiple schemes that this patent provides include the basic scheme of itself, independently of each other, not mutually
It restricts, but it can also be mutually combined in the case where there is no conflict, reach multiple effects and realize jointly.
The advantages of basic principle, main feature and the utility model of the utility model has been shown and described above.Ability
The technical staff in domain should be recognized that the present utility model is not limited to the above embodiments, described in the above embodiment and specification
Simply illustrate the principle of the utility model, on the premise of not departing from the spirit and scope of the utility model, the utility model can also
There are various changes and modifications, these changes and improvements are both fallen in claimed scope.
Claims (4)
1. high-voltage electromagnetic flowmeter new structure, the gauge outfit comprising flowmeter bodies and top, the flowmeter bodies both sides
Respectively contain ring flange, which is characterized in that the protrusion of a circle is included on ring flange, which surrounds flange center's circle distribution,
One layer of rubber layer is coated in the protrusion, also comprising abutted flange, a circle groove, protrusion and groove are included on the abutted flange
It can agree with.
2. high-voltage electromagnetic flowmeter new structure as described in claim 1, which is characterized in that also comprising upper on the ring flange
Barrier bed, the upper barrier bed are the plate of arc, can block the gap of two flange docking on the top.
3. high-voltage electromagnetic flowmeter new structure as claimed in claim 2, which is characterized in that the barrier bed is metal knot
Structure.
4. high-voltage electromagnetic flowmeter new structure as described in claim 1, which is characterized in that one is included in the hole of the flange
Enclose rubber layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721241264.1U CN207395820U (en) | 2017-09-26 | 2017-09-26 | High-voltage electromagnetic flowmeter new structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721241264.1U CN207395820U (en) | 2017-09-26 | 2017-09-26 | High-voltage electromagnetic flowmeter new structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207395820U true CN207395820U (en) | 2018-05-22 |
Family
ID=62405079
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721241264.1U Active CN207395820U (en) | 2017-09-26 | 2017-09-26 | High-voltage electromagnetic flowmeter new structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207395820U (en) |
-
2017
- 2017-09-26 CN CN201721241264.1U patent/CN207395820U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202990889U (en) | Coating vacuum heat-insulating oil pipe | |
CN208750195U (en) | A kind of ultra high molecular polyethylene steel skeleton composite | |
CN207743649U (en) | A kind of MPVCT power cable protecting pipes | |
CN207395820U (en) | High-voltage electromagnetic flowmeter new structure | |
CN209484087U (en) | A kind of anticorrosion sucker rod in oil field | |
CN204437712U (en) | The required cooling water water diversion apparatus of debugging in a kind of marine generator depressed place | |
CN205191051U (en) | Single point mooring oil transportation terminal rotary joint | |
CN203847857U (en) | Quick installation type flexible joint device for liquid conveying equipment | |
CN205155402U (en) | Seawater desalination is stainless steel flange for equipment | |
CN205479791U (en) | Enhancement mode HDPE double -walled bellows | |
CN205173763U (en) | Compressor mouth of pipe quick change coupler | |
CN204004842U (en) | A kind of insulation ocean petroleum pipeline | |
CN109238642B (en) | Be applied to blind pipe device of flowing safety experiment circulation system | |
CN203979747U (en) | A kind of novel pipeline compensator | |
CN203948846U (en) | A kind of linkage structure of metal tube | |
CN204083617U (en) | Composite-curve | |
CN204829046U (en) | Municipal administration pipeline connecting device | |
CN203115391U (en) | Novel water pipe | |
CN208169752U (en) | A kind of plumbing installation for oil exploitation | |
CN203348786U (en) | Lined stainless steel reducer pipe fitting | |
CN206929552U (en) | A kind of liquefied natural gas holding vessel | |
CN205424179U (en) | Novel oil pipe connecting elements | |
CN205781471U (en) | A kind of high-pressure composite pipe | |
CN204127548U (en) | A kind of linkage structure of pipe fittings | |
CN204692867U (en) | Curvedly connect formula outer electromagnetic welding double tube structure and outerly curvedly connect formula joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |