CN207352086U - A kind of electric performance testing device for wall-hung boiler assembly production chain - Google Patents

A kind of electric performance testing device for wall-hung boiler assembly production chain Download PDF

Info

Publication number
CN207352086U
CN207352086U CN201721180630.7U CN201721180630U CN207352086U CN 207352086 U CN207352086 U CN 207352086U CN 201721180630 U CN201721180630 U CN 201721180630U CN 207352086 U CN207352086 U CN 207352086U
Authority
CN
China
Prior art keywords
wall
hung boiler
probe
support plate
assembly production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721180630.7U
Other languages
Chinese (zh)
Inventor
樊煜
易淑云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiderri heating and cooling equipment Co., Ltd
Original Assignee
Xide Rui Heating Equipment (shanghai) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xide Rui Heating Equipment (shanghai) Co Ltd filed Critical Xide Rui Heating Equipment (shanghai) Co Ltd
Priority to CN201721180630.7U priority Critical patent/CN207352086U/en
Application granted granted Critical
Publication of CN207352086U publication Critical patent/CN207352086U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of electric performance testing device for wall-hung boiler assembly production chain, including the delivery track being connected with wall-hung boiler assembly production chain, support plate and probe are provided with the delivery track, socket and contact are fixed with the support plate, the delivery track is equipped with the mounting bracket for being used for fixing probe, push component is equipped with below the probe, the mounting bracket includes support arm and cross bar, the cross bar upper surface is fixedly installed locating piece, positioning bolt is threaded with the side wall of the locating piece, the push component includes push plate and lifting cylinder, the push plate is equipped with bar and locating wheel group away from support plate side, infrared inductor is fixedly installed below the push plate.The utility model provides working stability and a kind of high electric performance testing device for wall-hung boiler assembly production chain of the degree of automation.

Description

A kind of electric performance testing device for wall-hung boiler assembly production chain
Technical field
It the utility model is related to a kind of wall-hung boiler assembly production chain, more particularly to it is a kind of for wall-hung boiler assembly production chain Electric performance testing device.
Background technology
Wall-hung boiler is the abbreviation of burnt gas wall hanging furnace, and full name is " fuel wall hanging formula heating stove ", be one kind using natural gas as energy The water heater in source.As a kind of family expenses class fuel gas product, the security performance of wall-hung boiler requires very stringent, such as earth leakage protective, Excessive low water level protection, wind pressure protection, electronic ignition sensing, heating system anti-frost protection, the anti-clamping stagnation protection of water pump, water pump bypass protection, Water flow monitoring device, anti-dry and overtemperature prote, heating system overvoltage safety protection, blowout protection, cooling-water temperature sensor failure The safety protection functions such as protection are essential.
For ensure security, in wall-hung boiler actual production assembling process, producer all must complete assembling before half-and-half into Product wall-hung boiler carries out electric performance test, it is common practice to a station is added on wall-hung boiler assembly production chain, works as wall-hung boiler When being delivered to the station with delivery track, staff manually manually carries out electrical property detection by associated assay devices to it, Ensure that the electrical property for entering the semi-finished product wall-hung boiler of subsequent processing is qualified.The way substantially not enough automates, less efficient, It has impact on the packaging efficiency of wall-hung boiler to a certain extent.
Utility model content
The purpose of this utility model is to provide a kind of electric performance testing device for wall-hung boiler assembly production chain, utilizes load Plate coordinates delivery track and the probe being arranged on delivery track, and the packaging efficiency of wall-hung boiler is greatly improved.
The above-mentioned technical purpose of the utility model technical scheme is that:One kind is used for wall-hung boiler group Fill the electric performance testing device of assembly line, including the delivery track being connected with wall-hung boiler assembly production chain, on the delivery track The support plate for carrying semi-finished product wall-hung boiler is provided with, the probe for connecting test circuit is additionally provided with the delivery track, The delivery track conveys support plate to probe side;It is respectively fixed with the support plate for connecting semi-finished product wall-hung boiler The socket of internal circuit is electrically connected with the contact for connecting probe, the contact with socket.
By using above-mentioned technical proposal, during assembling operation, the installation of semi-finished product wall-hung boiler is initially mounted on support plate, And gradually moved under the action of delivery track to probe side;When the contact on support plate is to probe, support plate stops Only continue to convey, test circuit is connected with wall-hung boiler internal circuit, you can realize electric performance test, detect in semi-finished product wall-hung boiler The problems such as portion's circuit is with the presence or absence of electric leakage, short circuit or open circuit, whole electric performance test process is increasingly automated, improves semi-finished product Wall-hung boiler electric performance test efficiency, and then the packaging efficiency of wall-hung boiler is improved indirectly.
The utility model is further arranged to:The delivery track is equipped with the mounting bracket for being used for fixing probe, the spy Pin vertical stand is arranged on above delivery track, and the push component for being used for pushing support plate upwards is equipped with below the probe.
By using above-mentioned technical proposal, probe carriage is arranged on above delivery track by mounting bracket, is equipped with spy Push component below pin;When semi-finished product wall-hung boiler is moved to above push component with support plate, push component can push up Dynamic load plate so that support plate and delivery track depart from, and cause contact on the support plate lower end in contact with probe just, turn on automatically Test circuit and wall-hung boiler internal circuit, the degree of automation is higher, helps to improve the effect of semi-finished product wall-hung boiler electric performance test Rate.
The utility model is further arranged to:The mounting bracket includes support arm and cross bar, and the support arm is fixed vertically In on delivery track, the cross bar level is fixedly installed on the upper end of support arm, and the probe is fixedly installed on cross bar vertically.
By using above-mentioned technical proposal, cross bar is arranged on above delivery track by supporting arm frame, and is fixed by cross bar Probe, realizes the fixed installation of probe.
The utility model is further arranged to:The cross bar upper surface is fixedly installed locating piece, and the probe is worn vertically If jacking block and cross bar, the positioning bolt for being useful for locking probe is threadedly coupled on the side wall of the locating piece.
By using above-mentioned technical proposal, when positioning bolt is released, probe can be vertical in locating piece and cross bar Lifting, realizes the adjusting of probe height, can adjust pressure when probe is contacted with support plate upper contact, avoid tissue damage from touching Point;Meanwhile the also convenient test for adapting to different model wall-hung boiler of height for adjusting probe.
The utility model is further arranged to:The push component includes push plate and lifting cylinder, and the push plate is in level Set, the lifting cylinder is fixedly installed on below push plate, the piston rod of the lifting cylinder straight up, and its piston rod Upper end is with the push plate in fixed setting.
By using above-mentioned technical proposal, when support plate is moved to above push plate, lifting cylinder piston rod, which pushes up, to be pushed away Plate so that end in contact under the contact and probe on support plate, realizes semi-finished product wall-hung boiler automation electric performance test.
The utility model is further arranged to:The push plate is equipped with the bar for being used for stopping support plate, institute away from support plate side Bar is stated with delivery track in fixed setting.
By using above-mentioned technical proposal, on delivery track in course of conveying, work as load with support plate in semi-finished product wall-hung boiler When plate touches bar, bar can effectively avoid support plate from moving forward and exceed push plate, so that it is guaranteed that the lower end of probe Contact on lucky face support plate, ensures that probe can be docked correctly with contact.
The utility model is further arranged to:The upper end of the bar rotates the locating wheel being provided with for abutting support plate Group.
By using above-mentioned technical proposal, by setting locating wheel group on bar, avoid occurring between bar and support plate Sharp impacts, while facilitate support plate to cross bar and continue to feed forward.
The utility model is further arranged to:Infrared inductor, the infrared sense are fixedly installed below the push plate Device is answered electrically to be connected with lifting cylinder.
By using above-mentioned technical proposal, when semi-finished product wall-hung boiler is moved to above push plate with support plate and enters infrared induction During the induction range of device, infrared inductor can send electric signal to supporting controller, and controller sends electric signal and controls liter Sending down abnormally ascending cylinder starts, and the piston rod of lifting cylinder extends and pushes up push plate so that support plate upper contact and end in contact under probe, and Test circuit is connected, further improves the degree of automation of electric performance test.
In conclusion the utility model has the advantages that:Using delivery track by be fixed on support plate half into Product wall-hung boiler is delivered to above push plate, and by infrared inductor and supporting controller control lifting cylinder automatic start and upward Support plate is promoted, so that end in contact, turn on automatically wall-hung boiler internal circuit and test circuit under the contact and probe on support plate, Fully automatic electric performance test is realized to semi-finished product wall-hung boiler, electric performance test efficiency is greatly improved, helps to improve wall-hung boiler Packaging efficiency.
Brief description of the drawings
Fig. 1 is primarily used for embodying the integrally-built axonometric schematic diagram of the present embodiment;
Fig. 2 is the structure diagram that the present embodiment is mainly used for embodying support plate;
Fig. 3 is the partial enlarged view of part A in Fig. 1, is mainly used for embodying test suite;
Fig. 4 is the structure diagram that the present embodiment is mainly used for embodying push component.
Reference numeral:1st, delivery track;2nd, support plate;21st, socket;22nd, contact;3rd, test suite;31st, probe;32nd, install Frame;321st, support arm;322nd, cross bar;4th, locating piece;5th, positioning bolt;6th, component is pushed;61st, push plate;62nd, lifting cylinder;7、 Cradling piece;8th, bar;9th, locating wheel group;10th, infrared inductor.
Embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Referring to attached drawing 1, a kind of electric performance testing device for wall-hung boiler assembly production chain, is mainly used for semi-finished product wall Hang stove and carry out electric performance test, it includes delivery track 1, the support plate 2 being arranged on delivery track 1 and for testing semi-finished product The test suite 3 of wall-hung boiler.In wall-hung boiler assembling process, semi-finished product wall-hung boiler is fixed on support plate 2, and with support plate 2 defeated Send and conveyed on track 1 to 3 side of test suite, electric performance test is finally completed at test suite 3.
With reference to attached drawing 2, socket 21 and contact 22 are respectively fixed with support plate 2, wherein socket 21 is mainly used for connecting wall hanging Furnace interior circuit, and contact 22 is mainly used for connecting test circuit.
Referring to attached drawing 1 and attached drawing 3, above-mentioned test suite 3 includes probe 31 and the mounting bracket 32 for installing probe 31;Its Middle mounting bracket 32 includes support arm 321 and cross bar 322, and support arm 321 is equipped with two groups, and two support arms 321 are erected by bolt respectively The straight both sides for being fixed on 1 width of delivery track;322 level frame of cross bar is arranged on the upper end of two support arms 321, and cross bar 322 Both ends be fixedly connected respectively by bolt with the upper end of two support arms 321.
To install above-mentioned probe 31, the upper surface of above-mentioned 322 one end of cross bar has been bolted locating piece 4, probe 31 Locating piece 4 and cross bar 322 are worn vertically, and positioning bolt 5 is threaded with the side wall of locating piece 4.When positioning bolt 5 is screwed When tight, the end of positioning bolt 5 pushes against the side wall of probe 31, is fixed so as to be realized to probe 31;And it is released in positioning bolt 5 Afterwards, the height of probe 31 is freely adjustable.
Referring to attached drawing 1 and attached drawing 4, the lower section of above-mentioned mounting bracket 32 is equipped with push component 6, and push component 6 includes push plate 61 And for promoting the lifting cylinder 62 of push plate 61.
Push plate 61 is horizontally placed on the underface of probe 31, and its upper surface is less than the lower surface of above-mentioned support plate 2;Lifting air Cylinder 62 is fixedly installed on the lower section of push plate 61, the piston rod of lifting cylinder 62 straight up, and the upper end of its piston rod and push plate 61 are fixedly connected, so that lifting cylinder 62 can promote push plate 61 up and down.
Push plate 61 is equipped with cradling piece 7 away from the side of support plate 2, and cradling piece 7 is equipped with the bar 8 for being used for stopping support plate 2;Gear The lower end of bar 8 is fixedly connected by bolt with cradling piece 7, and the upper end of bar 8 is rotatably connected to locating wheel group 9 by shaft.
When semi-finished product wall-hung boiler moves to the top of push plate 61 with support plate 2, and the edge of support plate 2 is abutted with locating wheel group 9 When, the contact 22 on the lucky face support plate 2 of probe 31.
Referring to attached drawing 4, to further improve the degree of automation of test jobs, the lower section of above-mentioned push plate 61 is equipped with infrared sense Device 10 is answered, infrared inductor 10 is fixed on above-mentioned cradling piece 7, and is electrically connected with above-mentioned lifting cylinder 62.
When semi-finished product wall-hung boiler moves to the top of push plate 61 with support plate 2 and enters the induction region of infrared inductor 10, Infrared inductor 10 can send electric signal to supporting controller, and start by controller control lifting cylinder 62;Lifting air The piston rod of cylinder 62 extends and pushes up push plate 61 so that contact 22 and 31 times end in contact of probe on support plate 2, turn on automatically Test circuit and wall-hung boiler internal circuit.
The operation principle of the present embodiment is:In assembling process, semi-finished product wall-hung boiler is fixed on support plate 2, and in conveyor track Moved on road 1 with support plate 2 to 31 side of probe;When support plate 2 moves to 61 top of push plate, the side of support plate 2 and positioning Wheel group 9 abuts, so that the lucky face probe 31 in the contact 22 on support plate 2;At this time, infrared inductor 10 senses support plate 2, By supporting controller lifting cylinder 62 can be controlled to start, the piston rod of lifting cylinder 62 extends and pushes up push plate 61, So that contact 22 and 31 times end in contact of probe on support plate 2, so that turn on automatically wall-hung boiler internal circuit and test circuit, half-and-half Finished product wall-hung boiler realizes automation electric performance test.
After completing test, the piston rod of lifting cylinder 62 is shunk, and semi-finished product wall-hung boiler and support plate 2 decline with push plate 61, weight Newly fall to cross locating wheel group 9 on delivery track 1, and with delivery track 1, continue to feed to subsequent processing.
This specific embodiment is only explanation to the utility model, it is not the limitation to the utility model, ability Field technique personnel as needed can make the present embodiment the modification of no creative contribution after this specification is read, but As long as all protected in the right of the utility model be subject to Patent Law.

Claims (8)

1. a kind of electric performance testing device for wall-hung boiler assembly production chain, including it is connected with wall-hung boiler assembly production chain defeated Send track(1), it is characterized in that:The delivery track(1)On be provided with support plate for carrying semi-finished product wall-hung boiler(2), it is described Delivery track(1)On be additionally provided with probe for connecting test circuit(31), the delivery track(1)By support plate(2)To probe (31)Side conveys;The support plate(2)On be respectively fixed with socket for connecting semi-finished product wall-hung boiler internal circuit (21)With for connecting probe(31)Contact(22), the contact(22)With socket(21)Electrically connect.
2. a kind of electric performance testing device for wall-hung boiler assembly production chain according to claim 1, it is characterized in that:Institute State delivery track(1)It is equipped with and is used to fix probe(31)Mounting bracket(32), the probe(31)Vertical stand is arranged on conveyor track Road(1)Top, and the probe(31)Lower section, which is equipped with, to be used to push support plate upwards(2)Push component(6).
3. a kind of electric performance testing device for wall-hung boiler assembly production chain according to claim 2, it is characterized in that:Institute State mounting bracket(32)Including support arm(321)And cross bar(322), the support arm(321)It is fixed on delivery track vertically(1) On, the cross bar(322)Level is fixedly installed on support arm(321)Upper end, the probe(31)It is fixedly installed on horizontal stroke vertically Bar(322)On.
4. a kind of electric performance testing device for wall-hung boiler assembly production chain according to claim 3, it is characterized in that:Institute State cross bar(322)Upper surface is fixedly installed locating piece(4), the probe(31)Wear locating piece vertically(4)And cross bar (322), the locating piece(4)Side wall on be threadedly coupled be useful for locking probe(31)Positioning bolt(5).
5. a kind of electric performance testing device for wall-hung boiler assembly production chain according to claim 2, it is characterized in that:Institute State push component(6)Including push plate(61)And lifting cylinder(62), the push plate(61)In horizontally disposed, the lifting cylinder (62)It is fixedly installed on push plate(61)Lower section, the lifting cylinder(62)Piston rod straight up, and the upper end of its piston rod With the push plate(61)In fixed setting.
6. a kind of electric performance testing device for wall-hung boiler assembly production chain according to claim 5, it is characterized in that:Institute State push plate(61)Away from support plate(2)Side, which is equipped with, to be used to stop support plate(2)Bar(8), the bar(8)With delivery track (1)In fixed setting.
7. a kind of electric performance testing device for wall-hung boiler assembly production chain according to claim 6, it is characterized in that:Institute State bar(8)Upper end rotate and be provided with for abutting support plate(2)Locating wheel group(9).
8. a kind of electric performance testing device for wall-hung boiler assembly production chain according to claim 5 or 7, its feature It is:The push plate(61)Lower section be fixedly installed infrared inductor(10), the infrared inductor(10)With lifting cylinder (62)Electrically connect.
CN201721180630.7U 2017-09-15 2017-09-15 A kind of electric performance testing device for wall-hung boiler assembly production chain Active CN207352086U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721180630.7U CN207352086U (en) 2017-09-15 2017-09-15 A kind of electric performance testing device for wall-hung boiler assembly production chain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721180630.7U CN207352086U (en) 2017-09-15 2017-09-15 A kind of electric performance testing device for wall-hung boiler assembly production chain

Publications (1)

Publication Number Publication Date
CN207352086U true CN207352086U (en) 2018-05-11

Family

ID=62410048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721180630.7U Active CN207352086U (en) 2017-09-15 2017-09-15 A kind of electric performance testing device for wall-hung boiler assembly production chain

Country Status (1)

Country Link
CN (1) CN207352086U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109164301A (en) * 2018-10-26 2019-01-08 惠州市新泓威科技有限公司 The automatic resistance value detection device and its detection method of electronic smoke atomizer
CN109375066A (en) * 2018-09-13 2019-02-22 格力电器(武汉)有限公司 A kind of anti-electricity wall insulation resistance test auxiliary device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109375066A (en) * 2018-09-13 2019-02-22 格力电器(武汉)有限公司 A kind of anti-electricity wall insulation resistance test auxiliary device
CN109164301A (en) * 2018-10-26 2019-01-08 惠州市新泓威科技有限公司 The automatic resistance value detection device and its detection method of electronic smoke atomizer

Similar Documents

Publication Publication Date Title
CN207352086U (en) A kind of electric performance testing device for wall-hung boiler assembly production chain
CN104607860B (en) A kind of fixture of pipeline boxing jig
CN103661661A (en) Wind power blade climbing robot
CN102645402B (en) Toughened glass online detection device
CN206580485U (en) A kind of automotive check lifting device
CN106945296A (en) Inlet manifold assembling test production system
CN104568718B (en) Insulator temperature cycling test machine
CN205981569U (en) Motor edge leakage investigation machine
CN107934781A (en) Three-point fix snubber contact device
CN206953615U (en) Inlet manifold assembling test production system
CN205192461U (en) Jack automated inspection mechanism
CN202362315U (en) Speed measuring device for on-line induction annealing furnace
CN210742193U (en) Visual inspection platform for detecting internal defects of pipeline
CN105371797B (en) A kind of jack automatic detection mechanism
CN202548017U (en) Full-automatic equipment for detecting compressive strength of gasholders
CN109296785B (en) Blower check valve
CN208735260U (en) A kind of filling apparatus angle valve Direction Finder
CN203172952U (en) On-line quality testing tool
CN206580249U (en) A kind of tubing pressing device
CN202649090U (en) On-line detection device for toughened glass
CN206099167U (en) Can change cable termination post insulators strutting arrangement with electricity
CN203998808U (en) For delivery of the bracket system with carrier roller replacing
CN205869925U (en) Pressfitting connects device soon
CN205368444U (en) Steel pipe blank annealing automatic propelling device
CN205271338U (en) Pin leak protection dress induction system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200617

Address after: No.2000 guangqiong Road, economic and Technological Development Zone, Jiaxing City, Zhejiang Province, 314000

Patentee after: Xiderri heating and cooling equipment Co., Ltd

Address before: 201600 Songjiang District 3, 4, Guanghua Road, Songjiang District, Shanghai

Patentee before: BDR THERMEA (SHANGHAI) Co.,Ltd.

TR01 Transfer of patent right