CN207375653U - Portable kerbstone installation carriage - Google Patents

Portable kerbstone installation carriage Download PDF

Info

Publication number
CN207375653U
CN207375653U CN201721452865.7U CN201721452865U CN207375653U CN 207375653 U CN207375653 U CN 207375653U CN 201721452865 U CN201721452865 U CN 201721452865U CN 207375653 U CN207375653 U CN 207375653U
Authority
CN
China
Prior art keywords
hook
kerbstone
sunpender
loading plate
supporting leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721452865.7U
Other languages
Chinese (zh)
Inventor
王建国
刘数
吴湃
张浪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201721452865.7U priority Critical patent/CN207375653U/en
Application granted granted Critical
Publication of CN207375653U publication Critical patent/CN207375653U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Handcart (AREA)

Abstract

The utility model discloses a kind of portable kerbstone installation carriages, including loading plate, traveling wheel for walking is installed at left and right sides of loading plate, loading plate is fixedly connected with a support column, a sunpender is provided at the top of support column, the middle part of sunpender and the articulated connection of support top end, one end of sunpender is fixedly connected with lifting rope, kerbstone grabbing device is installed on lifting rope, the other end of sunpender is hingedly connected with pull rod, and clump weight is equipped on pull rod, and the bottom of clump weight is hinged with supporting leg, supporting leg can be supported clump weight, additionally it is possible to receive folded.By the lever principle of sunpender, worker can easily pick up kerbstone in Balance weight end, and be hoisted to installation position, thus significantly reduce the operating burden of worker, simple in structure, easy to use, improve construction efficiency.

Description

Portable kerbstone installation carriage
Technical field
The utility model is related to a kind of kerbstone mounting auxiliaries, and in particular to a kind of movable type kerbstone installation is small Vehicle.
Background technology
Kerbstone refers to being located at the boundary stone of pavement edge, and abbreviation kerb is commonly called as road serratd edge.It is as being arranged on road surface Edge and the rectangular slab of stone of other structural belts boundary.Kerbstone is the Stripwise construction object between both sides of highway road surface and curb, because shape Into drop, as steep cliff, so the strip-shaped configuration that kerbstone is formed, also shouts precipice, structure size is typically 99cm*15cm* 15cm is generally higher by road surface 10cm.The road construction indispensable ring during installation of kerbstone, since kerbstone is installed It is stringenter to line style, high range request, all it is to carry on the shoulder by the way of the back of the body is shouldered to carry out carrying and installation using worker among site operation, but It is since kerbstone weight is larger, the weight of one piece of kerbstone is in 100kg or so, single to be carried by worker, effect of not only constructing Rate is low, while larger body burden is also resulted in worker, is in addition also easy to all kinds of security incidents occur.
Utility model content
In view of the above shortcomings of the prior art, technical problem to be solved in the utility model is:One kind how is provided to carry High construction efficiency mitigates the portable kerbstone installation carriage of worker's construction burden.
In order to solve the above-mentioned technical problem, the utility model employs following technical solution:
A kind of movable type kerbstone installation carriage, including loading plate, the lower section of loading plate is extended in left-right direction to be had A piece axle, the both ends of axle are separately installed with wheel, and the bottom of loading plate is fixedly connected with the axle bed being rotatably assorted with axle, The center of carrying plate top surface is fixedly connected with the support column that an edge is extended perpendicular to in-plane where loading plate, A sunpender is provided at the top of support column, the middle part of sunpender is cut with scissors by the hinge shaft I extended in left-right direction with support top end It connects in succession, the both ends end of sunpender is located at loading plate edge perpendicular to its institute along the projection perpendicular to loading plate institute in the in-plane direction Outside projection in the in-plane direction, one end end that sunpender is located in front of loading plate is fixedly connected with a lifting rope, and lifting rope is remote One end from sunpender is equipped with kerbstone grabbing device, and one end that sunpender is located at loading plate rear is provided with pull rod, and the one of pull rod End is articulated and connected by the II sunpender end adjacent thereto of hinge shaft extended in left-right direction, and the other end of pull rod is provided with clump weight And with being fixedly connected at the top of clump weight, the weight of clump weight is more than the half of kerbstone weight to be installed and less than road to be installed The weight of kerb, the bottom of clump weight are provided with free bearing, and a supporting leg, the one end of supporting leg away from free bearing are hingedly connected on free bearing It is equipped with there are two being also set up on the universal wheel of ground surface, free bearing and is able to be in holding state and receipts to supporting leg The location hole that overlapping state is positioned, a positioning pin is equipped on supporting leg and can be by being inserted into corresponding location hole with to branch The state of leg is positioned, and when supporting leg is in holding state, supporting leg can be supported clump weight so as to making kerbstone Grabbing device captures the kerbstone on ground.
In the utility model, before handling is carried out to kerbstone, positioning is first carried out to supporting leg and is at holding state, Change trolley moving direction this makes it possible to easily trolley be promoted to move, and by universal wheel;Trolley is moved to curb clitter After putting area, the kerbstone on ground is captured using the kerbstone grabbing device of sunpender front end, then again to the shape of supporting leg State is changed, and is at receiving overlapping state, and so support is just no longer supported clump weight, since clump weight weight is less than Kerbstone weight, clump weight will be hanging;Since clump weight can apply kerbstone the active force of a part, worker only needs Applying small part strength just can easily lift kerbstone, and nurse one's health the size of corresponding application strength, while control kerbstone Vacant state is in clump weight, this makes it possible to moving cart to kerbstone installation site, kerbstone is installed.So The operating burden of worker is just significantly reduced, it is simple in structure, it is easy to use, improve construction efficiency.
As an optimization, the kerbstone grabbing device hangs cross bar, the main shaft downside for hanging cross bar including horizontally disposed master Uniform intervals are fixedly connected with multiple mounting parts along its length on face, and each mounting part is both provided with hook, and hook includes Hook part and connecting portion, connecting portion with main by hanging hinge shaft III and the mounting part articulated connection corresponding to it that cross bar is arranged in parallel So that hook part can hook the side bottom surface of kerbstone, the hook direction of two neighboring hook is reversed.It is satisfying the need When kerb is captured, first adjustment master, which hangs cross bar, makes its length direction consistent with the length direction of kerbstone, is then grasping It decides the hook hung on cross bar, it is made to be rotated towards opposite direction is hooked around hinge shaft, form the inside of hook and hook Space.Kerbstone is placed in and is hooked in space, is rotated further by linking up with, the hook part of hook is made to be inserted into the bottom of kerbstone, is completed Crawl to kerbstone, it is simple in structure, it is easy and convenient to handle.
As an optimization, torsional spring is also arranged on the hinge shaft III, the both ends of torsional spring are respectively engaged with the corresponding mounting On the connecting portion of portion and hook, torsional spring to kerbstone can hook for the hook part of hook along its hook direction provides spring Power, /V can be carried out so that the hook is under normal conditions in vertical to the hook by also having convexed to form on the mounting part The limiting section of setting.Before being captured to kerbstone, hook is rotated backward, torsional spring generates elastic deformation, when the hook part of hook is inserted Enter to after kerbstone bottom, worker can unclamp the operation to hook, and applying active force to hook by the spring force of torsional spring makes It firmly grasps kerbstone, avoids rocking of occurring during kerbstone is carried and hook is caused to come off, improving makes Security.
As an optimization, the quantity of the hook is at least four, is set between the hook on same hook direction Be equipped with to be fixed the connecting rod to link together.So when connecting rod is operated, it becomes possible to while to same hook The hook hung on direction is operated, more convenient to use.
In conclusion the beneficial effects of the utility model are:The utility model is simple in structure, using lever principle, leads to It crosses and clump weight is set to mitigate the burden of operation, it is easy to use, improve construction efficiency.
Description of the drawings
It is new to this practicality below in conjunction with attached drawing in order to make the purpose, technical scheme and advantage of utility model clearer Type is described in further detail, wherein:
Fig. 1 is the structure diagram of the utility model.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in Figure 1, the portable kerbstone installation carriage in present embodiment, including loading plate 1, loading plate 1 Lower section in left-right direction be extended have an axle, the both ends of axle are separately installed with wheel 2, and the bottom of loading plate 1 is consolidated Surely the axle bed being rotatably assorted with axle is connected with, the center of 1 top surface of loading plate is fixedly connected with an edge perpendicular to carrying The support column 3 that in-plane where plate is extended, the top of support column 3 are provided with a sunpender 4, and the middle part of sunpender 4 passes through The hinge shaft I extended in left-right direction and the articulated connection of support top end, the both ends end of sunpender 4 is along where loading plate 1 Projection on in-plane be located at loading plate 1 along perpendicular to it outside projection in the in-plane direction, sunpender 4 is located at loading plate One end end in 1 front is fixedly connected with a lifting rope 5, and the one end of lifting rope 5 away from sunpender 4 is equipped with kerbstone grabbing device, One end that sunpender is located at 1 rear of loading plate is provided with pull rod 6, one end of pull rod 6 by the hinge shaft II that extends in left-right direction with Its adjacent 4 end of sunpender articulated connection, the other end of pull rod 6 are provided with clump weight 7 and are fixedly connected with the top of clump weight 7, The weight of clump weight 7 is more than the half of kerbstone weight to be installed and less than the weight of kerbstone to be installed, the bottom of clump weight 7 Free bearing is provided with, a supporting leg 8 is hingedly connected on free bearing, the one end of supporting leg 8 away from free bearing is equipped with can be in ground surface Universal wheel 9, also set up that there are two be able to be in supporting leg 8 holding state and what receipts overlapping state was positioned determines on free bearing Position hole, is equipped with a positioning pin on supporting leg 8 and can be determined by being inserted into corresponding location hole with the state to supporting leg 8 Position, when supporting leg 8 is in holding state, supporting leg 8 can be supported clump weight 7 so as to making kerbstone grabbing device over the ground The kerbstone in face is captured.
In present embodiment, the kerbstone grabbing device hangs cross bar 10 including horizontally disposed master, and master hangs cross bar Uniform intervals are fixedly connected with multiple mounting parts 11 along its length on 10 shaft downside, and each mounting part 11 is respectively provided with There is a hook 12, hook 12 includes hook part and connecting portion, and connecting portion with main by hanging the hinge shaft III and its that cross bar 10 is arranged in parallel Corresponding mounting part 11 is articulated and connected so that hook part can hook the side bottom surface of kerbstone, two neighboring hook 12 Hook direction be reversed.
In present embodiment, torsional spring is also arranged on the hinge shaft III, the both ends of torsional spring are respectively engaged with accordingly The mounting part 11 and hook 12 connecting portion on, torsional spring can be hook 12 hook part along its hook direction to kerbstone into Row, which hooks, provides spring force, and /V can be carried out so that the extension to the hook 12 by also having been convexed to form on the mounting part 11 Hook is in vertically arranged limiting section under normal conditions.
In present embodiment, the quantity of the hook 12 is at least four, described on same hook direction Be provided with to be fixed the connecting rod 13 to link together between hook 12.
During specific implementation, the shaft upper side that the master hangs cross bar is set there are three shackle, and three shackles divide The both ends and centre position for hanging cross bar Wei Yu not be led, connecting screw are fixedly connected on shackle and by connecting screw thread fitting Hung in master on cross bar, link be provided with above cross bar positioned at main hang, link vertically on projection hang cross bar with master Center coincides, and the other end that three ropes and rope are linked on link is articulated in respectively on corresponding three shackles, so Lifting is more steady.Its uniform intervals is provided with more hounds centered on the axis of support column on carrying plate top surface, tiltedly One end of strut is fixedly connected on the support columns, and the other end is fixedly connected on loading plate, and each hound can with support column Form triangular support configurations.One end that sunpender is located at pull rod is additionally provided with hand handle, and the axis direction of hand handle is perpendicular to the axis of sunpender Line direction, the middle part of hand handle are fixedly connected with its sunpender so that it is convenient to promote entire trolley.
Finally illustrate, above example is merely intended for describing the technical solutions of the present application, but not for limiting the present application, although logical The preferred embodiment crossed with reference to the utility model has been described the utility model, but those of ordinary skill in the art It should be appreciated that various changes can be made to it in the form and details, without departing from the appended claims institute The spirit and scope of the utility model of restriction.

Claims (4)

1. a kind of movable type kerbstone installation carriage, it is characterised in that:Including loading plate, the lower section of loading plate is prolonged in left-right direction It stretches and is provided with an axle, the both ends of axle are separately installed with wheel, and the bottom of loading plate is fixedly connected with matches somebody with somebody with axle rotation The axle bed of conjunction, the center for carrying plate top surface are fixedly connected with edge in-plane where the loading plate and are extended Support column, a sunpender is provided at the top of support column, the middle part of sunpender passes through the hinge shaft I extended in left-right direction and support Top end is articulated and connected, and it is vertical that the both ends end of sunpender along the projection perpendicular to loading plate institute is in the in-plane direction located at loading plate edge Directly in it outside projection in the in-plane direction, one end end that sunpender is located in front of loading plate is fixedly connected with one and hangs Rope, the one end of lifting rope away from sunpender are equipped with kerbstone grabbing device, and one end that sunpender is located at loading plate rear is provided with pull rod, One end of pull rod is articulated and connected by the II sunpender end adjacent thereto of hinge shaft extended in left-right direction, and the other end of pull rod is set There is clump weight and with being fixedly connected at the top of clump weight, the weight of clump weight is more than the half of kerbstone weight to be installed and is less than The weight of kerbstone to be installed, the bottom of clump weight are provided with free bearing, a supporting leg are hingedly connected on free bearing, supporting leg is away from hinge Seat one end be equipped with can be also set up on the universal wheel of ground surface, free bearing there are two be able to supporting leg be in support State and the location hole that is positioned of overlapping state is received, a positioning pin is equipped on supporting leg and can be by being inserted into corresponding positioning Hole is positioned with the state to supporting leg, when supporting leg is in holding state, supporting leg clump weight can be supported so as to Kerbstone grabbing device is made to capture the kerbstone on ground.
2. movable type kerbstone installation carriage according to claim 1, it is characterised in that:The kerbstone grabbing device bag Include horizontally disposed master and hang cross bar, it is main hang on the shaft downside of cross bar uniform intervals along its length be fixedly connected with it is multiple Mounting part, each mounting part are both provided with hook, and hook includes hook part and connecting portion, and connecting portion is parallel by hanging cross bar with master The hinge shaft III of setting with its corresponding to mounting part be articulated and connected so that hook part can hook the side bottom surface of kerbstone, The hook direction of two neighboring hook is reversed.
3. movable type kerbstone installation carriage according to claim 2, it is characterised in that:It is also arranged on the hinge shaft III Torsional spring, the both ends of torsional spring are respectively engaged on the connecting portion of the corresponding mounting part and hook, and torsional spring can be the curved of hook Hook portion hooks direction along it and kerbstone is carried out to hook offer spring force, and also having been convexed to form on the mounting part can be to described Hook carries out /V so that the hook is in vertically arranged limiting section under normal conditions.
4. movable type kerbstone installation carriage according to claim 2, it is characterised in that:The quantity of the hook is at least Four, be provided with to be fixed the connecting rod to link together between the same hook hooked on direction.
CN201721452865.7U 2017-11-03 2017-11-03 Portable kerbstone installation carriage Active CN207375653U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721452865.7U CN207375653U (en) 2017-11-03 2017-11-03 Portable kerbstone installation carriage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721452865.7U CN207375653U (en) 2017-11-03 2017-11-03 Portable kerbstone installation carriage

Publications (1)

Publication Number Publication Date
CN207375653U true CN207375653U (en) 2018-05-18

Family

ID=62334877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721452865.7U Active CN207375653U (en) 2017-11-03 2017-11-03 Portable kerbstone installation carriage

Country Status (1)

Country Link
CN (1) CN207375653U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109795956A (en) * 2018-12-29 2019-05-24 国网山东省电力公司聊城供电公司 A kind of lever power equipment handling instrument
CN110485242A (en) * 2019-09-24 2019-11-22 中冶建工集团有限公司 A kind of method for carrying of kerbstone

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109795956A (en) * 2018-12-29 2019-05-24 国网山东省电力公司聊城供电公司 A kind of lever power equipment handling instrument
CN110485242A (en) * 2019-09-24 2019-11-22 中冶建工集团有限公司 A kind of method for carrying of kerbstone

Similar Documents

Publication Publication Date Title
CN207375653U (en) Portable kerbstone installation carriage
CN105217487B (en) Trailing arm swings transformer station's multi-functional carrying equipment that is adjustable, being lifted by crane using suspension hook
CN107311032B (en) A kind of bridge crane suspender automatic coupling/decoupling device
CN206561754U (en) A kind of luggage truck embraces folder
CN208915188U (en) A kind of stall protection trolley
CN207347052U (en) Kerbstone grabbing device
CN105174088A (en) Transformer substation multi-functional handling equipment with trailing arm swinging adjustable and adopting magnetic hanger loop for hoisting
CN205838392U (en) A kind of electronic jib crane
CN207376418U (en) Kerbstone installation auxiliary trolley
CN105197812B (en) The transformer station's multi-functional carrying equipment lifted by crane using magnetic hanging loop
CN202864678U (en) Self-locking hanger
CN208306673U (en) Kerbstone transport device
CN107253487A (en) Fold mountain region derrick car and detection folds mountain region derrick car
CN210653156U (en) Unmanned aerial vehicle's carrier
CN208647021U (en) A kind of suspension type dismantling pipeline of scrap-car
CN209094406U (en) Reinforcing bar pier nose feeding supports tow handle
CN206202386U (en) One kind is climbed truck
CN107587413A (en) A kind of kerbstone installation auxiliary chassis
CN103963872B (en) Trailer and comprise the construction machinery and equipment of this trailer
CN203739739U (en) Pipeline construction automatic pipe transporting and laying vehicle
CN208915187U (en) Tracked construction equipment thrust wheel dismounts special-purpose vehicle
CN207469056U (en) Kerbstone installation trolley with elevating function
CN218145420U (en) Portal type hoisting device
JP3043547U (en) Vehicle lifting equipment
CN203144044U (en) Rolling cloth moving van

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant