CN207347943U - A kind of template of continuous rigid frame bridge closure section - Google Patents
A kind of template of continuous rigid frame bridge closure section Download PDFInfo
- Publication number
- CN207347943U CN207347943U CN201721426546.9U CN201721426546U CN207347943U CN 207347943 U CN207347943 U CN 207347943U CN 201721426546 U CN201721426546 U CN 201721426546U CN 207347943 U CN207347943 U CN 207347943U
- Authority
- CN
- China
- Prior art keywords
- template
- fixed
- slab rubber
- rigid frame
- bamboo slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model proposes a kind of template of continuous rigid frame bridge closure section, including stent, the cradle top is laid with some compact arranged lumps of wood and forms jacking, and the fixed tight bamboo slab rubber of piece that is laid with forms bed die on jacking, the bamboo slab rubber is 1.2m × 2.0m, thickness 1.2cm;The side form of rectangular frame is set on the bed die, and the side form is tied up drawing using long bolt by the punching block being oppositely arranged and formed, fixed setting wooden model inside punching block, the fixed bamboo slab rubber of mould inner surface, and malthoid is laid with the bamboo slab rubber;Fixed and supported by steel pipe scaffold outside the punching block.The utility model is simple in structure, reduces security risk, prevents quality problems, shorten the construction period.
Description
Technical field
The utility model belongs to field of bridge construction, and in particular to a kind of template of continuous rigid frame bridge closure section.
Background technology
With socio-economic development and the scientific and technological progress of construction industry, the fast development of China's highway and urban transportation,
Cloverleaf Junction, high pier bridge, also largely build across the highway bridge of cheuch therewith.And High-pier Long-span continuous rigid frame bridge
Be through frequently with bridge structure form.And the closure section construction of continuous rigid frame bridge then becomes one of critical process.
The template used in the prior art usually occurs that spillage causes quality problems, or even because stress is unreasonable or stent
It is unstable to cause security incident, make claim for eot.For these problems, the utility model proposes it is a kind of it is rational in infrastructure it is continuous just
The template of structure beam bridge closure section.
Utility model content
For the deficiency in the presence of the prior art, the utility model proposes a kind of continuous rigid frame bridge conjunction rational in infrastructure
The template of imperial section, it is simple in structure, security risk is reduced, prevents quality problems, shortens the construction period.
The utility model is realized by following scheme:
A kind of template of continuous rigid frame bridge closure section, including stent, the cradle top are laid with some compact arranged
The lumps of wood forms jacking, and the fixed tight bamboo slab rubber of piece that is laid with forms bed die on jacking, and the bamboo slab rubber is 1.2m × 2.0m, thick
Spend for 1.2cm;The side form of rectangular frame is set on the bed die, and the side form pricks screw thread pair by the punching block being oppositely arranged using essence
Pull system is fixed, fixed setting wooden model inside punching block, the fixed bamboo slab rubber of mould inner surface, and malthoid is laid with the bamboo slab rubber;It is described
Fixed and supported by steel pipe scaffold outside punching block.
Preferably, the jacking is alternately arranged close-packed arrays using the lumps of wood of 10cm × 10cm, bottom uses some
The long lumps of wood away from 30cm is fixed on stent, and this structure makes the lumps of wood be not in whole seam rupture when undertaking power.
Preferably, the stent is full hall foot hand stent, upright bar main body spacing is 0.6m × 0.9m, 0.6m at jacking ×
0.6m, horizon bar step pitch are 0.9m, and scaffold centre and periphery are arranged circumferentially bridging, and are continuously set by ground to template face
Put, bridging is 45 °~60 ° with ground elevation, and vertical bridging is set every four rows, and spacing is not more than 6m, horizontal cross brace
By every two rows of settings together, bottom of upright rod sets bar of sweeping the floor.
Preferably, the bamboo slab rubber long side along bridge to arrangement.
Preferably, the stent is built with C15 concrete hardenings and levelling scar, concrete hardening layer thickness
Not less than 10cm.
Preferably, the nut bearing of long bolt sets wooden unit inside the side form.
The beneficial effects of the utility model are:
1st, supported using full hall foot hand stent, foot hand stent is built on concrete layer, and support is more firm;Jacking uses
The lumps of wood is alternately arranged, and is not in the fracture of whole seam, reduces security risk;
2nd, bamboo slab rubber long side makes side form more regular consistent with the seam of bed die, and be laid with bamboo slab rubber along bridge to arrangement
Malthoid, mortar leakage prevention;
3rd, the nut bearing of long bolt sets wooden unit inside side form, and paddle can be mended after form removal, is prevented because of nut corrosion
Caused problem of appearance.
Brief description of the drawings
Fig. 1 is the overlooking the structure diagram of the utility model embodiment bed die and side form.
Fig. 2 is the side structure schematic view of the utility model embodiment.
Embodiment
In order to make the technical means, creative features, achievable purpose and effectiveness that the utility model is realized easy to understand, under
Face combines specific attached drawing, and the utility model is expanded on further.
By taking the true highway TJ4 work areas flower Milky Way bridge in Nanchuan to road as an example, this spanning footpath is combined as 85+148+85 meters even
Continue firm structure, bridge total length is 326.0 meters, and double width bridge, box beam uses single box single chamber, and 12 meters of case top width, bottom is 6 meters wide, unilateral
3 meters of edge of a wing length.Main bridge single width box beam totally 2 cast-in-place segments, 2 end bay closure segments and a mid-span closure segment.
On the scar that flower Milky Way bridge side span Cast-in-Situ Segment scaffold basis is slotted in Blasting Excavation abutment, then use
The concrete of C15 is hardened, is levelling, and concrete hardening thickness is not less than 10cm, and foundation capability is fully able to meet foot
Hand cradle sets up requirement.
This bridge end bay Cast-in-Situ Segment full framing determines to select 48 × 2.75 steel pipes of specification Φ, Q235A, 1 main body spacing of upright bar
For other 0.6m × 0.9m of 0.6m × 0.6m at jacking, 2 step pitch of horizon bar is 0.9m, and the circumferential and middle setting in scaffold periphery is cut
Knife support 5, and continuously set by ground to top surface is operated, between bridging 5 and ground elevation are 45 °~60 °, middle bridging 5
Set every four rows, spacing is not more than 6m, and horizontal cross brace is pressed to be set together every two steps, and bottom of upright rod sets bar of sweeping the floor;Jacking 3
Close-packed arrays are alternately arranged using the lumps of wood of 10cm × 10cm, stent is fixed in bottom using the long lumps of wood 4 of some spacing 30cm
On, a root long lumps of wood is fixed on each horizon bar, stabilization beam of the root long lumps of wood as jacking is also set up between horizon bar.
After after holder jacking 3, installation is complete, measuring respectively goes out the sideline of Cast-in-Situ Segment box girder web side concrete, then by template construction
Personnel eject bed die sideline, and then installation dimension be bamboo slab rubber 6 that 1.2m × 2.0m thickness is 1.2cm on the lumps of wood again, elder generation two
Side is middle again, need to carry out the adjustment of plane side when last middle block bamboo slab rubber is put when on curve with portable plane, install, piece is tight
After reality, it is fixed on the lumps of wood.
Side form panel is pricked screw thread using essence and machined roadbed 1 is fixed on to pull system 10 using the big punching block 7 of customization
On, it is firm to be supported using steel pipe scaffold, the inside of punching block 7 fixed setting wooden model 8, the fixed bamboo slab rubber 6 of mould inner surface, inside side form
The nut bearing of long bolt sets wooden unit 9.
Bamboo slab rubber long side is along bridge to arrangement so that side form is consistent with end template piece rule, and bamboo film face is laid with one layer
11 mortar leakage prevention of malthoid.
In order to ensure the safety of stent, the plastic set of stent is eliminated, while measures the elastic settlement amount of stent, is stent
Arch rise left in advance foundation is provided, pre-pressing bracket uses molding concrete block and bundled steel strand wires or reinforcing bar piling prepressing.
Above description is merely a prefered embodiment of the utility model, on the scope of protection of the utility model is not limited in
Embodiment is stated, every technical solution for belonging to the utility model principle belongs to the scope of protection of the utility model.For this
For the technical staff in field, some improvement for being carried out on the premise of the principle of the utility model is not departed from, these improvement
It should be regarded as the scope of protection of the utility model.
Claims (6)
1. a kind of template of continuous rigid frame bridge closure section, including stent, it is characterised in that the cradle top is laid with some tight
The lumps of wood of solid matter row forms jacking, and the fixed tight bamboo slab rubber of piece that is laid with forms bed die on jacking, and the bamboo slab rubber is 1.2m
× 2.0m, thickness 1.2cm;The side form of rectangular frame is set on the bed die, and the side form is used by the punching block being oppositely arranged
Essence pricks screw thread and pull system is fixed, fixed setting wooden model inside punching block, the fixed bamboo slab rubber of mould inner surface, is laid with the bamboo slab rubber
Malthoid;Fixed and supported by steel pipe scaffold outside the punching block.
2. a kind of template of continuous rigid frame bridge closure section as claimed in claim 1, it is characterised in that the jacking uses
The lumps of wood close-packed arrays of 10cm × 10cm, bottom are fixed on stent using the long lumps of wood of some spacing 30cm.
3. a kind of template of continuous rigid frame bridge closure section as claimed in claim 1, it is characterised in that the stent is full hall
Foot hand stent, upright bar main body spacing are 0.6m × 0.9m, 0.6m × 0.6m at jacking, and horizon bar step pitch is 0.9m, in scaffold
Between and periphery be arranged circumferentially bridging, and continuously set by ground to template face, bridging is 45 °~60 ° with ground elevation, is erected
Set to bridging every four rows, spacing is not more than 6m, and horizontal cross brace is pressed to be set together per two rows of, and bottom of upright rod sets and sweeps the floor
Bar.
A kind of 4. template of continuous rigid frame bridge closure section as claimed in claim 1, it is characterised in that the bamboo slab rubber long side
Along bridge to arrangement.
5. a kind of template of continuous rigid frame bridge closure section as claimed in claim 3, it is characterised in that the stent is built
With in C15 concrete hardenings and levelling scar, concrete hardening layer thickness is not less than 10cm.
A kind of 6. template of continuous rigid frame bridge closure section as claimed in claim 1, it is characterised in that minister in the side form
The nut bearing of screw rod sets wooden unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721426546.9U CN207347943U (en) | 2017-10-31 | 2017-10-31 | A kind of template of continuous rigid frame bridge closure section |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721426546.9U CN207347943U (en) | 2017-10-31 | 2017-10-31 | A kind of template of continuous rigid frame bridge closure section |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207347943U true CN207347943U (en) | 2018-05-11 |
Family
ID=62353817
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721426546.9U Expired - Fee Related CN207347943U (en) | 2017-10-31 | 2017-10-31 | A kind of template of continuous rigid frame bridge closure section |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207347943U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115592800A (en) * | 2022-12-01 | 2023-01-13 | 中交第一航务工程局有限公司(Cn) | Construction method for bottom die of precast concrete structure |
-
2017
- 2017-10-31 CN CN201721426546.9U patent/CN207347943U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115592800A (en) * | 2022-12-01 | 2023-01-13 | 中交第一航务工程局有限公司(Cn) | Construction method for bottom die of precast concrete structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201648977U (en) | Slant legged rigid frame bracket system of cast-in-place prestressed concrete continuous beam at bridge site | |
CN108004928B (en) | A kind of asymmetric rigid frame-continuous girder construction technology | |
CN107905109A (en) | The loads such as the cast-in-place platform simulation of great-leap-forward bridge are segmented precompressed construction method | |
CN111910679B (en) | Construction method of overlong and ultrahigh-weight retaining wall under complex terrain | |
CN102787560B (en) | Integrated construction method of support of large cantilevered capping beam and vertical column | |
CN105297630A (en) | Construction method for double-component steel tubes of main arch arcs | |
CN101906768A (en) | Panel construction method of concrete faced rock-fill dam | |
CN107974942B (en) | A kind of abrupt slope side rigid frame-continuous girder end bay construction method | |
CN107905124B (en) | A kind of symmetrical expression rigid frame-continuous girder construction technology | |
CN211517947U (en) | Bridge case roof beam is prefabricated with shaped steel pedestal | |
CN103276893A (en) | Novel composite structure for supporting rigid building template and construction method | |
CN109610817A (en) | Cross beam falsework and its design and construction method | |
CN201924289U (en) | Bracket structure for 0# block of high-pier long-span continuous rigid frame bridge | |
CN105804117A (en) | Formwork tie bar structure of soil arch mould in cover-excavation method for mountain highway tunnel, and construction method thereof | |
CN106988319A (en) | A kind of rapid constructing method of large deep foundation pit agent structure side wall | |
CN207347943U (en) | A kind of template of continuous rigid frame bridge closure section | |
CN102733307A (en) | Method for constructing cast-in-place beam falsework | |
CN110158951A (en) | A kind of frame structure wooden template construction method entirely | |
CN106351129A (en) | Construction method for long-span continuous beam neighboring existing lines | |
CN108589769A (en) | A kind of embedding rock T shapes combined type column plate high gear wall construction method of overlength | |
CN205024719U (en) | Pile foundation and integrated reverse construction vertical braces system of underground continuous wall | |
CN204780635U (en) | Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures | |
CN107299596B (en) | Concrete support trestle plate lower supporting beam template system and construction method thereof | |
CN103243731B (en) | Mould supporting method for trapezoid cross section base of shear wall | |
CN113818352B (en) | Soft foundation high pier curve cast-in-situ box girder bridge and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||