CN207360653U - A kind of Steel tube packaging mechanism - Google Patents

A kind of Steel tube packaging mechanism Download PDF

Info

Publication number
CN207360653U
CN207360653U CN201721318007.3U CN201721318007U CN207360653U CN 207360653 U CN207360653 U CN 207360653U CN 201721318007 U CN201721318007 U CN 201721318007U CN 207360653 U CN207360653 U CN 207360653U
Authority
CN
China
Prior art keywords
bar
locating rod
steel tube
base crossbeam
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721318007.3U
Other languages
Chinese (zh)
Inventor
刘文敏
张�浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Hengji Steel Co Ltd
Original Assignee
Tianjin Hengji Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Hengji Steel Co Ltd filed Critical Tianjin Hengji Steel Co Ltd
Priority to CN201721318007.3U priority Critical patent/CN207360653U/en
Application granted granted Critical
Publication of CN207360653U publication Critical patent/CN207360653U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Package Frames And Binding Bands (AREA)

Abstract

The utility model discloses a kind of Steel tube packaging mechanism,Its key points of the technical solution are that the feeding platform being connected including base crossbeam and with base crossbeam,Base crossbeam is equipped with the first locating rod and the second locating rod,First locating rod is opposite with the second locating rod to be obliquely installed,The first bar and the second bar are provided with the base crossbeam,The first connecting element is provided between first bar and base crossbeam,First connecting element tilts to parallel with the second locating rod for the first bar to the second locating rod,The second connecting element is provided between second bar and the second locating rod,Second connecting element tilts to parallel with the first locating rod for the second bar to the first locating rod,First locating rod offers the first temporary hole away from ground one end,Second locating rod offers the second temporary hole away from ground one end,Reach the effect for quickly taking out the steel pipe for completing packing.

Description

A kind of Steel tube packaging mechanism
Technical field
A kind of steel pipe's production processing technique field is the utility model is related to, more particularly to a kind of Steel tube packaging mechanism.
Background technology
At present, the packing manner of precision tube uses loading end to pack for hexagonal packing mechanism mostly, packing Good accurate steel can form hex shape, not only conveniently check number but also more consolidated in transport.
Existing to refer to the Chinese patent that notification number is CN205256977U, it discloses a kind of packing of steel tube hexagon Frame, including fixed cross beam, fix baffle and the right fixed baffle that are fixed on crossbeam, the left activity that is connected with left fixed baffle Baffle, the right sideboard being connected with right fixed baffle.Locking device and shaft are equipped between fixed baffle and sideboard.
In use, firstly the need of sideboard is turned to need position after lock, then carry out packing process, finally, Need to unlock and then sideboard is turned to and can take out steel pipe and complete process the position of packed steel pipe taking-up.Take It is cumbersome, complicated to go out the process for the steel pipe packed, seriously affects work efficiency.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of Steel tube packaging mechanism, reach fast The effect that speed takes out the steel pipe for completing packing.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of Steel tube packaging mechanism, including base crossbeam and the feeding platform that is connected with base crossbeam, set on base crossbeam There are the first locating rod and the second locating rod, the first locating rod is opposite with the second locating rod to be obliquely installed, on the base crossbeam The first bar and the second bar are provided with, the first connecting element, the first grafting group are provided between the first bar and base crossbeam Part tilts to parallel with the second locating rod for the first bar to the second locating rod, is provided between the second bar and the second locating rod Second connecting element, the second connecting element tilted to for the second bar to the first locating rod it is parallel with the first locating rod, described A positioning rod offers the first temporary hole away from ground one end, and second locating rod offers second away from ground one end and keeps in Hole.
Through the above technical solutions, base crossbeam, the first locating rod, the second locating rod, the first bar and the second bar are total to With hexagonal basic configuration is surrounded, the steel pipe being placed on feeding platform is placed into the region surrounded, that is, is completed for steel pipe The sizing of heap hexangle type, after packed steel pipe heap, due to the first bar and the second bar, by connecting element to be plugged in first fixed On position bar and the second locating rod, so, the first bar and the second bar are pulled up when transporting packed steel pipe, by the first bar The temporary hole of insertion first is temporarily stored after extraction, devises the deposit position of the first bar, is reduced after the first bar is extracted and is lost The situation of mistake, adds the practicality of steel tube hexagon baling equipment.The temporary hole of insertion second is temporarily deposited after second bar is extracted Put, devise the deposit position of the second bar, reduce situation about losing after second gear pipe is extracted, add steel tube hexagon packing The practicality of equipment.Originally the hexagonal region surrounded is become to the trapezoid area of top opening, it is empty to have expanded the transport of steel pipe heap Between, and the easy way that the mode for creating open end is pulled up using the first bar and the second bar then reduces creation open end and needs The time wanted, enable that packed steel pipe heap is quick, is easily taken out from base crossbeam.
Preferably, the base crossbeam is provided at both ends with and is bulldozed mechanism.
Manually it is bulldozed through the above technical solutions, instead of with the working forms that steel tube hexagon heap end face is bulldozed using push plate The working forms of steel tube hexagon heap end face, reduce that the work of worker is slight, add the convenience of steel tube hexagon baling equipment.
Preferably, the mechanism that is bulldozed includes push plate, drive component and accessory part, push plate is arranged on base crossbeam two End, push plate are connected away from base crossbeam side with drive component, and drive component provides power for push plate, and accessory part is push plate Stretch out or retract and running orbit is provided.
Through the above technical solutions, using drive component to provide power for the stretching of push plate or retraction, accessory part passes through There is provided Route guiding push plate to stretch out or retract, reduce the consumption of manpower, add the work efficiency of push plate, improving push plate makes The property used.
Preferably, the accessory part includes affixed support plate on the ground, the connection of perforation is offered in support plate Hole and bullport, connecting hole connection drive component, bullport are connected with guiding bar, and guiding bar one end is fixed in push plate.
Through the above technical solutions, cylinder is to the adaptable of environment, and it is easy to operate, facilitate worker to use, improve steel The reliability of pipe hexagonal baling equipment.
Preferably, the guiding bar offers four groups with bullport.
Through the above technical solutions, four groups relatively stable, the guiding function of guiding bar is strengthened, improves push plate work Reliability.
Preferably, the feeding platform includes two parallel cylinders, cylinder is connected with support column, and cylinder is connected to first gear Bar.
Through the above technical solutions, feeding platform, which is designed to that two cylinder compositions can be greatly reduced, builds feeding platform Cost, while during feeding platform transport steel pipe, steel pipe and feeding platform are line contact form, reduce frictional force, improve Transportation Efficiency Rate.
Preferably, the feeding platform is equipped with supporting rack, supporting rack is among two cylinders.
Through the above technical solutions, supporting rack adds bearing capacity when carrying steel pipe, the transport of steel pipe is set more to stablize.
Preferably, the cylinder is tilted to base crossbeam direction.
Through the above technical solutions, the steel pipe transported on feeding platform is rolled from the first locating rod of trend under gravity It is dynamic, Transportation Model is simplified, improves the convenience of feeding platform.
Preferably, the cylinder, which is equipped with, stops bar, stop and runner assembly is equipped between bar and cylinder, runner assembly is for stopping Bar is turned to above cylinder center's axis.
Through the above technical solutions, steel pipe can be stopped along the inclined direction roller of base crossbeam to base crossbeam Bar is when turning to above cylinder, and under gravity, stopping bar can ride on cylinder while be hindered under stopping to first The steel pipe that bar tumbles is blocked, achievees the purpose that steel pipe of packing in batches, controls and uses easy to worker.
Preferably, the reinforcing rib away from the second bar is equipped with the top of first bar.
Through the above technical solutions, reducing the probability being stuck in when steel pipe is fallen between the first bar and feeding platform, increase The practicality of steel tube hexagon packing equipment.
In conclusion the utility model has the advantages that:
1st, steel tube hexagon baling equipment quickly can transport packed steel pipe after steel pipe completes packing work, reduce The loss of part, improves work efficiency;
2nd, security and practicality are improved;
3rd, the convenience of Steel tube packaging is improved.
Brief description of the drawings
Fig. 1 is the structure diagram of steel tube hexagon baling equipment;
Fig. 2 is the enlarged drawing of part A in Fig. 1;
Fig. 3 is the side structure schematic diagram of steel tube hexagon baling equipment;
Fig. 4 is the structure diagram of the accessory part of steel tube hexagon baling equipment;
Fig. 5 is structure diagram of the support plate with base crossbeam part of steel tube hexagon baling equipment;
Structure diagram during Fig. 6 during steel tube hexagon baling equipment transport steel pipe.
In figure, 1, feeding platform;11st, cylinder;111st, extension;1121st, hole is translated;1122nd, bar is translated;113rd, operation console; 114th, water fender;12nd, support column;13rd, supporting rack;2nd, bar is stopped;21st, runner assembly;211st, rotary cylinder;212nd, rotation axis;3、 Base crossbeam;311st, push plate;3111st, connecting hole;312nd, cylinder;313rd, accessory part;3131st, support plate;3132nd, guiding bar; 3133rd, bullport;4th, the first locating rod;41st, the first temporary hole;5th, the second locating rod;51st, the second temporary hole;6th, the first bar; 62nd, reinforcing rib;621st, supporting rod;7th, the second bar;8th, the first connecting element;81st, the first grafting body;82nd, the first spliced eye; 9th, the second connecting element;91st, the second spliced eye.
Embodiment
The utility model is described in further detail below in conjunction with attached drawing.The identical attached drawing of wherein identical parts Mark represents.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down" refer to It is the direction in attached drawing, word " bottom surface " and " top surface ", " interior " and " outer " are referred respectively to towards or away from particular elements geometry The direction at center.
A kind of Steel tube packaging mechanism, as shown in Figure 1, including square base crossbeam 3 and the feeding being connected with base crossbeam 3 Platform 1.
As shown in figure 5, the first locating rod 4 and the second locating rod 5 of square-tube-shaped are provided with base crossbeam 3, the first positioning 4 and second locating rod 5 of bar is obliquely installed on 3 surface of base crossbeam, and the first locating rod 4 and base crossbeam 3 are in 120 degree of angles, and second Locating rod 5 and base crossbeam 3 are in 60 degree of angles, one end that the first locating rod 4 and the second locating rod 5 are in contact with base crossbeam 3 it Between distance be less than the distance between discontiguous one end;Wherein, as shown in figure 3, away from base crossbeam 3 one in the first locating rod 4 End top offers square first and keeps in hole 41;In second locating rod 5 the second temporary hole is offered away from 3 one end of base crossbeam 51;Base crossbeam 3 is equipped with the first connecting element 8, and the second locating rod 5 is equipped with the second connecting element 9, the first connecting element 8, as shown in Fig. 2, including the first square grafting body 81, away from being offered at the top of 3 one end of base crossbeam on the first grafting body 81 The first square spliced eye 82, the first connecting element 8 are inserted with the first bar 6, and the first bar 6 is rectangular tube, the first bar 6 Reinforcing rib 62 is equipped between 1 end of feeding platform, reinforcing rib 62 is located at the top of the first bar 6 and is directed away from the second bar 7 direction.Supporting rod 621 is installed between 62 and first bar 6 of reinforcing rib, the first bar 6 can the first spliced eye of grafting 82 It can be plugged on again in the first temporary hole 41, the first connecting element 8 tilts to and second for the first bar 6 to the second locating rod 5 Locating rod 5 is parallel;Second connecting element 9 is to be opened in circle second spliced eye of second locating rod 5 away from 3 one end of base crossbeam 91, the second spliced eye 91 is plugged with columned second bar 7, tilted to for the second bar 7 it is parallel with the first locating rod 4, Two bars, 7 overhead height is higher than 1 surface of feeding platform.
Base crossbeam 3, which is provided at both ends with, is bulldozed mechanism, and being bulldozed mechanism includes hexagonal push plate 311, drive component and auxiliary Component 313 is helped, push plate 311 is arranged on 3 both ends of base crossbeam, and push plate 311 is connected away from 3 side of base crossbeam with drive component, Drive component is cylinder 312, and 312 actuating section of cylinder is fixed on accessory part 313, and accessory part 313 is more than including area The quadrate support plate 3131 of push plate 311, support plate 3131 are penetrated through equipped with a circular connecting hole 3111 penetrated through and four Circular bullport 3133, it is in square matrix array that the diameter of bullport 3133, which is less than connecting hole 3111 and four bullports 3133, Circumferential in connecting hole 3111, connecting hole 3111 is connected with 312 executable portion of cylinder being fixed in push plate 311, bullport 3133 Columned guiding bar 3132 is connected with, 3132 one end of guiding bar is fixed in push plate 311, guides the action rail of push plate 311 Mark.
As shown in Figure 1, feeding platform 1 is arranged on 4 side of the first locating rod, feeding platform 1 includes two cylinders parallel to each other 11, cylinder 11 is connected to the support column 12 of cylinder, and support column 12 is affixed on the ground, and structure phase is provided between two cylinders 11 As supporting rack 13, cylinder 11 and supporting rack 13 are connected to the first bar 6 and are tilted to 3 direction of base crossbeam, such as Fig. 2 institutes Showing, side of the cylinder 11 away from supporting rack 13 is equipped with runner assembly 21, and runner assembly 21 is connected with columned obstruction bar 2, Runner assembly 21 is turned to above 11 central axis of cylinder for stopping bar 2, wherein, runner assembly 21 includes turning for 11 shape of cylinder Dynamic cylinder 211, rotary cylinder 211 are rotatably connected to columned rotation axis 212;Cylinder 11 is set in the end face of the first locating rod 4 There is translation component, translation component is connected with the extension 111 of 11 shape of cylinder, and translation component includes the circle for being opened in 11 end face of cylinder Shape translates hole 1121, translates and columned translation bar 1122, translation 1122 external part of bar and extension are slidably connected in hole 1121 Cylinder is affixed;With 2 side of bar is stopped equipped with the square operation console 113 being placed on the ground, 113 surface of operation console opens up feeding platform 1 There is the bakie for being connected to ground strip, operation console 113 is equipped with rectangular water fender 114, water blocking close to material loading platform side Partly it is connected on plate 114 on operation console 113 and earthward direction tilts, operation console 113 coordinates with water fender 114, reduces work The ponding of people working region, the shoes of worker soak degree.
Wherein, after steel pipe transports feeding platform 1 by last process, since feeding platform 1 favours base crossbeam 3, steel Pipe under the influence of gravity, rolls, when being rolled to 1 end of feeding platform, the larger steel pipe of inertia leaves feeding to 3 direction of base crossbeam Fall after the second bar 7 is touched after platform 1 on base crossbeam 3;When the less steel pipe of inertia is fallen, since steel pipe has kinetic energy, After the reinforcing rib 62 of the first bar 6 is touched, tumble to base crossbeam 3, when the steel pipe fallen on base crossbeam 3 is assembled Phenomenon and cause uniformly fall when on base crossbeam 3 from the steel pipe that feeding platform 1 is fallen, the extension of the end face of feeding platform 1 Pipe 111 stretches out, and lengthens the length of material loading platform, changes steel pipe drop point, when steel pipe is in 4 second locating rod 5 of the first locating rod, the Under the constraint of one bar 6 and the second bar 7 during the hexagon of formation rule, the obstruction bar 2 of feeding platform 1 is rotated into cylinder 11 Above mandrel line, stop steel pipe and continue to tumble, start cylinder 312, after cylinder 312 promotes push plate 311 to be bulldozed steel pipe end surface, Retract under the traction of cylinder 312 origin-location, then pack to falling the steel pipe on base crossbeam 3, after the completion of packing, Pull up the first bar 6 and the second bar 7 is inserted respectively into the first temporary hole 41 and second and keeps in hole 51, as shown in fig. 6, shape Into open opening, after packed steel pipe is transported by opening, the first bar 6 and the second bar 7 are pulled up, are inserted into To home position, bar 2 will be stopped and left above 11 central axis of cylinder, continue the packing of next group steel pipe.
This specific embodiment is only explanation to the utility model, it is not the limitation to the utility model, ability Field technique personnel as needed can make the present embodiment the modification of no creative contribution after this specification is read, but As long as all protected in the right of the utility model be subject to Patent Law.

Claims (10)

1. a kind of Steel tube packaging mechanism, including base crossbeam (3) and the feeding platform (1) that is connected with base crossbeam (3), base are horizontal Beam (3) is equipped with the first locating rod (4) and the second locating rod (5), the first locating rod (4) with the second locating rod (5) is opposite inclines Tiltedly set, it is characterised in that:The first bar (6) and the second bar (7), the first bar (6) are provided with the base crossbeam (3) The first connecting element (8) is provided between base crossbeam (3), the first connecting element (8) is positioned for the first bar (6) to second Bar (5) tilts to parallel with the second locating rod (5), and the second grafting group is provided between the second bar (7) and the second locating rod (5) Part (9), the second connecting element (9) tilt to, institute parallel with the first locating rod (4) to the first locating rod (4) for the second bar (7) State the first locating rod (4) and offer first temporary hole (41) away from ground one end, second locating rod (5) is away from ground one end Offer second temporary hole (51).
2. Steel tube packaging mechanism according to claim 1, it is characterised in that:The base crossbeam (3), which is provided at both ends with, to push away Flattening mechanism.
3. Steel tube packaging mechanism according to claim 2, it is characterised in that:The mechanism that is bulldozed includes push plate (311), drives Dynamic component and accessory part (313), push plate (311) are arranged on base crossbeam (3) both ends, and push plate (311) is away from base crossbeam (3) Side is connected with drive component, and drive component provides power for push plate (311), and accessory part (313) is the stretching of push plate (311) Or retract and running orbit is provided.
4. Steel tube packaging mechanism according to claim 3, it is characterised in that:The accessory part (313) includes being fixed in Support plate (3131) on ground, the connecting hole (3111) and bullport (3133) of perforation is offered in support plate (3131), even Hole (3111) connection drive component is connect, bullport (3133) is connected with guiding bar (3132), and guiding bar (3132) one end is fixed in In push plate (311).
5. Steel tube packaging mechanism according to claim 4, it is characterised in that:The guiding bar (3132) and bullport (3133) four groups are offered.
6. Steel tube packaging mechanism according to claim 1, it is characterised in that:The feeding platform (1) include two it is parallel Cylinder (11), cylinder (11) are connected with support column (12), and cylinder (11) is connected to the first bar (6).
7. Steel tube packaging mechanism according to claim 6, it is characterised in that:The feeding platform (1) is equipped with supporting rack (13), Supporting rack (13) is among two cylinders (11).
8. Steel tube packaging mechanism according to claim 7, it is characterised in that:The cylinder (11) is square to base crossbeam (3) To inclination.
9. Steel tube packaging mechanism according to claim 8, it is characterised in that:The cylinder (11), which is equipped with, stops bar (2), resistance Block and runner assembly (21) is equipped between bar (2) and cylinder (11), runner assembly (21) is turned in cylinder (11) for stopping bar (2) Above mandrel line.
10. Steel tube packaging mechanism according to claim 1, it is characterised in that:It is equipped with the top of first bar (6) remote The reinforcing rib (62) of second bar (7).
CN201721318007.3U 2017-10-13 2017-10-13 A kind of Steel tube packaging mechanism Expired - Fee Related CN207360653U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721318007.3U CN207360653U (en) 2017-10-13 2017-10-13 A kind of Steel tube packaging mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721318007.3U CN207360653U (en) 2017-10-13 2017-10-13 A kind of Steel tube packaging mechanism

Publications (1)

Publication Number Publication Date
CN207360653U true CN207360653U (en) 2018-05-15

Family

ID=62347500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721318007.3U Expired - Fee Related CN207360653U (en) 2017-10-13 2017-10-13 A kind of Steel tube packaging mechanism

Country Status (1)

Country Link
CN (1) CN207360653U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108820311A (en) * 2018-05-18 2018-11-16 石家庄钢铁有限责任公司 A kind of end part aligning device of bar or tubing
CN113320737A (en) * 2021-06-09 2021-08-31 克拉玛依市科能防腐技术有限责任公司 Finished oil pipe packing device and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108820311A (en) * 2018-05-18 2018-11-16 石家庄钢铁有限责任公司 A kind of end part aligning device of bar or tubing
CN113320737A (en) * 2021-06-09 2021-08-31 克拉玛依市科能防腐技术有限责任公司 Finished oil pipe packing device and method

Similar Documents

Publication Publication Date Title
CN207360653U (en) A kind of Steel tube packaging mechanism
CN101920737A (en) Vertical type bicycle parking device
CN207725854U (en) Hopper in a kind of workshop
CN206571219U (en) Cartridge-type prestores parking stall
CN202508540U (en) Telescopic shelf
CN201457529U (en) Vertical bicycle stopping device
CN209651302U (en) A kind of plastic pipe tilting trestle
CN206521979U (en) The rotary parking stall device that prestores
CN207360633U (en) Round steel hexagonal packing mechanism
CN106476668B (en) Vehicle-mounted automatic loading and unloading oil pipe device
CN213801248U (en) Asphalt storage jar that can overturn
CN107060429B (en) A kind of sky parking
CN206501127U (en) A kind of safe fetching device of mould
CN212197390U (en) Material strip turnover mechanism in bolt manufacturing process
CN205971416U (en) Plastic film of convenient production deposits small handcart
CN206735289U (en) A kind of safe tilting device
CN206393612U (en) Glove shelf
CN218375374U (en) Engineering construction auxiliary device
CN207194585U (en) A kind of vehicle locating device for cylindrical parking lot
CN208614750U (en) Apparatus for placing is used in natural gas line processing
CN207173640U (en) A kind of cloth transport vehicle
CN207360313U (en) A kind of mine car structure that can increase transportation volume temporarily
CN107440409B (en) It is a kind of can small range adjust the steel construction rack of every lamellar spacing
CN217020333U (en) Tiled reinforcing bar storage rack
CN207847203U (en) A kind of lifting mechanism of longitudinal direction carrier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180515

Termination date: 20211013