CN207392270U - A kind of Construction of Deep Excavation Engineering and monitoring simulation test device - Google Patents

A kind of Construction of Deep Excavation Engineering and monitoring simulation test device Download PDF

Info

Publication number
CN207392270U
CN207392270U CN201721211668.6U CN201721211668U CN207392270U CN 207392270 U CN207392270 U CN 207392270U CN 201721211668 U CN201721211668 U CN 201721211668U CN 207392270 U CN207392270 U CN 207392270U
Authority
CN
China
Prior art keywords
construction
loading plate
simulation test
test device
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721211668.6U
Other languages
Chinese (zh)
Inventor
张定敏
杜胜利
严章勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721211668.6U priority Critical patent/CN207392270U/en
Application granted granted Critical
Publication of CN207392270U publication Critical patent/CN207392270U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses a kind of Construction of Deep Excavation Engineering and monitoring simulation test device, including loading plate, the upper end of the loading plate is equipped with bearing box, the lower end of the loading plate is equipped with support device, soil layer is equipped in the bearing box, multiple foundation pits are equidistantly equipped in the soil layer, monitoring device is equipped in the soil layer, the upper end one side of the loading plate is equipped with support plate, the upper end of the support plate is hinged with rotating bar, the one side of the rotating bar is equipped with tumbler, the rotating bar is equipped with opening, sliding slot is equipped in the opposing sidewalls of the opening, sliding block is installed in the sliding slot, movable block is fixed between two sliding blocks, nozzle is fixed on the movable block.The utility model is realized to the automatic watering in simulation foundation pit, conveniently adjusted to different position by the combination of water pump, tumbler, cylinder and nozzle, while reduces cost of labor, avoids unrestrained, is conveniently operated, suitable for popularization.

Description

A kind of Construction of Deep Excavation Engineering and monitoring simulation test device
Technical field
The utility model is related to foundation pit simulating experiment technique field more particularly to a kind of Construction of Deep Excavation Engineering and monitoring mould Intend experimental rig.
Background technology
With the exploitation of the underground space, the planning construction and high level, high-rise building of each main cities subway in the whole nation The continuous intensification on object basis, the safety problem and deep foundation pit construction of deep foundation pit construction have caused people to the perturbed problem of surrounding enviroment More and more concerns.At present, the mould of deep footing groove enclosing structure design, construction and the research and teaching of monitoring is had not been used in Intend experimental rig, existing foundation pit enclosure design theory is supplemented for being also required to by other means under complex geological condition Verification, and existing teaching link middle school student lack to deep foundation pit construction overall process and foundation pit construction dynamic process and its to week The visual understanding that surrounding environment influences, it is therefore desirable to simulated experiment, but existing analogue experiment installation is needed when adding water to foundation pit Will manually plus water, efficiency is low, and easily unrestrained, very inconvenient, for this purpose, we have proposed a kind of Construction of Deep Excavation Engineering and Simulation test device is monitored to solve the above problems.
Utility model content
The purpose of this utility model is and a kind of deep-foundation pit engineering proposed in order to solve shortcoming in the prior art Construction and monitoring simulation test device.
To achieve these goals, the utility model employs following technical solution:
A kind of Construction of Deep Excavation Engineering and monitoring simulation test device, including loading plate, the upper end of the loading plate is equipped with Bearing box, the lower end of the loading plate are equipped with support device, soil layer are equipped in the bearing box, is equidistantly equipped in the soil layer Multiple foundation pits, are equipped with monitoring device in the soil layer, and the upper end one side of the loading plate is equipped with support plate, the support plate it is upper End is hinged with rotating bar, and the one side of the rotating bar is equipped with tumbler, and the rotating bar is equipped with opening, the phase of the opening To being equipped with sliding slot on side wall, sliding block is installed in the sliding slot, is fixed with movable block between two sliding blocks, on the movable block Nozzle is fixed with, the lower end one side of the rotating bar is fixed with installing plate, and the one side of the installing plate is fixed with the second cylinder, institute The piston-rod end for stating the second cylinder is fixed on the one side of nozzle, and the lower end of the loading plate is equipped with water tank, in the water tank Bottom is equipped with water pump, is connected with water-supply-pipe on the water pump, one end of the water-supply-pipe is connected on nozzle.
Preferably, the support device includes the support leg for being arranged on loading plate lower end corner, the lower end of the support leg It is equipped with cushion block.
Preferably, the tumbler includes the first cylinder for being rotatably connected on support plate one side, first cylinder Piston-rod end is rotatably connected on the one side of rotating bar.
Preferably, it is fixed with illuminator on one end side wall of the support plate.
Preferably, the water-supply-pipe is hose.
Preferably, the bearing box is made of carbon steel.
In the utility model, in use, excavation pit can be simulated in soil layer, be monitored using monitoring device, it is necessary to During test for added water, water pump is fed the water by water-supply-pipe in nozzle, and the first cylinder is turned by the telescopic band turn lever of piston rod It moves to suitable position, meanwhile, the second cylinder is moved by the flexible drive nozzle of piston rod, then the foundation pit to needing to add water It carries out plus water, the utility model is realized by the combination of water pump, tumbler, cylinder and nozzle in simulation foundation pit Automatic watering, conveniently adjusted to different position, while reduce cost of labor avoids unrestrained, is conveniently operated, suitable for pushing away Extensively.
Description of the drawings
Fig. 1 be the utility model proposes a kind of Construction of Deep Excavation Engineering and monitoring simulation test device structural representation Figure;
Fig. 2 be the utility model proposes a kind of Construction of Deep Excavation Engineering and monitoring simulation test device mobile block structure Schematic diagram.
In figure:1 first cylinder, 2 rotating bars, 3 nozzles, 4 second cylinders, 5 installing plates, 6 bearing boxes, 7 foundation pits, 8 monitoring dresses It puts, 9 support plates, 10 water-supply-pipes, 11 water tanks, 12 cushion blocks, 13 support legs, 14 sliding blocks, 15 movable blocks, 16 sliding slots.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.
With reference to Fig. 1-2, a kind of Construction of Deep Excavation Engineering and monitoring simulation test device, including loading plate, loading plate it is upper End is equipped with bearing box 6, and the lower end of loading plate is equipped with support device, stablizes support, soil layer is equipped in bearing box 6, between being waited in soil layer Away from equipped with multiple foundation pits 7, simulated, monitoring device is equipped in soil layer, the upper end one side of loading plate is equipped with support plate 9, support The upper end of plate 9 is hinged with rotating bar 2, and the one side of rotating bar 2 is equipped with tumbler, and rotating bar 2 is equipped with opening, opening it is opposite Sliding slot 16 is equipped on side wall, sliding block 14 in sliding slot 16 is installed, movable block 15, movable block 15 are fixed between two sliding blocks 14 On be fixed with nozzle 3, the lower end one side of rotating bar 2 is fixed with installing plate 5, and the one side of installing plate 5 is fixed with the second cylinder 4, The piston-rod end of two cylinders 4 is fixed on the one side of nozzle 3, and the lower end of loading plate is equipped with water tank 11, and the bottom in water tank 11 is set There is water pump, water-supply-pipe 10 is connected on water pump, one end of water-supply-pipe 10 is connected on nozzle 3, and water pump is by water-supply-pipe 10 by water It is sent into nozzle 3.
In the utility model, support device includes being arranged on the support leg 13 of loading plate lower end corner, under support leg 13 End is equipped with cushion block 12, stablizes support, and tumbler includes the first cylinder 1 for being rotatably connected on 9 one side of support plate, the first cylinder 1 piston-rod end is rotatably connected on the one side of rotating bar 2, and the first cylinder 1 is rotated by the telescopic band turn lever 2 of piston rod To suitable position, illuminator is fixed on one end side wall of support plate 9, floor light, water-supply-pipe 10 is hose, bearing box 6 are made of carbon steel.
It in the utility model, in use, excavation pit 7 can be simulated in soil layer, is monitored, needed using monitoring device 8 When wanting test for added water, water pump is fed the water by water-supply-pipe 10 in nozzle 3, the telescopic band turn that the first cylinder 1 passes through piston rod Lever 2 turns to suitable position, meanwhile, the second cylinder 4 is moved by the flexible drive nozzle 3 of piston rod, then to needing The foundation pit of water is added to carry out adding water.
More than, it is only the preferable specific embodiment of the utility model, but the scope of protection of the utility model is not limited to In this, in the technical scope that any one skilled in the art discloses in the utility model, according to the utility model Technical solution and its utility model design be subject to equivalent substitution or change, should all cover the scope of protection of the utility model it It is interior.

Claims (6)

1. a kind of Construction of Deep Excavation Engineering and monitoring simulation test device, including loading plate, which is characterized in that the loading plate Upper end is equipped with bearing box (6), and the lower end of the loading plate is equipped with support device, soil layer, the soil are equipped in the bearing box (6) Multiple foundation pits (7) are equidistantly equipped in layer, monitoring device is equipped in the soil layer, the upper end one side of the loading plate is equipped with support Plate (9), the upper end of the support plate (9) are hinged with rotating bar (2), and the one side of the rotating bar (2) is equipped with tumbler, described Rotating bar (2) is equipped with opening, and sliding slot (16) is equipped in the opposing sidewalls of the opening, cunning is equipped in the sliding slot (16) Block (14) is fixed with movable block (15) between two sliding blocks (14), is fixed with nozzle (3) on the movable block (15), described turn The lower end one side of lever (2) is fixed with installing plate (5), and the one side of the installing plate (5) is fixed with the second cylinder (4), and described The piston-rod end of two cylinders (4) is fixed on the one side of nozzle (3), and the lower end of the loading plate is equipped with water tank (11), the water Bottom in case (11) is equipped with water pump, is connected with water-supply-pipe (10) on the water pump, one end of the water-supply-pipe (10) is connected to On nozzle (3).
2. a kind of Construction of Deep Excavation Engineering according to claim 1 and monitoring simulation test device, which is characterized in that described Support device includes the support leg (13) for being arranged on loading plate lower end corner, and the lower end of the support leg (13) is equipped with cushion block (12)。
3. a kind of Construction of Deep Excavation Engineering according to claim 1 and monitoring simulation test device, which is characterized in that described Tumbler includes the first cylinder (1) for being rotatably connected on support plate (9) one side, the piston-rod end of first cylinder (1) It is rotatably connected on the one side of rotating bar (2).
4. a kind of Construction of Deep Excavation Engineering according to claim 1 and monitoring simulation test device, which is characterized in that described Illuminator is fixed on one end side wall of support plate (9).
5. a kind of Construction of Deep Excavation Engineering according to claim 1 and monitoring simulation test device, which is characterized in that described Water-supply-pipe (10) is hose.
6. a kind of Construction of Deep Excavation Engineering according to claim 1 and monitoring simulation test device, which is characterized in that described Bearing box (6) is made of carbon steel.
CN201721211668.6U 2017-09-21 2017-09-21 A kind of Construction of Deep Excavation Engineering and monitoring simulation test device Expired - Fee Related CN207392270U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721211668.6U CN207392270U (en) 2017-09-21 2017-09-21 A kind of Construction of Deep Excavation Engineering and monitoring simulation test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721211668.6U CN207392270U (en) 2017-09-21 2017-09-21 A kind of Construction of Deep Excavation Engineering and monitoring simulation test device

Publications (1)

Publication Number Publication Date
CN207392270U true CN207392270U (en) 2018-05-22

Family

ID=62404780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721211668.6U Expired - Fee Related CN207392270U (en) 2017-09-21 2017-09-21 A kind of Construction of Deep Excavation Engineering and monitoring simulation test device

Country Status (1)

Country Link
CN (1) CN207392270U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537647A (en) * 2018-12-11 2019-03-29 佛山科学技术学院 A kind of analog foundation pit construction device and its application method
CN111549834A (en) * 2020-05-17 2020-08-18 张洪梅 Foundation pit excavation model test device based on surface water permeation and use method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537647A (en) * 2018-12-11 2019-03-29 佛山科学技术学院 A kind of analog foundation pit construction device and its application method
CN111549834A (en) * 2020-05-17 2020-08-18 张洪梅 Foundation pit excavation model test device based on surface water permeation and use method

Similar Documents

Publication Publication Date Title
CN103645297B (en) The analogue means of karst collapse
CN207776396U (en) For building strengthening, the operating platform of protection
CN207392270U (en) A kind of Construction of Deep Excavation Engineering and monitoring simulation test device
US9556636B2 (en) Method and apparatus for erecting tower with hydraulic cylinders
CN202090572U (en) Wall plastering machine for decorating building
CN204257101U (en) A kind of tunnel teaching experiment model
CN201619105U (en) Equipment overhaul stand
TN2009000500A1 (en) Automatic system for construction o f buildings
CN207211122U (en) A kind of construction land used face press
CN205003148U (en) Place subside and fault influence under pipe clay model test device
CN204098509U (en) A kind of steel net frame integral jacking slippage construction device
CN104234198B (en) A kind of movable plank house
CN103382813B (en) Support of bottom anchor drilling machine
CN203640248U (en) Fast construction device for external wall of light well
CN103759962A (en) Large tunnel analog loading experimental platform equipment
CN204005140U (en) Outdoor electronic display screen support
CN206346463U (en) A kind of slide cartridge for plastering machine Extensible upright rod
CN206635780U (en) A kind of soil nailed wall retaining structure
CN213597535U (en) Building engineering guard plate convenient to carry
CN209603145U (en) A kind of deep foundation pit support structure
CN206318671U (en) Intelligent support robot
CN207774680U (en) A kind of portable mechanism jacking apparatus
CN105134275A (en) Auxiliary support device for three-soft coal seam coal face hydraulic support
CN204728745U (en) A kind of movable maintenance repair shop
CN206829362U (en) A kind of portable sled block control room or switchgear house

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180522

Termination date: 20190921