CN207389673U - A kind of charge mechanism of material baling equipment - Google Patents
A kind of charge mechanism of material baling equipment Download PDFInfo
- Publication number
- CN207389673U CN207389673U CN201721289267.2U CN201721289267U CN207389673U CN 207389673 U CN207389673 U CN 207389673U CN 201721289267 U CN201721289267 U CN 201721289267U CN 207389673 U CN207389673 U CN 207389673U
- Authority
- CN
- China
- Prior art keywords
- connecting rod
- stent
- hinged
- hopper
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 title claims abstract description 68
- 230000007246 mechanism Effects 0.000 title claims abstract description 31
- 230000005540 biological transmission Effects 0.000 claims abstract 2
- 238000007599 discharging Methods 0.000 claims description 6
- 235000005121 Sorbus torminalis Nutrition 0.000 claims description 5
- 244000152100 Sorbus torminalis Species 0.000 claims description 5
- 239000000428 dust Substances 0.000 abstract description 5
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000004806 packaging method and process Methods 0.000 description 7
- 238000003825 pressing Methods 0.000 description 6
- 230000000712 assembly Effects 0.000 description 4
- 238000000429 assembly Methods 0.000 description 4
- 230000006835 compression Effects 0.000 description 4
- 238000007906 compression Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 238000000926 separation method Methods 0.000 description 3
- 230000004888 barrier function Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 210000003608 fece Anatomy 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Landscapes
- Basic Packing Technique (AREA)
Abstract
The utility model is related to a kind of charge mechanisms of material baling equipment, it includes hopper, bracket is arranged at left and right sides of hopper;Bracket is equipped with stent;Stent front end is hinged head rod and the second connecting rod, and head rod and the second connecting rod are respectively hinged at the both sides of stent front end, are sequentially connected by first rotating shaft;The lower end of second connecting rod is connected with the first compact heap being arranged below stent;Back-end support is hinged the 3rd connecting rod and the 4th connecting rod, and the 3rd connecting rod and the 4th connecting rod are respectively hinged at the both sides of stent front end, is connected by the second rotating shaft transmission;The fixing end of cylinder of the 3rd connecting rod upper end with being arranged on above stent is hinged;The lower end of 4th connecting rod is connected with the second compact heap being arranged below stent;Head rod and the 4th connecting rod are equipped with the 5th connecting rod, which can fix sack automatically, reduce dust and blow out, easy to operate, reduce working strength, improve production efficiency.
Description
Technical field
The utility model is related to material packaging field more particularly to a kind of charge mechanisms of material baling equipment.
Background technology
Nowadays, feed industry is more and more flourishing, and during the manufacturing of feed, the degree of automation is also higher and higher.
Finished product feedstuff is needed by charging, package, then is sent by delivery track to designated position, carries out a point heap stacking.
Charging is typically sack is directly placed at discharge outlet directly to feed, this need staff on the other hand by sack with
Discharge port is fixed, and controls hopper discharging on the other hand;There are following defects:1. sack can not be fitted closely with discharge port, in material
Dust can blow out from gap, and environment is impacted, and worker's body is impacted;2. for the staff to work repeatedly
For, this is undoubtedly huge working strength, and staff packs repeatedly so that work efficiency is low, and labor intensity is big, time-consuming to take
Power.
The content of the invention
To solve the above-mentioned problems, the purpose of this utility model is to provide a kind of charge mechanism of material baling equipment,
It can fix sack automatically, reduce dust and blow out, easy to operate, reduce working strength, improve production efficiency.
In order to realize above-mentioned purpose, the utility model employs following technical solution:A kind of material baling equipment
Including hopper, bracket is arranged at left and right sides of hopper for charge mechanism;Bracket is equipped with stent;Stent rear and front end is hinged with
Connecting rod;Wherein, stent front end is hinged head rod and the second connecting rod, and head rod and the second connecting rod are respectively articulated with
In the both sides of stent front end, it is sequentially connected by first rotating shaft;Head rod upper end and the cylinder that is arranged on above stent
Mobile terminal is hinged;The lower end of second connecting rod is connected with the first compact heap being arranged below stent;Back-end support the hinged 3rd
Connecting rod and the 4th connecting rod, the 3rd connecting rod and the 4th connecting rod are respectively hinged at the both sides of stent front end, pass through second turn
Axis is sequentially connected;The fixing end of cylinder of the 3rd connecting rod upper end with being arranged on above stent is hinged;The lower end of 4th connecting rod
It is connected with the second compact heap being arranged below stent;Head rod and the 4th connecting rod are equipped with the 5th connecting rod, and the 5th
The front end of connecting rod is hinged in the middle part of head rod, and the rear end of the 5th connecting rod is hinged in the 4th connecting rod.
In packaging, the sack corner of sack is outwards dug, is set in the first gripping block and the second gripping block, sack
Inside is faced at hopper outlet, and when the mobile terminal of cylinder pushes out, head rod upper end rotates forward, drives second to connect
Extension bar rotates backward, and the first gripping block also moves backward therewith;Meanwhile head rod drives the 5th connecting rod front end to Forward
Dynamic, the 5th connection rod rear end drives the 4th connecting rod to rotate forward, and the second gripping block also moves forward therewith;First gripping block and
Second gripping block is close to hopper outlet, and due to rotating, cooperate the sack both ends for clamping and placing therebetween;Again to
The built-in material of sack;At the end of packaging, the sack corner of sack is routed up, cylinder is to contract, and head rod upper end is backward
It rotates, the second connecting rod is driven to rotate forward, the first gripping block also moves forward therewith;Meanwhile head rod drives the 5th
Connecting rod front end moves backward, and the 5th connection rod rear end drives the 4th connecting rod to rotate backward, and the second gripping block is also therewith backward
It is mobile;First gripping block and the separation of the second gripping block, unclamp sack, complete quick pack;It is easy to operate, work efficiency is improved,
Reduce the working strength of staff.
Preferably, between the first gripping block and the second connecting rod lower end be equipped with the first clamping band, pass through the first bolt
It is fixed;Between second gripping block and the 4th connecting rod lower end be equipped with the second clamping band, fixed by the second bolt.
First clamping band is moved with the first gripping block, and the second clamping band is moved with the second gripping block;First clamping band
The sack of sack is bonded with the material mouth outer wall of hopper with the second clamping band so that dust will not blow out.
The big discharge nozzle such as circumferential is equipped with preferably, hopper tapered setting from top to bottom, at bottom opening.
Hopper tapered setting from top to bottom, facilitates discharging;The big discharge nozzle such as circumferential is equipped at bottom opening, facilitates sack
Suit.
Preferably, the inside of the first clamping band and the second clamping band is equipped with anti-skid chequer, discharging bottom of the tube is outwards equipped with convex
Edge..
When first clamping band and the second clamping band clamp the sack of sack, the first clamping band and the second clamping band are located at flange
Top forms screens with flange;Anti-skid chequer increases the first clamping band and the second clamping band and the frictional force of discharging pipe outer wall;Flange
Position-limiting action is played for the first clamping band and the second clamping band.
Preferably, stent is bolted on hopper side wall.
So that stent and hopper are fixed and more consolidated.
The utility model uses above-mentioned technical proposal:In packaging, the sack corner of sack is outwards dug, is set in the
In one gripping block and the second gripping block, bag interior is faced at hopper outlet, and when the mobile terminal of cylinder pushes out, first connects
Extension bar upper end rotates forward, the second connecting rod is driven to rotate backward, the first gripping block also moves backward therewith;Meanwhile first connects
Extension bar drives the 5th connecting rod front end to move forward, and the 5th connection rod rear end drives the 4th connecting rod to rotate forward, and second clamps
Block also moves forward therewith;First gripping block and the second gripping block are close to hopper outlet, and due to rotating, cooperate and clamp
Place sack both ends therebetween;Again to the built-in material of sack;At the end of packaging, the sack corner of sack is routed up, gas
Cylinder rotates backward to contract, head rod upper end, and the second connecting rod is driven to rotate forward, and the first gripping block is also therewith forward
It is mobile;Meanwhile head rod drive the 5th connecting rod front end move backward, the 5th connection rod rear end drive the 4th connecting rod to
After rotate, the second gripping block also moves backward therewith;First gripping block and the separation of the second gripping block, unclamp sack, complete quick
Pack;It is easy to operate, work efficiency is improved, reduces the working strength of staff.
Description of the drawings
Fig. 1 is a kind of structure diagram of material baling equipment;
Fig. 2 is a kind of charge mechanism I front views of material baling equipment;
Fig. 3 is a kind of charge mechanism I left views of material baling equipment;
Fig. 4 pushes over mechanism III front views for a kind of material baling equipment;
Fig. 5 pushes over mechanism III top views for a kind of material baling equipment;
Fig. 6 pushes over mechanism III left views for a kind of material baling equipment;
Fig. 7 is a kind of left view when pushing over mechanism III pushing hands work of material baling equipment;
Fig. 8 is a kind of pressing mechanism II front views of material baling equipment;
Fig. 9 is a kind of pressing mechanism II left views of material baling equipment.
Specific embodiment
Below in conjunction with the accompanying drawings, the preferred embodiment of the utility model is described in further detail.
Embodiment
A kind of material baling equipment as shown in figs 1-9 including charge mechanism I and pressing mechanism II and is arranged on dress
Expect the transmitting device between mechanism I and pressing mechanism II;Transmitting device is equipped with and pushes over mechanism III;
Charge mechanism I includes hopper 101, and 101 left and right sides of hopper is arranged with bracket 102;Bracket 102 is equipped with stent
103;103 rear and front end of stent is hinged with connecting rod;Wherein, 103 front end of stent is hinged 104 and second connecting rod of head rod
105,104 and second connecting rod 105 of head rod is respectively hinged at the both sides of 103 front end of stent, is passed by first rotating shaft 106
Dynamic connection;The mobile terminal of cylinder 107 of 104 upper end of head rod with being arranged on 103 top of stent is hinged;Second connecting rod
105 lower end is connected with being arranged on the first compact heap 108 of 103 lower section of stent;103 rear end of stent is hinged the 3rd connecting rod 109
With the 4th connecting rod 110, the 3rd connecting rod 109 and the 4th connecting rod 110 are respectively hinged at the both sides of 103 front end of stent, pass through
Second shaft 111 is sequentially connected;The fixing end of 3rd connecting rod, 109 upper end and the cylinder 107 being arranged on above stent 103 is cut with scissors
It connects;The lower end of 4th connecting rod 110 is connected with being arranged on the second compact heap 112 of 103 lower section of stent;104 He of head rod
4th connecting rod 110 is equipped with the 5th connecting rod 113, and the front end of the 5th connecting rod 113 is hinged on 104 middle part of head rod,
The rear end of 5th connecting rod 113 is hinged in the 4th connecting rod 110.
In packaging, the sack corner of sack is outwards dug, is set in the first gripping block and the second gripping block, sack
Inside faces 101 exit of hopper, and when the mobile terminal of cylinder 107 pushes out, 104 upper end of head rod rotates forward,
The second connecting rod 105 is driven to rotate backward, the first gripping block also moves backward therewith;Meanwhile head rod 104 drives the 5th
113 front end of connecting rod moves forward, and 113 rear end of the 5th connecting rod drives the 4th connecting rod 110 to rotate forward, the second gripping block
It moves forward therewith;First gripping block and the second gripping block are close to hopper 101 and export, and due to rotating, cooperate and clamp
Place sack both ends therebetween;Again to the built-in material of sack;At the end of packaging, the sack corner of sack is routed up, gas
Cylinder 107 rotates backward to contract, 104 upper end of head rod, the second connecting rod 105 is driven to rotate forward, the first gripping block
Also move forward therewith;Meanwhile head rod 104 drives 113 front end of the 5th connecting rod to move backward, the 5th connecting rod 113
Rear end drives the 4th connecting rod 110 to rotate backward, and the second gripping block also moves backward therewith;First gripping block and the second gripping block
Sack is unclamped in separation, completes quick pack;It is easy to operate, work efficiency is improved, reduces the working strength of staff.
Specifically, between 105 lower end of the first gripping block and the second connecting rod be equipped with the first clamping band 114, pass through first
Bolt 115 is fixed;Between 110 lower end of second gripping block and the 4th connecting rod be equipped with the second clamping band, consolidated by the second bolt
It is fixed.
First clamping band 114 is moved with the first gripping block, and the second clamping band is moved with the second gripping block;First clamps
With 114 and second clamping band the sack of sack is bonded with the material mouth outer wall of hopper 101 so that dust will not blow out.
Specifically, the tapered setting from top to bottom of hopper 101 is equipped with the big discharge nozzle 118 such as circumferential at bottom opening.
The tapered setting from top to bottom of hopper 101, facilitates discharging;The big discharge nozzle 118 such as circumferential, side are equipped at bottom opening
Faeces bag sub-set fills.
Specifically, the inside of the first clamping band 114 and the second clamping band is equipped with anti-skid chequer, and 118 bottom of discharge nozzle is to peripheral hardware
There is flange 119.
When first clamping band 114 and the second clamping band clamp the sack of sack, the first clamping band 114 and the second clamping band position
Above flange 119, screens is formed with flange 119;Anti-skid chequer increases the first clamping band 114 and the second clamping band and discharge nozzle
The frictional force of 118 outer walls;Flange 119 plays position-limiting action for the first clamping band 114 and the second clamping band.
Specifically, stent 103 is fixed on by the 3rd bolt 120 on 101 side wall of hopper.
It is more consolidated so that stent 103 and hopper 101 are fixed.
Pushing over mechanism includes horizontal conveying belt 301, and 301 one side of conveyer belt places and pushes away bag apparatus 302;Conveyer belt 301 it is another
The one side position opposite with pushing away bag apparatus 302 is equipped with baffle 303;Pushing away bag apparatus 302 includes pushing hands 304 and driving pushing hands 304
Actuator 305;Pushing hands 304 can stretch out under the driving of actuator 305 to 301 direction of conveyer belt;Conveyer belt 301 is in baffle
303 downstream positions are additionally provided with roller bearing 306.
Moved by the bagged material of charge mechanism I on conveyer belt 301, by sack suture and etc. after, bagged articles
Material pushes away bag apparatus 302 and pushes over bagged material to horizontal lying-type placement in vertical placement;Wherein actuator 305 drives pushing hands 304 to stretch
To 301 top of conveyer belt, bagged material is pushed over to 303 direction of baffle, baffle 303 plays barrier effect, prevents pushing hands 304 will
Bagged material releases conveyer belt 301;After pushing over, pushing hands 304 bounces back, and conveyer belt 301 moves on, and bagged material is sent to roller bearing
At 306, by bagged material righting in 306 rolling process of roller bearing so that bagged material can fitly be delivered to next mechanism.
Specifically, pushing hands 304 includes the first pushing hands 307304 and the second pushing hands 308304, the first pushing hands 307304 and second
Pushing hands 308304 is set gradually from top to down.
According to the different size of bagged material, the first pushing hands 307304 of setting pushes away bag or the second pushing hands 308304 pushes away bag;
When bagged material is smaller, using the second pushing hands 308304, when bagged material is larger, the first pushing hands 307304 is used;It is convenient
It is applicable in different size of bagged material.
Specifically, baffle 303 is obliquely installed towards 301 outside of conveyer belt.
State when preferably cooperation bagged material pushes over while playing barrier effect, extends machine service life.
Specifically, roller bearing 306 is vertically arranged in 301 one side of conveyer belt, and outer wall is located on conveyer belt 301, and part is outer
Wall is located at outside conveyer belt 301.
A part, which is located at outside conveyer belt 301, enables to roller bearing 306 to set bigger, and righting effect is more preferable.
The bagged material of erect-type placement is pushed over into horizontal lying-type placement by pushing over mechanism III, then is helped by roller bearing 306
Just;Bagged material is delivered to pressing mechanism II by conveyer belt 301 again;
Pressing mechanism II includes lower railway and the frame 201 being arranged on above lower railway;Lower railway includes preceding 202 He of track
Track 203 afterwards;Frame 201 is frame structure, includes the connection of preceding crossbearer, rear crossbearer 204, the preceding crossbearer of connection and rear crossbearer 204
The rear column of crossbearer and crossbearer 204 and preceding track 202 after the front column 206 of preceding track 202 and connection before frame 205, connection
207;Crossbearer 204 is equipped with drive component 208 afterwards, and rear column 207 is equipped with compression assemblies 209, drive component 208 and extruding group
Part 209 connects, for adjusting the distance of compression assemblies 209 and preceding track 202.
201 structural support of frame is secured, saves material;According to the size of bagged material, drive component 208 adjusts extruding group
Part 209 is with preceding track 202 apart from size;Bagged material is placed on rear track 203, during by compression assemblies 209 so that is squeezed
Pressure component 209 can squeeze bagged material just, and the air extrusion in the bag of bagged material is discharged, and be unlikely to too to squeeze
Pressure so that bagged material ruptures.
Preceding track 202 includes both sides fixed frame 222, and several prismatic tube bodies 210, rib are transversely provided between fixed frame 222
Column type tube body 210 can rotate under the driving of motor;
Prismatic tube body 210 has seamed edge when rotating and contacts, separates with bagged material, so that bagged material rocks,
It is distributed more uniformly after material shake in bag.
Track 203 includes the second guardrail 211 for being arranged on one side and the tube body that can be rotated under motor driving afterwards;
Second guardrail 211 is equipped with inductor 212, and inductor 212 is connected with external control system, external control system control motor,
For controlling the rotation of preceding 202 prismatic tube body 210 of track and 203 tube body of rear track.
When bagged material is appeared on rear track 203, inductor 212 obtains information, feeds back to external control system, outside
Portion's control system control motor break-off, preceding 202 prismatic tube body 210 of track and 203 tube body of rear track stop operating, bag
Dress material, which stops on rear track 203 to wait, to be moved, and bagged material below stops at rear 203 upstream of track;When after track 203
On bagged material move after, inductor 212 obtains information, feeds back to external control system, external control system control motor
Start to work, preceding 202 prismatic tube body 210 of track and 203 tube body of rear track start to rotate, bagged material below successively to
Track 203 moves afterwards, repeats above-mentioned work.
Specifically, prismatic tube body 210 is triangular prism-shaped.
Triangular prism-shaped tube body 210 has seamed edge when rotating and contacts, separates with bagged material, so that bagged material rocks
Bigger is distributed more uniformly after the material shake in bag.
Specifically, the position that inductor 212 is set is less than the height that bagged material is kept flat.
Inductor 212 is facilitated preferably to obtain the information for whether having packed material stop on rear track 203.
Specifically, the end of rear track 203 is equipped with the 3rd guardrail 213.
3rd guardrail 213 prevents that bagged material transfers out rear track during 212 failure of inductor for stopping bagged material
203。
Specifically, 210 both sides of prismatic tube body are equipped with the first guardrail 214.
Bagged material rocks bigger during prismatic tube body 210, and the first guardrail 214 prevents bagged material from shaking out preceding track
202。
Specifically, compression assemblies 209 are hinged on including one end on rear column 207, and one end is connected with two rotations of pressure roller 216
Pivoted arm 215;Pressure roller 216 is arranged between two rotating arms 215, is rotatablely connected with rotating arm 215;Between two rotating arms 215
Cross bar 217 is also associated with, 217 middle part of cross bar is equipped with the first connector 218, and the first connector 218 is connected with drive component 208;
Cross bar 217 can drive two rotating arms 215 to rotate under the action of drive component 208, adjust pressure roller 216 and preceding track 202
Distance.
Specifically, drive component 208 includes the second connector 219 and by the second connector 219 and rear crossbearer 204
The threaded rod 220 of connection;220 upper end of threaded rod is equipped with handle 221, and 220 lower end of threaded rod is connected with the first connector 218;The
Two connectors, 219 both ends are fixed on rear crossbearer 204, and middle part protrusion is equipped with screw hole;Threaded rod 220 connects through threaded hole and first
Fitting 218 connects.
Threaded rod 220 is connected on rear crossbearer 204 by the second connector 219, and the first connector 218 connects threaded rod 220
It is connected on cross bar 217;During swing handle 221, threaded rod 220 can move up or down;It is higher when bagged material is kept flat
When, swing handle 221 controls threaded rod 220 to move up, and cross bar 217 is driven to move up, and cross bar 217 drives two rotating arms
215 rotate, so as to which pressure roller 216 and the distance of preceding track 202 reduce;When shorter when bagged material is kept flat, swing handle 221 is controlled
Threaded rod 220 processed moves down, and cross bar 217 is driven to move down, and cross bar 217 drives two rotating arms 215 to rotate, so as to pressure roller
216 increase with the distance of preceding track 202.
Claims (5)
1. a kind of charge mechanism of material baling equipment, it is characterised in that:Including hopper, support is arranged at left and right sides of hopper
Frame;Bracket is equipped with stent;Stent rear and front end is hinged with connecting rod;Wherein, stent front end is hinged head rod and second
Connecting rod, head rod and the second connecting rod are respectively hinged at the both sides of stent front end, are sequentially connected by first rotating shaft;The
The mobile terminal of cylinder of the one connecting rod upper end with being arranged on above stent is hinged;The lower end of second connecting rod is with being arranged under stent
The first compact heap connection of side;Back-end support is hinged the 3rd connecting rod and the 4th connecting rod, the 3rd connecting rod and the 4th connecting rod
The both sides of stent front end are respectively hinged at, are connected by the second rotating shaft transmission;3rd connecting rod upper end is with being arranged on above stent
The fixing end of cylinder be hinged;The lower end of 4th connecting rod is connected with the second compact heap being arranged below stent;First connection
Bar and the 4th connecting rod are equipped with the 5th connecting rod, and the front end of the 5th connecting rod is hinged in the middle part of head rod, the 5th connection
The rear end of bar is hinged in the 4th connecting rod.
2. a kind of charge mechanism of material baling equipment according to claim 1, it is characterised in that:First gripping block and
Between two connecting rod lower ends be equipped with the first clamping band, fixed by the first bolt;Second gripping block and the 4th connecting rod lower end
Between be equipped with the second clamping band, fixed by the second bolt.
3. a kind of charge mechanism of material baling equipment according to claim 2, it is characterised in that:Hopper is from top to bottom gradually
Contracting is set, and the big discharge nozzle such as circumferential is equipped at bottom opening.
4. a kind of charge mechanism of material baling equipment according to claim 3, it is characterised in that:First clamping band and
The inside of two clamping bands is equipped with anti-skid chequer, and discharging bottom of the tube is outwards equipped with flange.
5. a kind of charge mechanism of material baling equipment according to claim 1, it is characterised in that:Stent is consolidated by bolt
It is scheduled on hopper side wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721289267.2U CN207389673U (en) | 2017-09-30 | 2017-09-30 | A kind of charge mechanism of material baling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721289267.2U CN207389673U (en) | 2017-09-30 | 2017-09-30 | A kind of charge mechanism of material baling equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207389673U true CN207389673U (en) | 2018-05-22 |
Family
ID=62331474
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721289267.2U Expired - Fee Related CN207389673U (en) | 2017-09-30 | 2017-09-30 | A kind of charge mechanism of material baling equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207389673U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107600536A (en) * | 2017-09-30 | 2018-01-19 | 浙江联盛生物科技有限公司 | A kind of charge mechanism of material baling equipment |
-
2017
- 2017-09-30 CN CN201721289267.2U patent/CN207389673U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107600536A (en) * | 2017-09-30 | 2018-01-19 | 浙江联盛生物科技有限公司 | A kind of charge mechanism of material baling equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104996168B (en) | Intelligent bagging charger | |
CN104044762B (en) | Automatic packing machine for all-model aluminium products | |
CN100513264C (en) | Bag opening machine | |
CN112208878A (en) | Solid ammonium nitrate crushing and bag-opening device | |
CN106946009B (en) | Ton bag discharge trolley | |
CN105905345B (en) | The encapsulation unit of limit switch packing machine | |
CN207389749U (en) | The pressing mechanism of material baling equipment | |
CN107512445A (en) | A kind of material packing press | |
CN207389673U (en) | A kind of charge mechanism of material baling equipment | |
CN113844860A (en) | Split-flow double-feeding car loader with feeding device capable of entering carriage | |
CN207389599U (en) | Material baling equipment | |
CN201109514Y (en) | Automatic bag opening machine | |
CN207389752U (en) | A kind of material baling equipment pushes over mechanism | |
CN207389672U (en) | A kind of material baling equipment | |
CN110406727A (en) | A kind of feeding mechanism and winding package box packing machine | |
CN208731331U (en) | A kind of sack filling machine reason is packed to set | |
CN207389748U (en) | A kind of pressing mechanism of material baling equipment | |
CN207389747U (en) | A kind of pressing mechanism of material packing press | |
CN207389746U (en) | A kind of material packing press | |
CN105235948A (en) | Automatic packaging machine for bulk materials | |
CN107554895A (en) | A kind of material baling equipment pushes over mechanism | |
CN107600536A (en) | A kind of charge mechanism of material baling equipment | |
CN114572465B (en) | Packaging bag packaging equipment and packaging method | |
CN107554830A (en) | Material baling equipment | |
CN107697371A (en) | The pressing mechanism of material baling equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180522 |