CN207334703U CN201721396415.0U CN201721396415U CN207334703U CN 207334703 U CN207334703 U CN 207334703U CN 201721396415 U CN201721396415 U CN 201721396415U CN 207334703 U CN207334703 U CN 207334703U
Authority
CN
China
Prior art keywords
hot gas
boiler
control system
triple valve
acquisition device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721396415.0U
Other languages
Chinese (zh)
Inventor
赵长发
郑卫民
郑天明
荆涛涛
王冬
范虎生
李志阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoning Dayuan Energy Co Ltd
Original Assignee
Luoning Dayuan Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoning Dayuan Energy Co Ltd filed Critical Luoning Dayuan Energy Co Ltd
Priority to CN201721396415.0U priority Critical patent/CN207334703U/en
Application granted granted Critical
Publication of CN207334703U publication Critical patent/CN207334703U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

The utility model discloses a kind of control system of natural gas afterheat boiler for power generation, including:The a plurality of hot gas conveyance conduit connected with boiler, each hot gas conveyance conduit are equipped with triple valve;Flow detection meter, it is used to detect the hot gas flow in each hot gas conveyance conduit;Hot gas demand acquisition device, it is used to obtain the required hot gas demand of boiler heating;Controller, it is connected with triple valve, flow detection meter and hot gas demand acquisition device, the hot gas demand that the hot gas flow and hot gas demand acquisition device that controller is used to be detected according to flowmeter are got, and controls the aperture of triple valve.Therefore by the hot gas amount for regulating and controlling the aperture of each triple valve to control into boiler, the precision into the hot gas amount of boiler can be ensured to greatest extent, to ensure the normal operation of boiler.

Description

A kind of control system of natural gas afterheat boiler for power generation
Technical field
Natural gas afterheat technical field of power generation is the utility model is related to, more particularly to a kind of natural gas afterheat power generation pot The control system of stove.
Background technology
Natural gas uses high-pressure delivery in long distance delivery process, reach user using when need to depressurize.Therefore in gas transmission When generally use combustion engine driving natural gas boosting machine the pressure in gas pipeline is maintained in certain scope, in pressure reduction In give off substantial amounts of hot gas, at present mainly using these hot gas come the water in heating boiler, so as to produce superheated steam, overheat Steam drive steam turbine is rotated and produced electricl energy.But existing control system is difficult to the hot gas amount that accurately control enters boiler, because This Rankine cycle system that cannot be guaranteed subsequently to connect effectively works.
Therefore, a kind of control system of natural gas afterheat boiler for power generation how is provided, to improve the hot gas into boiler The control accuracy of amount, is the technical problem that those skilled in the art are badly in need of solving.
Utility model content
The purpose of this utility model is to provide a kind of control system of natural gas afterheat boiler for power generation, can effectively solve Into boiler hot gas amount control accuracy the problems such as.
In order to solve the above technical problems, the utility model provides following technical solution:
A kind of control system of natural gas afterheat boiler for power generation, including:
The a plurality of hot gas conveyance conduit connected with boiler, each hot gas conveyance conduit are equipped with triple valve;
Flow detection meter, it is used to detect the hot gas flow in each hot gas conveyance conduit;
Hot gas demand acquisition device, it is used to obtain the required hot gas demand of the boiler heating;
Controller, it is connected with the triple valve, the flow detection meter and the hot gas demand acquisition device, institute State the hot gas that the hot gas flow and the hot gas demand acquisition device that controller is used to detect according to the flowmeter are got Demand, controls the aperture of the triple valve.
Preferably, the controller and triple valve, the flow detection meter and hot gas demand obtain dress The circuit for putting connection is equipped with signal isolator.
Preferably, the motor for controlling the triple valve to open and close is further included, the motor is connected with stand-by power supply device.
Preferably, the stand-by power supply device includes storage battery and the inverter connected with the storage battery.
Preferably, the boiler is connected by S type bend pipes with chimney.
Preferably, the inner wall of the gas outlet of the boiler is tapered along the circulating direction of gas.
Preferably, circulating direction flaring of the inner wall of the air inlet of the chimney along gas.
Preferably, by-pass flue is connected with the S types bend pipe, the by-pass flue is equipped with air-introduced machine, the bypass The outlet of flue is connected with the chimney.
Compared with prior art, above-mentioned technical proposal has the following advantages:
A kind of control system of natural gas afterheat boiler for power generation provided by the utility model, including:A plurality of and boiler The hot gas conveyance conduit of connection, each hot gas conveyance conduit are equipped with triple valve;Flow detection meter, it is used to detect each hot gas conveying Hot gas flow in pipeline;Hot gas demand acquisition device, it is used to obtain the required hot gas demand of boiler heating;Control Device, it is connected with triple valve, flow detection meter and hot gas demand acquisition device, and controller is used for what is detected according to flowmeter The hot gas demand that hot gas flow and hot gas demand acquisition device are got, controls the aperture of triple valve.Therefore regulation and control are passed through The aperture of each triple valve controls the hot gas amount into boiler, can ensure the precision into the hot gas amount of boiler to greatest extent, with Ensure the normal operation of boiler.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of the utility model or technical solution of the prior art Attached drawing is briefly described needed in technology description, it should be apparent that, drawings in the following description are that this practicality is new Some embodiments of type, for those of ordinary skill in the art, without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
A kind of control for natural gas afterheat boiler for power generation that Fig. 1 is provided by a kind of embodiment of the utility model The structure diagram of system.
Embodiment
It is understandable in order to enable the above-mentioned purpose of the utility model, feature and advantage to become apparent, it is right below in conjunction with the accompanying drawings Specific embodiment of the present utility model is described in detail.
Detail is elaborated in the following description in order to fully understand the utility model.But the utility model can Implemented with a variety of different from other manner described here, those skilled in the art can be without prejudice to the utility model connotation In the case of do similar popularization.Therefore the utility model is from the limitation of following public embodiment.
Please refer to Fig.1, a kind of natural gas afterheat that Fig. 1 is provided by a kind of embodiment of the utility model, which generates electricity, to be used The structure diagram of the control system of boiler.
A kind of embodiment of the utility model provides a kind of control system of natural gas afterheat boiler for power generation, Including:The hot gas conveyance conduit 2 that a plurality of and boiler 1 connects, each hot gas conveyance conduit 2 are equipped with triple valve 3;Flow detection meter, It is used to detect the hot gas flow in each hot gas conveyance conduit 2;Hot gas demand acquisition device, it, which is used to obtaining boiler 1, heats Required hot gas demand;Controller 4, it is connected with triple valve 3, flow detection meter and hot gas demand acquisition device, The hot gas demand that the hot gas flow and hot gas demand acquisition device that controller 4 is used to be detected according to flowmeter are got, control The aperture of triple valve 3 processed.
In the present embodiment, flow detection meter can be arranged on triple valve 3, i.e., it is defeated to possess detection hot gas for the triple valve 3 Send pipeline 2 conveying come hot gas flow function, secondly hot gas demand acquisition device can obtain boiler 1 heat it is required Hot gas demand, since the water that boiler 1 heats different temperatures and volume is also different, same day in addition to the demand of hot gas When right source of the gas is less, can for hot gas combustion engine it is limited, therefore controlled by regulating and controlling the aperture of each triple valve 3 into boiler 1 Hot gas amount, can ensure to greatest extent into boiler 1 hot gas amount precision, to ensure the normal operation of boiler 1.
Such as three hot gas conveyance conduits 2 can be set, i.e., controller 4 needs the aperture of three triple valves 3, comes smart Really hot gas amount of the control into boiler 1.The hot gas conveyance conduit 2 of other quantity can certainly be selected according to actual conditions, this Embodiment is not construed as limiting this.
Further, the circuit that controller 4 is connected with triple valve 3, flow detection meter and hot gas demand acquisition device It is equipped with signal isolator.Interference signal can effectively be abandoned by signal isolator, make signal transmission more accurate.
Further, the motor for controlling triple valve 3 to open and close is further included, motor is connected with stand-by power supply device.Its In under normal circumstances, motor can be powered by civilian alternating current, when having a power failure, can be supplied by stand-by power supply device Electricity, to ensure the normal operation of system.
Specifically, stand-by power supply device includes storage battery 5 and the inverter 6 connected with storage battery 5.
In one embodiment of the utility model, boiler 1 is connected by S types bend pipe 7 and chimney 8.By S types bend pipe 7, The flow resistance of gas can be reduced.
Further, the inner wall of the gas outlet of boiler 1 is tapered along the circulating direction of gas.Such as the tapering internal wall can be Tubaeform, tubaeform gas outlet flows into S types bend pipe 7 easy to gas.
Secondly, circulating direction flaring of the inner wall of the air inlet of chimney 8 along gas.Such as the flaring inner wall can be loudspeaker Shape, tubaeform air inlet enter chimney 8 easy to gas from S types bend pipe 7.
Further, by-pass flue 9 is connected with S types bend pipe 7, by-pass flue 9 is equipped with air-introduced machine 10, by-pass flue 9 outlet and chimney 8 connect.It is easy to the gas that boiler 1 is discharged being discharged into air from chimney 8 by air-introduced machine 10.When only When one valve is opened, air-introduced machine 10 is closed, the gas that boiler 1 is discharged air can be discharged into from chimney 8 by the suction of chimney 8 In.
Each embodiment is described by the way of progressive in this specification, what each embodiment stressed be and other The difference of embodiment, between each embodiment identical similar portion mutually referring to.
A kind of control system of natural gas afterheat boiler for power generation provided by the utility model has been carried out in detail above Introduce.Specific case used herein is set forth the principle and embodiment of the utility model, above example Illustrate to be only intended to help the method and its core concept for understanding the utility model.It should be pointed out that for the general of the art For logical technical staff, on the premise of the utility model principle is not departed from, some improvement can also be carried out to the utility model And modification, these are improved and modification is also fallen into the protection domain of the utility model claims.To the disclosed embodiments Described above, enables professional and technical personnel in the field to realize or using the utility model.A variety of modifications to these embodiments It will be apparent for those skilled in the art, the general principles defined herein can not depart from this In the case of the spirit or scope of utility model, realize in other embodiments.Therefore, the utility model is not intended to be limited to The embodiments shown herein, and it is to fit to the most wide model consistent with the principles and novel features disclosed herein Enclose.

Claims (8)

  1. A kind of 1. control system of natural gas afterheat boiler for power generation, it is characterised in that including:
    The a plurality of hot gas conveyance conduit connected with boiler, each hot gas conveyance conduit are equipped with triple valve;
    Flow detection meter, it is used to detect the hot gas flow in each hot gas conveyance conduit;
    Hot gas demand acquisition device, it is used to obtain the required hot gas demand of the boiler heating;
    Controller, it is connected with the triple valve, the flow detection meter and the hot gas demand acquisition device, the control The hot gas demand that the hot gas flow and the hot gas demand acquisition device that device processed is used to be detected according to the flowmeter are got Amount, controls the aperture of the triple valve.
  2. 2. control system according to claim 1, it is characterised in that the controller and the triple valve, the flow Detection meter and the circuit of hot gas demand acquisition device connection are equipped with signal isolator.
  3. 3. control system according to claim 2, it is characterised in that further include the electricity for controlling the triple valve to open and close Machine, the motor are connected with stand-by power supply device.
  4. 4. control system according to claim 3, it is characterised in that the stand-by power supply device include storage battery and and The inverter of the storage battery connection.
  5. 5. control system according to any one of claims 1 to 4, it is characterised in that the boiler passes through S types bend pipe and cigarette Chimney connects.
  6. 6. control system according to claim 5, it is characterised in that stream of the inner wall of the gas outlet of the boiler along gas Logical direction is tapered.
  7. 7. control system according to claim 6, it is characterised in that stream of the inner wall of the air inlet of the chimney along gas Logical direction flaring.
  8. 8. control system according to claim 7, it is characterised in that by-pass flue is connected with the S types bend pipe, it is described By-pass flue is equipped with air-introduced machine, and the outlet of the by-pass flue is connected with the chimney.
CN201721396415.0U 2017-10-24 2017-10-24 A kind of control system of natural gas afterheat boiler for power generation Active CN207334703U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721396415.0U CN207334703U (en) 2017-10-24 2017-10-24 A kind of control system of natural gas afterheat boiler for power generation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721396415.0U CN207334703U (en) 2017-10-24 2017-10-24 A kind of control system of natural gas afterheat boiler for power generation

Publications (1)

Publication Number Publication Date
CN207334703U true CN207334703U (en) 2018-05-08

Family

ID=62363604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721396415.0U Active CN207334703U (en) 2017-10-24 2017-10-24 A kind of control system of natural gas afterheat boiler for power generation

Country Status (1)

Country Link
CN (1) CN207334703U (en)

Similar Documents

Publication Publication Date Title
CN104075373B (en) Wall-hung boiler constant-temperature control method and system based on measure by door floor heating
CN207702743U (en) Automatic-boosting hot water circulating device and its application system
CN205825411U (en) A kind of gas heater of band heating function
CN103644032B (en) Pressure feedwater cascade utilization heated natural gas system in GTCC power plant exhaust heat boiler
CN202647714U (en) Boiler economizer system
CN207334703U (en) A kind of control system of natural gas afterheat boiler for power generation
CN106762115A (en) A kind of co-generation unit with compensation function
CN104654580A (en) Heat accumulating type vacuum phase change boiler
CN108088070A (en) A kind of Intelligent preheating gas heater and its subsystem and implementation method
CN206942815U (en) Steam Turbine attachment structure
CN207230905U (en) A kind of gas heater
CN206637822U (en) A kind of antifreeze boosting type gas heater
CN206468425U (en) Engine and its electric control pump
CN203489488U (en) Waterway system for gas heating water furnace
CN210532674U (en) Gas water heating equipment
CN204853992U (en) Air source boiler based on wiFi wireless control
CN207406389U (en) A kind of biomass high-temperature super-pressure reheating generating set quickly opens furnace system
CN206583108U (en) High-efficiency condensation premixes boiler monitoring system
CN202032724U (en) Novel solar gas water heater
CN106370034A (en) Flue gas heat exchange system for urea pyrolysis
CN201723977U (en) Electromagnetic heating oil transporting device
CN107036071B (en) The adjusting method and its regulating device of the inflow temperature of flue gas heat-exchange unit
CN206222439U (en) A kind of individual well draws the heating plant of oil drop
CN205119491U (en) Heating device and use this heating device's fast ware of giving birth to of hot water
CN207080291U (en) A kind of distributed busbar protection heated by natural gas system