CN207331786U - Prefabricated ground-connecting-wall connector extruding and water resistance test device - Google Patents

Prefabricated ground-connecting-wall connector extruding and water resistance test device Download PDF

Info

Publication number
CN207331786U
CN207331786U CN201721306538.0U CN201721306538U CN207331786U CN 207331786 U CN207331786 U CN 207331786U CN 201721306538 U CN201721306538 U CN 201721306538U CN 207331786 U CN207331786 U CN 207331786U
Authority
CN
China
Prior art keywords
reinforced concrete
groove
prefabricated reinforced
prefabricated
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721306538.0U
Other languages
Chinese (zh)
Inventor
许国光
油新华
耿冬青
马庆松
张清林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201721306538.0U priority Critical patent/CN207331786U/en
Application granted granted Critical
Publication of CN207331786U publication Critical patent/CN207331786U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a kind of prefabricated ground-connecting-wall connector extruding and water resistance test device, it includes:Experiment loading frame, experiment loading frame include the first experiment loading frame and the second experiment loading frame;Steel plate frame, steel plate frame are arranged on the inside of experiment loading frame, form the experiment cavity of rectangular parallelepiped structure;Prefabricated reinforced concrete public affairs groove and prefabricated reinforced concrete female groove are installed in test cavity body, and expansion water-stop adhesive tape is set in the position that prefabricated reinforced concrete female groove is docked with prefabricated reinforced concrete public affairs groove;Hydraulic jack, hydraulic jack are installed between prefabricated reinforced concrete public affairs groove and steel plate frame, or hydraulic jack is installed between prefabricated reinforced concrete female groove and steel plate frame.The utility model device can test prefabricated reinforced concrete public affairs groove and prefabricated reinforced concrete female groove, and so more really the stress and deformation performance of reaction practice of construction center tap, joint distortion and pressure are preferably reacted in expansion water-stop adhesive tape.

Description

Prefabricated ground-connecting-wall connector extruding and water resistance test device
Technical field
The utility model belongs to construction material performance testing device technical field, is connect more particularly to a kind of prefabricated ground-connecting-wall Head extruding and water resistance test device.
Background technology
With economic rapid development and the continuous improvement of the level of urbanization, urban issues becomes increasingly conspicuous, such as densely populated, It is traffic congestion, resource exhaustion, surging etc. using area deficiency, land price.Using the underground space configuration urban infrastructure be from Fundamentally solve the effective way of issues about the cities' development.Man-hour requirement underground space enclosed structure is applied in progress hypogee to apply Work.At present, underground space building enclosure is most commonly used that diaphram wall.
Diaphram wall is divided into cast-type diaphram wall and coercion underground continuous wall.However, since cast-type underground connects Continuous wall is irrigated under water, and inevitably there are some defects and disadvantage.First, concrete setting is waited to cause the duration to prolong It is long;Secondly, quality is not easy to ensure when pouring;Again, degree of plainness for wall surface is difficult to control in soft stratum.
Therefore, problem above can be solved using prefabricated ground-connecting-wall technology.But use coercion underground continuous wall, its connector Processing be that emphasis is also difficult point.After connector type of attachment determines, how special equipment test prefabricated reinforced concrete is utilized The applicability and feasibility of public groove and prefabricated reinforced concrete female groove be one have in face of the problem of.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated ground-connecting-wall connector extruding and water resistance test device.
The technical solution that the utility model solves above-mentioned technical problem is as follows:A kind of prefabricated ground-connecting-wall connector extruding and waterproof Performance test apparatus, for being tested for the property to prefabricated reinforced concrete public affairs groove and prefabricated reinforced concrete female groove;It includes:
Experiment loading frame, the experiment loading frame include the first experiment loading frame and the second experiment loading frame; Experiment loading frame is rectangle structure;First experiment loading frame and the second experiment loading frame are arranged in parallel up and down;
Steel plate frame, steel plate frame are arranged on the inside of experiment loading frame, form the experiment cavity of rectangular parallelepiped structure;
Prefabricated reinforced concrete public affairs groove and prefabricated reinforced concrete female groove are installed in test cavity body, in precast reinforced coagulation The position that native female groove is docked with prefabricated reinforced concrete public affairs groove sets expansion water-stop adhesive tape;
Hydraulic jack, the hydraulic jack is installed between prefabricated reinforced concrete public affairs groove and steel plate frame, or liquid Jack is pressed to be installed between prefabricated reinforced concrete female groove and steel plate frame.
The utility model extruding of prefabricated ground-connecting-wall connector and water resistance test device as described above, further, in liquid Pressure jack is welded with jacking with the end that steel plate frame is connected;In hydraulic jack and prefabricated reinforced concrete public affairs groove or pre-manufactured steel The position of reinforced concrete female groove connection sets partial pressure steel plate.
The utility model extruding of prefabricated ground-connecting-wall connector and water resistance test device as described above, further, are also wrapped Include cement paste filled layer;The cement paste filled layer is filled in the male groove of prefabricated reinforced concrete and prefabricated reinforced concrete is female Gap position between groove.
The utility model extruding of prefabricated ground-connecting-wall connector and water resistance test device as described above, further, are also wrapped Mantle fiber steel pipe is included, the mantle fiber steel pipe is embedded in the cement paste filled layer, and cement paste is stretched out in one end of mantle fiber steel pipe Filled layer.
The utility model extruding of prefabricated ground-connecting-wall connector and water resistance test device as described above, further, are also wrapped Bentonite plugged zone is included, the bentonite plugged zone is filled between prefabricated reinforced concrete public affairs groove and steel plate frame;Alternatively, swelling Grave blocking layer is filled between prefabricated reinforced concrete female groove and steel plate frame.
The beneficial effects of the utility model are:
The utility model device can test prefabricated reinforced concrete public affairs groove and prefabricated reinforced concrete female groove, this Sample more really reacts the stress and deformation performance of practice of construction center tap, and preferably reaction stops in expansion for joint distortion and pressure On glue bar.
The utility model cleverly solves the problem that seam is difficult to hydraulic pressurization using pre-buried mantle fiber steel pipe, passes through The pressurization of pre-buried mantle fiber steel pipe, control joint moulding pressure simultaneously observe infiltration situation in time, understand prefabricated reinforced concrete public affairs groove with Prefabricated reinforced concrete female groove sealing situation.
Brief description of the drawings
By the detailed description made in conjunction with the following drawings, the above-mentioned and/or otherwise advantage of the utility model will Becoming more apparent upon and be easier to understand, these attached drawings are simply schematical, are not intended to limit the utility model, wherein:
Fig. 1 be the utility model the first embodiment the extruding of prefabricated ground-connecting-wall connector and water resistance test device it is vertical Body schematic diagram;
Fig. 2 is the schematic top plan view of the extruding of prefabricated ground-connecting-wall connector and water resistance test device;
Fig. 3 is the side schematic view of the extruding of prefabricated ground-connecting-wall connector and water resistance test device;
Fig. 4 is the prefabricated ground-connecting-wall connector extruding of second of embodiment of the utility model and standing for water resistance test device Body schematic diagram.
In attached drawing, parts list represented by the reference numerals is as follows:
1st, experiment loading frame, 2, steel plate frame, 3, prefabricated reinforced concrete public affairs groove, 4, prefabricated reinforced concrete female groove, 5, Hydraulic jack, 6, expansion water-stop adhesive tape, 7, mantle fiber steel pipe, 8, cement paste filled layer, 9, bentonite plugged zone, 11, first Experiment loading frame, the 12, second experiment loading frame.
Embodiment
Hereinafter, the extruding of prefabricated ground-connecting-wall connector and water resistance test dress of the utility model are described with reference to the accompanying drawings The embodiment put.
The embodiment recorded herein is the specific embodiment of the utility model, for illustrating the utility model Design, is explanatory and exemplary, should not be construed as the limit to the utility model embodiment and the scope of the utility model System.In addition to the embodiment recorded herein, those skilled in the art can also be based on the application claims and specification institute is public The content opened includes doing using the embodiment to recording herein using obvious other technical solutions, these technical solutions Go out the technical solution of any obvious substitutions and modifications.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the utility model, it is schematically indicated each several part Shape and its correlation.Note that for the ease of clearly show the utility model embodiment each component structure, respectively Do not drawn between attached drawing according to identical ratio.Identical reference marker is used to represent identical part.
Fig. 1, Fig. 2 and Fig. 3 show the extruding of prefabricated ground-connecting-wall connector and water resistance examination of a kind of embodiment of the utility model Experiment device, for being tested for the property to prefabricated reinforced concrete public affairs groove 3 and prefabricated reinforced concrete female groove 4;It includes:
Experiment loading frame 1, experiment loading frame 1 include the first experiment loading frame 11 and the second experiment loading frame 12;Experiment loading frame 1 is rectangle structure;First experiment loading frame 11 with the second experiment loading frame is parallel about 12 sets Put;Experiment loading frame plays reaction frame, there is provided the installation link position of jack, easy to pressurize.It is embodied in one kind Experiment loading frame is welded using channel steel in example, ensures that frame has enough rigidity.
Steel plate frame 2, steel plate frame 2 are arranged on the inner side of experiment loading frame 1, form the experiment cavity of rectangular parallelepiped structure;Steel plate Frame provides enclosure space, simulates the grooving in practice of construction.
Prefabricated reinforced concrete public affairs groove 3 and prefabricated reinforced concrete female groove 4 are installed in test cavity body, precast reinforced mixed The position that solidifying soil female groove 4 is docked with prefabricated reinforced concrete public affairs groove 3 sets expansion water-stop adhesive tape 6;Expansion water-stop adhesive tape 6 is prefabricated Before reinforced concrete God in charge of the Earth groove 3 lifts, the front end of plush copper is pasted when 24 is small in advance.Prefabricated reinforced concrete public affairs groove 3 and pre-manufactured steel Reinforced concrete female groove 4 simulates actual prefabricated ground-connecting-wall connector, easy to the squeezing effect and waterproof effect of test splice.
The utility model device can test prefabricated reinforced concrete public affairs groove and prefabricated reinforced concrete female groove, this Sample more really reacts the stress and deformation performance of practice of construction center tap, and preferably reaction stops in expansion for joint distortion and pressure On glue bar.
The utility model device is capable of the correlation of preferable reaction pressure and expansion water-stop adhesive tape deformation, can cross as reality The lateral pressurizing jack of wall of engineering provides parameter, prefabricated reinforced concrete public affairs groove and prefabricated reinforced concrete female groove detached peaks Duty pressure can also react the size of the frictional force of the extruding generation of expansion water-stop adhesive tape, female groove and public affairs after assessment external force revocation The deformation of groove seam.
The utility model cleverly solves the problem that seam is difficult to hydraulic pressurization using pre-buried mantle fiber steel pipe, passes through The pressurization of pre-buried mantle fiber steel pipe, control joint moulding pressure simultaneously observe infiltration situation in time, understand prefabricated reinforced concrete public affairs groove with Prefabricated reinforced concrete female groove sealing situation.
Hydraulic jack 5, hydraulic jack 5 is installed between prefabricated reinforced concrete public affairs groove 3 and steel plate frame 2, or liquid Jack 5 is pressed to be installed between prefabricated reinforced concrete female groove 4 and steel plate frame 2.
The prefabricated ground-connecting-wall connector extruding of the utility model above-described embodiment and water resistance test device, moreover it is possible to carry out such as Lower improvement, jacking is welded with hydraulic jack 5 with the end that steel plate frame 2 is connected;In hydraulic jack 5 and precast reinforced coagulation The position that God in charge of the Earth's groove 3 or prefabricated reinforced concrete female groove 4 connect sets partial pressure steel plate.Hydraulic jack 5 provides plus-pressure, to protect Card pressure can add and occur without lateral sliding, at 5 both ends of jack and steel tank junction welding jacking, and in top pressure Partial pressure steel plate is placed at wall and disperses pushing tow pressure.
The prefabricated ground-connecting-wall connector extruding of the utility model above-described embodiment and water resistance test device, moreover it is possible to carry out such as Lower improvement, as shown in figure 4, further including cement paste filled layer 8;Cement paste filled layer 8 is filled in prefabricated reinforced concrete public affairs Gap position between groove 3 and prefabricated reinforced concrete female groove 4.Prefabricated reinforced concrete is realized using cement paste filled layer 8 The sealing in gap between public groove 3 and prefabricated reinforced concrete female groove 4.
The prefabricated ground-connecting-wall connector extruding of the utility model above-described embodiment and water resistance test device, moreover it is possible to carry out such as Lower improvement, as shown in figure 4, further including mantle fiber steel pipe 7, mantle fiber steel pipe 7 is embedded in cement paste filled layer 8, mantle fiber steel pipe 7 Cement paste filled layer 8 is stretched out in one end.Pre-buried mantle fiber steel pipe 7 is used for the slip casting effect and sealing for testing cement paste filled layer 8 Effect.
The effect of mantle fiber steel pipe is that connection water filling pressue device carries out applied voltage test, to examine prefabricated reinforced concrete public Groove or the ejection for water plugging of female groove seam and water-proof strip water-stagnating effect.The tool lower end of mantle fiber steel pipe is closed with adhesive waterproof tape during construction, with Cement paste is avoided to flow into tube body;Pressure is enough to break through adhesive waterproof tape during test pressurization, and when pressure is larger, current can be along dampening Cement paste and the micro chink of water-swellable bar flow out, when there is water exudation in observation cement paste filled layer side sealing bar position, The water injection pressure of record at this time.
The prefabricated ground-connecting-wall connector extruding of the utility model above-described embodiment and water resistance test device, moreover it is possible to carry out such as Lower improvement, further includes bentonite plugged zone 9, bentonite plugged zone 9 be filled in prefabricated reinforced concrete public affairs groove 3 and steel plate frame 2 it Between;Alternatively, bentonite plugged zone 9 is filled between prefabricated reinforced concrete female groove 4 and steel plate frame 2.
For being smoothed out for guarantee test, and relatively good article rubber water stop pressure and deformation analysis data is obtained, with And test prefabricated reinforced concrete public affairs groove 3 and the water-stagnating effect of prefabricated reinforced concrete female groove 4, using following test procedure:
Step 1, tests preparation, completes frame and the processing of steel plate groove body, purchases jack, oil pressure pump, article rubber water stop The work such as claim with vernier calliper.Check the reading of jack pressure dial plate in advance at the same time, dial plate is checked using type vibration wire rope meter and is read Relation between number and jack jacking force, fitting is linear, then calculates the corresponding dial reading of every grade of on-load pressure;
Step 2, in advance prefabricated reinforced concrete male and female groove component, and reach the curing strength of concrete;
Step 3, pastes water-swellable article rubber water stop, article rubber water stop, which is pasted, uses AB in public groove component both sides extrusion position Glue or neoprene adhesive, needed after pasting place 24 it is small when more than can be only achieved adhesion strength;
Step 4, reaching adhesion strength can use overhead traveling crane to hang female groove component and public groove component in steel plate respectively later Relevant position in groove, and steel plate is placed behind public groove component, after the centering of position, jack is placed, somewhat adds a point pressure Jack is set not tilt;
Step 5, pressurization after testing wall and the completion of pressurized equipment Assembling, are used using the pressuring method of classification Each jack synchronzed press 1t, 2t, 3t, 4t, 5t, stablize pressurization 5 minutes after loading is completed per first class pressure, then distinguish The spacing on the outside of two end faces of male and female groove and at internal article rubber water stop is measured, 8 groups of data are measured altogether under every first class pressure;Last Stablize 10 minutes after the completion of stage pressure loading, then off-load step by step, measure respectively per 8 groups of data after level-one off-load, off-load is not Need time interval.After afterbody off-load completes DATA REASONING, jack pressure release;
Step 6, unloads jack, and detaching equipment observes the deformation of adhesive tape, ginseng is provided for actual wall pressurizing and deformation Number, the experiment of connector squeezing effect are completed;
Step 7, the gap between the public groove of bentonite closure and steel tank are used for sealing;
Step 8, male and female groove seaming position priming petock cement paste simultaneously fix mantle fiber steel pipe;
Step 9, after cement paste reaches curing strength, connects water filling pressue device, test seam seepage pressure is Through position and the flow velocity of seeping water, and make a record.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and further feature combination, and those skilled in the art are also Other combinations between each technical characteristic can be carried out according to the purpose of invention, are subject to the purpose for realizing the utility model.

Claims (5)

1. a kind of prefabricated ground-connecting-wall connector extruding and water resistance test device, for prefabricated reinforced concrete public affairs groove and prefabricated Armored concrete female groove is tested for the property;It is characterised in that it includes:
Experiment loading frame, the experiment loading frame include the first experiment loading frame and the second experiment loading frame;Experiment Loading frame is rectangle structure;First experiment loading frame and the second experiment loading frame are arranged in parallel up and down;
Steel plate frame, steel plate frame are arranged on the inside of experiment loading frame, form the experiment cavity of rectangular parallelepiped structure;
Prefabricated reinforced concrete public affairs groove and prefabricated reinforced concrete female groove are installed in test cavity body, female in prefabricated reinforced concrete The position that groove is docked with prefabricated reinforced concrete public affairs groove sets expansion water-stop adhesive tape;
Hydraulic jack, the hydraulic jack is installed between prefabricated reinforced concrete public affairs groove and steel plate frame, or hydraulic pressure thousand Jin top is installed between prefabricated reinforced concrete female groove and steel plate frame.
2. prefabricated ground-connecting-wall connector extruding according to claim 1 and water resistance test device, it is characterised in that in liquid Pressure jack is welded with jacking with the end that steel plate frame is connected;In hydraulic jack and prefabricated reinforced concrete public affairs groove or pre-manufactured steel The position of reinforced concrete female groove connection sets partial pressure steel plate.
3. prefabricated ground-connecting-wall connector extruding according to claim 1 and water resistance test device, it is characterised in that also wrap Include cement paste filled layer;The cement paste filled layer is filled in the male groove of prefabricated reinforced concrete and prefabricated reinforced concrete is female Gap position between groove.
4. prefabricated ground-connecting-wall connector extruding according to claim 3 and water resistance test device, it is characterised in that also wrap Mantle fiber steel pipe is included, the mantle fiber steel pipe is embedded in the cement paste filled layer, and cement paste is stretched out in one end of mantle fiber steel pipe Filled layer.
5. the extruding of prefabricated ground-connecting-wall connector and water resistance test device according to claim 3 or 4, it is characterised in that Bentonite plugged zone is further included, the bentonite plugged zone is filled between prefabricated reinforced concrete public affairs groove and steel plate frame;Alternatively, Bentonite plugged zone is filled between prefabricated reinforced concrete female groove and steel plate frame.
CN201721306538.0U 2017-10-11 2017-10-11 Prefabricated ground-connecting-wall connector extruding and water resistance test device Expired - Fee Related CN207331786U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721306538.0U CN207331786U (en) 2017-10-11 2017-10-11 Prefabricated ground-connecting-wall connector extruding and water resistance test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721306538.0U CN207331786U (en) 2017-10-11 2017-10-11 Prefabricated ground-connecting-wall connector extruding and water resistance test device

Publications (1)

Publication Number Publication Date
CN207331786U true CN207331786U (en) 2018-05-08

Family

ID=62368403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721306538.0U Expired - Fee Related CN207331786U (en) 2017-10-11 2017-10-11 Prefabricated ground-connecting-wall connector extruding and water resistance test device

Country Status (1)

Country Link
CN (1) CN207331786U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110056016A (en) * 2019-03-14 2019-07-26 姚燕明 A kind of underground continuous wall connector waterproof performance simulation laboratory test system and test method
CN114252345A (en) * 2021-11-25 2022-03-29 中国建筑第八工程局有限公司 Performance detection device and detection method for ground connecting wall milling joint

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110056016A (en) * 2019-03-14 2019-07-26 姚燕明 A kind of underground continuous wall connector waterproof performance simulation laboratory test system and test method
CN110056016B (en) * 2019-03-14 2023-10-20 姚燕明 Indoor simulation test system and method for waterproof performance of underground diaphragm wall joint
CN114252345A (en) * 2021-11-25 2022-03-29 中国建筑第八工程局有限公司 Performance detection device and detection method for ground connecting wall milling joint
CN114252345B (en) * 2021-11-25 2024-02-06 中国建筑第八工程局有限公司 Performance detection device and detection method for ground continuous wall milling joint

Similar Documents

Publication Publication Date Title
CN207331786U (en) Prefabricated ground-connecting-wall connector extruding and water resistance test device
CN101832140B (en) Testing method of water pressure distribution law of subsea tunnel lining
CN106840086B (en) Quick consolidation soft soil test device of ultralow position vacuum preloading method
CN106840977A (en) Slurry filling imitation device
CN106814016A (en) The analogy method of slurry filling imitation device
CN111982720A (en) Test device and method for simulating saturated stratum subway circulating vibration influence
CN108397200B (en) Back-fabricated construction method for tunnel connection section structure of subway station
CN208140705U (en) It is a kind of can automatic collection pore pressure permeability consolidometer
CN103091222A (en) Device for simulating and testing water burst of tunnel fissure
CN207231732U (en) A kind of assembled piping lane joint waterproofing test device
CN103926182A (en) Permeability coefficient test method and test device under normal pressure
CN107179391B (en) A kind of experimental rig burying under-traverse tunnel shallow layer grouting for an ultra shallow
CN112229981A (en) Device for simulating comprehensive influence of foundation pit excavation and multi-gradient precipitation on tunnel
CN115839822A (en) Test system and method for inducing mountain tunnel flooding and drainage process by heavy rainfall
CN203441447U (en) Visual horizontal well gravel packing simulation test device
CN112525802A (en) Device for testing impermeability of water stop in deformation joint
CN204479416U (en) A kind of coercion underground continuous wall joint seal adhesive tape pressure test device
CN212103999U (en) Vacuum degree monitoring device along drain bar degree of depth in vacuum preloading foundation
CN211877636U (en) Measuring equipment considering bearing capacity of pressure grouting anchor rod
CN210636473U (en) Indoor simulation test system for waterproof performance of underground continuous wall joint
CN110056016B (en) Indoor simulation test system and method for waterproof performance of underground diaphragm wall joint
CN112903419A (en) Rock mass anchor rod drawing coupling test device and test method under seepage effect
CN209117682U (en) Subgrade slope engineering model test box
CN207439823U (en) A kind of soil body test for tensile strength device
CN105300616A (en) Waterproof test method using transverse seam of grout layer and rubber waterstop strip

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180508

Termination date: 20191011