Prior art keywords
slip support
pushing tow
support abutment
assembly tooling
immersed tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201721110542.XU
Other languages
Chinese (zh)
Inventor
戴伟
鞠小刚
王强
苏怀平
吴宏亮
谢颖秋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhenghua Heavy Industries Co Ltd
Original Assignee
Shanghai Zhenghua Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhenghua Heavy Industries Co Ltd filed Critical Shanghai Zhenghua Heavy Industries Co Ltd
Priority to CN201721110542.XU priority Critical patent/CN207362886U/en
Application granted granted Critical
Publication of CN207362886U publication Critical patent/CN207362886U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a kind of immersed tube tunnel final connector pushing tow girder to slide assembly tooling, the assembly tooling includes being arranged on multiple top slip support abutments on the upside of FS final spice body construction, the multiple lower part slip support abutments being arranged on the downside of FS final spice body construction, the girder fixing bracket being arranged on the slip support abutment of lower part, the slideway for the carrying lower part slip support abutment being arranged on ground and the thrustor one, the thrustor two that is arranged on slideway that are arranged on the slip support abutment of top, the top slip support abutment and is fixedly connected with FS final spice body construction.The utility model carries out horizontal sliding assembling by designing multiple top slip support abutments and multiple lower part slip support abutments and thrustor to girder crown wall and bottom wall, it is set to be deformed assembling later in body tensioning and turn, it is consistent with actual use operating mode, not only efficiency of assembling and precision are high, and be not in that sliding block destroys and pushing tow girder situations such as getting stuck, operating efficiency and assembly precision has been effectively ensured.

Description

Immersed tube tunnel final connector pushing tow girder slides assembly tooling
Technical field
The present invention relates to a kind of seabed immersed tube tunnel final connector assembly tooling, more particularly to a kind of immersed tube tunnel final Connector pushing tow girder slides assembly tooling.
Background technology
FS final spice is the key component of port Zhuhai and Macao bridge major project island tunnel engineering, is sunk just by large-scale floating crane lifting Behind position, pushing tow girder compression temporary leaking water Gina is realized to be isolated with seawater.The installation of pushing tow girder is heavy to closing in FS final spice Process is wanted, is the key of Project Success.Pushing tow girder is long by 37.8, wide by 11.3, high 1.5 meters of loop configuration, and Component Flexible is big, peace It need to ensure that girder can be smoothly put into the main structure groove for only having 3 ~ 8mm gaps with it during dress.Conventional scheme is vertically mounted on body Tensioning and carry out before turning over, notch mode is inserted into using lifting, installation positioning accuracy is low, and operating mode is inconsistent with actually using, vertical Not only there is prestressed stretch-draw after straight installation, and body welding end seal door, structure can be deformed, while girder has certain scratch Degree, can cause sliding block to destroy, the situation that pushing tow girder gets stuck.Therefore in order to ensure the good assembling of pushing tow girder, need to design specially Assembly tooling and technique.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of immersed tube tunnel final connector pushing tow girder sliding dress With frock, rear horizontal sliding mounting means is deformed using body tensioning and turn, this programme installation accuracy is high, operating mode and reality Border is carried out using unanimously after malformation, there is no sliding block destruction, the situation that pushing tow girder gets stuck.
In order to solve the above-mentioned technical problem, the utility model adopts the following technical solution:
A kind of immersed tube tunnel final connector pushing tow girder slides assembly tooling, including is arranged on FS final spice body construction Multiple top slip support abutments of side, the multiple lower part slip support abutments being arranged on the downside of FS final spice body construction, be arranged on lower part The slideway of girder fixing bracket, the carrying lower part slip support abutment being arranged on ground on slip support abutment and be arranged on top sliding Thrustor one on bearing, the thrustor two being arranged on slideway, the top slip support abutment and FS final spice bulk junction Structure is fixedly connected.The utility model immersed tube tunnel final connector pushing tow girder slides assembly tooling, by setting multiple tops to slide Move bearing and multiple lower part slip support abutments and thrustor to carry out horizontal sliding assembling to girder crown wall and bottom wall, not only assemble Efficiency and precision are high, and are not in that sliding block destroys and situations such as pushing tow girder gets stuck.
Preferably, the top slip support abutment is tripod structure, it is with good load-bearing property and is easily installed It is fixed.
Preferably, plane is provided with slide plate one on the top slip support abutment, the slide plate one is engineering plastic alloy MGA plates, it contributes to sliding to operate with good mechanical property.
Preferably, the slide plate one is provided with slide plate bottom plate with interplanar on the slip support abutment of top and adjusts backing plate one, The installation and fixation that are provided with beneficial to slide plate of slide plate bottom plate, the horizontal difference of height of bearing can be finely adjusted by adjusting backing plate one.
Preferably, the adjusting backing plate one is welded to connect the plane on the slip support abutment of top, the slide plate bottom plate welding It is connected to and adjusts on backing plate one, the slide plate one is bolted with slide plate bottom plate.
Preferably, the top slip support abutment quantity is 6, support well can be played to pushing tow girder crown wall and is slided Shifting acts on.
Preferably, the lower part slip support abutment is rectangular box structure, the lower part slip support abutment quantity is 5, can Support and phorogenesis well are played to pushing tow girder bottom wall.
Preferably, being provided with slide plate two between the lower part slip support abutment and slideway, the slide plate two is engineering plastics Alloy MGA plates, the slide plate two by being bolted on the bottom surface of lower part slip support abutment, its with good mechanical property, Sliding is contributed to operate, and it is easy for assemble or unload.
Preferably, plane is provided with adjusting backing plate two, the adjusting backing plate two and lower part on the lower part slip support abutment Plane-welding connects on slip support abutment, and the horizontal difference of height of bearing can be finely adjusted by adjusting backing plate two.
Preferably, the girder fixing bracket is in 7 fonts, the girder fixing bracket and plane on the slip support abutment of lower part It is welded to connect, the structure stationarity is good and easy to process and assembles.
Preferably, the slideway is made of the slide for setting bearing beam on the ground and being arranged on bearing beam, the cunning Rail is welded to connect with bearing beam, and bearing beam can improve integral planar degree and good supporting role is played to slide.
Preferably, the thrustor one include be installed on top slip support abutment on pushing tow bearing one and with pushing tow branch The jack one of the connection of seat one, the thrustor active force is good and is easily installed fixation.
Preferably, the thrustor two include installed in slideway slide on pushing tow bearing two and with pushing tow bearing The jack two of two connections, the thrustor active force is good and is easily installed fixation.
Preferably, the pushing tow bearing one and pushing tow bearing two are board plug type bearing, easy to quick regulation jack Position.
Compared with prior art, a kind of beneficial effect of immersed tube tunnel final connector pushing tow girder sliding assembly tooling of the present invention Fruit:Girder crown wall and bottom wall are carried out by designing multiple top slip support abutments and multiple lower part slip support abutments and thrustor Horizontal sliding assembles, and makes it be deformed assembling later in body tensioning and turn, consistent with actual use operating mode, not only assembles Efficiency and precision are high, and are not in that sliding block destroys and situations such as pushing tow girder gets stuck, and operating efficiency and dress has been effectively ensured With precision.
Brief description of the drawings
The present invention is described in further detail with reference to the accompanying drawings and detailed description.
Fig. 1 is a kind of structure diagram of immersed tube tunnel final connector pushing tow girder sliding assembly tooling of the present invention.
Fig. 2 is the structure diagram of middle and upper part slip support abutment of the present invention.
Fig. 3 is the structure diagram of middle and lower part slip support abutment of the present invention.
Fig. 4 is the structure diagram of thrustor one in the present invention.
Wherein, reference numeral:1 is FS final spice body construction, and 2 be top slip support abutment, and 3 be lower part slip support abutment, and 4 are Girder fixing bracket, 5 be slide plate one, and 6 be slide plate bottom plate, and 7 is adjust backing plate one, and 8 be slide plate two, and 9 is adjust backing plate two, and 10 are Bearing beam, 11 be slide, and 12 be pushing tow bearing one, and 13 be jack one, and 14 be pushing tow bearing two, and 15 be jack two, and 16 be top Push away girder.
Embodiment
All features disclosed in this specification, or disclosed all methods or during the step of, except mutually exclusive Feature and/or step beyond, can combine in any way.
Any feature disclosed in this specification, unless specifically stated, can be equivalent by other or with similar purpose Alternative features are replaced.I.e., unless specifically stated, each feature is an example in a series of equivalent or similar characteristics .
As shown in Figures 1 to 4, a kind of immersed tube tunnel final connector pushing tow girder sliding assembly tooling of the present invention, including set Put multiple top slip support abutments 2 on the upside of FS final spice body construction 1, be arranged on the more of the downside of FS final spice body construction 1 A lower part slip support abutment 3, the girder fixing bracket 4 being arranged on lower part slip support abutment 3, the carrying lower part cunning being arranged on ground Move slideway and the thrustor one being arranged on top slip support abutment 2, the thrustor two being arranged on slideway, the institute of bearing 3 Top slip support abutment 2 is stated to be fixedly connected with FS final spice body construction 1.The top slip support abutment 2 is tripod structure, can be adopted Made of I-shaped steel.Plane is provided with slide plate 1 on the top slip support abutment 2, and the slide plate 1 is engineering plastic alloy MGA plates.The slide plate 1 is provided with slide plate bottom plate 6 with interplanar on top slip support abutment 2 and adjusts backing plate 1.The adjusting Backing plate 1 is welded to connect the plane on top slip support abutment 2, and the slide plate bottom plate 6 is welded to connect on backing plate 1 is adjusted, institute Slide plate 1 is stated to be bolted with slide plate bottom plate 6.2 quantity of top slip support abutment is 6.The lower part slip support abutment 3 For rectangular box structure, 3 quantity of lower part slip support abutment is 5.Cunning is provided between the lower part slip support abutment 3 and slideway Plate 28, the slide plate 28 are engineering plastic alloy MGA plates, and the slide plate 28 is bolted in lower part slip support abutment 3 On bottom surface.Plane, which is provided with, on the lower part slip support abutment 3 adjusts backing plate 29, the adjusting backing plate 29 and lower part slip support abutment Plane-welding connects on 3.The girder fixing bracket 4 is in 7 fonts, and the girder fixing bracket 4 on lower part slip support abutment 3 with putting down Face is welded to connect.The slideway is by setting bearing beam 10 on the ground and the slide 11 being arranged on bearing beam 10 to form, the cunning Rail 11 is welded to connect with bearing beam 10.The thrustor one includes one 12 He of pushing tow bearing being installed on top slip support abutment 2 The jack 1 being connected with pushing tow bearing 1.The thrustor two includes the pushing tow branch on the slide 11 of slideway Seat 2 14 and the jack 2 15 being connected with pushing tow bearing 2 14.The pushing tow bearing 1 and pushing tow bearing 2 14 are plate Formula bearing.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement made within refreshing and principle etc., should all be included in the protection scope of the present invention.

Claims (14)

1. a kind of immersed tube tunnel final connector pushing tow girder slides assembly tooling, it is characterised in that:Including being arranged on FS final spice Body construction(1)Multiple top slip support abutments of upside(2), be arranged on FS final spice body construction(1)Multiple lower parts of downside Slip support abutment(3), be arranged on lower part slip support abutment(3)On girder fixing bracket(4), the carrying lower part that is arranged on ground slides Move bearing(3)Slideway and be arranged on top slip support abutment(2)On thrustor one, the thrustor that is arranged on slideway Two, the top slip support abutment(2)With FS final spice body construction(1)It is fixedly connected.
A kind of 2. immersed tube tunnel final connector pushing tow girder sliding assembly tooling according to claim 1, it is characterised in that: The top slip support abutment(2)For tripod structure.
3. a kind of immersed tube tunnel final connector pushing tow girder sliding assembly tooling according to claim 1 or 2, its feature exist In:The top slip support abutment(2)Upper plane is provided with slide plate one(5), the slide plate one(5)For engineering plastic alloy MGA plates.
A kind of 4. immersed tube tunnel final connector pushing tow girder sliding assembly tooling according to claim 3, it is characterised in that: The slide plate one(5)With top slip support abutment(2)Upper interplanar is provided with slide plate bottom plate(6)With adjusting backing plate one(7).
A kind of 5. immersed tube tunnel final connector pushing tow girder sliding assembly tooling according to claim 4, it is characterised in that: The adjusting backing plate one(7)It is welded to connect in top slip support abutment(2)Upper plane, the slide plate bottom plate(6)It is welded to connect and is adjusting Save backing plate one(7)On, the slide plate one(5)With slide plate bottom plate(6)It is bolted.
6. a kind of immersed tube tunnel final connector pushing tow girder sliding assembly tooling according to claim 1 or 2, its feature exist In:The top slip support abutment(2)Quantity is 6.
A kind of 7. immersed tube tunnel final connector pushing tow girder sliding assembly tooling according to claim 1, it is characterised in that: The lower part slip support abutment(3)For rectangular box structure, the lower part slip support abutment(3)Quantity is 5.
8. a kind of immersed tube tunnel final connector pushing tow girder sliding assembly tooling according to claim 1 or 7, its feature exist In:The lower part slip support abutment(3)Slide plate two is provided between slideway(8), the slide plate two(8)For engineering plastic alloy MGA plates, the slide plate two(8)It is bolted in lower part slip support abutment(3)Bottom surface on.
A kind of 9. immersed tube tunnel final connector pushing tow girder sliding assembly tooling according to claim 1, it is characterised in that: The lower part slip support abutment(3)Upper plane, which is provided with, adjusts backing plate two(9), the adjusting backing plate two(9)With lower part slip support abutment (3)Upper plane-welding connection.
10. a kind of immersed tube tunnel final connector pushing tow girder sliding assembly tooling according to claim 1, its feature exist In:The girder fixing bracket(4)In 7 fonts, the girder fixing bracket(4)With lower part slip support abutment(3)Upper plane-welding Connection.
11. a kind of immersed tube tunnel final connector pushing tow girder sliding assembly tooling according to claim 1, its feature exist In:The slideway is by setting bearing beam on the ground(10)Be arranged on bearing beam(10)On slide(11)Form, the slide (11)With bearing beam(10)It is welded to connect.
12. a kind of immersed tube tunnel final connector pushing tow girder sliding assembly tooling according to claim 1, its feature exist In:The thrustor one includes being installed on top slip support abutment(2)On pushing tow bearing one(12)With with pushing tow bearing one (12)The jack one of connection(13).
13. a kind of immersed tube tunnel final connector pushing tow girder sliding assembly tooling according to claim 1, its feature exist In:The thrustor two includes the slide installed in slideway(11)On pushing tow bearing two(14)With with pushing tow bearing two(14) The jack two of connection(15).
14. a kind of immersed tube tunnel final connector pushing tow girder sliding assembly tooling according to claim 12 or 13, it is special Sign is:The pushing tow bearing one(12)With pushing tow bearing two(14)It is board plug type bearing.
CN201721110542.XU 2017-08-31 2017-08-31 Immersed tube tunnel final connector pushing tow girder slides assembly tooling Withdrawn - After Issue CN207362886U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721110542.XU CN207362886U (en) 2017-08-31 2017-08-31 Immersed tube tunnel final connector pushing tow girder slides assembly tooling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721110542.XU CN207362886U (en) 2017-08-31 2017-08-31 Immersed tube tunnel final connector pushing tow girder slides assembly tooling

Publications (1)

Publication Number Publication Date
CN207362886U true CN207362886U (en) 2018-05-15

Family

ID=62351807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721110542.XU Withdrawn - After Issue CN207362886U (en) 2017-08-31 2017-08-31 Immersed tube tunnel final connector pushing tow girder slides assembly tooling

Country Status (1)

Country Link
CN (1) CN207362886U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107687180A (en) * 2017-08-31 2018-02-13 上海振华重工(集团)股份有限公司 A kind of immersed tube tunnel final joint pushing tow girder sliding assembly tooling and pushing tow girder sliding assembly method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107687180A (en) * 2017-08-31 2018-02-13 上海振华重工(集团)股份有限公司 A kind of immersed tube tunnel final joint pushing tow girder sliding assembly tooling and pushing tow girder sliding assembly method
CN107687180B (en) * 2017-08-31 2023-05-26 上海振华重工(集团)股份有限公司 Sliding assembly tool and sliding assembly method for pushing trabecula of final joint of immersed tube tunnel

Similar Documents

Publication Publication Date Title
CN201173884Y (en) Large-sized laminar shearing mold case device for underground structure jigging platform test
CN103107219B (en) The method of photovoltaic board system, photovoltaic panel fixing device and installing photovoltaic board system
CN204847453U (en) Integral type height -adjustable prevents subsiding track fixing system
CN104061369B (en) The assembled movable cable support of medium and high voltage cable line arrangement in a kind of distance passage
CN207362886U (en) Immersed tube tunnel final connector pushing tow girder slides assembly tooling
CN204385569U (en) A kind of dock is floating ballast bed
CN205025029U (en) Clear water precast concrete exterior wall cladding connected node structure
CN109443933B (en) Test device for fixing abutment deflection and friction reduction and working method thereof
CN107687180A (en) A kind of immersed tube tunnel final joint pushing tow girder sliding assembly tooling and pushing tow girder sliding assembly method
CN202390827U (en) Hot rods for supporting and fixing pipeline under ground
CN202227479U (en) Sliding connection joint between steel structure component and concrete component
CN205894577U (en) Bulky heavy stone material flip -chip structure
CN209325175U (en) Adjustable support frame
CN203911856U (en) Quick mounting structure for photovoltaic assembly
CN203846494U (en) Breast beam soil anchor rod segmented connection structure
CN213636935U (en) Sliding support of outdoor cable bridge
CN207862963U (en) Assembled is adjustable basis
CN110080297A (en) Pipe gallery node location road subtracts sink device
CN206034461U (en) Subway foundation pit large -span support system
CN204677892U (en) A kind of pipeline is shelved in advance
CN210459692U (en) Novel connecting structure for cross beam and stand column of glass curtain wall
CN2415115Y (en) Shielding door system bottom bearing joint for underground railway platform
CN204057606U (en) The supporting construction of elevator landing sill
CN203907021U (en) Fabricated movable cable bracket for laying medium/high-voltage cable line in long distance channel
CN204919594U (en) Chassis is prevented sinking by bridge style transformer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20180515

Effective date of abandoning: 20230526

AV01 Patent right actively abandoned

Granted publication date: 20180515

Effective date of abandoning: 20230526

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned