CN207361448U - It is a kind of coloured silk steel coil put during hold-down mechanism - Google Patents

It is a kind of coloured silk steel coil put during hold-down mechanism Download PDF

Info

Publication number
CN207361448U
CN207361448U CN201721228256.3U CN201721228256U CN207361448U CN 207361448 U CN207361448 U CN 207361448U CN 201721228256 U CN201721228256 U CN 201721228256U CN 207361448 U CN207361448 U CN 207361448U
Authority
CN
China
Prior art keywords
mounting post
swing rod
spring
strip
contacted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721228256.3U
Other languages
Chinese (zh)
Inventor
赵军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Tuition Metal Material Co Ltd
Original Assignee
Jiangsu Tuition Metal Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Tuition Metal Material Co Ltd filed Critical Jiangsu Tuition Metal Material Co Ltd
Priority to CN201721228256.3U priority Critical patent/CN207361448U/en
Application granted granted Critical
Publication of CN207361448U publication Critical patent/CN207361448U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Basic Packing Technique (AREA)

Abstract

A kind of hold-down mechanism during being put the utility model discloses color steel coil, first mounting post and the equal vertical welding of the second mounting post are on bottom plate, first swing rod is by bolted splice in the top of the first mounting post, second swing rod is actively plugged in the first mounting post and the second mounting post, first swing rod is located at the upper end of the second swing rod, one end of first spring is contacted on the first swing rod, the other end is contacted in the first mounting post, second spring is sheathed on the second swing rod, and one end of second spring is contacted on the second swing rod, the other end is contacted in the second mounting post, two pinch rollers are rotatably connected in the first mounting post and the second mounting post respectively.Two pinch rollers in the utility model are tightly connected on color coil of strip all the time under the action of the first spring and second spring, journey is let off in the volume of color coil of strip, it can effectively prevent that there is a phenomenon where roll up bullet for color coil of strip, when color coil of strip has been not used and has needed to repack color coil of strip, tightening operation need not be carried out to color coil of strip, it is easy to use.

Description

It is a kind of coloured silk steel coil put during hold-down mechanism
Technical field:
It the utility model is related to the hold-down mechanism during a kind of color steel coil is put.
Background technology:
For existing coloured silk coil of strip during being put using shaft volume, color coil of strip can have the phenomenon of volume bullet, not complete in color coil of strip When having used entirely and having needed to repack color coil of strip, due to the volume bullet of color coil of strip, in the color coil of strip of packaging, it is necessary to first to coloured silk Coil of strip is tightened, its tightening process is very cumbersome, to use increase trouble.
Utility model content:
The utility model is to be provided to solve the above-mentioned problems of the prior art during a kind of color steel coil puts Hold-down mechanism.
There is technical solution used by the utility model:A kind of coloured silk steel coil put during hold-down mechanism, including bottom plate First mounting post, the second mounting post, the first swing rod, the second swing rod, the first spring, second spring and pinch roller, first installation Column and the equal vertical welding of the second mounting post on bottom plate, the first swing rod by bolted splice in the top of the first mounting post, second Swing rod is actively plugged in the first mounting post and the second mounting post, and the first swing rod is located at the upper end of the second swing rod, the first spring One end is contacted on the first swing rod, and the other end is contacted in the first mounting post, and second spring is sheathed on the second swing rod, and second One end of spring is contacted on the second swing rod, and the other end is contacted in the second mounting post, and two pinch rollers are rotatably connected on first respectively In mounting post and the second mounting post.
Further, first mounting post is equipped with erecting bed, and guide rod, the first spring are vertically connected with erecting bed It is sheathed on guide rod, and the bottom of the first spring is connected on erecting bed, top is connected on the first swing rod.
Further, second swing rod is equipped with boss portion, and one end of second spring is connected in boss portion.
The utility model has the advantages that:Two pinch rollers in the utility model are in the first spring and second spring Under the action of be tightly connected on color coil of strip all the time, let off journey in the volume of color coil of strip, can effectively prevent color coil of strip from rolling up The phenomenon of bullet, when color coil of strip has been not used and has needed to repack color coil of strip, it is not necessary to tightening operation is carried out to color coil of strip, is used It is convenient.
Brief description of the drawings:
Fig. 1 is the utility model structure chart.
Embodiment:
The utility model will be further described below with reference to the accompanying drawings.
As shown in Figure 1, the utility model discloses the hold-down mechanism during a kind of color steel coil is put, including bottom plate 11, the One mounting post 31, the second mounting post 32, the first swing rod 33, the second swing rod 34, the first spring 35, second spring 36 and pinch roller 37, First mounting post 31 and 32 equal vertical welding of the second mounting post are on bottom plate 11, and the first swing rod 33 is by bolted splice in the first peace The top of column 31 is filled, the second swing rod 34 is actively plugged in the first mounting post 31 and the second mounting post 32, and the first swing rod 33 is located at The upper end of second swing rod 34.One end of first spring 35 is contacted on the first swing rod 33, and the other end contacts at the first mounting post 31 On, second spring 36 is sheathed on the second swing rod 34, and one end of second spring 36 is contacted on the second swing rod 34, and the other end supports Touch in the second mounting post 32, two pinch rollers 37 are rotatably connected in the first mounting post 31 and the second mounting post 32 respectively.
Erecting bed 311 is equipped with the first mounting post 31, erecting bed 311 is perpendicular to the first mounting post 31, in erecting bed 311 On be vertically connected with guide rod 312, the first spring 35 is sheathed on guide rod 312, and the bottom of the first spring 35 is connected to erecting bed On 311, top is connected on the first swing rod 33.
Boss portion 341 is equipped with the second swing rod 34, one end of second spring 36 is connected in boss portion 341.
Let off journey in the volume of color coil of strip, two pinch rollers 37 under the action of the first spring 35 and second spring 36 all the time tightly It is connected on color coil of strip, prevents color coil of strip there is a phenomenon where rolling up bullet, when color coil of strip has been not used and has needed to repack color coil of strip, Tightening operation need not be carried out to color coil of strip, it is easy to use.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, some improvement can also be made on the premise of the utility model principle is not departed from, these improvement also should be regarded as The scope of protection of the utility model.

Claims (3)

1. it is a kind of coloured silk steel coil put during hold-down mechanism, it is characterised in that:Including bottom plate (11), the first mounting post (31), Second mounting post (32), the first swing rod (33), the second swing rod (34), the first spring (35), second spring (36) and pinch roller (37), In on bottom plate (11), the first swing rod (33) passes through bolt for first mounting post (31) and the second mounting post (32) vertical welding The top of the first mounting post (31) is articulated with, the second swing rod (34) is actively plugged in the first mounting post (31) and the second mounting post (32) on, the first swing rod (33) is located at the upper end of the second swing rod (34), and one end of the first spring (35) contacts at the first swing rod (33) on, the other end is contacted in the first mounting post (31), and second spring (36) is sheathed on the second swing rod (34), and the second bullet One end of spring (36) is contacted on the second swing rod (34), and the other end is contacted in the second mounting post (32), and two pinch rollers (37) are respectively It is rotatably connected in the first mounting post (31) and the second mounting post (32).
The hold-down mechanism during 2. coloured silk steel coil is put as claimed in claim 1, it is characterised in that:First mounting post (31) erecting bed (311) is equipped with, guide rod (312) is vertically connected with erecting bed (311), the first spring (35), which is sheathed on, leads On bar (312), and the bottom of the first spring (35) is connected on erecting bed (311), and top is connected on the first swing rod (33).
The hold-down mechanism during 3. coloured silk steel coil is put as claimed in claim 1, it is characterised in that:Second swing rod (34) Boss portion (341) is equipped with, one end of second spring (36) is connected in boss portion (341).
CN201721228256.3U 2017-09-23 2017-09-23 It is a kind of coloured silk steel coil put during hold-down mechanism Expired - Fee Related CN207361448U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721228256.3U CN207361448U (en) 2017-09-23 2017-09-23 It is a kind of coloured silk steel coil put during hold-down mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721228256.3U CN207361448U (en) 2017-09-23 2017-09-23 It is a kind of coloured silk steel coil put during hold-down mechanism

Publications (1)

Publication Number Publication Date
CN207361448U true CN207361448U (en) 2018-05-15

Family

ID=62349256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721228256.3U Expired - Fee Related CN207361448U (en) 2017-09-23 2017-09-23 It is a kind of coloured silk steel coil put during hold-down mechanism

Country Status (1)

Country Link
CN (1) CN207361448U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532038A (en) * 2018-06-01 2018-09-14 嘉兴市华益股份有限公司 One grows flax material transfer reel releasing mechanism
CN109534040A (en) * 2018-11-09 2019-03-29 邱国盛 A kind of tarred canvas curling is mechanical
CN112707217A (en) * 2020-11-27 2021-04-27 南京肯特复合材料股份有限公司 Polytetrafluoroethylene film pulls coiling apparatus
CN115071901A (en) * 2022-06-17 2022-09-20 日照检验认证有限公司 Ship draft reading device convenient to read

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532038A (en) * 2018-06-01 2018-09-14 嘉兴市华益股份有限公司 One grows flax material transfer reel releasing mechanism
CN108532038B (en) * 2018-06-01 2023-05-12 嘉兴市华益股份有限公司 Flax passes material and rolls up mechanism of unreeling
CN109534040A (en) * 2018-11-09 2019-03-29 邱国盛 A kind of tarred canvas curling is mechanical
CN112707217A (en) * 2020-11-27 2021-04-27 南京肯特复合材料股份有限公司 Polytetrafluoroethylene film pulls coiling apparatus
CN115071901A (en) * 2022-06-17 2022-09-20 日照检验认证有限公司 Ship draft reading device convenient to read

Similar Documents

Publication Publication Date Title
CN207361448U (en) It is a kind of coloured silk steel coil put during hold-down mechanism
CN205829036U (en) A kind of communication cable sets up uses fixed clamp device
CN203877423U (en) Conveying device of packaging machine
CN103449224A (en) Material rolling mechanism for packing bag
CN204416749U (en) A kind of detent mechanism of flux-cored wire
CN203045267U (en) Device for on-line installation of paper sleeve
CN206663409U (en) A kind of printed matter circle of contact angle apparatus
CN206537929U (en) A kind of notebook backboard feeding device
CN206550153U (en) winder
CN202912569U (en) Front idler hanger
CN207357807U (en) It is a kind of coloured silk steel coil put during compression support device
CN203209667U (en) Synchronous lifting mechanism of lower die support
CN202594077U (en) Adhesive tape roll placing rack
CN207072777U (en) A kind of jacking apparatus with auto-lock function
CN206992255U (en) A kind of pole piece cache mechanism for cylindrical lithium battery film-making winding integrated machine
CN203157312U (en) Print roller bracket for color printing equipment
CN207293707U (en) It is built-in to there is axis to turn round discharging device
CN208856609U (en) A kind of cutting device for shutting down homeostasis tension
CN203945784U (en) Rolling-up mechanism for gravure printing machine
CN205204099U (en) Belt feeder aligning device
CN207158716U (en) A kind of piler speed-limiting device
CN202752506U (en) Drive handle of steel wire winding device
CN206747383U (en) A kind of handware punching press drift erecting device
CN204435438U (en) The steel jacket box of secondary load in the vertical accumulated loading test in cushion cap top
CN207401925U (en) A kind of decoiling equipment for finishing equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180515