CN207339069U - A kind of hook for being used to replace insulator chain - Google Patents
A kind of hook for being used to replace insulator chain Download PDFInfo
- Publication number
- CN207339069U CN207339069U CN201720835063.8U CN201720835063U CN207339069U CN 207339069 U CN207339069 U CN 207339069U CN 201720835063 U CN201720835063 U CN 201720835063U CN 207339069 U CN207339069 U CN 207339069U
- Authority
- CN
- China
- Prior art keywords
- cramping body
- insulator chain
- hook
- utility
- rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of hook for being used to replace insulator chain, it includes hanger bulk and rope connecting portion, rope connecting portion includes the first cramping body and the second cramping body, first cramping body and the second cramping body are opposite to separatedly setting, the lower end of first cramping body and the second cramping body is fixedly connected by rigid member, the upper end of first cramping body and the second cramping body is bolted to connection, and hanger bulk is fixed on the upper end of the first cramping body.The utility model can substitute shackle in the operations such as insulator chain are replaced, and can meet the job requirements for replacing bunch of insulator, make power tool lighter, can also mitigate the labor intensity of on-site personnel.
Description
Technical field
It the utility model is related to a kind of hook for being used to replace insulator chain.
Background technology
In the operation for replacing V-type insulator chain at present, plying is matched somebody with somebody using insulated hanging pole or suspender belt usually in the case of powered
Thick stick carries out operation;Generally coordinate chain block to carry out replacement operation using suspender belt or steel wire rope during power failure operation, pass through contractile filaments
Conducting wire load is transferred on bearing tool by thick stick or chain block, and insulator does not stress, and can be replaced after insulator relaxation,
Load is transferred on insulator again after the completion of to be replaced.
In 500kV transmission lines of electricity carry out replacing the operation such as insulator chain, often using shackle and insulation strut, pull rod, hang
Bar is connected with steel wire rope, shackle only limit the use of in insulation strut, pull rod, sunpender and the steel wire rope with being arrived used in above-mentioned operation,
Tower head end construction hole is attached, therefore the operation Work tool weight, volume, the length that are combined into are relatively large, and is unfavorable for transporting
It is defeated, increase the labor intensity of on-site personnel, there are operational hazards.
Utility model content
The purpose of this utility model is to provide a kind of hook for being used to replace insulator chain, can meet to replace bunch of insulator
Job requirements, make power tool lighter, can also mitigate the labor intensity of on-site personnel.
To achieve the above object, the technical scheme adopted by the utility model is that:
A kind of hook for being used to replace insulator chain, it includes hanger bulk and rope connecting portion, and rope connecting portion includes
First cramping body and the second cramping body, the first cramping body and the second cramping body are opposite to separatedly setting, the first cramping body and the
The lower end of two cramping bodies is fixedly connected by rigid member, and the upper end of the first cramping body and the second cramping body is bolted company
Connect, hanger bulk is fixed on the upper end of the first cramping body.
In the operation such as insulator chain is replaced, the utility model can substitute shackle, for insulation strut, pull rod, hang
Bar and steel wire rope etc. connect, and the hanger bulk of the utility model specifically is hooked in insulation strut or pull rod or sunpender or steel wire
On rope, then by the rope for lifting insulator chain through the first cramping body and the second cramping body of rope connecting portion
Gap, the upper end of rope are bundled on rigid member, and the lower end of rope is fixedly connected with insulator chain lifting device, at this time using exhausted
Insulator chain can be lifted and replaced by edge substring lifting device.
One kind as the utility model is improved, and the hanger bulk, the first cramping body and the second cramping body are all by steel
Plate is made.
One kind as the utility model is improved, and the rigid member is fixed seat, and the both ends of fixed seat are pressed from both sides with first respectively
Body and the second cramping body integrated molding are held, and fixed seat is provided with hollow hole.
Further, outer circumferential surface of the fixed seating between the first cramping body and the second cramping body on the inside of gap is light
Sliding arc surface.
Compared with prior art, the utility model has the following advantages:
The utility model can substitute shackle in the operations such as insulator chain are replaced, and can meet the work for replacing bunch of insulator
Industry demand, makes power tool lighter, can also mitigate the labor intensity of on-site personnel.
Brief description of the drawings
Fig. 1 is the schematic diagram that the utility model is used to replace the hook of insulator chain;
Fig. 2 is the left view of Fig. 1.
Embodiment
The content of the utility model is described in further details with reference to the accompanying drawings and detailed description.It is appreciated that
, specific embodiment described herein is used only for explaining the utility model, rather than the restriction to the utility model.In addition
It should also be noted that, for the ease of describing, part relevant with the utility model rather than full content are illustrate only in attached drawing.
Embodiment
Fig. 1 is refer to, a kind of hook for being used to replace insulator chain, it includes hanger bulk 10 and rope connecting portion 20.
Rope connecting portion 20 includes the first cramping body 21 and the second cramping body 22, the first cramping body 21 and the second cramping body 22
Opposite to separatedly setting, the first cramping body 21 is fixedly connected with the lower end of the second cramping body 22 by rigid member 23, the first folder
The upper end that body 21 is held with the second cramping body 22 is fixedly connected by bolt 24, and hanger bulk 10 is fixed on the upper of the first cramping body 21
End.
In the operation such as insulator chain is replaced, the utility model can substitute shackle, for insulation strut, pull rod, hang
Bar and steel wire rope etc. connect, and the hanger bulk of the utility model specifically is hooked in insulation strut or pull rod or sunpender or steel wire
On rope, then by the rope for lifting insulator chain through the first cramping body and the second cramping body of rope connecting portion
Gap, the upper end of rope are bundled on rigid member, and the lower end of rope is fixedly connected with insulator chain lifting device, at this time using exhausted
Insulator chain can be lifted and replaced by edge substring lifting device.The utility model is relative to shackle, the spy with install convenient
Point, hanger bulk need to only be hung over be hooked object;And the mechanical strength of the utility model hook is the 5 of common shack
Times, meet the work operation of equivalent diameter steel wire rope and insulation branch, draw, the requirement of mechanical strength of sunpender, while maintain cost;This reality
Coordinated with novel hook by rope and insulator chain lifting device to replace insulator chain, electrical insulation properties are good, can be with
Meet live-working safety distance, while be also suitable power failure operation;The utility model hook weight for conventional tool 15%-
20%, greatly save the labor intensity of field work and working at height personnel.
In the present embodiment, the hanger bulk 10, the first cramping body 21 and the second cramping body 22 are all made of steel plate.
The hanger bulk of tabular and the contact area bigger for being hooked object, thus hanger bulk energy hook obtain it is more steady;First folder of steel plate
Hold body and the second cramping body and can contact area bigger with rope so that rope will not be waved arbitrarily.
In the present embodiment, the rigid member 23 is fixed seat, the both ends of fixed seat respectively with the first cramping body 21 and
Two cramping bodies, 22 integrated molding, and fixed seat is provided with hollow hole 25, can be with to be provided with the fixed seat of hollow hole as connector
The overall weight of hook is reduced in the case where ensureing the intensity of rigid member, in addition hollow hole can also be used for the bundle of rope as connecting hole
It is strapped fixed;Moreover, outer circumferential surface of the fixed seating between the first cramping body 21 and the second cramping body 22 on the inside of gap is light
Sliding arc surface 26, smooth arc surface can avoid damage to rope and cause security incident, while make hoisting rope and fixed seat more
Close fit.
In conclusion the utility model is combined by hanger bulk and rope connecting portion, make replacing insulator chain etc.
Shackle can be substituted in industry, is had the following advantages compared with prior art:
1st, the utility model has the characteristics that install convenient, need to only hang over hanger bulk and be hooked object relative to shackle
;
2 and the mechanical strength of the utility model hook be 5 times of common shack, meet that equivalent diameter steel wire rope is lived and make
Industry and insulation branch, draw, the requirement of mechanical strength of sunpender, while maintains cost;
3rd, the utility model hook is coordinated by rope and insulator chain lifting device to replace insulator chain, electric insulation
It is functional, it can meet live-working safety distance, while be also suitable power failure operation;
4th, the utility model hook weight is 15%-the 20% of conventional tool, greatlys save field work and working at height
The labor intensity of personnel.
Above-listed detailed description is illustrating for the utility model possible embodiments, which simultaneously is not used to limit
The scope of the claims of the utility model, all equivalence enforcements or change without departing from carried out by the utility model, are intended to be limited solely by this case
In the scope of the claims.
Claims (4)
- A kind of 1. hook for being used to replace insulator chain, it is characterised in that:Including hanger bulk and rope connecting portion, rope connection Portion includes the first cramping body and the second cramping body, and the first cramping body and the second cramping body are opposite to separatedly setting, and first clamps The lower end of body and the second cramping body is fixedly connected by rigid member, and the upper end of the first cramping body and the second cramping body is consolidated by bolt Fixed connection, hanger bulk are fixed on the upper end of the first cramping body.
- 2. the hook according to claim 1 for being used to replace insulator chain, it is characterised in that:The hanger bulk, first Cramping body and the second cramping body are all made of steel plate.
- 3. the hook according to claim 1 for being used to replace insulator chain, it is characterised in that:The rigid member is fixation Seat, the both ends of fixed seat are respectively with the first cramping body and the second cramping body integrated molding, and fixed seat is provided with hollow hole.
- 4. the hook according to claim 3 for being used to replace insulator chain, it is characterised in that:The fixed seating is in first Outer circumferential surface between cramping body and the second cramping body on the inside of gap is smooth arc surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720835063.8U CN207339069U (en) | 2017-07-11 | 2017-07-11 | A kind of hook for being used to replace insulator chain |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720835063.8U CN207339069U (en) | 2017-07-11 | 2017-07-11 | A kind of hook for being used to replace insulator chain |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207339069U true CN207339069U (en) | 2018-05-08 |
Family
ID=62426427
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720835063.8U Active CN207339069U (en) | 2017-07-11 | 2017-07-11 | A kind of hook for being used to replace insulator chain |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207339069U (en) |
-
2017
- 2017-07-11 CN CN201720835063.8U patent/CN207339069U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103207116B (en) | Long-time property detection device for carbon fiber composite material cable core | |
WO2012100595A1 (en) | Tool for replacing ceramic rod type insulator | |
CN101814707B (en) | Tool for live replacement of 220kV line 'V' string insulator and method | |
CN201146346Y (en) | Portable insulation maintenance gap bridge | |
CN207339069U (en) | A kind of hook for being used to replace insulator chain | |
CN103795005A (en) | Special tool for dual protection of wire of strain tower | |
CN201868790U (en) | Insulating gap bridge for repairing power lines | |
CN207339070U (en) | A kind of light-duty replacement insulator chain instrument | |
CN204265218U (en) | A kind of power station unit internal head cover special hanger | |
CN203553745U (en) | A 800kV extra high voltage direct current line 150kN level soft insulation pull rod | |
CN106451237B (en) | Strain insulator string of ultrahigh voltage transmission line passes in and out operation attachment device and application method | |
CN106448952B (en) | Y types strain insulator string and anchor support | |
CN209571767U (en) | A kind of machete OK a karaoke club power test fixture | |
CN103247972A (en) | Wire tractor | |
CN207218127U (en) | A kind of high intensity packway bar | |
CN201332246Y (en) | Large-tonnage conducting wire lifter | |
CN103618250A (en) | Operating method for electrified replacement of double-V double-L insulator chains of extra-high voltage circuit | |
CN204376315U (en) | The universal insulator string bottle-holding rack of a kind of lightweight | |
CN206442062U (en) | Strain insulator string of ultrahigh voltage transmission line passes in and out operation attachment means | |
CN214114652U (en) | Special flexible insulation lifting appliance for ultra-high voltage live working | |
CN104143781B (en) | The electrification installation method of electricity testing grounding ring and the installation tool of electricity testing grounding ring | |
CN106115504A (en) | A kind of suspender | |
CN105762702A (en) | Method for replacing L-shaped insulator string of +/-800kV direct current transmission line | |
CN206471748U (en) | Universal 500kV straight lines wineglass tower line maintenance cross-arm hanging point device | |
CN205932999U (en) | Hanger |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |