CN207348440U - A kind of Construction of Civil Engineering formwork for placing - Google Patents
A kind of Construction of Civil Engineering formwork for placing Download PDFInfo
- Publication number
- CN207348440U CN207348440U CN201721077945.9U CN201721077945U CN207348440U CN 207348440 U CN207348440 U CN 207348440U CN 201721077945 U CN201721077945 U CN 201721077945U CN 207348440 U CN207348440 U CN 207348440U
- Authority
- CN
- China
- Prior art keywords
- template
- slot
- card slot
- construction
- civil engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 29
- 238000009415 formwork Methods 0.000 title claims abstract description 20
- 239000004743 Polypropylene Substances 0.000 claims description 3
- 239000002245 particle Substances 0.000 claims description 3
- 239000004033 plastic Substances 0.000 claims description 3
- 229920003023 plastic Polymers 0.000 claims description 3
- -1 polypropylene Polymers 0.000 claims description 3
- 229920001155 polypropylene Polymers 0.000 claims description 3
- 238000000465 moulding Methods 0.000 abstract description 12
- 230000000694 effects Effects 0.000 abstract description 8
- 239000002699 waste material Substances 0.000 abstract description 8
- 238000009434 installation Methods 0.000 abstract description 7
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 238000005266 casting Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 2
- 235000017491 Bambusa tulda Nutrition 0.000 description 2
- 241001330002 Bambuseae Species 0.000 description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 2
- 239000011425 bamboo Substances 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a kind of Construction of Civil Engineering formwork for placing, including main board, card slot and fixed plate, the card slot is arranged on the end face of main board, and template is installed with by card slot, the card slot is provided with two groups, and the opposite both ends of card slot are connected by side bayonet slot, the side of the template is provided with installation fixture block, and it is installed with side template by installing fixture block, corresponding side bayonet slot is provided with straight slot inside the main board, side bayonet slot and card slot are corresponded in the straight slot is provided at both ends with positioning plate, the fixed plate corresponds to the end set of straight slot, the end face of the positioning plate is fixedly connected by the end face of negative pressure spring straight slot corresponding with fixed plate.The Construction of Civil Engineering formwork for placing, production cost is low, easy to operation, and stability is strong, effectively improves the molding effect of concreting, reduces the waste rate of concrete.
Description
Technical field
It the utility model is related to construction engineering technical field, more particularly to a kind of Construction of Civil Engineering formwork for placing.
Background technology
Construction formwork is one of common equipment in Construction of Civil Engineering, it is mainly used for concreting forming construction
In.Existing Construction of Civil Engineering template causes installation and removal very difficult, influences construction speed and construction since volume is larger
Quality.In addition, highway, railway structure thing template use steel form or bamboo slab rubber substantially in the past.Bamboo slab rubber is due to by itself
Material defect rigidity and intensity often do not reach requirement, yielding, reuse number it is few, it is desirable to supporting back rib material compared with
It is more.The advantages of steel form, is that rigidity and intensity are good, is unlikely to deform, but its cost is higher, pours the Structure Appearance Quality built up
Generally.After substantial amounts of steel form reuses two or three of work points, due to that cannot be reused after local deformation or surface corrosion, only
It can be sold as scrap iron, newly-started journey purchases brand-new steel form again, causes old steel form superfluous and wastes, while increases engineering again
Cost.
At present to formwork for placing used in civil engineering, it has not been convenient to operate, stability is poor when being poured to template, and pours
The concrete material built easily spills at formwork for placing, causes material waste.
Utility model content
The purpose of this utility model is to solve shortcoming existing in the prior art, and a kind of civil engineering proposed is applied
Work formwork for placing.
To achieve these goals, the utility model employs following technical solution:
A kind of Construction of Civil Engineering formwork for placing, including main board, card slot and fixed plate, the card slot are arranged on main body
On the end face of plate, and template is installed with by card slot, the card slot is provided with two groups, and the opposite both ends of card slot pass through side bayonet slot
It is connected, the side of the template is provided with installation fixture block, and is installed with side template by installing fixture block, and the side template leads to
Cross bayonet to fill with installation fixture block fixing card, corresponding side bayonet slot is provided with straight slot inside the main board, respective side in the straight slot
Card slot and card slot are provided at both ends with positioning plate, and the fixed plate is fixedly mounted on the side wall of main board, and the end of corresponding straight slot
Portion is set, and the end face of the positioning plate is fixedly connected by the end face of negative pressure spring straight slot corresponding with fixed plate.
Preferably, the card slot is arranged on main board by side bayonet slot in mouth shape, the size of the template and side template
It is consistent with the size of card slot and side bayonet slot.Civil engineering molding concrete column as needed in construction, by template and side form
The bottom of plate is snapped fits into card slot and side bayonet slot respectively, to the cavity casting concrete formed between template and side template, is poured
Into concrete column.
Preferably, the template and side template are integrally formed setting, the template and side using polypropylene plastics particle
The consistency of thickness of template.While ensureing pouring molding effect, the input cost of Construction of Civil Engineering, template and side template are reduced
Between concreting is accepted by card slot seamless clamp, improve the smooth effect of concrete column forming.
Preferably, the length of the positioning plate is more than the width of side template, and the side bayonet slot communicates setting with straight slot.Positioning
Plate enters in straight slot negative pressure spring back pressure, after template and side template are snapped fits into card slot and side bayonet slot, unclamps to positioning plate
Pressure, positioning plate fix the outer wall support of side template by the elasticity of negative pressure spring, make the both ends of side template to the two of template
End is fixed, and is improved the fastness installed between template and side template, and compactness, is reduced the molding waste of concreting
Rate.
Preferably, the outside of the negative pressure spring is provided with telescopic sleeving rod, the outside of the telescopic sleeving rod and negative pressure spring
Suit, and be fixedly connected respectively with fixed plate and positioning plate by the both ends of telescopic sleeving rod.Telescopic sleeving rod stretches negative pressure spring
Contracting protection, avoids negative pressure spring from changing the supporting track of positioning plate, the pressure for making negative pressure spring flexibly support positioning plate
Power reduces.
In the utility model, civil engineering molding concrete column as needed in construction, positioning plate is to negative pressure spring
Back pressure enters in straight slot, after template and side template are snapped fits into card slot and side bayonet slot, unclamps the pressure to positioning plate, positioning plate leads to
The elasticity for crossing negative pressure spring fixes the outer wall support of side template, the both ends of side template is fixed the both ends of template, to template
The cavity casting concrete formed between side template, it is comprehensive that the place of pouring is protected, the molding effect of concrete is improved, is reduced
The waste rate of concrete, after the completion of pouring, by positioning plate by negative pressure spring retraction, unclamps the support to side template, to template
Dismantled with side template.The Construction of Civil Engineering formwork for placing, production cost is low, easy to operation, and stability is strong, effectively improves mixed
The effect of solidifying soil pouring molding, reduces the waste rate of concrete.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of Construction of Civil Engineering formwork for placing structure diagram;
Fig. 2 be the utility model proposes a kind of Construction of Civil Engineering formwork for placing main body plate structure schematic diagram;
Fig. 3 be the utility model proposes a kind of Construction of Civil Engineering formwork for placing template and side form board mounting structure
Schematic diagram.
In figure:1 main board;11;Straight slot;12 positioning plates;121 negative pressure springs;2 card slots;21 side bayonet slots;22 templates;221
Fixture block is installed;23 side templates;231 bayonets;3 fixed plates;31 telescopic sleeving rods.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
With reference to Fig. 1-3, a kind of Construction of Civil Engineering formwork for placing, including main board 1, card slot 2 and fixed plate 3 are described
Card slot 2 is arranged on the end face of main board 1, and is installed with template 22 by card slot 2, and the card slot 2 is provided with two groups, and card slot
2 opposite both ends are connected by side bayonet slot 21, and the side of the template 22 is provided with installation fixture block 221, and passes through installation
Fixture block 221 is installed with side template 23, and the side template 23 is fixed with installation fixture block 221 by bayonet 231 and clamped, the card slot 2
It is arranged on by side bayonet slot 21 in mouth shape on main board 1, size and card slot 2 and the side bayonet slot 21 of the template 22 and side template 23
Size it is consistent.Civil engineering molding concrete column as needed in construction, by the bottom of template 22 and side template 23 point
Do not snap fits into card slot 2 and side bayonet slot 21, to the cavity casting concrete formed between template 22 and side template 23, pour build up it is mixed
Solidifying earth pillar.The template 22 and side template 23 are integrally formed setting, the template 22 and side form using polypropylene plastics particle
The consistency of thickness of plate 23.While ensureing pouring molding effect, the input cost of Construction of Civil Engineering, template 22 and side form are reduced
Concreting is accepted by seamless clamp of card slot 2 between plate 23, improves the smooth effect of concrete column forming.The master
The corresponding side bayonet slot 21 in the inside of body plate 1 is provided with straight slot 11, and being provided at both ends with for side bayonet slot 2 and card slot 21 is corresponded in the straight slot 11
Positioning plate 12, the fixed plate 3 are fixedly mounted on the side wall of main board 1, and the end set of corresponding straight slot 11, the positioning plate
12 end face is fixedly connected by the end face of the straight slot 11 corresponding with fixed plate 13 of negative pressure spring 121.The length of the positioning plate 12
More than the width of side template 23, the side bayonet slot 21 communicates setting with straight slot 11.Positioning plate 12 enters 121 back pressure of negative pressure spring logical
In groove 11, after template 22 and side template 23 are snapped fits into card slot 2 and side bayonet slot 21, the pressure to positioning plate 12 is unclamped, is positioned
Plate 12 fixes the outer wall support of side template 23 by the elasticity of negative pressure spring 121, makes the both ends of side template 23 to template 22
Both ends are fixed, and improve the fastness installed between template 22 and side template 23, and compactness, it is molding to reduce concreting
Waste rate.The outside of the negative pressure spring 121 is provided with telescopic sleeving rod 31, and the telescopic sleeving rod 31 is outer with negative pressure spring 121
Portion is set with, and is fixedly connected respectively with fixed plate 13 and positioning plate 12 by the both ends of telescopic sleeving rod 31.Telescopic sleeving rod 31 is to negative
The flexible protection of pressing spring 121, avoids negative pressure spring 121 from changing the supporting track of positioning plate 12, makes negative pressure spring 121
The pressure that positioning plate 12 flexibly supports is reduced.
In the utility model, civil engineering molding concrete column as needed in construction, positioning plate 12 is to negative pressure bullet
121 back pressure of spring enters in straight slot 11, after template 22 and side template 23 are snapped fits into card slot 2 and side bayonet slot 21, unclamps to positioning plate
12 pressure, positioning plate 12 fix the outer wall support of side template 23 by the elasticity of negative pressure spring 121, make the two of side template 23
Hold and the both ends of template 22 are fixed, it is comprehensive to pouring to the cavity casting concrete formed between template 22 and side template 23
Place's protection, improves the molding effect of concrete, reduces the waste rate of concrete, after the completion of pouring, positioning plate 12 is passed through negative pressure
Spring 121 bounces back, and unclamps the support to side template 23, and template 22 and side template 23 are dismantled.
The above, is only the preferable embodiment of the utility model, but the scope of protection of the utility model is not
This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality
New technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (5)
1. a kind of Construction of Civil Engineering formwork for placing, including main board(1), card slot(2)And fixed plate(3), it is characterised in that
The card slot(2)It is arranged on main board(1)End face on, and pass through card slot(2)It is installed with template(22), the card slot(2)If
It is equipped with two groups, and card slot(2)Opposite both ends pass through side bayonet slot(21)It is connected, the template(22)Side be provided with peace
Be loaded block(221), and by installing fixture block(221)It is installed with side template(23), the side template(23)Pass through bayonet(231)With
Fixture block is installed(221)It is fixed to clamp, the main board(1)The corresponding side bayonet slot in inside(21)It is provided with straight slot(11), the straight slot
(11)Interior corresponding side bayonet slot(21)And card slot(2)Be provided at both ends with positioning plate(12), the fixed plate(3)It is fixedly mounted on master
Body plate(1)Side wall, and corresponding straight slot(11)End set, the positioning plate(12)End face pass through negative pressure spring(121)
With fixed plate(3)Corresponding straight slot(11)End face be fixedly connected.
A kind of 2. Construction of Civil Engineering formwork for placing according to claim 1, it is characterised in that the card slot(2)It is logical
Cross side bayonet slot(21)Main board is arranged in mouth shape(1)On, the template(22)And side template(23)Size and card slot(2)With
Side bayonet slot(21)Size it is consistent.
A kind of 3. Construction of Civil Engineering formwork for placing according to claim 1, it is characterised in that the template(22)With
Side template(23)Setting, the template are integrally formed using polypropylene plastics particle(22)And side template(23)Thickness one
Cause.
A kind of 4. Construction of Civil Engineering formwork for placing according to claim 1, it is characterised in that the positioning plate(12)
Length be more than side template(23)Width, the side bayonet slot(21)With straight slot(11)Communicate setting.
A kind of 5. Construction of Civil Engineering formwork for placing according to claim 1, it is characterised in that the negative pressure spring
(121)Outside be provided with telescopic sleeving rod(31), the telescopic sleeving rod(31)With negative pressure spring(121)Exterior suit, and lead to
Cross telescopic sleeving rod(31)Both ends respectively with fixed plate(3)And positioning plate(12)It is fixedly connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721077945.9U CN207348440U (en) | 2017-08-27 | 2017-08-27 | A kind of Construction of Civil Engineering formwork for placing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721077945.9U CN207348440U (en) | 2017-08-27 | 2017-08-27 | A kind of Construction of Civil Engineering formwork for placing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207348440U true CN207348440U (en) | 2018-05-11 |
Family
ID=62412990
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721077945.9U Active CN207348440U (en) | 2017-08-27 | 2017-08-27 | A kind of Construction of Civil Engineering formwork for placing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207348440U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110043028A (en) * | 2019-05-17 | 2019-07-23 | 山西八建集团有限公司 | Side form structure at construction joint or post-cast strip |
-
2017
- 2017-08-27 CN CN201721077945.9U patent/CN207348440U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110043028A (en) * | 2019-05-17 | 2019-07-23 | 山西八建集团有限公司 | Side form structure at construction joint or post-cast strip |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207847066U (en) | A kind of construction formwork for placing | |
CN101182773A (en) | Railway large-bore tunnel oval-shaped table-board cap brim bias-cutting type hole-door construction method | |
CN207348440U (en) | A kind of Construction of Civil Engineering formwork for placing | |
CN207079910U (en) | A kind of steel concrete shuttering for being easy to quick form removal | |
CN206796130U (en) | A kind of concrete mold with reserving hole | |
CN207983648U (en) | A kind of adjustable concrete column molding die | |
CN108468348B (en) | The porous piping lane construction technology of box quick assembly and disassembly mould | |
CN207942538U (en) | A kind of prefabricated case beam external mold harden structure and exterior sheathing disassembly system | |
CN205325942U (en) | Piping lane box culvert pouring mold | |
CN208068520U (en) | A kind of septic tank mold | |
CN206189449U (en) | Soleplate with lead integrated plank sheathing system of wall | |
CN201447648U (en) | Resin concrete drainage ditch | |
CN209353713U (en) | A kind of bracing structural that building template system uses | |
CN206616588U (en) | A kind of anti-piping lane casing core pulling mould that caves in of assembled | |
CN206070403U (en) | A kind of sliding form apparatus for formwork for placing | |
CN207295425U (en) | A kind of hole-forming device for bridge pad pinner anchor hole | |
CN205077855U (en) | Surbase steel mould is led to constructional steel | |
CN210421461U (en) | Construction joint waterproof construction | |
CN201419434Y (en) | Moulding plate for track precast slab | |
CN218406551U (en) | Novel concrete vibrates device | |
CN211250713U (en) | Prestressed concrete tubular pile production auxiliary device | |
CN219137444U (en) | Fixed die device for road bridge building construction | |
CN207362624U (en) | A kind of concrete plate connecting elements for express highway pavement | |
CN212670634U (en) | Pipe gallery pouring mold for fixing water-stopping adhesive tape | |
CN214272934U (en) | Mould structure of usefulness is pour in civil engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191205 Address after: 362200 15th floor, Jinxin building, 352 South Ring Road, Anhai Town, Jinjiang City, Quanzhou City, Fujian Province Patentee after: Fujian Jinnan Construction Group Co., Ltd Address before: 362000 No. 226 Ma Shan Ding Road, Huian Town, Huian City, Fujian Province Patentee before: Wang Xiaojin |