CN207347943U - A kind of template of continuous rigid frame bridge closure section - Google Patents

A kind of template of continuous rigid frame bridge closure section Download PDF

Info

Publication number
CN207347943U
CN207347943U CN201721426546.9U CN201721426546U CN207347943U CN 207347943 U CN207347943 U CN 207347943U CN 201721426546 U CN201721426546 U CN 201721426546U CN 207347943 U CN207347943 U CN 207347943U
Authority
CN
China
Prior art keywords
template
fixed
slab rubber
rigid frame
bamboo slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721426546.9U
Other languages
Chinese (zh)
Inventor
高峰
张斌
郑波
杨强
杜炳明
唐颖
李骏毅
胡贇
李洋
王梓丞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCEGC NO11 CONSTRUCTION ENGINEERING Co Ltd
Chongqing Construction Engineering Group Co Ltd
Original Assignee
CCEGC NO11 CONSTRUCTION ENGINEERING Co Ltd
Chongqing Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCEGC NO11 CONSTRUCTION ENGINEERING Co Ltd, Chongqing Construction Engineering Group Co Ltd filed Critical CCEGC NO11 CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201721426546.9U priority Critical patent/CN207347943U/en
Application granted granted Critical
Publication of CN207347943U publication Critical patent/CN207347943U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model proposes a kind of template of continuous rigid frame bridge closure section, including stent, the cradle top is laid with some compact arranged lumps of wood and forms jacking, and the fixed tight bamboo slab rubber of piece that is laid with forms bed die on jacking, the bamboo slab rubber is 1.2m × 2.0m, thickness 1.2cm;The side form of rectangular frame is set on the bed die, and the side form is tied up drawing using long bolt by the punching block being oppositely arranged and formed, fixed setting wooden model inside punching block, the fixed bamboo slab rubber of mould inner surface, and malthoid is laid with the bamboo slab rubber;Fixed and supported by steel pipe scaffold outside the punching block.The utility model is simple in structure, reduces security risk, prevents quality problems, shorten the construction period.

Description

A kind of template of continuous rigid frame bridge closure section
Technical field
The utility model belongs to field of bridge construction, and in particular to a kind of template of continuous rigid frame bridge closure section.
Background technology
With socio-economic development and the scientific and technological progress of construction industry, the fast development of China's highway and urban transportation, Cloverleaf Junction, high pier bridge, also largely build across the highway bridge of cheuch therewith.And High-pier Long-span continuous rigid frame bridge Be through frequently with bridge structure form.And the closure section construction of continuous rigid frame bridge then becomes one of critical process.
The template used in the prior art usually occurs that spillage causes quality problems, or even because stress is unreasonable or stent It is unstable to cause security incident, make claim for eot.For these problems, the utility model proposes it is a kind of it is rational in infrastructure it is continuous just The template of structure beam bridge closure section.
Utility model content
For the deficiency in the presence of the prior art, the utility model proposes a kind of continuous rigid frame bridge conjunction rational in infrastructure The template of imperial section, it is simple in structure, security risk is reduced, prevents quality problems, shortens the construction period.
The utility model is realized by following scheme:
A kind of template of continuous rigid frame bridge closure section, including stent, the cradle top are laid with some compact arranged The lumps of wood forms jacking, and the fixed tight bamboo slab rubber of piece that is laid with forms bed die on jacking, and the bamboo slab rubber is 1.2m × 2.0m, thick Spend for 1.2cm;The side form of rectangular frame is set on the bed die, and the side form pricks screw thread pair by the punching block being oppositely arranged using essence Pull system is fixed, fixed setting wooden model inside punching block, the fixed bamboo slab rubber of mould inner surface, and malthoid is laid with the bamboo slab rubber;It is described Fixed and supported by steel pipe scaffold outside punching block.
Preferably, the jacking is alternately arranged close-packed arrays using the lumps of wood of 10cm × 10cm, bottom uses some The long lumps of wood away from 30cm is fixed on stent, and this structure makes the lumps of wood be not in whole seam rupture when undertaking power.
Preferably, the stent is full hall foot hand stent, upright bar main body spacing is 0.6m × 0.9m, 0.6m at jacking × 0.6m, horizon bar step pitch are 0.9m, and scaffold centre and periphery are arranged circumferentially bridging, and are continuously set by ground to template face Put, bridging is 45 °~60 ° with ground elevation, and vertical bridging is set every four rows, and spacing is not more than 6m, horizontal cross brace By every two rows of settings together, bottom of upright rod sets bar of sweeping the floor.
Preferably, the bamboo slab rubber long side along bridge to arrangement.
Preferably, the stent is built with C15 concrete hardenings and levelling scar, concrete hardening layer thickness Not less than 10cm.
Preferably, the nut bearing of long bolt sets wooden unit inside the side form.
The beneficial effects of the utility model are:
1st, supported using full hall foot hand stent, foot hand stent is built on concrete layer, and support is more firm;Jacking uses The lumps of wood is alternately arranged, and is not in the fracture of whole seam, reduces security risk;
2nd, bamboo slab rubber long side makes side form more regular consistent with the seam of bed die, and be laid with bamboo slab rubber along bridge to arrangement Malthoid, mortar leakage prevention;
3rd, the nut bearing of long bolt sets wooden unit inside side form, and paddle can be mended after form removal, is prevented because of nut corrosion Caused problem of appearance.
Brief description of the drawings
Fig. 1 is the overlooking the structure diagram of the utility model embodiment bed die and side form.
Fig. 2 is the side structure schematic view of the utility model embodiment.
Embodiment
In order to make the technical means, creative features, achievable purpose and effectiveness that the utility model is realized easy to understand, under Face combines specific attached drawing, and the utility model is expanded on further.
By taking the true highway TJ4 work areas flower Milky Way bridge in Nanchuan to road as an example, this spanning footpath is combined as 85+148+85 meters even Continue firm structure, bridge total length is 326.0 meters, and double width bridge, box beam uses single box single chamber, and 12 meters of case top width, bottom is 6 meters wide, unilateral 3 meters of edge of a wing length.Main bridge single width box beam totally 2 cast-in-place segments, 2 end bay closure segments and a mid-span closure segment.
On the scar that flower Milky Way bridge side span Cast-in-Situ Segment scaffold basis is slotted in Blasting Excavation abutment, then use The concrete of C15 is hardened, is levelling, and concrete hardening thickness is not less than 10cm, and foundation capability is fully able to meet foot Hand cradle sets up requirement.
This bridge end bay Cast-in-Situ Segment full framing determines to select 48 × 2.75 steel pipes of specification Φ, Q235A, 1 main body spacing of upright bar For other 0.6m × 0.9m of 0.6m × 0.6m at jacking, 2 step pitch of horizon bar is 0.9m, and the circumferential and middle setting in scaffold periphery is cut Knife support 5, and continuously set by ground to top surface is operated, between bridging 5 and ground elevation are 45 °~60 °, middle bridging 5 Set every four rows, spacing is not more than 6m, and horizontal cross brace is pressed to be set together every two steps, and bottom of upright rod sets bar of sweeping the floor;Jacking 3 Close-packed arrays are alternately arranged using the lumps of wood of 10cm × 10cm, stent is fixed in bottom using the long lumps of wood 4 of some spacing 30cm On, a root long lumps of wood is fixed on each horizon bar, stabilization beam of the root long lumps of wood as jacking is also set up between horizon bar.
After after holder jacking 3, installation is complete, measuring respectively goes out the sideline of Cast-in-Situ Segment box girder web side concrete, then by template construction Personnel eject bed die sideline, and then installation dimension be bamboo slab rubber 6 that 1.2m × 2.0m thickness is 1.2cm on the lumps of wood again, elder generation two Side is middle again, need to carry out the adjustment of plane side when last middle block bamboo slab rubber is put when on curve with portable plane, install, piece is tight After reality, it is fixed on the lumps of wood.
Side form panel is pricked screw thread using essence and machined roadbed 1 is fixed on to pull system 10 using the big punching block 7 of customization On, it is firm to be supported using steel pipe scaffold, the inside of punching block 7 fixed setting wooden model 8, the fixed bamboo slab rubber 6 of mould inner surface, inside side form The nut bearing of long bolt sets wooden unit 9.
Bamboo slab rubber long side is along bridge to arrangement so that side form is consistent with end template piece rule, and bamboo film face is laid with one layer 11 mortar leakage prevention of malthoid.
In order to ensure the safety of stent, the plastic set of stent is eliminated, while measures the elastic settlement amount of stent, is stent Arch rise left in advance foundation is provided, pre-pressing bracket uses molding concrete block and bundled steel strand wires or reinforcing bar piling prepressing.
Above description is merely a prefered embodiment of the utility model, on the scope of protection of the utility model is not limited in Embodiment is stated, every technical solution for belonging to the utility model principle belongs to the scope of protection of the utility model.For this For the technical staff in field, some improvement for being carried out on the premise of the principle of the utility model is not departed from, these improvement It should be regarded as the scope of protection of the utility model.

Claims (6)

1. a kind of template of continuous rigid frame bridge closure section, including stent, it is characterised in that the cradle top is laid with some tight The lumps of wood of solid matter row forms jacking, and the fixed tight bamboo slab rubber of piece that is laid with forms bed die on jacking, and the bamboo slab rubber is 1.2m × 2.0m, thickness 1.2cm;The side form of rectangular frame is set on the bed die, and the side form is used by the punching block being oppositely arranged Essence pricks screw thread and pull system is fixed, fixed setting wooden model inside punching block, the fixed bamboo slab rubber of mould inner surface, is laid with the bamboo slab rubber Malthoid;Fixed and supported by steel pipe scaffold outside the punching block.
2. a kind of template of continuous rigid frame bridge closure section as claimed in claim 1, it is characterised in that the jacking uses The lumps of wood close-packed arrays of 10cm × 10cm, bottom are fixed on stent using the long lumps of wood of some spacing 30cm.
3. a kind of template of continuous rigid frame bridge closure section as claimed in claim 1, it is characterised in that the stent is full hall Foot hand stent, upright bar main body spacing are 0.6m × 0.9m, 0.6m × 0.6m at jacking, and horizon bar step pitch is 0.9m, in scaffold Between and periphery be arranged circumferentially bridging, and continuously set by ground to template face, bridging is 45 °~60 ° with ground elevation, is erected Set to bridging every four rows, spacing is not more than 6m, and horizontal cross brace is pressed to be set together per two rows of, and bottom of upright rod sets and sweeps the floor Bar.
A kind of 4. template of continuous rigid frame bridge closure section as claimed in claim 1, it is characterised in that the bamboo slab rubber long side Along bridge to arrangement.
5. a kind of template of continuous rigid frame bridge closure section as claimed in claim 3, it is characterised in that the stent is built With in C15 concrete hardenings and levelling scar, concrete hardening layer thickness is not less than 10cm.
A kind of 6. template of continuous rigid frame bridge closure section as claimed in claim 1, it is characterised in that minister in the side form The nut bearing of screw rod sets wooden unit.
CN201721426546.9U 2017-10-31 2017-10-31 A kind of template of continuous rigid frame bridge closure section Expired - Fee Related CN207347943U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721426546.9U CN207347943U (en) 2017-10-31 2017-10-31 A kind of template of continuous rigid frame bridge closure section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721426546.9U CN207347943U (en) 2017-10-31 2017-10-31 A kind of template of continuous rigid frame bridge closure section

Publications (1)

Publication Number Publication Date
CN207347943U true CN207347943U (en) 2018-05-11

Family

ID=62353817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721426546.9U Expired - Fee Related CN207347943U (en) 2017-10-31 2017-10-31 A kind of template of continuous rigid frame bridge closure section

Country Status (1)

Country Link
CN (1) CN207347943U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115592800A (en) * 2022-12-01 2023-01-13 中交第一航务工程局有限公司(Cn) Construction method for bottom die of precast concrete structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115592800A (en) * 2022-12-01 2023-01-13 中交第一航务工程局有限公司(Cn) Construction method for bottom die of precast concrete structure

Similar Documents

Publication Publication Date Title
CN201648977U (en) Slant legged rigid frame bracket system of cast-in-place prestressed concrete continuous beam at bridge site
CN108004928B (en) A kind of asymmetric rigid frame-continuous girder construction technology
CN107905109A (en) The loads such as the cast-in-place platform simulation of great-leap-forward bridge are segmented precompressed construction method
CN111910679B (en) Construction method of overlong and ultrahigh-weight retaining wall under complex terrain
CN102787560B (en) Integrated construction method of support of large cantilevered capping beam and vertical column
CN105297630A (en) Construction method for double-component steel tubes of main arch arcs
CN101906768A (en) Panel construction method of concrete faced rock-fill dam
CN107974942B (en) A kind of abrupt slope side rigid frame-continuous girder end bay construction method
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN211517947U (en) Bridge case roof beam is prefabricated with shaped steel pedestal
CN103276893A (en) Novel composite structure for supporting rigid building template and construction method
CN109610817A (en) Cross beam falsework and its design and construction method
CN201924289U (en) Bracket structure for 0# block of high-pier long-span continuous rigid frame bridge
CN105804117A (en) Formwork tie bar structure of soil arch mould in cover-excavation method for mountain highway tunnel, and construction method thereof
CN106988319A (en) A kind of rapid constructing method of large deep foundation pit agent structure side wall
CN207347943U (en) A kind of template of continuous rigid frame bridge closure section
CN102733307A (en) Method for constructing cast-in-place beam falsework
CN110158951A (en) A kind of frame structure wooden template construction method entirely
CN106351129A (en) Construction method for long-span continuous beam neighboring existing lines
CN108589769A (en) A kind of embedding rock T shapes combined type column plate high gear wall construction method of overlength
CN205024719U (en) Pile foundation and integrated reverse construction vertical braces system of underground continuous wall
CN204780635U (en) Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures
CN107299596B (en) Concrete support trestle plate lower supporting beam template system and construction method thereof
CN103243731B (en) Mould supporting method for trapezoid cross section base of shear wall
CN113818352B (en) Soft foundation high pier curve cast-in-situ box girder bridge and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant