CN207362859U - 圆形双排钢管桩围堰 - Google Patents

圆形双排钢管桩围堰 Download PDF

Info

Publication number
CN207362859U
CN207362859U CN201721299412.5U CN201721299412U CN207362859U CN 207362859 U CN207362859 U CN 207362859U CN 201721299412 U CN201721299412 U CN 201721299412U CN 207362859 U CN207362859 U CN 207362859U
Authority
CN
China
Prior art keywords
steel
pipe pile
cofferdam
rows
canvas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721299412.5U
Other languages
English (en)
Inventor
王静
裴伟民
韩冬
袁静
张颖
任磊
王荣幸
尹桂平
李昆明
周海霞
张全福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Duogu Engineering Design Co Ltd
Original Assignee
Suzhou Duogu Engineering Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Duogu Engineering Design Co Ltd filed Critical Suzhou Duogu Engineering Design Co Ltd
Priority to CN201721299412.5U priority Critical patent/CN207362859U/zh
Application granted granted Critical
Publication of CN207362859U publication Critical patent/CN207362859U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

本实用新型涉及水利工程施工围堰,特别涉及河道中或河岸边水工建筑物施工过程中的一种圆形双排钢管桩围堰,所述的围堰包括钢管桩和帆布,所述钢管桩为两排,且下端插入河底,且向外圆形分布,在两排圆形钢管桩的两侧分别设有横向连接的水平钢管,在两排圆形钢管桩的内侧分别设有帆布,在所述的帆布之间设有泥土形成围堰,可以满足各种工程施工需要。

Description

圆形双排钢管桩围堰
技术领域
本实用新型涉及水利工程施工围堰,特别涉及河道中或河岸边水工建筑物施工过程中的一种圆形双排钢管桩围堰。
背景技术
水利工程建筑物都离不开水,好多水工建筑物都建在水中或河岸边,为了创造干地施工的条件,就要筑好施工围堰,常规的施工围堰有:土石围堰,钢板桩围堰,钢管桩围堰等。但有些工程受场地、取土源、地质、土壤渗透系数、水位变化等的影响,以上的围堰不能满足特殊的施工要求,这就要把几种围堰进行综合应用,满足具体施工要求。
实用新型内容
为了解决上述问题,本实用新型提供一种圆形双排钢管桩围堰,本实用新型采用双排钢管桩间隔一定距离打入土中,水平布置成圆形,在两排钢管桩中间放入淤泥,为了防止淤泥流失,在淤泥和钢管桩之间放入不透水帆布;为了使双排钢管桩围堰稳定,在双排钢管桩顶部外侧加两根水平圆形钢管,用钢丝绳固定成一体,可以满足多种施工要求。
为实现上述目的,本实用新型提供如下技术方案:
一种圆形双排钢管桩围堰,包括钢管桩和帆布,所述钢管桩为两排,且下端插入河底,且向外圆形分布,在两排圆形钢管桩的两侧分别设有横向连接的水平钢管,在两排圆形钢管桩的内侧分别设有帆布,在所述的帆布之间设有泥土形成围堰,所述的围堰呈圆形包围湖中或河中的施工区。
进一步的,所述的水平钢管设在两排钢管桩的两侧,距离顶部20-50cm,水平且顺着钢管桩的弧形设置,水平钢管的直径为5-10cm。
进一步的,所述的帆布上边设置在水平钢管上,下边坠有砖块且置于河底泥中。
进一步的,所述的两排圆形钢管桩上端设有钢丝绳相互连接固定成一体。
如若在河中施工,则在施工区的上下游各设置所述的圆形钢管桩围堰,如果是在河边施工,可以沿施区处半包围设置弧形钢管桩围堰,如果是在湖中、河中施工,可以沿施工区域圆形包围设置圆形钢管桩围堰。
本实用新型的有益效果
1.钢管桩围堰可以节省场地,节约土方,双排钢管桩可以增加围堰自身的稳定性。
2.围堰的弧形设计增加了对水的抵抗力;
3.就地取材,就近取土,使用后恢复原状;
4.帆布减少了围堰的渗漏。
附图说明
图1是本申请的圆形双排钢管桩围堰主视结构示意图;
图2是本申请的圆形双排钢管桩围堰俯视结构示意图;
图3是图2A-A截面图;
图4是本申请的圆形双排钢管桩围堰设置在河边的俯视结构示意图,如若设置在湖中,则围堰俯视呈圆形结构。
图中序号:1-河岸,2-钢管桩,3-水平钢管,4-钢丝绳,5-帆布,6-泥土,7-施工区。
具体实施方式
为使本申请的目的和技术方案更加清楚,以下结合附图对本申请的技术方案进行清楚、完整地描述。所描述的实施例是本申请的一部分实施例,而不是全部的实施例,基于所描述的本申请的实施例,本领域普通技术人员在无需创造性劳动的前提下所获得的所有其他实施例,都属于本申请保护的范围。
实施例:参考附图,一种圆形双排钢管桩围堰,包括钢管桩2和帆布5,所述钢管桩2为两排,且下端插入河底一定深度,且向外圆形分布,在两排圆形钢管桩2的两侧分别设有横向连接水平钢管3,在两排圆形钢管桩2的内侧分别设有帆布5,在所述的帆布5之间设有泥土6形成围堰。
进一步的,所述的连接水平钢管3设在两排钢管桩2的两侧,距离顶部20-50cm,水平且顺着钢管桩2的圆弧形设置,连接水平钢管3的直径为5-10cm。
进一步的,所述的帆布5上边设置在连接水平钢管3上,下边坠有砖块且置于河底泥中。
进一步的,所述的两排圆形钢管桩2上端设有钢丝绳4相互连接固定成一体。
如若在河中施工,则在施工区7的上下游各设置所述的弧形钢管桩围堰,如果是在河边施工,可以沿施工区7处半包围设置圆弧形钢管桩围堰,如果是在湖中、河中施工,可以沿施工区域圆形包围设置圆形钢管桩围堰。本圆形双排钢管桩围堰可以满足各种工程施工需要。
施工后拆解钢丝绳,拔出钢管桩,淤泥会自动流平或捞出淤泥即可。

Claims (4)

1.一种圆形双排钢管桩围堰,包括钢管桩(2)和帆布(5),其特征在于,所述钢管桩(2)为两排,且下端插入河底,且向外圆形分布,在两排圆形钢管桩(2)的两侧分别设有横向连接水平钢管(3),在两排圆形钢管桩(2)的内侧分别设有帆布(5),在所述的帆布(5)之间设有泥土(6)形成围堰,所述的围堰呈圆形包围湖中或河中的施工区(7)。
2.根据权利要求1所述的圆形双排钢管桩围堰,其特征在于所述的水平钢管(3)设在两排钢管桩(2)的两侧,距离顶部20-50cm,水平且顺着钢管桩(2)的弧形设置,水平钢管(3)的直径为5-10cm。
3.根据权利要求1或2所述的圆形双排钢管桩围堰,其特征在于所述的帆布(5)上边设置在水平钢管(3)上,下边坠有砖块且置于河底泥中。
4.根据权利要求1或2所述的圆形双排钢管桩围堰,其特征在于所述的两排圆形钢管桩(2)上端设有钢丝绳(4)相互连接固定成一体。
CN201721299412.5U 2017-03-19 2017-03-19 圆形双排钢管桩围堰 Expired - Fee Related CN207362859U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721299412.5U CN207362859U (zh) 2017-03-19 2017-03-19 圆形双排钢管桩围堰

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201720265336.XU CN206956747U (zh) 2017-03-19 2017-03-19 弧形双排钢管桩围堰
CN201721299412.5U CN207362859U (zh) 2017-03-19 2017-03-19 圆形双排钢管桩围堰

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201720265336.XU Division CN206956747U (zh) 2017-03-19 2017-03-19 弧形双排钢管桩围堰

Publications (1)

Publication Number Publication Date
CN207362859U true CN207362859U (zh) 2018-05-15

Family

ID=61377360

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201721298781.2U Expired - Fee Related CN208009454U (zh) 2017-03-19 2017-03-19 一种弧形双排钢管桩围堰
CN201721299412.5U Expired - Fee Related CN207362859U (zh) 2017-03-19 2017-03-19 圆形双排钢管桩围堰
CN201720265336.XU Expired - Fee Related CN206956747U (zh) 2017-03-19 2017-03-19 弧形双排钢管桩围堰

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201721298781.2U Expired - Fee Related CN208009454U (zh) 2017-03-19 2017-03-19 一种弧形双排钢管桩围堰

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201720265336.XU Expired - Fee Related CN206956747U (zh) 2017-03-19 2017-03-19 弧形双排钢管桩围堰

Country Status (1)

Country Link
CN (3) CN208009454U (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024637B (zh) * 2018-07-21 2020-07-14 四川启创建设工程有限公司 一种组合围堰及其建造施工方法
CN111576458A (zh) * 2020-06-02 2020-08-25 浙江交工金筑交通建设有限公司 一种无内支撑钢管桩围堰结构及其施工方法

Also Published As

Publication number Publication date
CN206956747U (zh) 2018-02-02
CN208009454U (zh) 2018-10-26

Similar Documents

Publication Publication Date Title
CN109418184A (zh) 深远海养殖网箱
CN206815355U (zh) 一种河道桩基围堰
CN104389318B (zh) 用于海上风电的钢砼‑钢构混合重力式基础及其施工方法
CN211646450U (zh) 海上风电单桩-翼板-堆石体复合基础
CN207362859U (zh) 圆形双排钢管桩围堰
CN204676584U (zh) 一种高桩桁架式海上风机基础结构
CN110185059B (zh) 一种吸力筒导管架风机基础及其施工方法
CN205134343U (zh) 一种钢管桩围堰结构
CN106759081A (zh) 一种利用透空式堤坝辅助边坡排水的装置
CN108755720A (zh) 大型综合管廊下穿较窄过水河道的河水导流方法
CN112854260A (zh) 一种生态混凝土岩土护坡结构及施工方法
CN203977417U (zh) 一种深水桩基础用加强肋嵌入式钢护筒
CN108252298B (zh) 一种二次膨胀桩及其施工方法
CN106320360A (zh) 海上岩石地基条件下预应力自锁锚杆加强变径单桩风机基础及其施工方法
CN206015511U (zh) 一种植桩钢管柱
CN208415222U (zh) 一种四桩腿海上风电导管架
CN108547277A (zh) 一种四桩腿海上风电导管架
CN211571752U (zh) 一种风景园林设计生态护坡
CN204875811U (zh) 一种复合式多排桩基坑支护结构
CN207498974U (zh) 重力式高压射水冲击装置
CN206722402U (zh) 地下室防水施工用造型墙支模结构
CN206545206U (zh) 一种土木工程组合桩
CN202298627U (zh) 一种基坑支护结构
CN205990619U (zh) 一种地下水丰富且地质不良深基坑开挖支护结构
CN205444219U (zh) 基坑疏干兼减压的降水管井

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180515

Termination date: 20190319