CN207375653U - Portable kerbstone installation carriage - Google Patents
Portable kerbstone installation carriage Download PDFInfo
- Publication number
- CN207375653U CN207375653U CN201721452865.7U CN201721452865U CN207375653U CN 207375653 U CN207375653 U CN 207375653U CN 201721452865 U CN201721452865 U CN 201721452865U CN 207375653 U CN207375653 U CN 207375653U
- Authority
- CN
- China
- Prior art keywords
- hook
- kerbstone
- sunpender
- loading plate
- supporting leg
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Handcart (AREA)
Abstract
The utility model discloses a kind of portable kerbstone installation carriages, including loading plate, traveling wheel for walking is installed at left and right sides of loading plate, loading plate is fixedly connected with a support column, a sunpender is provided at the top of support column, the middle part of sunpender and the articulated connection of support top end, one end of sunpender is fixedly connected with lifting rope, kerbstone grabbing device is installed on lifting rope, the other end of sunpender is hingedly connected with pull rod, and clump weight is equipped on pull rod, and the bottom of clump weight is hinged with supporting leg, supporting leg can be supported clump weight, additionally it is possible to receive folded.By the lever principle of sunpender, worker can easily pick up kerbstone in Balance weight end, and be hoisted to installation position, thus significantly reduce the operating burden of worker, simple in structure, easy to use, improve construction efficiency.
Description
Technical field
The utility model is related to a kind of kerbstone mounting auxiliaries, and in particular to a kind of movable type kerbstone installation is small
Vehicle.
Background technology
Kerbstone refers to being located at the boundary stone of pavement edge, and abbreviation kerb is commonly called as road serratd edge.It is as being arranged on road surface
Edge and the rectangular slab of stone of other structural belts boundary.Kerbstone is the Stripwise construction object between both sides of highway road surface and curb, because shape
Into drop, as steep cliff, so the strip-shaped configuration that kerbstone is formed, also shouts precipice, structure size is typically 99cm*15cm*
15cm is generally higher by road surface 10cm.The road construction indispensable ring during installation of kerbstone, since kerbstone is installed
It is stringenter to line style, high range request, all it is to carry on the shoulder by the way of the back of the body is shouldered to carry out carrying and installation using worker among site operation, but
It is since kerbstone weight is larger, the weight of one piece of kerbstone is in 100kg or so, single to be carried by worker, effect of not only constructing
Rate is low, while larger body burden is also resulted in worker, is in addition also easy to all kinds of security incidents occur.
Utility model content
In view of the above shortcomings of the prior art, technical problem to be solved in the utility model is:One kind how is provided to carry
High construction efficiency mitigates the portable kerbstone installation carriage of worker's construction burden.
In order to solve the above-mentioned technical problem, the utility model employs following technical solution:
A kind of movable type kerbstone installation carriage, including loading plate, the lower section of loading plate is extended in left-right direction to be had
A piece axle, the both ends of axle are separately installed with wheel, and the bottom of loading plate is fixedly connected with the axle bed being rotatably assorted with axle,
The center of carrying plate top surface is fixedly connected with the support column that an edge is extended perpendicular to in-plane where loading plate,
A sunpender is provided at the top of support column, the middle part of sunpender is cut with scissors by the hinge shaft I extended in left-right direction with support top end
It connects in succession, the both ends end of sunpender is located at loading plate edge perpendicular to its institute along the projection perpendicular to loading plate institute in the in-plane direction
Outside projection in the in-plane direction, one end end that sunpender is located in front of loading plate is fixedly connected with a lifting rope, and lifting rope is remote
One end from sunpender is equipped with kerbstone grabbing device, and one end that sunpender is located at loading plate rear is provided with pull rod, and the one of pull rod
End is articulated and connected by the II sunpender end adjacent thereto of hinge shaft extended in left-right direction, and the other end of pull rod is provided with clump weight
And with being fixedly connected at the top of clump weight, the weight of clump weight is more than the half of kerbstone weight to be installed and less than road to be installed
The weight of kerb, the bottom of clump weight are provided with free bearing, and a supporting leg, the one end of supporting leg away from free bearing are hingedly connected on free bearing
It is equipped with there are two being also set up on the universal wheel of ground surface, free bearing and is able to be in holding state and receipts to supporting leg
The location hole that overlapping state is positioned, a positioning pin is equipped on supporting leg and can be by being inserted into corresponding location hole with to branch
The state of leg is positioned, and when supporting leg is in holding state, supporting leg can be supported clump weight so as to making kerbstone
Grabbing device captures the kerbstone on ground.
In the utility model, before handling is carried out to kerbstone, positioning is first carried out to supporting leg and is at holding state,
Change trolley moving direction this makes it possible to easily trolley be promoted to move, and by universal wheel;Trolley is moved to curb clitter
After putting area, the kerbstone on ground is captured using the kerbstone grabbing device of sunpender front end, then again to the shape of supporting leg
State is changed, and is at receiving overlapping state, and so support is just no longer supported clump weight, since clump weight weight is less than
Kerbstone weight, clump weight will be hanging;Since clump weight can apply kerbstone the active force of a part, worker only needs
Applying small part strength just can easily lift kerbstone, and nurse one's health the size of corresponding application strength, while control kerbstone
Vacant state is in clump weight, this makes it possible to moving cart to kerbstone installation site, kerbstone is installed.So
The operating burden of worker is just significantly reduced, it is simple in structure, it is easy to use, improve construction efficiency.
As an optimization, the kerbstone grabbing device hangs cross bar, the main shaft downside for hanging cross bar including horizontally disposed master
Uniform intervals are fixedly connected with multiple mounting parts along its length on face, and each mounting part is both provided with hook, and hook includes
Hook part and connecting portion, connecting portion with main by hanging hinge shaft III and the mounting part articulated connection corresponding to it that cross bar is arranged in parallel
So that hook part can hook the side bottom surface of kerbstone, the hook direction of two neighboring hook is reversed.It is satisfying the need
When kerb is captured, first adjustment master, which hangs cross bar, makes its length direction consistent with the length direction of kerbstone, is then grasping
It decides the hook hung on cross bar, it is made to be rotated towards opposite direction is hooked around hinge shaft, form the inside of hook and hook
Space.Kerbstone is placed in and is hooked in space, is rotated further by linking up with, the hook part of hook is made to be inserted into the bottom of kerbstone, is completed
Crawl to kerbstone, it is simple in structure, it is easy and convenient to handle.
As an optimization, torsional spring is also arranged on the hinge shaft III, the both ends of torsional spring are respectively engaged with the corresponding mounting
On the connecting portion of portion and hook, torsional spring to kerbstone can hook for the hook part of hook along its hook direction provides spring
Power, /V can be carried out so that the hook is under normal conditions in vertical to the hook by also having convexed to form on the mounting part
The limiting section of setting.Before being captured to kerbstone, hook is rotated backward, torsional spring generates elastic deformation, when the hook part of hook is inserted
Enter to after kerbstone bottom, worker can unclamp the operation to hook, and applying active force to hook by the spring force of torsional spring makes
It firmly grasps kerbstone, avoids rocking of occurring during kerbstone is carried and hook is caused to come off, improving makes
Security.
As an optimization, the quantity of the hook is at least four, is set between the hook on same hook direction
Be equipped with to be fixed the connecting rod to link together.So when connecting rod is operated, it becomes possible to while to same hook
The hook hung on direction is operated, more convenient to use.
In conclusion the beneficial effects of the utility model are:The utility model is simple in structure, using lever principle, leads to
It crosses and clump weight is set to mitigate the burden of operation, it is easy to use, improve construction efficiency.
Description of the drawings
It is new to this practicality below in conjunction with attached drawing in order to make the purpose, technical scheme and advantage of utility model clearer
Type is described in further detail, wherein:
Fig. 1 is the structure diagram of the utility model.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in Figure 1, the portable kerbstone installation carriage in present embodiment, including loading plate 1, loading plate 1
Lower section in left-right direction be extended have an axle, the both ends of axle are separately installed with wheel 2, and the bottom of loading plate 1 is consolidated
Surely the axle bed being rotatably assorted with axle is connected with, the center of 1 top surface of loading plate is fixedly connected with an edge perpendicular to carrying
The support column 3 that in-plane where plate is extended, the top of support column 3 are provided with a sunpender 4, and the middle part of sunpender 4 passes through
The hinge shaft I extended in left-right direction and the articulated connection of support top end, the both ends end of sunpender 4 is along where loading plate 1
Projection on in-plane be located at loading plate 1 along perpendicular to it outside projection in the in-plane direction, sunpender 4 is located at loading plate
One end end in 1 front is fixedly connected with a lifting rope 5, and the one end of lifting rope 5 away from sunpender 4 is equipped with kerbstone grabbing device,
One end that sunpender is located at 1 rear of loading plate is provided with pull rod 6, one end of pull rod 6 by the hinge shaft II that extends in left-right direction with
Its adjacent 4 end of sunpender articulated connection, the other end of pull rod 6 are provided with clump weight 7 and are fixedly connected with the top of clump weight 7,
The weight of clump weight 7 is more than the half of kerbstone weight to be installed and less than the weight of kerbstone to be installed, the bottom of clump weight 7
Free bearing is provided with, a supporting leg 8 is hingedly connected on free bearing, the one end of supporting leg 8 away from free bearing is equipped with can be in ground surface
Universal wheel 9, also set up that there are two be able to be in supporting leg 8 holding state and what receipts overlapping state was positioned determines on free bearing
Position hole, is equipped with a positioning pin on supporting leg 8 and can be determined by being inserted into corresponding location hole with the state to supporting leg 8
Position, when supporting leg 8 is in holding state, supporting leg 8 can be supported clump weight 7 so as to making kerbstone grabbing device over the ground
The kerbstone in face is captured.
In present embodiment, the kerbstone grabbing device hangs cross bar 10 including horizontally disposed master, and master hangs cross bar
Uniform intervals are fixedly connected with multiple mounting parts 11 along its length on 10 shaft downside, and each mounting part 11 is respectively provided with
There is a hook 12, hook 12 includes hook part and connecting portion, and connecting portion with main by hanging the hinge shaft III and its that cross bar 10 is arranged in parallel
Corresponding mounting part 11 is articulated and connected so that hook part can hook the side bottom surface of kerbstone, two neighboring hook 12
Hook direction be reversed.
In present embodiment, torsional spring is also arranged on the hinge shaft III, the both ends of torsional spring are respectively engaged with accordingly
The mounting part 11 and hook 12 connecting portion on, torsional spring can be hook 12 hook part along its hook direction to kerbstone into
Row, which hooks, provides spring force, and /V can be carried out so that the extension to the hook 12 by also having been convexed to form on the mounting part 11
Hook is in vertically arranged limiting section under normal conditions.
In present embodiment, the quantity of the hook 12 is at least four, described on same hook direction
Be provided with to be fixed the connecting rod 13 to link together between hook 12.
During specific implementation, the shaft upper side that the master hangs cross bar is set there are three shackle, and three shackles divide
The both ends and centre position for hanging cross bar Wei Yu not be led, connecting screw are fixedly connected on shackle and by connecting screw thread fitting
Hung in master on cross bar, link be provided with above cross bar positioned at main hang, link vertically on projection hang cross bar with master
Center coincides, and the other end that three ropes and rope are linked on link is articulated in respectively on corresponding three shackles, so
Lifting is more steady.Its uniform intervals is provided with more hounds centered on the axis of support column on carrying plate top surface, tiltedly
One end of strut is fixedly connected on the support columns, and the other end is fixedly connected on loading plate, and each hound can with support column
Form triangular support configurations.One end that sunpender is located at pull rod is additionally provided with hand handle, and the axis direction of hand handle is perpendicular to the axis of sunpender
Line direction, the middle part of hand handle are fixedly connected with its sunpender so that it is convenient to promote entire trolley.
Finally illustrate, above example is merely intended for describing the technical solutions of the present application, but not for limiting the present application, although logical
The preferred embodiment crossed with reference to the utility model has been described the utility model, but those of ordinary skill in the art
It should be appreciated that various changes can be made to it in the form and details, without departing from the appended claims institute
The spirit and scope of the utility model of restriction.
Claims (4)
1. a kind of movable type kerbstone installation carriage, it is characterised in that:Including loading plate, the lower section of loading plate is prolonged in left-right direction
It stretches and is provided with an axle, the both ends of axle are separately installed with wheel, and the bottom of loading plate is fixedly connected with matches somebody with somebody with axle rotation
The axle bed of conjunction, the center for carrying plate top surface are fixedly connected with edge in-plane where the loading plate and are extended
Support column, a sunpender is provided at the top of support column, the middle part of sunpender passes through the hinge shaft I extended in left-right direction and support
Top end is articulated and connected, and it is vertical that the both ends end of sunpender along the projection perpendicular to loading plate institute is in the in-plane direction located at loading plate edge
Directly in it outside projection in the in-plane direction, one end end that sunpender is located in front of loading plate is fixedly connected with one and hangs
Rope, the one end of lifting rope away from sunpender are equipped with kerbstone grabbing device, and one end that sunpender is located at loading plate rear is provided with pull rod,
One end of pull rod is articulated and connected by the II sunpender end adjacent thereto of hinge shaft extended in left-right direction, and the other end of pull rod is set
There is clump weight and with being fixedly connected at the top of clump weight, the weight of clump weight is more than the half of kerbstone weight to be installed and is less than
The weight of kerbstone to be installed, the bottom of clump weight are provided with free bearing, a supporting leg are hingedly connected on free bearing, supporting leg is away from hinge
Seat one end be equipped with can be also set up on the universal wheel of ground surface, free bearing there are two be able to supporting leg be in support
State and the location hole that is positioned of overlapping state is received, a positioning pin is equipped on supporting leg and can be by being inserted into corresponding positioning
Hole is positioned with the state to supporting leg, when supporting leg is in holding state, supporting leg clump weight can be supported so as to
Kerbstone grabbing device is made to capture the kerbstone on ground.
2. movable type kerbstone installation carriage according to claim 1, it is characterised in that:The kerbstone grabbing device bag
Include horizontally disposed master and hang cross bar, it is main hang on the shaft downside of cross bar uniform intervals along its length be fixedly connected with it is multiple
Mounting part, each mounting part are both provided with hook, and hook includes hook part and connecting portion, and connecting portion is parallel by hanging cross bar with master
The hinge shaft III of setting with its corresponding to mounting part be articulated and connected so that hook part can hook the side bottom surface of kerbstone,
The hook direction of two neighboring hook is reversed.
3. movable type kerbstone installation carriage according to claim 2, it is characterised in that:It is also arranged on the hinge shaft III
Torsional spring, the both ends of torsional spring are respectively engaged on the connecting portion of the corresponding mounting part and hook, and torsional spring can be the curved of hook
Hook portion hooks direction along it and kerbstone is carried out to hook offer spring force, and also having been convexed to form on the mounting part can be to described
Hook carries out /V so that the hook is in vertically arranged limiting section under normal conditions.
4. movable type kerbstone installation carriage according to claim 2, it is characterised in that:The quantity of the hook is at least
Four, be provided with to be fixed the connecting rod to link together between the same hook hooked on direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721452865.7U CN207375653U (en) | 2017-11-03 | 2017-11-03 | Portable kerbstone installation carriage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721452865.7U CN207375653U (en) | 2017-11-03 | 2017-11-03 | Portable kerbstone installation carriage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207375653U true CN207375653U (en) | 2018-05-18 |
Family
ID=62334877
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721452865.7U Active CN207375653U (en) | 2017-11-03 | 2017-11-03 | Portable kerbstone installation carriage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207375653U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109795956A (en) * | 2018-12-29 | 2019-05-24 | 国网山东省电力公司聊城供电公司 | A kind of lever power equipment handling instrument |
CN110485242A (en) * | 2019-09-24 | 2019-11-22 | 中冶建工集团有限公司 | A kind of method for carrying of kerbstone |
-
2017
- 2017-11-03 CN CN201721452865.7U patent/CN207375653U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109795956A (en) * | 2018-12-29 | 2019-05-24 | 国网山东省电力公司聊城供电公司 | A kind of lever power equipment handling instrument |
CN110485242A (en) * | 2019-09-24 | 2019-11-22 | 中冶建工集团有限公司 | A kind of method for carrying of kerbstone |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207375653U (en) | Portable kerbstone installation carriage | |
CN105217487B (en) | Trailing arm swings transformer station's multi-functional carrying equipment that is adjustable, being lifted by crane using suspension hook | |
CN107311032B (en) | A kind of bridge crane suspender automatic coupling/decoupling device | |
CN206561754U (en) | A kind of luggage truck embraces folder | |
CN208915188U (en) | A kind of stall protection trolley | |
CN207347052U (en) | Kerbstone grabbing device | |
CN105174088A (en) | Transformer substation multi-functional handling equipment with trailing arm swinging adjustable and adopting magnetic hanger loop for hoisting | |
CN205838392U (en) | A kind of electronic jib crane | |
CN207376418U (en) | Kerbstone installation auxiliary trolley | |
CN105197812B (en) | The transformer station's multi-functional carrying equipment lifted by crane using magnetic hanging loop | |
CN202864678U (en) | Self-locking hanger | |
CN208306673U (en) | Kerbstone transport device | |
CN107253487A (en) | Fold mountain region derrick car and detection folds mountain region derrick car | |
CN210653156U (en) | Unmanned aerial vehicle's carrier | |
CN208647021U (en) | A kind of suspension type dismantling pipeline of scrap-car | |
CN209094406U (en) | Reinforcing bar pier nose feeding supports tow handle | |
CN206202386U (en) | One kind is climbed truck | |
CN107587413A (en) | A kind of kerbstone installation auxiliary chassis | |
CN103963872B (en) | Trailer and comprise the construction machinery and equipment of this trailer | |
CN203739739U (en) | Pipeline construction automatic pipe transporting and laying vehicle | |
CN208915187U (en) | Tracked construction equipment thrust wheel dismounts special-purpose vehicle | |
CN207469056U (en) | Kerbstone installation trolley with elevating function | |
CN218145420U (en) | Portal type hoisting device | |
JP3043547U (en) | Vehicle lifting equipment | |
CN203144044U (en) | Rolling cloth moving van |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |