CN207348865U - A kind of municipal administration is holed equipment with high efficiency - Google Patents

A kind of municipal administration is holed equipment with high efficiency Download PDF

Info

Publication number
CN207348865U
CN207348865U CN201720844019.3U CN201720844019U CN207348865U CN 207348865 U CN207348865 U CN 207348865U CN 201720844019 U CN201720844019 U CN 201720844019U CN 207348865 U CN207348865 U CN 207348865U
Authority
CN
China
Prior art keywords
shaft
bearing seat
belt
equipment
belt pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720844019.3U
Other languages
Chinese (zh)
Inventor
余乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hong Xu Engineering Project Management Co Ltd
Original Assignee
Jiangsu Hong Xu Engineering Project Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Hong Xu Engineering Project Management Co Ltd filed Critical Jiangsu Hong Xu Engineering Project Management Co Ltd
Priority to CN201720844019.3U priority Critical patent/CN207348865U/en
Application granted granted Critical
Publication of CN207348865U publication Critical patent/CN207348865U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

It the utility model is related to one kind to hole equipment, more particularly to a kind of municipal administration is holed equipment with high efficiency.The technical problem to be solved by the present invention is to provide it is a kind of can replace manually digging fast, efficient, the safe to use municipal administration of tunnel, speed holed equipment with high efficiency.In order to solve the above-mentioned technical problem, the utility model provides such a municipal administration and is holed equipment with high efficiency, includes motor, first rotating shaft, first bearing seat, vehicle frame, drill bit, second shaft etc.;First bearing seat, motor and second bearing seat are from left to right equipped with vehicle frame successively, first bearing seat is interior to be connected with first rotating shaft by interference, and first rotating shaft left end is equipped with drill bit, and motor is connected by shaft coupling with first rotating shaft.The utility model, which has reached, can replace manually digging fast, efficient, the safe to use effect of tunnel, speed, and tunnel and easy to use, service life of equipment length can be dug through in a short time using this equipment.

Description

A kind of municipal administration is holed equipment with high efficiency
Technical field
It the utility model is related to one kind to hole equipment, more particularly to a kind of municipal administration is holed equipment with high efficiency.
Background technology
Urban operating mechanism refers to the communal facility built by government, legal person or citizen investment, refers generally to various in planning region Building, structures, equipment etc..Urban road(Containing bridge), urban track traffic, water supply, draining, combustion gas, heating power, gardens it is green Facility and the affiliated facilities such as change, environmental sanitation, road lighting, industrial refuse medical waste, Domestic garbage treatment equipment, place. Tunnel is the engineering works being embedded in stratum, is a kind of form of human use's underground space.Tunnel can be divided into traffic tunnel Road, Hydraulic Tunnel, municipal tunnel, mining tunnel.The tunnel meeting synthesis that Organisation for Economic Co-operation and Development in 1970 is held Various factors, to tunnel definition is:" act on any method regulation shape and size with certain purposes, in subsurface The basal area of build is more than the cavern of 2 ㎡." with the development of urban construction and the increase of population, aboveground area is fewer and fewer, respectively Kind tunnel construction starts to rise, and manually holing takes time and effort, inefficiency, it is impossible to meet our present fast pace lifes, Therefore there is an urgent need for research and develop it is a kind of can replace manually dig tunnel, speed it is fast, efficient, safe to use municipal administration with high efficiency dig tunnel Road equipment.
The content of the invention
(1)Technical problems to be solved
The utility model in order to overcome the fewer and fewer various tunnel constructions of aboveground area start rise, manually hole it is time-consuming Effort, inefficiency, cannot meet the shortcomings that our present fast pace lifes, and the technical problems to be solved in the utility model is There is provided it is a kind of can replace manually digging fast, efficient, the safe to use municipal administration of tunnel, speed holed equipment with high efficiency.
(2)Technical solution
In order to solve the above-mentioned technical problem, the utility model provides such a municipal administration and is holed equipment with high efficiency, Include motor, first rotating shaft, first bearing seat, vehicle frame, drill bit, the second shaft, second bearing seat and wheel, from a left side on vehicle frame First bearing seat, motor and second bearing seat are equipped with successively to the right side, first bearing seat is interior to be connected with first rotating shaft by interference, First rotating shaft left end is equipped with drill bit, and motor is connected by shaft coupling with first rotating shaft, is set in second bearing seat by interference connection There is the second shaft, wheel is equipped with by flat key in the second shaft.
Preferably, multiple apertures are provided with drill bit.
Preferably, further included first bevel gear, the 3rd shaft, 3rd bearing seat, second bevel gear, the first belt pulley, First connects belt, transmission wheel, the second belt pulley, conveyer belt, the 4th shaft and fourth bearing seat, passes through flat key in first rotating shaft Equipped with first bevel gear, 3rd bearing seat and fourth bearing seat are from left to right equipped with vehicle frame successively, is passed through in 3rd bearing seat Interference is connected with the 3rd shaft, and second bevel gear and the first belt pulley, first bevel gear are equipped with by flat key in the 3rd shaft Engaged with second bevel gear, the 4th shaft is connected with by interference in fourth bearing seat, is equipped with the 4th shaft by flat key Second belt pulley and transmission wheel, are equipped with the first connection belt, are equipped between transmission wheel between the second belt pulley and the first belt pulley Conveyer belt.
Preferably, the second connection belt and the 3rd belt pulley have been further included, the 3rd skin are equipped with by flat key in the second shaft Belt wheel, is equipped with the second connection belt between the 3rd belt pulley and the second belt pulley, the second connection crossbelt is placed.
Preferably, crawler belt has been further included, wheel is externally provided with crawler belt.
Preferably, drill bit material is Q235 steel.
Operation principle:When needing to hole, suitable position is moved the device into, motor rotation is manually started, makes the One shaft drives drill bit to rotate, the work holed, and motor is manually closed after work.
Because being provided with multiple apertures on drill bit, the soil of generation of holing, stone etc. can come out from aperture, make to hole Process it is more smooth, be conducive to impurity removal, it is more preferable to bore dynamic effect.
Because first bevel gear, the 3rd shaft, 3rd bearing seat, second bevel gear, the first belt pulley, first are further included Belt, transmission wheel, the second belt pulley, conveyer belt, the 4th shaft and fourth bearing seat are connected, is equipped with first rotating shaft by flat key First bevel gear, is from left to right equipped with 3rd bearing seat and fourth bearing seat on vehicle frame, passes through interference in 3rd bearing seat successively It is connected with the 3rd shaft, second bevel gear and the first belt pulley is equipped with by flat key in the 3rd shaft, first bevel gear and the Two bevel gears engage, and are connected with the 4th shaft by interference in fourth bearing seat, and second is equipped with by flat key in the 4th shaft Belt pulley and transmission wheel, are equipped with the first connection belt, transmission are equipped between transmission wheel between the second belt pulley and the first belt pulley Band, first rotating shaft, which constantly rotates, makes first bevel gear constantly rotate, and second bevel gear is constantly rotated clockwise, passes through the 3rd turn Axis makes the first belt pulley constantly rotate clockwise, and the second belt pulley is constantly rotated clockwise by the first connection belt, passes through 4th shaft makes transmission wheel constantly rotate clockwise, and the soil dug out and stone is transported to equipment, using effect is good, more Be conducive to excavate progress faster, impurities removal thing.
Because having further included the second connection belt and the 3rd belt pulley, the 3rd belt is equipped with by flat key in the second shaft Wheel, is equipped with the second connection belt between the 3rd belt pulley and the second belt pulley, the second connection crossbelt is placed, the second belt pulley Constantly rotate clockwise, the 3rd belt pulley is constantly rotated counterclockwise by the second connection belt, equipment is pushed ahead automatically, Save manpower.
Because having further included crawler belt, wheel is externally provided with crawler belt, effectively prevents equipment skidding and ground grading.
Because drill bit material is Q235 steel, hard sharp, tunnel can be quickly dug through.
(3)Beneficial effect
The utility model, which has reached, can replace manually digging fast, efficient, the safe to use effect of tunnel, speed, make Tunnel and easy to use can be dug through in a short time with this equipment, and service life of equipment length, is without a large amount of manual operations It can complete, it is safe to use, a large amount of manual labors are saved, reduce the cost for digging through tunnel.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the utility model.
Fig. 2 is second of main structure diagram of the utility model.
Fig. 3 is the third main structure diagram of the utility model.
Fig. 4 is the 4th kind of main structure diagram of the utility model.
Fig. 5 makes the 5th kind of main structure diagram of the utility model.
Mark in attached drawing for:1- motors, 2- first rotating shafts, 3- first bearing seats, 4- drill bits, the second shafts of 5-, 6- Two bearing bracket, 7- wheels, 8- vehicle frames, 9- apertures, 10- first bevel gears, the 3rd shafts of 11-, 12- 3rd bearing seats, 13- second Bevel gear, the first belt pulleys of 14-, the connection belts of 15- first, 16- transmission wheels, the second belt pulleys of 17-, the 4th shafts of 18-, 19- Fourth bearing seat, 20- conveyer belts, the connection belts of 21- second, the 3rd belt pulleys of 22-, 23- crawler belts.
Embodiment
The utility model is further described with reference to the accompanying drawings and examples.
Embodiment 1
A kind of municipal administration is holed equipment with high efficiency, as shown in Figs. 1-5, includes motor 1, first rotating shaft 2, clutch shaft bearing Seat 3, vehicle frame 8, drill bit 4, the second shaft 5, second bearing seat 6 and wheel 7, are from left to right equipped with clutch shaft bearing on vehicle frame 8 successively Seat 3, motor 1 and second bearing seat 6, first bearing seat 3 is interior to be connected with first rotating shaft 2 by interference, and 2 left end of first rotating shaft is set There is drill bit 4, motor 1 is connected by shaft coupling with first rotating shaft 2, and the second shaft is connected with by interference in second bearing seat 6 5, wheel 7 is equipped with by flat key in the second shaft 5.
Embodiment 2
A kind of municipal administration is holed equipment with high efficiency, as shown in Figs. 1-5, includes motor 1, first rotating shaft 2, clutch shaft bearing Seat 3, vehicle frame 8, drill bit 4, the second shaft 5, second bearing seat 6 and wheel 7, are from left to right equipped with clutch shaft bearing on vehicle frame 8 successively Seat 3, motor 1 and second bearing seat 6, first bearing seat 3 is interior to be connected with first rotating shaft 2 by interference, and 2 left end of first rotating shaft is set There is drill bit 4, motor 1 is connected by shaft coupling with first rotating shaft 2, and the second shaft is connected with by interference in second bearing seat 6 5, wheel 7 is equipped with by flat key in the second shaft 5.
Multiple apertures 9 are provided with drill bit 4.
Embodiment 3
A kind of municipal administration is holed equipment with high efficiency, as shown in Figs. 1-5, includes motor 1, first rotating shaft 2, clutch shaft bearing Seat 3, vehicle frame 8, drill bit 4, the second shaft 5, second bearing seat 6 and wheel 7, are from left to right equipped with clutch shaft bearing on vehicle frame 8 successively Seat 3, motor 1 and second bearing seat 6, first bearing seat 3 is interior to be connected with first rotating shaft 2 by interference, and 2 left end of first rotating shaft is set There is drill bit 4, motor 1 is connected by shaft coupling with first rotating shaft 2, and the second shaft is connected with by interference in second bearing seat 6 5, wheel 7 is equipped with by flat key in the second shaft 5.
Multiple apertures 9 are provided with drill bit 4.
First bevel gear 10, the 3rd shaft 11,3rd bearing seat 12, second bevel gear 13, the first belt pulley are further included 14th, the first connection belt 15, transmission wheel 16, the second belt pulley 17, conveyer belt 20, the 4th shaft 18 and fourth bearing seat 19, the First bevel gear 10 is equipped with by flat key in one shaft 2,12 and the 4th axis of 3rd bearing seat is from left to right equipped with successively on vehicle frame 8 Bearing 19, is connected with the 3rd shaft 11 in 3rd bearing seat 12 by interference, and second is equipped with by flat key in the 3rd shaft 11 13 and first belt pulley 14 of bevel gear, first bevel gear 10 are engaged with second bevel gear 13, pass through interference in fourth bearing seat 19 It is connected with the 4th shaft 18, second belt pulley 17 and transmission wheel 16, the second belt pulley is equipped with by flat key in the 4th shaft 18 17 and first are equipped with the first connection belt 15 between belt pulley 14, and conveyer belt 20 is equipped between transmission wheel 16.
Embodiment 4
A kind of municipal administration is holed equipment with high efficiency, as shown in Figs. 1-5, includes motor 1, first rotating shaft 2, clutch shaft bearing Seat 3, vehicle frame 8, drill bit 4, the second shaft 5, second bearing seat 6 and wheel 7, are from left to right equipped with clutch shaft bearing on vehicle frame 8 successively Seat 3, motor 1 and second bearing seat 6, first bearing seat 3 is interior to be connected with first rotating shaft 2 by interference, and 2 left end of first rotating shaft is set There is drill bit 4, motor 1 is connected by shaft coupling with first rotating shaft 2, and the second shaft is connected with by interference in second bearing seat 6 5, wheel 7 is equipped with by flat key in the second shaft 5.
Multiple apertures 9 are provided with drill bit 4.
First bevel gear 10, the 3rd shaft 11,3rd bearing seat 12, second bevel gear 13, the first belt pulley are further included 14th, the first connection belt 15, transmission wheel 16, the second belt pulley 17, conveyer belt 20, the 4th shaft 18 and fourth bearing seat 19, the First bevel gear 10 is equipped with by flat key in one shaft 2,12 and the 4th axis of 3rd bearing seat is from left to right equipped with successively on vehicle frame 8 Bearing 19, is connected with the 3rd shaft 11 in 3rd bearing seat 12 by interference, and second is equipped with by flat key in the 3rd shaft 11 13 and first belt pulley 14 of bevel gear, first bevel gear 10 are engaged with second bevel gear 13, pass through interference in fourth bearing seat 19 It is connected with the 4th shaft 18, second belt pulley 17 and transmission wheel 16, the second belt pulley is equipped with by flat key in the 4th shaft 18 17 and first are equipped with the first connection belt 15 between belt pulley 14, and conveyer belt 20 is equipped between transmission wheel 16.
The second connection belt 21 and the 3rd belt pulley 22 are further included, the 3rd belt are equipped with by flat key in the second shaft 5 Wheel 22, is equipped with the second connection belt 21 between the 3rd belt pulley 22 and the second belt pulley 17, the second connection belt 21, which intersects, to be placed.
Crawler belt 23 is further included, wheel 7 is externally provided with crawler belt 23.
4 material of drill bit is Q235 steel.
Operation principle:When needing to hole, suitable position is moved the device into, motor 1 is manually started and rotates, makes One shaft 2 drives drill bit 4 to rotate, the work holed, and motor 1 is manually closed after work.
Because being provided with multiple apertures 9 on drill bit 4, the soil of generation of holing, stone etc. can come out from aperture 9, make digging The process in tunnel is more smooth, is conducive to impurity removal, and it is more preferable to bore dynamic effect.
Because first bevel gear 10, the 3rd shaft 11,3rd bearing seat 12, second bevel gear 13, the first skin are further included Belt wheel 14, first connects belt 15, transmission wheel 16, the second belt pulley 17, conveyer belt 20, the 4th shaft 18 and fourth bearing seat 19, first bevel gear 10 is equipped with by flat key in first rotating shaft 2,12 He of 3rd bearing seat is from left to right equipped with successively on vehicle frame 8 Fourth bearing seat 19,3rd bearing seat 12 is interior to be connected with the 3rd shaft 11 by interference, is set in the 3rd shaft 11 by flat key There is 13 and first belt pulley 14 of second bevel gear, first bevel gear 10 is engaged with second bevel gear 13, is led in fourth bearing seat 19 Interference is connected with the 4th shaft 18, and the second belt pulley 17 and transmission wheel 16 are equipped with by flat key in the 4th shaft 18, and second The first connection belt 15 is equipped between 17 and first belt pulley 14 of belt pulley, is equipped with conveyer belt 20 between transmission wheel 16, first turn Axis 2, which constantly rotates, makes first bevel gear 10 constantly rotate, and second bevel gear 13 is constantly rotated clockwise, passes through the 3rd shaft 11 The first belt pulley 14 is constantly rotated clockwise, the second belt pulley 17 is constantly rotated clockwise by the first connection belt 15, Transmission wheel 16 is constantly rotated clockwise by the 4th shaft 18, the soil dug out and stone are transported into equipment, use effect Fruit is good, is more conducive to excavation progress faster, impurities removal thing.
Because having further included the second connection belt 21 and the 3rd belt pulley 22, the 3rd is equipped with by flat key in the second shaft 5 Belt pulley 22, is equipped with the second connection belt 21 between the 3rd belt pulley 22 and the second belt pulley 17, the second connection belt 21 intersects Place, the second belt pulley 17 constantly rotates clockwise, and the 3rd belt pulley 22 is constantly turned counterclockwise by the second connection belt 21 It is dynamic, equipment is pushed ahead automatically, save manpower.
Because having further included crawler belt 23, wheel 7 is externally provided with crawler belt 23, effectively prevents equipment skidding and ground grading.
Because 4 material of drill bit is Q235 steel, hard sharp, tunnel can be quickly dug through.
Embodiment described above only expresses the preferred embodiment of the utility model, its description is more specific and detailed, But it should not be interpreted as limiting the scope of the present invention.It should be pointed out that for the common of this area For technical staff, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these are all Belong to the scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (6)

1. a kind of municipal administration is holed equipment with high efficiency, it is characterised in that includes motor(1), first rotating shaft(2), first axle Bearing(3), vehicle frame(8), drill bit(4), the second shaft(5), second bearing seat(6)And wheel(7), vehicle frame(8)On from left to right First bearing seat is equipped with successively(3), motor(1)And second bearing seat(6), first bearing seat(3)It is interior to be connected with by interference First rotating shaft(2), first rotating shaft(2)Left end is equipped with drill bit(4), motor(1)Pass through shaft coupling and first rotating shaft(2)It is connected, the Two bearing bracket(6)It is interior that second shaft is connected with by interference(5), the second shaft(5)It is upper that wheel is equipped with by flat key(7).
2. a kind of municipal administration according to claim 1 is holed equipment with high efficiency, it is characterised in that drill bit(4)On be provided with Multiple apertures(9).
3. a kind of municipal administration according to claim 2 is holed equipment with high efficiency, it is characterised in that has further included the first cone Gear(10), the 3rd shaft(11), 3rd bearing seat(12), second bevel gear(13), the first belt pulley(14), first connection skin Band(15), transmission wheel(16), the second belt pulley(17), conveyer belt(20), the 4th shaft(18)With fourth bearing seat(19), first Shaft(2)It is upper that first bevel gear is equipped with by flat key(10), vehicle frame(8)On be from left to right equipped with 3rd bearing seat successively(12)With Fourth bearing seat(19), 3rd bearing seat(12)It is interior that 3rd shaft is connected with by interference(11), the 3rd shaft(11)It is upper logical Cross flat key and be equipped with second bevel gear(13)With the first belt pulley(14), first bevel gear(10)With second bevel gear(13)Engagement, Fourth bearing seat(19)It is interior that 4th shaft is connected with by interference(18), the 4th shaft(18)It is upper that second skin is equipped with by flat key Belt wheel(17)And transmission wheel(16), the second belt pulley(17)With the first belt pulley(14)Between be equipped with first connection belt(15), Transmission wheel(16)Between be equipped with conveyer belt(20).
4. a kind of municipal administration according to claim 3 is holed equipment with high efficiency, it is characterised in that has further included the second company Lace(21)With the 3rd belt pulley(22), the second shaft(5)It is upper that 3rd belt pulley is equipped with by flat key(22), the 3rd belt pulley (22)With the second belt pulley(17)Between be equipped with second connection belt(21), the second connection belt(21)Intersect and place.
5. a kind of municipal administration according to claim 4 is holed equipment with high efficiency, it is characterised in that has further included crawler belt (23), wheel(7)It is externally provided with crawler belt(23).
6. a kind of municipal administration according to claim 5 is holed equipment with high efficiency, it is characterised in that drill bit(4)Material is Q235 steel.
CN201720844019.3U 2017-07-13 2017-07-13 A kind of municipal administration is holed equipment with high efficiency Expired - Fee Related CN207348865U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720844019.3U CN207348865U (en) 2017-07-13 2017-07-13 A kind of municipal administration is holed equipment with high efficiency

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720844019.3U CN207348865U (en) 2017-07-13 2017-07-13 A kind of municipal administration is holed equipment with high efficiency

Publications (1)

Publication Number Publication Date
CN207348865U true CN207348865U (en) 2018-05-11

Family

ID=62359148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720844019.3U Expired - Fee Related CN207348865U (en) 2017-07-13 2017-07-13 A kind of municipal administration is holed equipment with high efficiency

Country Status (1)

Country Link
CN (1) CN207348865U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109338857A (en) * 2018-10-15 2019-02-15 钟浪婵 A kind of high efficiency tile work equipment in ground for building
CN111472767A (en) * 2020-04-21 2020-07-31 山东科技大学 Microwave presplitting and cutting tooth rock breaking system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109338857A (en) * 2018-10-15 2019-02-15 钟浪婵 A kind of high efficiency tile work equipment in ground for building
CN111472767A (en) * 2020-04-21 2020-07-31 山东科技大学 Microwave presplitting and cutting tooth rock breaking system

Similar Documents

Publication Publication Date Title
CN105297807B (en) A kind of integrated pipe canal open cut development machine with automatic backfill function
CN204212700U (en) Drill bit in a kind of conduit jacking
CN207348865U (en) A kind of municipal administration is holed equipment with high efficiency
CN206694038U (en) Hob type push pipe excavator
CN107386965A (en) A kind of portable rock drilling perforating device
CN101736763B (en) Foundation pit excavator
CN102031797B (en) Mining hydraulic excavator
CN101864781B (en) Mining machine for dredging
CN201901889U (en) Mining hydraulic excavating machine
CN203488099U (en) Hydraulic control rapid drilling machine
CN203701176U (en) Smashing and suction device used for excavation and suction vehicle
CN107780523A (en) A kind of manhole dirt cleaning device
CN207003514U (en) A kind of two-wheeled digging excavation conveyer
CN202406491U (en) Broad-width chain knife type furrowing machine
CN204782768U (en) Drilling machine
CN106223384A (en) A kind of disk furrower
CN207003522U (en) A kind of two-wheeled, which loosens the soil, excavates conveyer
CN201354460Y (en) Civil engineering foundation pit excavating device
CN202652842U (en) Hydraulic drilling tree planter
CN202730812U (en) Rapid construction groove wall machine
CN205935006U (en) Disc ditching machine
CN202990854U (en) Oil hydraulic system for crawler-type full-hydraulic underground drill rig
CN206692008U (en) A kind of crawler belt takes off material conveying feeder
CN206015768U (en) Level is short to refute hack machinery
CN217976295U (en) Triangular chain plate type circulating tunneling cutting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180511

Termination date: 20190713

CF01 Termination of patent right due to non-payment of annual fee