CN207332331U - A kind of steel truss hydraulic lifting system - Google Patents

A kind of steel truss hydraulic lifting system Download PDF

Info

Publication number
CN207332331U
CN207332331U CN201721133162.8U CN201721133162U CN207332331U CN 207332331 U CN207332331 U CN 207332331U CN 201721133162 U CN201721133162 U CN 201721133162U CN 207332331 U CN207332331 U CN 207332331U
Authority
CN
China
Prior art keywords
jack
anchor head
lifting
strand wires
steel strand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721133162.8U
Other languages
Chinese (zh)
Inventor
毛国伟
朱浙军
王挺
冯涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU EQUIPMENT INSTALLATION CO Ltd
Original Assignee
HANGZHOU EQUIPMENT INSTALLATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU EQUIPMENT INSTALLATION CO Ltd filed Critical HANGZHOU EQUIPMENT INSTALLATION CO Ltd
Priority to CN201721133162.8U priority Critical patent/CN207332331U/en
Application granted granted Critical
Publication of CN207332331U publication Critical patent/CN207332331U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of steel truss hydraulic lifting system, including 4 jack, 2 oil pump stations and a computer controlling center, the jack is used for lifting heavy, each jack is equipped with upper anchor head and lower anchor head and through upper anchor head and the steel strand wires of lower anchor head, the lower anchor head is fixed on jack supporting rack bottom by anchor head oil cylinder once, the upper anchor head is fixed on mandril of lifting jack by anchor head oil cylinder on one, and weight is fixed on steel strand wires bottom;The oil pump station is used to give jack fuel feeding;The computer controlling center is used for control oil pump station and jack acts.The utility model is controlled using PLC, participated in without excessive personnel, the quantity for participating in worker can be reduced, reduce labor strength, arrange personnel to be monitored at each node that need to be only lifted, ensure the security of lifting, while lifted steadily using 4 jack, so that its lifting process is reliable and stable, it is ensured that lifting safety and reliability.

Description

A kind of steel truss hydraulic lifting system
Technical field
It the utility model is related to a kind of construction auxiliary tool, more particularly to a kind of steel truss hydraulic lifting system.
Background technology
A steel truss would generally be designed in building construction process, among two steel frame constructions to be connected, if directly Tap into capable installation to build, not only difficulty is big, but also abnormally dangerous;Therefore it is frequently necessary to the steel truss assembled carrying out overall carry Lift operations, but since steel truss weight and volume is all bigger, the lifting difficulty to steel truss is larger, operates at the same time Process is more complicated, it is necessary to arrange a large amount of workers to participate in, and improves labor strength, and safety and reliability hardly results in guarantor Barrier.
Utility model content
The utility model is in order to solve above-mentioned defect existing in the prior art and deficiency, there is provided one kind lifting operation letter It is single, the quantity for participating in worker can be reduced, reduce labor strength, and lifting process is reliable and stable, it is ensured that lifting security With the steel truss hydraulic lifting system of reliability.
The technical solution of the utility model:A kind of steel truss hydraulic lifting system, including 4 jack, 2 oil pump stations and One computer controlling center,
The jack is used for lifting heavy, each jack be equipped with upper anchor head and lower anchor head and through upper anchor head and The steel strand wires of lower anchor head, the lower anchor head are fixed on jack supporting rack bottom by anchor head oil cylinder once, and the upper anchor head leads to Cross anchor head oil cylinder on one to be fixed on mandril of lifting jack, weight is fixed on steel strand wires bottom;
The oil pump station is used to give jack fuel feeding;
The computer controlling center is used for control oil pump station and jack acts.
The utility model is controlled using PLC, is participated in without excessive personnel, can reduce the quantity for participating in worker, reduces work People's labor intensity, only arranges personnel to be monitored at each node that need to be lifted, ensures the security of lifting, while use 4 Jack is lifted steadily so that its lifting process is reliable and stable, it is ensured that lifting safety and reliability.
Preferably, the jack is 350 tons of jack, and the steel strand wires pre- answer pulling force steel to twist using high strength low relaxed Line, quantity are 25, its nominal diameter 15.24mm, tensile strength 1860N/mm, rupture pull force 260.7KN, elongation exist Minimum load 221.5KN, elasticity modulus 198Gpa when 1%, relaxation Shuai≤2.5%, every meter of weight 1.1Kg.
This kind of structure further ensures that the safety and reliability of its lifting.
Preferably, the steel strand wires are divided into left-handed and two kinds of specifications of dextrorotation, oppositely oriented, the steel per adjacent two steel strand wires Twisted wire stretches out 0.5 meter of jack.
This kind of structure can prevent steel strand wires from deforming or winding in lifting process, improve its improving stability and reliable Property.
Preferably, the mandril of lifting jack is L-shape, and the jack supporting rack is equipped with the cunning for coordinating mandril of lifting jack Groove.
This kind of structure further improves the stability and reliability of its lifting.
Preferably, each stroke of the jack is 250mm, and lifting speed is about 4-6m/h.
This kind of structure can improve it and lift stationarity and reliability on the premise of ensureing to lift speed.
The utility model is controlled using PLC, is participated in without excessive personnel, can reduce the quantity for participating in worker, reduces work People's labor intensity, only arranges personnel to be monitored at each node that need to be lifted, ensures the security of lifting, while use 4 Jack is lifted steadily so that its lifting process is reliable and stable, it is ensured that lifting safety and reliability.
Brief description of the drawings
Fig. 1-6 is the schematic diagram of jack lifting process in the utility model;
1. jack supporting rack in figure, 2. mandril of lifting jack, 3. sliding slots, 4. steel strand wires, anchor head on 5., 6. times anchor heads, 7. Weight, anchor head oil cylinder on 8., 9. cast anchor hair oil cylinder.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings, but is not that model is protected to the utility model The limitation enclosed.
A kind of steel truss hydraulic lifting system, including 4 jack, 2 oil pump stations and a computer controlling center,
As shown in figures 1 to 6, jack is used for lifting heavy 7, each jack be equipped with upper anchor head 5 and lower anchor head 6 and Through upper anchor head 5 and the steel strand wires 4 of lower anchor head 6, lower anchor head 6 is fixed on 1 bottom of jack supporting rack by anchor head oil cylinder 9 once Portion, upper anchor head 5 are fixed on mandril of lifting jack 2 by anchor head oil cylinder 8 on one, and weight 7 is fixed on 4 bottom of steel strand wires;
The oil pump station is used to give jack fuel feeding;
The computer controlling center is used for control oil pump station and jack acts.
Jack is 350 tons of jack, steel strand wires 4 using it is high strength low relaxed it is pre- answer pulling force steel strand wires, quantity is 25, Its nominal diameter 15.24mm, tensile strength 1860N/mm, rupture pull force 260.7KN, minimum lotus of the elongation at 1% Carry 221.5KN, elasticity modulus 198Gpa, relaxation Shuai≤2.5%, every meter of weight 1.1Kg.Steel strand wires 4 are divided to for left-handed and two kinds of dextrorotation Specification, oppositely oriented per adjacent two steel strand wires 4, steel strand wires 4 stretch out 0.5 meter of jack.Mandril of lifting jack 2 is L-shape, and thousand Jin topmast support 1 is equipped with the sliding slot 3 for coordinating mandril of lifting jack 2.
When the utility model assembles, jack is vertically disposed in lifting platform, is fixed with bolt or seven word otic placodes, carried at the same time There is steel strand wires mounting platform under peaceful platform.The anchorage up and down of jack is opened, every steel strand wires should be checked conscientiously before penetrating Whether steel strand wires cut place meets the requirements, according to status requirement of the steel strand wires in jack, one by one by every steel strand wires from dredging The boosted platform of guide plate penetrates oil cylinder, after steel strand wires stretch out, is individually stepped up with U-clamp, after confirmation is errorless, slowly comes loose, until Confirm that steel strand wires will not glide, then wear one, after the completion of all steel strand wires penetrate, pin anchorage, U-clamp up and down and be not allowed to solve Remove, mark is carried out according to oil cylinder position on plate is dredged, while the steel strand wires of bottom two are clamped with U-clamp, plate will be dredged along steel Twisted wire is made in order from top to bottom, then installs lower anchor head, notices that lower anchor head direction is consistent with oil cylinder direction, whole installation process is made sure to keep in mind Steel strand wires safety, whole construction site penetrate into from steel strand wires and remove tight welding job, damaged to prevent steel strand wires caused by energization Wound.
Steel strand wires pretension:
Steel strand wires penetrate oil cylinder, and jack lifts in place, and lower anchor head will carry out steel strand wires pretension work after installation is complete, Pretension is carried out using 1 ton of bottle gouard moved by hands, using falsework, steel strand wires is tensioned by root, if U-clamp clamps a steel strand wires, U Clevis is not allowed to release, if U-clamp clamps several steel strand wires, first can open U-clamp, after the completion of pretension, U-clamp be recovered, in advance During tight, someone is not allowed at lower anchor head.
The operation principle of jack:
The lower anchor head of jack is fixed on lifting bracket together with jack supporting rack, and upper anchor head is then fixed on jack top On bar, it can move up and down with mandril of lifting jack.
The action process of jack:1st step:Anchor head clamps in upper anchor head hydraulic oil cylinder driving, clamps steel strand wires (such as Fig. 1 institutes Show);2nd step:Anchor head unclamps under a hydraulic oil cylinder driving of casting anchor, and mandril of lifting jack jacks up lifting heavy (as shown in Figure 2);3rd step:Under Anchor head hydraulic oil cylinder driving is casted anchor head clamping, clamps steel strand wires (as shown in Figure 3);4th step:Mandril of lifting jack micro, upper anchor head oil cylinder Anchor head is unclamped in driving disengages (as shown in Figure 4) with steel strand wires;5th step:Upper anchor head rises, and upper anchor head is complete loose (as shown in Figure 5); 6th step:Mandril of lifting jack drives upper anchor head to retract (as shown in Figure 6) in situ, and then progress next round clamps steel strand wires and drives weight Thing rises.
After jack stretches cylinder in place, tightly cast anchor, Song Shangmao, carries out contracting steel, can return to initial position and be carried next time Rise.Opposite action process can then realize the decline of weight.The each stroke of jack is 250mm, and lifting speed is about 4- 6m/h。
The utility model is by the action of computer controlling center control oil pump station and jack, it can be achieved that hydraulic synchronization carries Construction technology is risen, is controlled by stroke and displacement sensing monitoring and computer, data feedback and control instruction transmission can be full-automatic Realize that synchronization action, load balancing, posture correction, Stress Control, operation locking, process are shown and a variety of work(such as fault alarm Energy.
Operating personnel can carry out hydraulic pressure lift in central control room by hydraulic synchronization computer control system man-machine interface The observation of process and related data and (or) the issue of control instruction.
One computer controlling center controls four 350T jack respectively by two oil pump stations.
Jack is controlled by load equilibrium mode in overall lifting process, is only seen in principle for relative displacement Survey, do not adjust;But if the relative displacement of four hoist points is more than 30mm, it should be adjusted.
Since this time is promoted to computer control, participated in without excessive personnel, but personnel are also needed at each node lifted It is monitored, to ensure the security of lifting, need to be monitored in following parts-layout personnel:
One lifting commander in chief, collects information in lifting process, so as to the correct order of the number of hair, a computer operation at any time Personnel, four jack monitoring personnels, two pumps station personnel, need four workers to follow lift structure to carry out in lifting process Monitoring, each need to respectively arrange interface one worker, and when truss is reached to interface, it is dry whether monitoring original structure bracket has Disturb, four survey crews need to be arranged interface two sides to be observed, needed in lifting process stress monitoring personnel to lift structure into Row monitoring, all personnel related with lifting need to respectively be equipped with an intercom and two pieces of batteries, such as occur at respective monitoring different Become, should notify commander in chief at once, ensure lifting safety.It should be numbered before lifting in each operating position, with eye-catching number Word is labeled, so that commanding can understand information everywhere.
After truss lifting in place, the operating platform made in advance is placed in position, arrangement personnel carry out the tune to interface Section.
To ensure the security of lifting, measure for improvement need to be checked and checked and accepted, particular content is shown in inspection record table.
Computer controlling center, oil pump station and jack in the utility model are the conventional equipment of market buying, therefore Concrete structure and connection are not stated carefully.

Claims (5)

  1. A kind of 1. steel truss hydraulic lifting system, it is characterised in that:It includes 4 jack, 2 oil pump stations and a computer Control centre,
    The jack is used for lifting heavy, and each jack is equipped with upper anchor head and lower anchor head and through upper anchor head and casts anchor The steel strand wires of head, the lower anchor head are fixed on jack supporting rack bottom by anchor head oil cylinder once, and the upper anchor head passes through one Upper anchor head oil cylinder is fixed on mandril of lifting jack, and weight is fixed on steel strand wires bottom;
    The oil pump station is used to give jack fuel feeding;
    The computer controlling center is used for control oil pump station and jack acts.
  2. A kind of 2. steel truss hydraulic lifting system according to claim 1, it is characterised in that:The jack is 350 tons Core-theaded type jack, the steel strand wires using it is high strength low relaxed it is pre- answer pulling force steel strand wires, quantity is 25, its nominal diameter 15.24mm, tensile strength 1860N/mm, rupture pull force 260.7KN, minimum load 221.5KN of the elongation at 1%, bullet Property modulus 198Gpa, relaxation rate≤2.5%, every meter weight 1.1Kg.
  3. A kind of 3. steel truss hydraulic lifting system according to claim 2, it is characterised in that:The steel strand wires are divided into left-handed Oppositely oriented per adjacent two steel strand wires with two kinds of specifications of dextrorotation, steel strand wires stretch out 0.5 meter of jack.
  4. A kind of 4. steel truss hydraulic lifting system according to claim 1, it is characterised in that:The mandril of lifting jack is in L Shape, the jack supporting rack are equipped with the sliding slot for coordinating mandril of lifting jack.
  5. A kind of 5. steel truss hydraulic lifting system according to claim 2, it is characterised in that:The each row of the jack Journey is 250mm, and lifting speed is 4-6m/h.
CN201721133162.8U 2017-09-06 2017-09-06 A kind of steel truss hydraulic lifting system Active CN207332331U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721133162.8U CN207332331U (en) 2017-09-06 2017-09-06 A kind of steel truss hydraulic lifting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721133162.8U CN207332331U (en) 2017-09-06 2017-09-06 A kind of steel truss hydraulic lifting system

Publications (1)

Publication Number Publication Date
CN207332331U true CN207332331U (en) 2018-05-08

Family

ID=62371392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721133162.8U Active CN207332331U (en) 2017-09-06 2017-09-06 A kind of steel truss hydraulic lifting system

Country Status (1)

Country Link
CN (1) CN207332331U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610878A (en) * 2018-12-17 2019-04-12 济南王府园林古建筑工程有限公司 Multifunctional wall body corrects instrument and wall antidote
CN113879919A (en) * 2021-09-08 2022-01-04 中交武汉港湾工程设计研究院有限公司 Compact multipurpose self-winding steel strand continuous lifting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610878A (en) * 2018-12-17 2019-04-12 济南王府园林古建筑工程有限公司 Multifunctional wall body corrects instrument and wall antidote
CN113879919A (en) * 2021-09-08 2022-01-04 中交武汉港湾工程设计研究院有限公司 Compact multipurpose self-winding steel strand continuous lifting device

Similar Documents

Publication Publication Date Title
CN111364363B (en) Stay cable construction tensioning method
CN102162774B (en) Steel-structure distribution-girder-type double-track whole opening box girder static load test device and construction method thereof
CN113353782B (en) Low-clearance ground wall-connected reinforcement cage rapid hoisting construction method
CN207332331U (en) A kind of steel truss hydraulic lifting system
CN210193173U (en) Large-scale H shaped steel stand hoist and mount hoist that breaks off relations fast
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN110205940A (en) 0# block construction bracket and its reverse drawing preloading method
CN109610834A (en) The high-altitude construction method of Long-span Multi-storey Frame heavy duty concrete structure
CN107142954B (en) Steel hanging box lifting system for integral lifting and lifting method thereof
CN106150057B (en) A kind of split blade type hydraulic pressure lift climbing frame
CN102030270B (en) Auxiliary tool and method for replacing wire rope of bridge crane
CN105464456A (en) Method and lifting sling for assembling extra-high voltage transmission iron tower through helicopter
CN114180456A (en) Hoisting posture adjusting method for giant laterally inclined truss structure
CN107161879A (en) Attached wall provision for disengagement and its method for dismounting on rear side of derrick crane
CN202214681U (en) Suspension bridge sling replacing device
CN212687327U (en) Lifting device for coal mine maintenance equipment
CN112227378B (en) Auxiliary device for hoisting reinforcement cage
CN102286943B (en) Suspension bridge sling replacing device
CN112456348B (en) Heat absorber hoisting method
CN210505201U (en) Equipment for hoisting reinforcing steel bars in batches
CN112456305A (en) Linear segmented turning-over method
CN110697564A (en) Hoisting device and hoisting method for precast concrete beam
CN205663226U (en) Super high -rise building thing top steel construction symmetry is hung and is drawn device
CN109205469A (en) A kind of split type structure of electric block and its electric control system
CN217516497U (en) Punching jack rigging for hoisting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant