CN207376394U - A kind of heavy-load road Rainwater collection system - Google Patents

A kind of heavy-load road Rainwater collection system Download PDF

Info

Publication number
CN207376394U
CN207376394U CN201720750200.8U CN201720750200U CN207376394U CN 207376394 U CN207376394 U CN 207376394U CN 201720750200 U CN201720750200 U CN 201720750200U CN 207376394 U CN207376394 U CN 207376394U
Authority
CN
China
Prior art keywords
rainwater
heavy
layer
collection system
cement pavement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720750200.8U
Other languages
Chinese (zh)
Inventor
胡再兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shentong Sponge City Technology Jiangsu Co Ltd
Original Assignee
Shanghai Shentong Sponge City Construction Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Shentong Sponge City Construction Development Co Ltd filed Critical Shanghai Shentong Sponge City Construction Development Co Ltd
Priority to CN201720750200.8U priority Critical patent/CN207376394U/en
Application granted granted Critical
Publication of CN207376394U publication Critical patent/CN207376394U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a kind of heavy-load road Rainwater collection system, including cement pavement surface layer, Cement Pavement Base Course, concrete layer, filter layer, geotextiles and the rainwater storage module being laid with successively from top to bottom;Wherein, Permeable blind pipe is longitudinally embedded in cement pavement surface layer, Cement Pavement Base Course, concrete layer and filter layer, the top of Permeable blind pipe is flushed with the surface of cement pavement surface layer, and the bottom of Permeable blind pipe is located in filter layer;Cement pavement surface layer is connected by Permeable blind pipe with filter layer, rainwater storage module connection rain water using device.The heavy-load road Rainwater collection system of the utility model, has many advantages, such as that service life is long, and moisture storage capacity is big, drainage effect is good, and the existing heavily loaded cement pavement avoided the problem that is when using one section of cycle because surface gathered water need to seriously be re-replaced.

Description

A kind of heavy-load road Rainwater collection system
Technical field
The utility model is related to a kind of rain water collecting system for road improvement ponding more particularly to a kind of heavy-load roads Rainwater collection system.
Background technology
Sponge city refers to, by strengthening urban planning and development control, it is raw to give full play to building, road and greenery patches, water system etc. State system to the receiving of rainwater, store and receive, permeate and slow releasing function, effectively control rainfall runoff, realize that nature accumulates, oozes naturally Thoroughly, the urban development mode of self-purification.
When traditional water resources development mode can not be further added by water source, recycle rainwater become a kind of not only economy but also Practical water resources development mode.Rainwater has multi-functional as the utilization of non -traditional resources:Water resource is alleviated in using water wisely Crisis.The combination of rain water collecting system technology and Green Space Construction will largely change us due to water resource increasingly depleted And the life that day is hoped to heave a sigh.
At present, the earth's surface of modern city is constantly covered by the building construction of armored concrete and fluid-tight road surface, by In city, common motor vehicle cement pavement lacks the ability for absorbing heat and permeating rainwater, and people walking along the street face has certain ooze Permeability, but usually people walking along the street face is higher than cement Supporting Load Pavement, therefore the ponding of blue or green Supporting Load Pavement can only be by being arranged on roadside Rain double-edged fine-toothed comb be discharged into city planting ductwork, so bring a series of problems:When rainfall is concentrated in 1 short time, due to a large amount of rainwater River can only be discharged by pumping equipment, has aggravated the burden of pumping equipment significantly;Therefore, road ponding is not easy to discharge, and gives The comfortableness and security of vehicles and pedestrians bring adverse effect;2 fluid-tight Supporting Load Pavements allow to what is permeated the ground Rainwater is less, and level of ground water is caused drastically to decline, and industrial production and the modern life make the extraction amount of underground water be doubled and redoubled;Soil In water deficient, anoxic, ground temperature rise etc., thus directly affect the health of urban vegetation, be further exacerbated by city Arid, water shortage problem;3 fluid-tight Supporting Load Pavements are difficult to carry out exchanging for heat and humidity with air, easily generate that " heat island is imitated Should " so that urban inner temperature is excessively high, causes climatic deterioration.
In order to solve the above technical problems, Chinese patent CN102251456A discloses a kind of ecological permeable stratal configuration, It includes the aquifer that water can be stored with infiltrative surface layer and below surface layer, in closely connected between surface layer and aquifer It is folded with the permeable formation that can be guided and be oozed under current.The permeable road structure make the ponding on road surface infiltrate into downside water storage Layer realizes rainwater discharge and the collecting action on road surface;When being in high temperature drying weather in the external world, the rainwater of collection can be fed back in ground Table plays and adjusts humidity, reduces the effects that temperature.But this road structure can only tackle the relatively low situation of rainfall, work as chance To strong convective weather, the situation of the rainfall moisture storage capacity of aquifer saturation generally in more than 50mm per hour, the structure Under, then it can not realize continuation water storage, cause surface gathered water;Since existing city planting ductwork generally existing design standard is low, dilatation is difficult, The problem of drainability is inadequate during heavy rain even if the cistern is connected directly to city planting ductwork, also results in city planting ductwork Rainwater pours in down a chimney.Meanwhile the laying structure of this road can be seen that this laying structure and can be only applied to the underloadings such as Route for pedestrians Road surface, and may not apply on this Supporting Load Pavement of motor vehicle cement road, and city ponding is primarily due to by concrete mixer Caused by the ponding of motor-car cement pavement, therefore, which still cannot be effectively prevented the product of motor vehicle cement pavement Water.
And due to replacing the cement Supporting Load Pavement of original motor vehicle in manpower or in material resources it all it is one non- The engineering often wasted, therefore, the utility model are directed to the cement Supporting Load Pavement for being currently used for motor vehicle, it is proposed that a kind of heavy duty road Road rain water collecting system.
Utility model content
Technical problem to be solved in the utility model is for drawbacks described above of the prior art, provides a kind of heavily loaded road Road Rainwater collection system.
The utility model uses following technical scheme to solve above-mentioned technical problem:
The utility model provides a kind of heavy-load road Rainwater collection system, including the water being laid with successively from top to bottom Mud top course 1, Cement Pavement Base Course 4, concrete layer 7, filter layer 8, geotextiles 9 and rainwater storage module 10;Wherein, it is described Permeable blind pipe 2 is longitudinally embedded in cement pavement surface layer 1, Cement Pavement Base Course 4, concrete layer 7 and filter layer 8, it is described permeable The top of blind pipe 2 is flushed with the surface of the cement pavement surface layer 1, and the bottom of the Permeable blind pipe 2 is located at the filter layer 8 It is interior;The cement pavement surface layer 1 is connected by Permeable blind pipe 2 with filter layer 8, for rainwater on road surface to be passed sequentially through Permeable blind pipe 2nd, filter layer 8, geotextiles 9 are stored in rainwater storage module 10, and the rainwater storage module 10 connects rain water using device 12, For being recycled to the rainwater being stored in the rainwater storage module 10.
Further, on the heavy-load road Rainwater collection system, 1 both sides of cement pavement surface layer are equipped with Drainage grill 3, the drainage grill 3 are connected with municipal blow-off pipe 5.
It is further preferred that on the heavy-load road Rainwater collection system, further include and the municipal blowdown The rain water drainage filter device 6 that pipe 5 connects, the rain water drainage filter device 6 are connected with the rainwater storage module 10, will The rainwater collected by the drainage grill 3 is stored in after abandoned stream filters in the rainwater storage module 10.
Further, on the heavy-load road Rainwater collection system, the rain water drainage filter device 6 into The mouth of a river is connected with the top of the municipal blow-off pipe 5;And the sewage draining exit of the rain water drainage filter device 6 is arranged with the municipal administration The bottom connection of dirty pipe 5.
Further, on the heavy-load road Rainwater collection system, the filter layer 8 filters for cobblestone Layer.
Further, on the heavy-load road Rainwater collection system, 10 bottom of the rainwater storage module paving Equipped with ground layer 11, the ground layer 11 is yellow sand and cement bed course.
Further, on the heavy-load road Rainwater collection system, the rainwater storage module 10 with it is described Antiseepage film is equipped between ground layer 11.
Further, on the heavy-load road Rainwater collection system, the rainwater storage module 10 is by several A interconnected storage element is staggered composition, and the storage element material uses high impact modified pp material.
Further, on the heavy-load road Rainwater collection system, the volume of the storage element is (1000-1200) mm × 900mm × (500-600) mm, the effective soil water of the volume of the storage element is 0.2-0.5m3
Further, on the heavy-load road Rainwater collection system, the thickness of the cement pavement surface layer 1 is 30-50mm;The thickness of the Cement Pavement Base Course 4 is 40-70mm.
Further, on the heavy-load road Rainwater collection system, the thickness of the concrete layer 7 is 60- 80mm;The thickness of the filter layer 8 is 80-200mm.
The utility model uses above technical scheme, compared with prior art, has the following technical effect that:
The utility model heavy-load road Rainwater collection system, by being laid with concrete layer, mistake below cement pavement Permeable blind pipe is buried in filtering layer, the rainwater of cement pavement longitudinally through Permeable blind pipe is collected, is stored in rain after filter layer filtering In water storage module;Simultaneously using drainage grill by the rainwater lateral collection of cement pavement in municipal blow-off pipe, part rainwater It being stored in after the filtering of rain water drainage filter device in rainwater storage module, extra rainwater is discharged by municipal blow-off pipe, and Water in rainwater storage module can directly permeate the ground recharge of groundwater, can also be carried out by rain water using device effective Recycling;In this way, the system can also avoid the ponding of cement Supporting Load Pavement in the rainfall larger rainy day, pass through rainwater The dual-drainage processing of the municipal blow-off pipe of storage module, avoids existing cement pavement after municipal blow-off pipe stores full water, rain Water again on overflow to road surface the phenomenon that;Meanwhile when being in high temperature drying weather in the external world, the rain of collection in rainwater storage module Water can be fed back by rain water using device in earth's surface, played and adjusted humidity, reduce the effects that temperature;The system can be resisted The rainfall of 500mm/h.
Description of the drawings
Fig. 1 is a kind of structure diagram of heavy-load road Rainwater collection system of the utility model;
Wherein, 1- cement pavements surface layer, 2- Permeable blind pipes, 3- drainage grills, 4- Cement Pavement Base Courses, 5- municipal administration blowdowns Pipe, 6- rain water drainage filter devices, 7- concrete layers, 8- filter layers, 9- geotextiles, 10- rainwater storage modules, 11- ground layers, 12- rain water using devices.
Specific embodiment
The technical solution of the utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in Figure 1, the utility model embodiment provides a kind of heavy-load road Rainwater collection system, including from upper Cement pavement surface layer 1, Cement Pavement Base Course 4, concrete layer 7, filter layer 8, geotextiles 9 and the rainwater storage being laid with successively under and Module 10;Wherein, longitudinally it is embedded in cement pavement surface layer 1, Cement Pavement Base Course 4, concrete layer 7 and filter layer 8 permeable blind Pipe 2, the top of Permeable blind pipe 2 are flushed with the surface of cement pavement surface layer 1, and the bottom of Permeable blind pipe 2 is located in filter layer 8;Water Mud top course 1 is connected by Permeable blind pipe 2 with filter layer 8, for rainwater on road surface to be passed sequentially through Permeable blind pipe 2, filter layer 8th, geotextiles 9 are stored in rainwater storage module 10, and rainwater storage module 10 connects rain water using device 12, for being stored in Rainwater in rainwater storage module 10 is recycled.
A preferred skill embodiment as the utility model, on the heavy-load road Rainwater collection system, cement 1 both sides of top course are equipped with drainage grill 3, and drainage grill 3 is connected with municipal administration blow-off pipe 5, for will be on cement pavement surface layer 1 Rainwater carries out emission treatment laterally across municipal blow-off pipe 5, and 2 displacement of Permeable blind pipe is not in the case of avoiding amount of rainfall larger Foot the problem of causing to cause surface gathered water, is acted on by the dual-drainage of drainage grill 3 and Permeable blind pipe 2, can be to greatest extent It realizes rainwater shunting, avoids surface gathered water.
As an optimal technical scheme for the present embodiment, which further includes and city The rain water drainage filter device 6 that political affairs blow-off pipe 5 connects, rain water drainage filter device 6 connects with rainwater storage module 10, will be by The rainwater that drainage grill 3 is collected is stored in after abandoned stream filters in rainwater storage module 10, by the rainwater after abandoned stream filters It is stored in rainwater storage module 10, rainwater storage module 10 is connected with rain water using device 8, for being stored in rainwater storage Rainwater in module 10 is recycled.
As an optimal technical scheme for the present embodiment, on the heavy-load road Rainwater collection system, rainwater The water inlet of abandoned stream filter device 6 is connected with the top of municipal blow-off pipe 5;The water outlet and rainwater of rain water drainage filter device 6 Storage module 10 connects, for by extra rainwater by 6 abandoned stream of rain water drainage filter device, be filtered into clear water and be stored in rainwater In storage module 10;And the sewage draining exit of rain water drainage filter device 6 is connected with the bottom of municipal blow-off pipe 5, for by abandoned stream, The sewage backflow of filtering to municipal blow-off pipe 5 carries out emission treatment.
As an optimal technical scheme of the present embodiment, on the heavy-load road Rainwater collection system, cement road Face surface layer 1 and Cement Pavement Base Course 4 are just formed using permeable cement paving of the porosity more than 10%;Preferable porosity 15%- 20% permeable cement paving just forms so that the rainwater on road surface may penetrate into Cement Pavement Base Course 4, water on cement pavement surface layer 1 The porosity of mud sub-surface 4 is relatively larger than the porosity of cement pavement surface layer 1, is embedded in permeable blind in Cement Pavement Base Course 4 It is evenly equipped with several permeable hole (not shown)s on 2 tube wall of pipe, the rainwater in Cement Pavement Base Course 4 can equally pass through Permeable blind pipe 2 penetrate into filter layer 8 through concrete layer 7, then penetrate into rainwater storage module 6, but its infiltration capacity is relatively small.
As an optimal technical scheme of the present embodiment, on the heavy-load road Rainwater collection system, filter layer 8 For cobblestone filter layer;10 bottom of rainwater storage module is equipped with ground layer 11, and ground layer 11 is yellow sand and cement bed course so that A rainwater part in rainwater storage module 10 can be directed through ground layer 11 and permeate the ground recharge of groundwater.Alternatively, in rainwater Antiseepage film (not shown) is equipped between storage module 6 and ground layer 7, the rainwater in rainwater storage module 10 is complete It is recycled by rain water using device 12, is fed back such as by rain water using device 12 in earth's surface, cleaned for road, Green area irrigation etc. plays and adjusts humidity, reduces the effects that temperature.
As an optimal technical scheme of the present embodiment, on the heavy-load road Rainwater collection system, rain water storage Storing module 10 is staggered by several interconnected storage elements and formed, and storage element material uses high impact modified poly- third Alkene raw material, it is preferable that the volume of used storage element is (1000-1200) mm × 900mm × (500-600) mm, is stored The effective soil water of the volume of unit is 0.2-0.5m3
As an optimal technical scheme of the present embodiment, on the heavy-load road Rainwater collection system, cement road The thickness of face surface layer 1 is 30-50mm, is preferably 35-40mm;The thickness of Cement Pavement Base Course 4 is 40-70mm, is preferably 50- 60mm;The thickness of concrete layer 7 is 60-80mm, is preferably 65-70mm;The thickness of filter layer 8 is 80-200mm, is preferably 135-160mm。
When running into strong convective weather, rainfall is generally in more than 50mm per hour, the heavy-load road rain of the utility model Rainwater can be carried out two-way point by water Collection utilization system by drainage grill 3 and municipal blow-off pipe 5 or Permeable blind pipe 2 simultaneously Stream process is simultaneously separately stored in rainwater storage module 10, avoids caused weight in the case of municipal 5 draining saturation of blow-off pipe Carry surface gathered water problem.In addition, the cement Supporting Load Pavement of the heavy-load road Rainwater collection system using the utility model, tool There is the advantages that service life is long, and moisture storage capacity is big, drainage effect is good, the ordinary cement road surface avoided is using one section of cycle Shi Yin road The problem of area water need to seriously be re-replaced saves manpower and in material resources, meets the demand for development in existing sponge city.
Specific embodiment of the utility model is described in detail above, but it is only used as example, the utility model It is not restricted to particular embodiments described above.To those skilled in the art, it is any that the practicality is equal Modifications and substitutions are also all among the scope of the utility model.Therefore, the institute under the spirit and scope for not departing from the utility model The impartial conversion of work and modification should all be covered in the scope of the utility model.

Claims (10)

1. a kind of heavy-load road Rainwater collection system, which is characterized in that including the cement pavement being laid with successively from top to bottom Surface layer (1), Cement Pavement Base Course (4), concrete layer (7), filter layer (8), geotextiles (9) and rainwater storage module (10);Its In, it is longitudinally embedded in the cement pavement surface layer (1), Cement Pavement Base Course (4), concrete layer (7) and filter layer (8) permeable Blind pipe (2), the top of the Permeable blind pipe (2) are flushed with the surface of the cement pavement surface layer (1), the Permeable blind pipe (2) Bottom be located in the filter layer (8);The cement pavement surface layer (1) is connected by Permeable blind pipe (2) with filter layer (8), Rainwater storage module (10) is stored in for rainwater on road surface to be passed sequentially through Permeable blind pipe (2), filter layer (8), geotextiles (9) It is interior, rainwater storage module (10) the connection rain water using device (12).
2. heavy-load road Rainwater collection system according to claim 1, which is characterized in that the cement pavement surface layer (1) both sides are equipped with drainage grill (3), and the drainage grill (3) connects with municipal blow-off pipe (5).
3. heavy-load road Rainwater collection system according to claim 2, which is characterized in that further include and the municipal administration The rain water drainage filter device (6) of blow-off pipe (5) connection, the rain water drainage filter device (6) and the rainwater storage module (10) connect, the rainwater collected by the drainage grill (3) is stored in the rainwater storage module after abandoned stream filters (10) in.
4. heavy-load road Rainwater collection system according to claim 3, which is characterized in that the rain water drainage filtering The water inlet of device (6) is connected with the top of the municipal blow-off pipe (5);And the row of the rain water drainage filter device (6) Dirty mouth is connected with the bottom of the municipal blow-off pipe (5).
5. heavy-load road Rainwater collection system according to claim 1, which is characterized in that the rainwater storage module (10) bottom is equipped with ground layer (11), and the ground layer (11) is yellow sand and cement bed course.
6. heavy-load road Rainwater collection system according to claim 5, which is characterized in that the rainwater storage module (10) it is equipped with antiseepage film between the ground layer (11).
7. heavy-load road Rainwater collection system according to claim 1, which is characterized in that the rainwater storage module (10) it is staggered and is formed by several interconnected storage elements, the storage element material uses high impact modified poly- third Alkene raw material.
8. heavy-load road Rainwater collection system according to claim 7, which is characterized in that the body of the storage element Product is (1000-1200) mm × 900mm × (500-600) mm, and the effective soil water of the volume of the storage element is 0.2- 0.5m3
9. heavy-load road Rainwater collection system according to claim 1, which is characterized in that the cement pavement surface layer (1) thickness is 30-50mm;The thickness of the Cement Pavement Base Course (4) is 40-70mm.
10. heavy-load road Rainwater collection system according to claim 1, which is characterized in that the concrete layer (7) Thickness be 60-80mm;The thickness of the filter layer (8) is 80-200mm.
CN201720750200.8U 2017-06-26 2017-06-26 A kind of heavy-load road Rainwater collection system Expired - Fee Related CN207376394U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720750200.8U CN207376394U (en) 2017-06-26 2017-06-26 A kind of heavy-load road Rainwater collection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720750200.8U CN207376394U (en) 2017-06-26 2017-06-26 A kind of heavy-load road Rainwater collection system

Publications (1)

Publication Number Publication Date
CN207376394U true CN207376394U (en) 2018-05-18

Family

ID=62298777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720750200.8U Expired - Fee Related CN207376394U (en) 2017-06-26 2017-06-26 A kind of heavy-load road Rainwater collection system

Country Status (1)

Country Link
CN (1) CN207376394U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424493A (en) * 2020-04-04 2020-07-17 山西省交通科技研发有限公司 Sponge city-based water permeating-water storing-draining type green paving system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424493A (en) * 2020-04-04 2020-07-17 山西省交通科技研发有限公司 Sponge city-based water permeating-water storing-draining type green paving system

Similar Documents

Publication Publication Date Title
CN203160147U (en) Rainwater collection and drainage system for road
CN207362631U (en) A kind of road rain water recovery system of sponge urban construction
CN206529670U (en) A kind of road drainage system in sponge city
CN103174079B (en) A kind of roadway rainwater collection system for preventing surface gathered water
CN211472020U (en) Municipal administration permeable pavement road drainage structure with function is collected to rainwater
CN211621076U (en) Sponge city permeable pavement
CN210395596U (en) Ecological town road in sponge city
CN205502122U (en) A rainwater collection clean system for urban afforestation
CN111058343A (en) Sponge city ecological pavement system permeates water
CN213296166U (en) Sponge urban road green median
CN211368282U (en) Municipal road pavement structure based on sponge city
CN107268378A (en) A kind of asphalt pavement structure
CN110145014A (en) A kind of ecological pavement shunting water guide function with municipal administration
CN106499002A (en) Green grassland rainwater cyclic utilization system
CN207376394U (en) A kind of heavy-load road Rainwater collection system
CN206233301U (en) Green grassland rainwater cyclic utilization system
CN105421647B (en) A kind of step building block of Collection utilization rainwater
CN207121779U (en) A kind of underloading road rainwater collecting utilizes system
CN203160092U (en) A road rainwater collecting system for preventing water from gathering on road surfaces
CN105484125A (en) Step capable of collecting and utilizing rainwater
CN203160091U (en) A road pavement structure for preventing water from gathering on road surfaces
CN111535098A (en) Rainwater drainage system for green belts and sidewalks of town roads and construction method
CN107268379A (en) A kind of solid road and its construction technology
CN214301064U (en) Rainwater infiltration system based on ecological parking lot
CN109423939A (en) Ecological garden all-purpose road

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211116

Address after: 214000 No. 1112 Xicheng Road, Yuecheng Town, Jiangyin, Wuxi City, Jiangsu Province

Patentee after: Shentong sponge City Technology (Jiangsu) Co., Ltd

Address before: 201500 No. 800, Rongdong Road, LvXiang Town, Jinshan District, Shanghai

Patentee before: Shanghai Shentong sponge city construction and Development Co., Ltd

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180518

Termination date: 20210626

CF01 Termination of patent right due to non-payment of annual fee