CN207330173U CN201721407048.XU CN201721407048U CN207330173U CN 207330173 U CN207330173 U CN 207330173U CN 201721407048 U CN201721407048 U CN 201721407048U CN 207330173 U CN207330173 U CN 207330173U
Authority
CN
China
Prior art keywords
pulley
cable crane
cable
rope
pulleys
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201721407048.XU
Other languages
Chinese (zh)
Inventor
李德坤
万慧
李燕青
古宇鹏
程琳刚
王福生
周龙
杨大瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
8th Engineering Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
8th Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, 8th Engineering Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201721407048.XU priority Critical patent/CN207330173U/en
Application granted granted Critical
Publication of CN207330173U publication Critical patent/CN207330173U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of cable crane tower frame self-balance system, it is related to cable crane construction field, including a cable crane pylon, second pulley, some main ropes, some 3rd pulleys and an adjustment rope, cable crane tower top is equipped with a cable saddle and at least two first pulleys, and two first pulleys are distributed in the both sides of cable saddle;Second pulley is arranged on the side of cable crane pylon;Main rope both passes through cable saddle, and one end is connected with second pulley, and the other end is in opposite side fixed setting of the cable crane pylon away from second pulley;3rd pulley is correspondingly arranged with second pulley, and is fixedly arranged on ground;Adjustment rope both ends are fixedly connected with the ground, and middle part alternately passes through the 3rd pulley and second pulley, and adjust bitter end portion's correspondence through a first pulley.The cable crane tower frame self-balance system of the utility model, the scope of application is wider, and balance quality is good, and overturn-preventing ability is strong.

Description

A kind of cable crane tower frame self-balance system
Technical field
It the utility model is related to cable crane technical field of construction, and in particular to a kind of cable crane tower frame self-balance system System.
Background technology
Usual cable crane pylon is installed on overhead, and is consolidated by built-in fitting and king-tower, and in cable crane Tower top sets cable saddle, and main rope, hoisting rope and the hauling rope of cable crane pass through cable saddle, by its tension force effect in cable crane On pylon, since main rope, hoisting rope and hauling rope are set diagonally downward, the Force decomposition to cable crane pylon is vertical force With along bridge to horizontal force.However, cable crane pylon can bear vertical force, but horizontal force can not be born, in horizontal force Under the action of, cable crane pylon easily topples.
In the prior art, in order to balance main rope, hoisting rope and the horizontal force of hauling rope, set on cable crane pylon more The cable wind rope that root is obliquely installed, cable wind rope one end is connected with tower top, the other end is connected with ground.
But cable crane, in unloaded or lifting operating mode, when overhead traveling crane is located at different positions, cable crane pylon is subject to Horizontal resultant it is of different sizes, and the excursion of horizontal resultant is very big.And be fixedly installed cable wind rope be only capable of bearing it is a certain Specific horizontal resultant scope, can not be suitable for the excursion of cable crane horizontal resultant, cause the balance of cable crane Can be poor, overturn-preventing ability is weaker.
Utility model content
It is certainly flat the purpose of this utility model is to provide a kind of cable crane pylon for defect existing in the prior art Balance system, the scope of application is wider, and balance quality is good, and overturn-preventing ability is strong.
To achieve the above objectives, the technical scheme adopted by the utility model is that:
A kind of cable crane tower frame self-balance system, including:
One cable crane pylon, its top are equipped with a cable saddle and at least two first pulleys, two first pulleys point It is distributed in the both sides of the cable saddle;
An at least second pulley, it is arranged on the side of the cable crane pylon;
Some main ropes, it both passes through the cable saddle, and described main rope one end is connected with the second pulley, and the other end is in institute State opposite side fixed setting of the cable crane pylon away from the second pulley;
At least two the 3rd pulleys being correspondingly arranged with the second pulley, it is fixedly arranged on ground;
One adjustment rope, its both ends are fixedly connected with the ground, and the 3rd pulley and second are alternately passed through in the middle part of the adjustment rope Pulley, and the bitter end portion's correspondence that adjusts is through a first pulley;Meanwhile
All cable saddles, first pulley, second pulley, main rope, the 3rd pulley and adjustment Suo Jun are along the cable crane The center line symmetrical setting of pylon direction across bridge.
Based on the above technical solutions, the second pulley is identical with main rope quantity, and each main rope end is equal It is connected with a second pulley, between the two neighboring second pulley and the adjacent second pulley and first is slided The 3rd pulley is correspondingly provided between wheel.
Based on the above technical solutions, the upright projection of all second pulleys on the ground is located at same straight line On.
Based on the above technical solutions, all second pulleys and the 3rd pulley are alternately distributed along direction across bridge.
Based on the above technical solutions, the horizontal spacing of the two neighboring second pulley and the two neighboring master Horizontal spacing approximately equal of the rope on the cable saddle.
Based on the above technical solutions, the horizontal spacing of two neighboring 3rd pulley and the second pulley Lateral dimension approximately equal.
Based on the above technical solutions, the upright projection of all 3rd pulleys on the ground is located at same straight line On.
Based on the above technical solutions, the cable crane tower top is equipped with multiple first pulleys, and position One the 3rd pulley is correspondingly provided between adjacent two first pulley of the cable saddle homonymy, the adjustment bitter end portion is alternately worn Cross the first pulley and the 3rd pulley.
Compared with prior art, the utility model has the advantage of:
(1) the cable crane tower frame self-balance system of the utility model by first pulley by cable crane pylon side Main rope Suo Li is acted on opposite side, and after the weight that hanging object is played on main rope changes, main rope opposite side is to cable crane tower The active force of frame also can synchronously change, and be applicable to different lifting operating modes, and the scope of application is wider, and cause cable crane Machine pylon along bridge to horizontal resultant it is smaller, balance quality is good, and overturn-preventing ability is strong.
(2) the main rope end of the utility model is respectively connected with a second pulley, and adjustment rope alternately passes through the 3rd pulley and the Two pulleys, the Suo Li sizes for making adjustment rope are the half of main cable force, and adjustment Suo Shouli is smaller, are not only convenient for installation anchoring, and And adjustment Suo Buyi is broken, structural soundness is more preferable.
(3) the cable crane tower top of the utility model is equipped with multiple first pulleys, can be applied according to different Work situation, adjusts the quantity of first pulley, so that the horizontal resultant of cable crane pylon is adjusted, it is applied widely.
Brief description of the drawings
Fig. 1 is the structure diagram of one cable crane tower frame self-balance system of the utility model embodiment;
Fig. 2 is the side view of Fig. 1.
In figure:1- cable crane pylons, 2- cable saddles, 3- first pulleys, 4- second pulleys, 5- main ropes, the 3rd pulleys of 6-, 7- Adjust rope.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and embodiments.
Embodiment one
Referring to shown in Fig. 1 and Fig. 2, the utility model embodiment provides a kind of cable crane tower frame self-balance system, including One second pulley 4 of cable crane pylon 1, six, 5, seven the 3rd pulleys 6 of six roots of sensation main rope and an adjustment rope 7.
The top of cable crane pylon 1 is equipped with a cable saddle 2 and two first pulleys 3, and two first pulleys 3 are distributed in cable saddle 2 Both sides.Second pulley 4 is arranged on the side of cable crane pylon 1, and all main ropes 5 both pass through cable saddle 2, and 5 one end of main rope and the Two pulleys 4 are connected, and the other end is in opposite side fixed setting of the cable crane pylon 1 away from second pulley 4.
In actual use, one end that main rope 5 is fixedly installed can need directly to be anchored at the side of massif according to operating mode, It can also be connected on another cable crane pylon 1.
3rd pulley 6 is correspondingly arranged with second pulley 4, and the 3rd pulley 6 is fixedly arranged on ground.Adjust rope 7 both ends with Ground is affixed, and 7 middle part of adjustment rope alternately passes through the 3rd pulley 6 and second pulley 4, and adjusts 7 end correspondence of rope through one first Pulley 3;Meanwhile all cable saddles 2, first pulley 3, second pulley 4, main rope 5, the 3rd pulley 6 and adjustment rope 7 are along cable crane The center line symmetrical setting of 1 direction across bridge of pylon, can make balanced, the phase along cable crane pylon 1 along direction across bridge direction horizontal force Mutually offset, will not be to causing the horizontal applied force of direction across bridge along cable crane pylon 1, so that whole self-balancing system structure It is firm.
Specifically, second pulley 4 is identical with 5 quantity of main rope, and each 5 end of main rope is respectively connected with a second pulley 4, adjacent One the 3rd pulley 6 is correspondingly provided between two second pulleys 4 and between adjacent second pulley 4 and first pulley 3, is adjusted Whole rope 7 alternately passes through the 3rd pulley 6 and second pulley 4, and the half that the Suo Li sizes for making adjustment rope 7 are 5 Suo Li of main rope, adjusts rope 7 stress are smaller, are not only convenient for installation anchoring, and adjust rope 7 and be not easy to break, and structural soundness is more preferable.
Preferably, the upright projection of all second pulleys 4 on the ground is located along the same line, and all 3rd pulleys 6 exist Upright projection on ground is located along the same line, and all 4 and the 3rd pulleys 6 of second pulley are alternately distributed along direction across bridge.It is adjacent The horizontal spacing of two second pulleys 4 and horizontal spacing approximately equal of the two neighboring main rope 5 on cable saddle 2, can make main rope 5 Keeping parallelism as far as possible, and the horizontal spacing of two neighboring 3rd pulley 6 and the lateral dimension approximately equal of second pulley 4, make tune Whole rope 7 is as far as possible with 5 keeping parallelism of main rope, so that adjustment 7 stress of rope is more balanced, balance is more preferable.
The utility model embodiment additionally provides a kind of installation method of above-mentioned cable crane tower frame self-balance system, including Following steps:
All 5 one end of main rope are fixedly installed, the other end passes through cable saddle 2, and installs on cable crane pylon 1 the respectively One pulley 3, install second pulley 4, on the ground the 3rd pulley 6 of installation in 5 end of main rope;
7 middle part of adjustment rope is alternately passed through into 4 and the 3rd pulley 6 of second pulley, and 7 end of adjustment rope is passed through into first pulley It is fixedly connected with the ground after 3.
Further, first pulley 3 is welded with cable crane pylon 1, and the 3rd pulley 6 is anchored at ground by built-in fitting On.
Embodiment two
The present embodiment is differed only in embodiment one:The top of cable crane pylon 1 is equipped with four first pulleys 3, and One the 3rd pulley 6 is correspondingly provided between adjacent two first pulley 3 of 2 homonymy of cable saddle, 7 end of adjustment rope alternately passes through first 3 and the 3rd pulley 6 of pulley, according to different condition of construction, can adjust the quantity of first pulley 3, so as to adjust cable crane The horizontal resultant of pylon, it is applied widely.
The cable crane tower frame self-balance system of the utility model is by first pulley 3 by 1 side of cable crane pylon 5 Suo Li of main rope is acted on the opposite side of cable crane pylon 1, after the weight that hanging object is played on main rope 5 changes, main rope 5 Opposite side also can synchronously change the active force of cable crane pylon 1, be applicable to different lifting operating modes, the scope of application It is wider, and cause cable crane pylon 1 along bridge to horizontal resultant it is smaller, balance quality is good, and overturn-preventing ability is strong.
The utility model is not limited to the above embodiment, for those skilled in the art, not On the premise of departing from the utility model principle, some improvements and modifications can also be made, these improvements and modifications are also considered as this reality Within new protection domain.The content not being described in detail in this specification belongs to known to professional and technical personnel in the field The prior art.

Claims (8)

  1. A kind of 1. cable crane tower frame self-balance system, it is characterised in that including:
    One cable crane pylon (1), its top are equipped with a cable saddle (2) and at least two first pulleys (3), and two described first slide Wheel (3) is distributed in the both sides of the cable saddle (2);
    An at least second pulley (4), it is arranged on the side of the cable crane pylon (1);
    Some main ropes (5), it both passes through the cable saddle (2), and the main rope (5) one end is connected with the second pulley (4), separately One end is fixedly installed in opposite side of the cable crane pylon (1) away from the second pulley (4);
    At least two the 3rd pulleys (6) being correspondingly arranged with the second pulley (4), it is fixedly arranged on ground;
    One adjustment rope (7), its both ends is fixedly connected with the ground, alternately passed through in the middle part of the adjustment rope (7) the 3rd pulley (6) and Second pulley (4), and rope (7) the end correspondence that adjusts is through a first pulley (3);Meanwhile
    All cable saddles (2), first pulley (3), second pulley (4), main rope (5), the 3rd pulley (6) and adjustment rope (7) are equal Along the center line symmetrical setting of cable crane pylon (1) direction across bridge.
  2. 2. cable crane tower frame self-balance system as claimed in claim 1, it is characterised in that:The second pulley (4) and master Rope (5) quantity is identical, and each main rope (5) end is respectively connected with a second pulley (4), and two neighboring described second slides The 3rd pulley is correspondingly provided between wheel (4) and between the adjacent second pulley (4) and first pulley (3) (6)。
  3. 3. cable crane tower frame self-balance system as claimed in claim 2, it is characterised in that:All second pulleys (4) Upright projection on the ground is located along the same line.
  4. 4. cable crane tower frame self-balance system as claimed in claim 2, it is characterised in that:All second pulleys (4) It is alternately distributed with the 3rd pulley (6) along direction across bridge.
  5. 5. cable crane tower frame self-balance system as claimed in claim 4, it is characterised in that:The two neighboring second pulley (4) horizontal spacing and horizontal spacing approximately equal of the two neighboring main rope (5) on the cable saddle (2).
  6. 6. cable crane tower frame self-balance system as claimed in claim 4, it is characterised in that:Two neighboring 3rd pulley (6) horizontal spacing and the lateral dimension approximately equal of the second pulley (4).
  7. 7. cable crane tower frame self-balance system as claimed in claim 1, it is characterised in that:All 3rd pulleys (6) Upright projection on the ground is located along the same line.
  8. 8. cable crane tower frame self-balance system as claimed in claim 1, it is characterised in that:The cable crane pylon (1) Top is equipped with multiple first pulleys (3), and between adjacent two first pulley (3) of the cable saddle (2) homonymy One the 3rd pulley (6) is correspondingly provided with, described adjustment rope (7) end alternately passes through the first pulley (3) and the 3rd pulley (6).
CN201721407048.XU 2017-10-26 2017-10-26 A kind of cable crane tower frame self-balance system Withdrawn - After Issue CN207330173U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721407048.XU CN207330173U (en) 2017-10-26 2017-10-26 A kind of cable crane tower frame self-balance system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721407048.XU CN207330173U (en) 2017-10-26 2017-10-26 A kind of cable crane tower frame self-balance system

Publications (1)

Publication Number Publication Date
CN207330173U true CN207330173U (en) 2018-05-08

Family

ID=62363818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721407048.XU Withdrawn - After Issue CN207330173U (en) 2017-10-26 2017-10-26 A kind of cable crane tower frame self-balance system

Country Status (1)

Country Link
CN (1) CN207330173U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107673239A (en) * 2017-10-26 2018-02-09 中铁大桥局集团第八工程有限公司 A kind of cable crane tower frame self-balance system and its installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107673239A (en) * 2017-10-26 2018-02-09 中铁大桥局集团第八工程有限公司 A kind of cable crane tower frame self-balance system and its installation method
CN107673239B (en) * 2017-10-26 2023-11-28 中铁大桥局集团第八工程有限公司 Cable crane tower self-balancing system and installation method thereof

Similar Documents

Publication Publication Date Title
CN201598821U (en) Steel wire suspending system of high altitude operating nacelle
CN203924874U (en) Attaching pole is from lifting appliance
CN201172597Y (en) Wide span heavy-load cable hoisting machine
CN106758767B (en) A kind of suspension bridge segmented cat road and its construction method
CN105226568B (en) A kind of transmission line composite insulator overhauls support and its operational method
CN106758882B (en) For the hood type automatic leveling anchor of CFST Arch Bridge suspender replacement and its for the method for suspender replacement
CN207878295U (en) Suspension bridge changes rope device
CN202201604U (en) Self-balance rope end composite set
CN109610922A (en) A kind of typical case's landform tower erection construction equipment
CN207330173U (en) A kind of cable crane tower frame self-balance system
CN106677543A (en) Supporting structure for mounting of roof beam string segments
CN207891749U (en) A kind of steel box-girder suspender
CN105337236B (en) The windproof anchoring of ultra-high-tension power transmission line
CN107673239A (en) A kind of cable crane tower frame self-balance system and its installation method
CN207381872U (en) A kind of cable pulley block
CN109082996A (en) Inclined cable-stayed structure for bridge construction
CN111924720A (en) Wind cable anchoring system of cable crane tower and construction method
CN204371545U (en) A kind of power station impeller apparatus for examination and repair
CN209508791U (en) A kind of suspension cable structure of cable-stayed bridge
CN206035075U (en) Install convenient mast stay wire tower
CN207053091U (en) It is a kind of to be easy to manage line and the cable testing bridge with heat sinking function
CN203411907U (en) Puller for cable releasing of suspension bridge
CN102208777A (en) Construction method for parallel suspension of lead trolleys by using V-shaped strings
CN105421230B (en) A kind of multidirectional adjustable type button anchor beam device
CN205603088U (en) Prevent rocking hoisting machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20180508

Effective date of abandoning: 20231128

AV01 Patent right actively abandoned

Granted publication date: 20180508

Effective date of abandoning: 20231128