CN207372006U - Foundry's dust-extraction unit - Google Patents

Foundry's dust-extraction unit Download PDF

Info

Publication number
CN207372006U
CN207372006U CN201721014240.2U CN201721014240U CN207372006U CN 207372006 U CN207372006 U CN 207372006U CN 201721014240 U CN201721014240 U CN 201721014240U CN 207372006 U CN207372006 U CN 207372006U
Authority
CN
China
Prior art keywords
pipeline
dust
cupola
furnace
foundry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721014240.2U
Other languages
Chinese (zh)
Inventor
王麟
孙超
于福戆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Lvsang Industry Corp Ltd
Original Assignee
Dalian Lvsang Industry Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Lvsang Industry Corp Ltd filed Critical Dalian Lvsang Industry Corp Ltd
Priority to CN201721014240.2U priority Critical patent/CN207372006U/en
Application granted granted Critical
Publication of CN207372006U publication Critical patent/CN207372006U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

Foundry's dust-extraction unit, upper pipeline is installed on workshop roof, upper pipeline lower part is installed by dust excluding hood, dust excluding hood cheats surface before being located at furnace cupola, the upper pipeline of dust excluding hood is connected with duster for cupola furnace pipeline connection by hose road, and upper pipeline, which is connected with duster for cupola furnace pipeline at shunting, is equipped with electric control valve.Foundry's dust-extraction unit of the utility model, utilize the deduster facility of foundry's furnace cupola, the pipeline of workshop dust excluding hood with deduster is connected, the total system with air quality in workshop in a set of purification furnace cupola is formed, reduces cost and be not take up limited plant area.

Description

Foundry's dust-extraction unit
Technical field
The utility model is related to field of dust removal equipment more particularly to a kind of devices for foundry's dedusting.
Background technology
Foundry melts and quenched molten iron is needed using furnace cupola and electric furnace, this two techniques can all generate in the process Certain flue dust.Flue dust is constantly accumulative in workshop with production, not only influences staff's health, and when reaching a certain amount of From workshop, overdraught window is blown out, and causes atmosphere pollution.China puts more effort to atmospheric environment improvement in recent years, worker couple The requirement of working environment is also continuously improved, and the dust treatment of especially foundry has become relevant unit and has in workshop The problem faced at present, there are no dust-cleaning scheme in the effective workshop of comparative maturity.It is previous to be removed for the whirlwind and cloth bag of dedusting Dirt device not only there are problems that occupying place in limited car fare, and be difficult to solve Various Seasonal flue dust to drift what direction was differed Problem.
Utility model content
In order to solve the above problem existing for existing workshop dedusting method, the utility model provides a kind of good dedusting effect Foundry's dust-extraction unit.
The utility model technical solution used for the above purpose is:Foundry's dust-extraction unit, upper pipeline 1 It is installed on workshop roof 3,1 lower part of upper pipeline installation dust excluding hood 2, dust excluding hood 2 cheats surface, upper tube before being located at furnace cupola Road 1 connects duster for cupola furnace pipeline 6, and 6 one end of duster for cupola furnace pipeline is connected with duster for cupola furnace.
The dust excluding hood 2 is fixed on by fixed lacing wire 9 and fixed beam 10 on workshop roof 3.
The upper pipeline 1 of the dust excluding hood 2 is connected with 6 connection of duster for cupola furnace pipeline by hose road 4.
The upper pipeline 1, which is connected with duster for cupola furnace pipeline 6 at shunting, is equipped with electric control valve 5.
The dust excluding hood 2, upper pipeline 1 and 6 material of duster for cupola furnace pipeline are 1mm thickness galvanized sheets.
Using the deduster facility of foundry's furnace cupola, workshop is removed for foundry's dust-extraction unit of the utility model The pipeline of dust hood is connected with deduster, forms the total system with air quality in workshop in a set of purification furnace cupola, reduces Cost and it is not take up limited plant area.
Description of the drawings
Fig. 1 is the utility model foundry dust-extraction unit dust excluding hood part-structure figure.
Fig. 2 is the utility model foundry dust-extraction unit furnace cupola and deduster part-structure figure.
Fig. 3 is the utility model foundry dust-extraction unit dust excluding hood part side block diagram.
In figure:1st, upper pipeline, 2, dust excluding hood, 3, workshop roof, 4, be flexible coupling pipeline, 5, regulating valve, 6, furnace cupola removes Dirt device pipeline, 7, furnace cupola, 8, furnace cupola melt pit, 9, fixed lacing wire, 10, fixed beam.
Specific embodiment
Foundry's dust-extraction unit structure of the utility model as shown in Figs. 1-3, due to Various Seasonal, from furnace cupola and The flue dust of electric furnace drifts that direction is inconsistent, and foundry is needed according to the requirement of production locally using fan, commonsense method It is difficult to effectively absorb, the utility model uses such as lower structure:Upper pipeline 1 is installed on workshop roof 3,1 lower part of upper pipeline Dust excluding hood 2 is installed, according to actual use situation, can multiple dust excluding hoods 2 be selected according to furnace cupola quantity, each dust excluding hood 2 is distinguished Upper pipeline 1 is connected, furnace cupola dedusting pipeline 6 is connected behind upper pipeline interflow, dust excluding hood 2 passes through fixed lacing wire 9 and fixed beam 10 are fixed on workshop roof 3, and dust excluding hood 2 cheats surface before being located at furnace cupola, and upper pipeline 1 and the furnace cupola of dust excluding hood 2 remove 6 connection of dirt device pipeline is connected by hose road 4, and 6 one end of duster for cupola furnace pipeline is connected with duster for cupola furnace, top Pipeline 1, which is connected with duster for cupola furnace pipeline 6 at shunting, is equipped with electric control valve 5.Dust hood is cheated before being mounted on furnace cupola on just Side is mainly used for cylinder molten iron flue dust before absorption furnace cupola, while because setting height(from bottom) is higher, to integrated air quality in cleaning shop Also function to positive effect.Since deduster course of work wind turbine generates vibration, Vibration propagation shakes to during pipeline there may be larger Width, dust hood pipeline are connected part with deduster original pipeline using flexible connection structure, and being flexible coupling can avoid because case is in workshop Top vibration effect case is fixed and service life.The air inducing fan delivery that deduster uses is 32000-37000m3/ h, removal life For air quantity and transmission process the loss air quantity of duster for cupola furnace in production, the air quantity for workshop dust excluding hood is maintained at 10000m3/ more than h can meet the needs of workshop dedusting;The wind pressure of deduster adapted wind turbine is 4300-4700Pa, existing On the pipeline of deduster opening is set to be connected with dust excluding hood, on the basis of ensureing deduster for the normal dedusting of furnace cupola, at least There is 1000Pa wind pressure for dust excluding hood dust suction.Electric control valve is set at main line and dust excluding hood pipeline flow dividing, according to two The operating condition of furnace cupola opens corresponding different dust excluding hoods, efficiently using the extra air quantity of fan of dust remover.
Dust excluding hood 2 and piping material while ensureing assimilation effect and service life, are mitigated whole using 1mm thickness galvanized sheets Body weight reduces the construction volume in installation process.Using the deduster facility of foundry's furnace cupola, by the pipe of workshop dust excluding hood Road is connected with deduster, formed in a set of purification furnace cupola and in workshop air quality total system, reduce cost and not Occupy limited plant area;Electric control valve is installed in pipeline junction, temporarily no part is closed by dust collecting system, is kept away Exempt from air quantity loss, efficiently use limited resources, avoid wasting;This scheme is used not only for foundry, to other workshops Also widely use, the industry of covering is also more.

Claims (3)

1. foundry's dust-extraction unit, it is characterised in that:Upper pipeline(1)It is installed on workshop roof(3)On, upper pipeline(1) Lower part is installed by dust excluding hood(2), dust excluding hood(2)Upper pipeline(1)With duster for cupola furnace pipeline(6)Connection passes through hose Road(4)Connection;Dust excluding hood(2)Directly over being cheated before furnace cupola, upper pipeline(1)Connect duster for cupola furnace pipeline(6), punching Its stove deduster pipeline(6)One end is connected with duster for cupola furnace, upper pipeline(1)With duster for cupola furnace pipeline(6)Connection Electric control valve is equipped at shunting(5).
2. foundry's dust-extraction unit according to claim 1, it is characterised in that:The dust excluding hood(2)It is drawn by fixed Muscle(9)And fixed beam(10)It is fixed on workshop roof(3)On.
3. foundry's dust-extraction unit according to claim 1, it is characterised in that:The dust excluding hood(2), upper pipeline (1)With duster for cupola furnace pipeline(6)Material is 1mm thickness galvanized sheets.
CN201721014240.2U 2017-08-15 2017-08-15 Foundry's dust-extraction unit Active CN207372006U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721014240.2U CN207372006U (en) 2017-08-15 2017-08-15 Foundry's dust-extraction unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721014240.2U CN207372006U (en) 2017-08-15 2017-08-15 Foundry's dust-extraction unit

Publications (1)

Publication Number Publication Date
CN207372006U true CN207372006U (en) 2018-05-18

Family

ID=62341840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721014240.2U Active CN207372006U (en) 2017-08-15 2017-08-15 Foundry's dust-extraction unit

Country Status (1)

Country Link
CN (1) CN207372006U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109365464A (en) * 2018-11-01 2019-02-22 邯郸慧桥复合材料科技有限公司 A kind of movable type dust excluding hood
CN110064748A (en) * 2019-05-23 2019-07-30 芜湖泓鹄材料技术有限公司 Dust pelletizing system suitable for pouring product line

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109365464A (en) * 2018-11-01 2019-02-22 邯郸慧桥复合材料科技有限公司 A kind of movable type dust excluding hood
CN109365464B (en) * 2018-11-01 2024-03-08 邯郸慧桥复合材料科技有限公司 Movable dust hood
CN110064748A (en) * 2019-05-23 2019-07-30 芜湖泓鹄材料技术有限公司 Dust pelletizing system suitable for pouring product line

Similar Documents

Publication Publication Date Title
CN207372006U (en) Foundry's dust-extraction unit
CN108435701A (en) Rail cleaning device
CN209155414U (en) Dust-extraction unit is used in a kind of construction of environment-friendly type building
CN202539128U (en) Heavy rail scale purging and collecting device
CN102672621B (en) Sand blasting machine
CN205856707U (en) A kind of open-end spinning frame movable type cleaning device
CN204549285U (en) A kind of power plant coal dust process regenerative apparatus
CN208583104U (en) Dust-extraction unit for Iron Works mine slot flue gas trapping
CN206981369U (en) The dust suction collection device of tank descaling machine
CN204923917U (en) Portable dust collector in line frequency furnace stokehold
CN202380017U (en) Secondary dust removal system for converters
CN207237595U (en) One kind polishing workshop air cleaning system
CN207031344U (en) Tamping coke oven coal-charging dust arrester
CN203829863U (en) Wet filter three-machine combined type dust removal desulfurizer
CN106808569A (en) One kind automatically controls drifting dust cleaner
CN205870193U (en) A automatic production line of polishing that removes dust for panel beating
CN206751860U (en) The simple third dedusting system of converter based on a tank
CN206538485U (en) A kind of laser melting coating smoke collecting device
CN106978518A (en) The simple third dedusting system and method for converter based on a tank
CN210683825U (en) Device for preventing slag iron from splashing
CN218190292U (en) External dust collector is used to flotation device side
CN206837689U (en) A kind of dusting smoke-discharging device of Metal Melting
CN204149034U (en) The aluminium section bar sand-blasting machine of novel dust removing system
CN203061533U (en) Ash discharging and dust removing device
CN107642998A (en) A kind of steel mill emission-control equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant