CN106758882B - For the hood type automatic leveling anchor of CFST Arch Bridge suspender replacement and its for the method for suspender replacement - Google Patents

For the hood type automatic leveling anchor of CFST Arch Bridge suspender replacement and its for the method for suspender replacement Download PDF

Info

Publication number
CN106758882B
CN106758882B CN201710084222.XA CN201710084222A CN106758882B CN 106758882 B CN106758882 B CN 106758882B CN 201710084222 A CN201710084222 A CN 201710084222A CN 106758882 B CN106758882 B CN 106758882B
Authority
CN
China
Prior art keywords
antiskid
anchor
hood type
upper beam
sunpender
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710084222.XA
Other languages
Chinese (zh)
Other versions
CN106758882A (en
Inventor
窦勇芝
韦福堂
甘科
李东平
孙长军
汪孝龙
黎祖金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIUZHOU OVM ENGINEERING Co Ltd
Liuzhou OVM Machinery Co Ltd
Original Assignee
LIUZHOU OVM ENGINEERING Co Ltd
Liuzhou OVM Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIUZHOU OVM ENGINEERING Co Ltd, Liuzhou OVM Machinery Co Ltd filed Critical LIUZHOU OVM ENGINEERING Co Ltd
Priority to CN201710084222.XA priority Critical patent/CN106758882B/en
Publication of CN106758882A publication Critical patent/CN106758882A/en
Application granted granted Critical
Publication of CN106758882B publication Critical patent/CN106758882B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A method of for the hood type automatic leveling anchor of CFST Arch Bridge suspender replacement and its for suspender replacement, the automatic leveling anchor includes upper beam, stretching end anchorage I, II, upper and lower interim rope, conversion beam, fixing end anchorage I, II, lower joist and two hood type vaults being mounted on CFST Arch Bridge arch anchor anti-slip system, and each hood type vault anchoring anti-slip system is made of 2 rotary hanging tools, antiskid steel case, upper beam, antiskid anchor ear and rubber pad;Under working condition, upper and lower interim rope is each passed through upper beam or lower conversion beam, jack, is anchored with stretching end anchorage I, II and fixing end anchorage I, II, lower joist catches suspender crossbeam lower surface;Rubber pad is arranged between antiskid anchor ear and tubular arch side, and antiskid steel lower box part cambered surface is fixedly connected with antiskid anchor ear, and the one side and antiskid steel case side of upper beam lower layer " well " word structure are adjacent to, another side and antiskid steel case are bolted by high-strength bolt.The apparatus structure is simple, size is smaller, and easy construction, work efficiency are high.

Description

For CFST Arch Bridge suspender replacement hood type automatic leveling anchor and It is used for the method for suspender replacement
Technical field
It is especially a kind of for steel pipe truss concrete arch-type bridge suspender replacement the present invention relates to a kind of bridge construction equipment Tool derrick rig and its method replaced for arch bridge suspender.
Background technology
It is hung currently, most of CFST Arch Bridge suspender replacement rope power conversion devices are mainly interim sunpender or interim pocket Device, part need to take welding manner to fix leveling wedge block or antiskid block on arch, reach the upper leveling of arch convenient for setting crossbeam Or the purpose of antiskid;When interim sunpender or interim pocket device for hoisting need to be transferred at next suspender replacement, arch upper beam needs large size Lifting appliance lifting operation, the disadvantage is that:Engineer operation intensity is big, and site welding quality is difficult to control, and it is mixed to be easy to damage raw steel pipe Solidifying soil arch rib and application, wedge block cannot be used in turn, and the dismounting progress that resumes operation is slow, large-scale lifting appliance machine-team consumption Greatly, construction cost is higher.
Application publication number is:CN102926332 A, entitled " the tool derrick rig of steel arch bridge suspender replacement And its replacing options " a kind of tool derrick rig of steel arch bridge suspender replacement is disclosed, shortcoming is still need to be every Place replaces boom location welded limiting device nearby, and site welding quality is difficult to control, to raw steel structure arch rib and is coated with damage, Limiting device material cannot be used in turn, and replaced sunpender and finished and need to carry out repair place to the position of steel structure surface local welding Reason;Wire line thimble is more around arch ring road number, and working procedure is complicated, and engineer operation intensity is big, and dismounting resumes operation, and progress is slow, and large size rises Hang that equipment machine-team consumption is big, and construction cost is higher.
To solve the above problems, the applicant has successively applied for Patent No. 201520814605.4, it is entitled: " a kind of towed tool derrick rig for steel pipe truss concrete arch-type bridge suspender replacement ", the patent No. 201521046495.8 entitled:The utility model patent of " a kind of frictional anchoring suspender replacement device of traction ", successively Two kinds " arch bridge suspender replaces rope power conversion device " are disclosed, solve above-mentioned technical problem of the existing technology, but all deposit Being related to, mach component is more, the higher problem of manufacturing cost, especially anti-in the towed vault anchoring of vault setting Sliding system construction size is larger, less practical in some areas.
For this purpose, the applicant again had submitted in 2016 " number of patent application 201610664498.0, it is entitled: 《Hood type tool derrick rig for steel pipe truss concrete arch-type bridge suspender replacement》" application for a patent for invention, further solve It has determined the above problem, but in implementation process, it has been found that there are still some shortcomingss for the patent application technology, for example has been related to machine and adds The component of work is more, and manufacturing cost is also higher, and especially leveling steel case processing installation needs field lofting, blanking, welding, scene peace It is larger to fill working strength.
Invention content
The purpose of the present invention is be directed to the applicant " number of patent application 201610664498.0, it is entitled:《With In the hood type tool derrick rig of steel pipe truss concrete arch-type bridge suspender replacement》" be further improved, provide and a kind of being used for steel The hood type automatic leveling anchor that pipe concrete arch bridge suspender is replaced and its method for suspender replacement, the hood type are embraced Hoop formula automatic leveling anchor is simple in structure, size is smaller, and it is less to be related to mach component, and scene is not required to welding leveling Steel case can be used in turn, easy construction, work efficiency height.
The technical solution to solve the above problems is:A kind of hood type for CFST Arch Bridge suspender replacement is adjusted automatically Flat anchor, including:Upper beam, stretching end anchorage I, upper interim rope, stretching end anchorage II, conversion beam, fixing end anchorage I, Interim rope, lower joist and fixing end anchorage II down;
The hood type automatic leveling anchor further includes two hood type arches being mounted on CFST Arch Bridge arch Top anchoring anti-slip system, each hood type vault anchor anti-slip system by 2 rotary hanging tools, antiskid steel case, upper beam, antiskid Anchor ear and rubber pad composition;
The two sides of the antiskid steel case are rectangular steel plates, another two sides are shape of a saddle steel plate, and top surface is rectangular steel plates, are spelled It is welded into steel box structure;
The upper beam is double-layer structure, is connected between the two by high-strength bolt, and the superstructure of upper beam is longitudinal The understructure of distribution beam, upper beam is " well " word structure;
The antiskid anchor ear is two halves formula steel hoop structure, is connected by high-strength bolt and real by pre-tightening high-strength bolt Existing antiskid;
The rotary hanging tool is the overall structure that intermediate trepanning cylinder and both ends are connected with an axis pin, 2 rotary liftings Tool is located at upper beam both ends, will be connect with upper beam by axis pin, and adaptive realize rotatably is rotated additionally by axis pin The leveling of suspender;
Under working condition, upper interim Suo Shangduan passes through upper beam to be anchored with stretching end anchorage I, and upper interim rope lower end, which passes through, to be turned Beam is changed, is anchored with fixing end anchorage I;Interim Suo Shangduan sequentially passes through conversion beam, jack down, is anchored with stretching end anchorage II, Interim rope lower end passes through lower joist to be anchored with fixing end anchorage II down, and lower joist catches suspender crossbeam lower surface;It is anti-for increasing The rubber pad of friction coefficient is arranged between antiskid anchor ear and tubular arch side between sliding anchor ear and tubular arch, antiskid steel lower box part Cambered surface is fixedly connected with antiskid anchor ear by weld seam, and the one side and antiskid steel case side of upper beam lower layer " well " word structure are adjacent to, Using antiskid steel case as antiskid reaction supporting point, the another side and antiskid steel case of upper beam lower layer " well " word structure pass through high-strength spiral shell Rockbolt connects.
Relevant another technical solution is:A kind of method of steel pipe arch bridge suspender replacement, it is using the above-mentioned use of the present invention In CFST Arch Bridge suspender replacement hood type automatic leveling anchor be used for steel pipe arch bridge suspender replacement method, it Include the following steps:
A, hood type automatic leveling anchor of the installation for CFST Arch Bridge suspender replacement:
This is used for hood type automatic leveling anchor upper beam, the stretching end anchorage of CFST Arch Bridge suspender replacement I, upper interim rope, stretching end anchorage II, conversion beam, fixing end anchorage I, lower interim rope, lower joist and fixing end anchorage II and Two hood type vaults being mounted on CFST Arch Bridge arch anchor anti-slip system;Each hood type vault anchoring antiskid system System is made of 2 rotary hanging tools, antiskid steel case, upper beam, antiskid anchor ear and rubber pad;
A1, it is longitudinally asymmetric on tubular arch one hood type vault be installed respectively in former sunpender anchor anti-slip system, often A hood type vault anchoring anti-slip system is made of 2 rotary hanging tools, antiskid steel case, upper beam, antiskid anchor ear and rubber pad;
The two sides of the antiskid steel case are rectangular steel plates, another two sides are shape of a saddle steel plate, and top surface is rectangular steel plates, are spelled It is welded into steel box structure;
The upper beam is double-layer structure, is connected between the two by high-strength bolt, and the superstructure of upper beam is longitudinal The understructure of distribution beam, upper beam is " well " word structure;
The antiskid anchor ear is two halves formula steel hoop structure, is connected by high-strength bolt and real by pre-tightening high-strength bolt Existing antiskid;
The rotary hanging tool is the overall structure that intermediate trepanning cylinder and both ends are connected with an axis pin, 2 rotary liftings Tool is located at upper beam both ends, will be connect with upper beam by axis pin, and adaptive realize rotatably is rotated additionally by axis pin The leveling of suspender;
Bar lazy halyard is changed in A2, installation --- upper interim rope and lower interim rope:
Upper interim Suo Shangduan is anchored across upper beam stretching end anchorage I, upper interim rope lower end passes through conversion beam, with admittedly Fixed end anchorage I anchors;Interim Suo Shangduan sequentially passes through conversion beam, jack down, is anchored with stretching end anchorage II, under lower interim rope End is anchored across lower joist fixing end anchorage II, and lower joist catches suspender crossbeam lower surface;For increasing antiskid anchor ear and steel The rubber pad of friction coefficient is arranged between antiskid anchor ear and tubular arch side between pipeline overhead lifting, antiskid steel lower box part cambered surface and antiskid Anchor ear is fixedly connected by weld seam, and the one side and antiskid steel case side of upper beam lower layer " well " word structure are adjacent to, with antiskid steel case Another side for antiskid reaction supporting point, upper beam lower layer " well " word structure is bolted with antiskid steel case by high-strength bolt;
A3, the connection safety for checking each component of hood type automatic leveling anchor and stabilization hold lotus ability:
By driving interim rope under jack tension slowly to carry out examination tensioning step by step, hood type automatic leveling anchoring dress is checked The connection safety and stabilization for setting each component hold lotus ability;
B, it removes former sunpender, complete conversion of the Suo Li systems to hood type automatic leveling anchor:
When former sunpender is formally removed, former sunpender steel wire is cut off step by step, interim rope under synchronous tensioning step by step, realization will be former Old suspender force is converted to hood type automatic leveling anchor, and Suo Li system transforms are completed;Suo Li transfer processes bridge floor step by step Absolute altitude variation control is within ± 5mm, and after former sunpender cut-out, interim rope under anchoring removes former sunpender later;
C, new sunpender is installed, complete conversion of the Suo Li systems to new sunpender:
New sunpender is installed to finish, step by step the new sunpender of tensioning, it is synchronous put step by step under interim rope, realization adjusts hood type automatically Flat anchor Suo Li is converted to new sunpender, completes Suo Li system transforms, step by step Suo Li transfer processes floor elevation variation control Within ± 5mm, new suspender tension in place after, pass through anchor head nut and anchor new sunpender;
D, hood type automatic leveling anchor is removed, is transferred at next former sunpender;
E, every suspender replacement repeats step A~step D, completes other suspender replacements.
Due to the adoption of the above technical scheme, the hood type for CFST Arch Bridge suspender replacement of the present invention is adjusted automatically Flat anchor and its method for suspender replacement have the advantages that:
1. the device does not change original structure stress system in suspender replacement Suo Li transfer processes, to original structure stress shadow Sound is smaller:
There are one installations for the hood type automatic leveling anchor for CFST Arch Bridge suspender replacement of the present invention Hood type vault on CFST Arch Bridge arch anchors anti-slip system, which anchors anti-slip system by rotary Suspender, antiskid steel case, upper beam, antiskid anchor ear and rubber pad composition;By pre-tightening antiskid anchor ear high-strength bolt to realize on arch Antiskid is anchored, additionally by the adaptive leveling for realizing rotary hanging tool of axis pin rotation of rotary hanging tool.
The hood type automatic leveling anchor for CFST Arch Bridge suspender replacement of the present invention is used for sunpender When replacement, anti-slip system is anchored using the hood type being arranged on arch, is connect with bridge floor conversion beam by upper interim rope, suspender crossbeam Lower setting subiculum beam, is connect by lower interim rope with bridge floor conversion beam, and by the jack on tensioning bridge floor conversion beam, realization is hung Bar Suo Li conversions;The device does not change original structure stress system in suspender replacement Suo Li transfer processes, to original structure stress shadow Sound is smaller, and manual work intensity is small, and work efficiency is high, and it is fast that construction peace tears progress open, not damaged to former steel tube arch rib and application, is convenient for standard Change construction.
2. simple in structure, construction cost is low:
The hood type automatic leveling anchor for CFST Arch Bridge suspender replacement of the present invention is used and is mounted on Hood type vault on steel pipe truss concrete arch bridge arch anchors anti-slip system, and rubber pad is arranged in antiskid anchor ear and tubular arch side Between face, with antiskid anchor ear by solder design, upper beam is bolted with antiskid steel case by high-strength bolt, will be rotated antiskid steel case Formula suspender is mounted on upper beam both ends, you can realizes the upper suspender automatic leveling of arch;
1. relative to " a kind of towed tool derrick rig for steel pipe truss concrete arch-type bridge suspender replacement ", " one The frictional anchoring suspender replacement device of kind traction ", apparatus of the present invention need not pass through setting draft gear, adjustable screw, walking Mechanism, levelling mechanism encircle upper antiskid and leveling to realize jointly, need not also be filled by setting hauling rope, horseback riding type friction anchoring Set, rotary type suspender encircles upper antiskid and leveling to realize jointly, need not also replace at boom location, take be moved to every time The device of welding leveling different angle is connect with vault realizes leveling;Only by setting hood type automatic leveling anchor, Rotary hanging tool encircles upper antiskid and leveling to realize jointly, and structure is simpler, size is smaller, and it is less to be related to mach component, Manufacturing cost is relatively low, not damaged to former steel tube arch rib and application, is convenient for standardized construction.
2. relative to " Patent No. 201610664498.0, denomination of invention《More for steel pipe truss concrete arch-type bridge sunpender The hood type tool derrick rig changed》For, structure of the invention is simpler, size is smaller, and it is less to be related to mach component, system It causes relatively low:
《Hood type tool derrick rig for steel pipe truss concrete arch-type bridge suspender replacement》Except including upper beam, tensioning Hold anchorage, upper and lower interim rope, conversion beam outside fixing end anchorage and lower joist, further includes by bolt, suspender belt, anchoring anchor ear, adjusts The hood type vault anchoring anti-slip system of flat steel case, upper beam, antiskid rope and antiskid anchor ear composition, anchoring anchor ear one end, which passes through, inserts Pin, suspender belt are anchored at canoe on steel pipe truss arch ring, and one end of antiskid rope is fixedly connected with anchoring anchor ear bottom, is another End is fixedly connected with antiskid anchor ear bottom;Pass through between the antiskid anchor ear and anchoring anchor ear of hood type vault anchoring anti-slip system Steel strand wires or push-and-pull rod connection, vault leveling pass through leveling steel case leveling;
And the present invention is without being respectively set anchoring anchor ear and antiskid anchor ear;It need to only be arranged by rotary hanging tool in vault, resist Sliding steel case, upper beam, antiskid anchor ear and rubber pad composition hood type vault anchor anti-slip system, and vault leveling passes through rotary type Suspender realizes automatic leveling;Reduce leveling steel case, anchoring anchor ear, suspender belt and the steel for connecting antiskid anchor ear with anchoring anchor ear The parts such as twisted wire or push-and-pull rod, structure are simpler;
Secondly, scene of the present invention is not required to welding leveling steel case, can be used in turn, easy construction, work efficiency height.
Due to the above feature, the present invention is used for the hood type automatic leveling anchor of CFST Arch Bridge suspender replacement And its method for suspender replacement can be suitably used for the old suspender replacement of various arch bridges, and it is applied widely, there is preferably society's warp Ji benefit.
In the following, automatic to the hood type for CFST Arch Bridge suspender replacement of the present invention in conjunction with the accompanying drawings and embodiments Leveling anchor and its technical characteristic of method for suspender replacement are further described.
Description of the drawings
Fig. 1 is the entirety of the hood type automatic leveling anchor for CFST Arch Bridge suspender replacement of the present invention Structure and install and use status diagram;
Fig. 2 is the A direction views of Fig. 1;
Fig. 3 is the B direction views of Fig. 1;
Fig. 4 is the overall structure signal of the hood type automatic leveling anchor for CFST Arch Bridge suspender replacement Figure;
Fig. 5 is the C direction views of Fig. 4;
Fig. 6 is the D direction views of Fig. 4;
Fig. 7 is the upper anti-slip system structural schematic diagram of arch;
Fig. 8:Antiskid steel case, antiskid hooping structure and assembling schematic diagram;
Fig. 9:Upper beam structural schematic diagram;
Figure 10:Rotary hanging tool structural schematic diagram.
In figure:
1- upper beams, the upper layer of 101- upper beams, the lower layer of 102- upper beams, 2- rotary hanging tools, 3- antiskid steel casees, 4- Upper interim rope, 5- stretching ends anchorage I, 6- tubular archs, 7- antiskid anchor ears, 8- rubber pads, interim rope under 9-, 10- stretching end anchorages II, 11- jack, 12- conversion beams, 13- fixing ends anchorage I, joist under 14-, 15- fixing ends anchorage II, 16- suspender crossbeams, The former sunpenders of 17-.
Specific implementation mode
Embodiment one:
A kind of hood type automatic leveling anchor for CFST Arch Bridge suspender replacement:
As shown in Figure 1, the hood type automatic leveling anchor includes:Upper beam 1, stretching end anchorage I 5, upper interim rope 4, stretching end anchorage II 10, conversion beam 12, fixing end anchorage I 13, lower interim rope 9, lower joist 14 and fixing end anchorage II 15 with And two hood type vaults being mounted on CFST Arch Bridge arch anchor anti-slip system, each hood type vault anchors antiskid System is made of 2 rotary hanging tools 2, antiskid steel case 3, upper beam 1, antiskid anchor ear 7 and rubber pad 8(Referring to Fig. 1-Fig. 6);
The two sides of the antiskid steel case 3 are rectangular steel plates, another two sides are shape of a saddle steel plate, and top surface is rectangular steel plates, It is welded into steel box structure(Referring to Fig. 7, Fig. 8);
The upper beam 1 is double-layer structure, is connected between the two by high-strength bolt, 101 structure of upper layer of upper beam 102 structure of lower layer for longitudinal distribution beam, upper beam is " well " word structure(Referring to Fig. 9);
The antiskid anchor ear 7 is two halves formula steel hoop structure, is connected by high-strength bolt and real by pre-tightening high-strength bolt Existing antiskid(Referring to Fig. 7);
The rubber pad 8 is mounted between antiskid anchor ear and tubular arch, increases friction coefficient between the two;
The rotary hanging tool 2 is the overall structure that intermediate trepanning cylinder and both ends are connected with an axis pin, 2 rotary liftings Tool 2 is located at 1 both ends of upper beam, will be connect with upper beam 1 by axis pin, and rotating adaptive realize additionally by axis pin rotates The leveling of formula suspender(Referring to Figure 10);
Under working condition, upper 4 upper end of interim rope passes through upper beam 1 to be anchored with stretching end anchorage I 5, and upper 4 lower end of interim rope is worn Conversion beam 12 is crossed, is anchored with fixing end anchorage I 13;9 upper end of interim rope sequentially passes through conversion beam 12, jack 11 down, uses tensioning Anchorage II 10 is held to anchor, lower 9 lower end of interim rope passes through lower joist 14 to be anchored with fixing end anchorage II 15, and lower joist 14 catches sunpender 16 lower surface of crossbeam;For increase friction coefficient between antiskid anchor ear 7 and tubular arch rubber pad 8 be arranged antiskid anchor ear 7 with Between 6 side of tubular arch, 3 lower part cambered surface of antiskid steel case is fixedly connected with antiskid anchor ear 7 by weld seam, 1 lower layer of upper beam " well " One side of word structure is adjacent to 3 side of antiskid steel case, with antiskid steel case 3 for antiskid reaction supporting point, 1 lower layer of upper beam " well " The another side of word structure is bolted with antiskid steel case 3 by high-strength bolt(Referring to Fig. 1-Fig. 6).
Embodiment two
A kind of method of steel pipe arch bridge suspender replacement, it is to use to be used for CFST Arch Bridge sunpender described in embodiment one The method that the hood type automatic leveling anchor of replacement realizes steel pipe arch bridge suspender replacement, it includes the following steps:
A, hood type automatic leveling anchor of the installation for CFST Arch Bridge suspender replacement:
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, this is used for the hood type of CFST Arch Bridge suspender replacement certainly Dynamic leveling anchor upper beam 1, stretching end anchorage I 5, upper interim rope 4, stretching end anchorage II 10, conversion beam 12, fixing end anchor Have I 13, lower interim rope 9, lower joist 14 and fixing end anchorage II 15 and two are mounted on embracing on CFST Arch Bridge arch Hoop formula vault anchors anti-slip system, each hood type vault anchoring anti-slip system by 2 rotary hanging tools 2, antiskid steel case 3, on Crossbeam 1, antiskid anchor ear 7 and rubber pad 8 form;
A1, it is longitudinally asymmetric on tubular arch 6 hood type vault be installed respectively in former sunpender 17 anchor anti-slip system, The hood type vault anchors anti-slip system by 8 groups of rotary hanging tool 2, antiskid steel case 3, upper beam 1, antiskid anchor ear 7 and rubber pad At;
The two sides of the antiskid steel case 3 are rectangular steel plates, another two sides are shape of a saddle steel plate, and top surface is rectangular steel plates, It is welded into steel box structure(Referring to Fig. 7, Fig. 8);
The upper beam 1 is double-layer structure, is connected between the two by high-strength bolt, the upper layer 101 of upper beam is vertical To distribution beam, 102 structure of lower layer of upper beam is " well " word structure(Referring to Fig. 9);
The antiskid anchor ear 7 is two halves formula steel hoop structure, is connected by high-strength bolt and real by pre-tightening high-strength bolt Existing antiskid(Referring to Fig. 7);
The rotary hanging tool 2 is the overall structure that intermediate trepanning cylinder and both ends are connected with an axis pin, 2 rotary liftings Tool 2 is located at 1 both ends of upper beam, will be connect with upper beam 1 by axis pin, and rotating adaptive realize additionally by axis pin rotates The leveling of formula suspender(Referring to Figure 10);
Bar lazy halyard is changed in A2, installation --- upper interim rope 4 and lower interim rope 9:
The stretching end anchorage I 5 of upper beam 1 is passed through to anchor upper 4 upper end of interim rope, upper 4 lower end of interim rope passes through conversion beam 12, it is anchored with fixing end anchorage I 13;9 upper end of interim rope sequentially passes through conversion beam 12, jack 11 down, with stretching end anchorage II 10 anchorings, lower 9 lower end of interim rope pass through lower joist 14 to be anchored with fixing end anchorage II 15, and lower joist 14 is caught under suspender crossbeam 16 Surface;Rubber pad 8 for increasing friction coefficient between antiskid anchor ear 7 and tubular arch is arranged in antiskid anchor ear 7 and 6 side of tubular arch Between face, 3 lower part cambered surface of antiskid steel case is fixedly connected with antiskid anchor ear 7 by weld seam, 1 lower layer of upper beam " well " word structure It is adjacent on one side with 3 side of antiskid steel case, with antiskid steel case 3 for antiskid reaction supporting point, 1 lower layer of upper beam " well " word structure Another side is bolted with antiskid steel case 3 by high-strength bolt;
A3, the connection safety for checking each component of hood type automatic leveling anchor and stabilization hold lotus ability:
By driving interim rope 9 under 11 tensioning of jack slowly to carry out examination tensioning step by step, hood type automatic leveling anchor is checked It is fixedly mounted with the connection safety for setting each component and stabilization holds lotus ability;
B, it removes former sunpender, complete conversion of the Suo Li systems to hood type automatic leveling anchor:
When former sunpender 17 is formally removed, 17 steel wire of former sunpender is cut off step by step, interim rope 9, real under synchronous tensioning step by step Now former suspender force is converted to hood type automatic leveling anchor, completes Suo Li system transforms;Suo Li is converted step by step The variation control of journey floor elevation is within ± 5mm, and after former sunpender 17 is cut off, interim rope 9 under anchoring removes former sunpender later 17;
C, new sunpender is installed, complete conversion of the Suo Li systems to new sunpender:
New sunpender is installed to finish, step by step the new sunpender of tensioning, it is synchronous put step by step under interim rope 9, realize hood type is automatic Leveling anchor Suo Li is converted to new sunpender, completes Suo Li system transforms, step by step Suo Li transfer processes floor elevation variation control System within ± 5mm, new suspender tension in place after, pass through anchor head nut and anchor new sunpender;
D, hood type automatic leveling anchor is removed, is transferred at next former sunpender;
E, every suspender replacement repeats step A~step D, completes other suspender replacements.

Claims (2)

1. a kind of hood type automatic leveling anchor for CFST Arch Bridge suspender replacement, including:Upper beam(1)、 Stretching end anchorage I(5), upper interim rope(4), stretching end anchorage II(10), conversion beam(12), fixing end anchorage I(13), it is lower interim Rope(9), lower joist(14)With fixing end anchorage II(15);It is characterized in that:
The hood type automatic leveling anchor further includes two hood type vault anchors being mounted on CFST Arch Bridge arch Gu anti-slip system, each hood type vault anchors anti-slip system by 2 rotary hanging tools(2), antiskid steel case(3), upper beam (1), antiskid anchor ear(7)And rubber pad(8)Composition;
The antiskid steel case(3)Two sides be rectangular steel plates, another two sides are shape of a saddle steel plate, top surface is rectangular steel plates, spell It is welded into steel box structure;
The upper beam(1)It for double-layer structure, is connected between the two by high-strength bolt, the upper layer of upper beam(101)Structure For longitudinal distribution beam, the lower layer of upper beam(102)Structure is " well " word structure;
The antiskid anchor ear(7)For two halves formula steel hoop structure, is connected by high-strength bolt and realized by pre-tightening high-strength bolt Antiskid;
The rotary hanging tool(2)The overall structure of an axis pin, 2 rotary hanging tools are connected with for intermediate trepanning cylinder and both ends (2)It is located at upper beam(1)Both ends, will be with upper beam by axis pin(1)Connection rotates adaptive realize additionally by axis pin The leveling of rotary hanging tool;
Under working condition, upper interim rope(4)Upper end passes through upper beam(1)With stretching end anchorage I(5)Anchoring, upper interim rope(4)Under End is across conversion beam(12), with fixing end anchorage I(13)Anchoring;Interim rope down(9)Upper end sequentially passes through conversion beam(12), it is very heavy Top(11), with stretching end anchorage II(10)Anchoring, lower interim rope(9)Lower end passes through lower joist(14)With fixing end anchorage II(15) Anchoring, lower joist(14)Catch suspender crossbeam(16)Lower surface;For increasing antiskid anchor ear(7)The friction coefficient between tubular arch Rubber pad(8)It is arranged in antiskid anchor ear(7)With tubular arch(6)Between side, antiskid steel case(3)Lower part cambered surface and antiskid anchor ear (7)It is fixedly connected by weld seam, upper beam(1)One side of lower layer " well " word structure and antiskid steel case(3)Side is adjacent to, with anti- Sliding steel case(3)For antiskid reaction supporting point, upper beam(1)The another side of lower layer " well " word structure and antiskid steel case(3)Pass through height Strong screw rod bolt.
2. a kind of method of steel pipe arch bridge suspender replacement, it is to use to be used for CFST Arch Bridge sunpender described in claim 1 The method that the hood type automatic leveling anchor of replacement is used for steel pipe arch bridge suspender replacement, it is characterised in that:It includes as follows Step:
A, hood type automatic leveling anchor of the installation for CFST Arch Bridge suspender replacement:
The hood type automatic leveling anchor for being used for CFST Arch Bridge suspender replacement includes upper beam(1), stretching end Anchorage I(5), upper interim rope(4), stretching end anchorage II(10), conversion beam(12), fixing end anchorage I(13), lower interim rope(9)、 Lower joist(14)With fixing end anchorage II(15)And two hood type vault anchorings being mounted on CFST Arch Bridge arch Anti-slip system;Each hood type vault anchors anti-slip system by 2 rotary hanging tools(2), antiskid steel case(3), upper beam(1)、 Antiskid anchor ear(7)And rubber pad(8)Composition;
A1, in tubular arch(6)It is upper longitudinally asymmetric in former sunpender(17)One hood type vault is installed respectively and anchors anti-slip system, Each hood type vault anchors anti-slip system by 2 rotary hanging tools(2), antiskid steel case(3), upper beam(1), antiskid anchor ear (7)And rubber pad(8)Composition;
The antiskid steel case(3)Two sides be rectangular steel plates, another two sides are shape of a saddle steel plate, top surface is rectangular steel plates, spell It is welded into steel box structure;
The upper beam(1)It for double-layer structure, is connected between the two by high-strength bolt, the upper layer of upper beam(101)Structure For longitudinal distribution beam, the lower layer of upper beam(102)Structure is " well " word structure;
The antiskid anchor ear(7)For two halves formula steel hoop structure, is connected by high-strength bolt and realized by pre-tightening high-strength bolt Antiskid;
The rotary hanging tool(2)The overall structure of an axis pin, 2 rotary hanging tools are connected with for intermediate trepanning cylinder and both ends (2)It is located at upper beam(1)Both ends, will be with upper beam by axis pin(1)Connection rotates adaptive realize additionally by axis pin The leveling of rotary hanging tool;
Bar lazy halyard is changed in A2, installation --- upper interim rope(4)With lower interim rope(9):
By upper interim rope(4)Upper end passes through upper beam(1)With stretching end anchorage I(5)Anchoring, upper interim rope(4)Lower end, which passes through, to be turned Change beam(12), with fixing end anchorage I(13)Anchoring;Interim rope down(9)Upper end sequentially passes through conversion beam(12), jack(11), With stretching end anchorage II(10)Anchoring, lower interim rope(9)Lower end passes through lower joist(14)With fixing end anchorage II(15)Anchoring, under Joist(14)Catch suspender crossbeam(16)Lower surface;For increasing antiskid anchor ear(7)The rubber of friction coefficient between tubular arch Pad(8)Mounted on antiskid anchor ear(7)With tubular arch(6)Between side, antiskid steel case(3)Lower part cambered surface and antiskid anchor ear(7)It is logical It crosses weld seam to be fixedly connected, upper beam(1)One side of lower layer " well " word structure and antiskid steel case(3)Side is adjacent to, with antiskid steel case (3)For antiskid reaction supporting point, upper beam(1)The another side of lower layer " well " word structure and antiskid steel case(3)Pass through high-strength bolt Bolt;
A3, the connection safety for checking each component of hood type automatic leveling anchor and stabilization hold lotus ability:
By driving jack(11)Interim rope under tensioning(9)Examination tensioning is slowly carried out step by step, checks hood type automatic leveling anchor It is fixedly mounted with the connection safety for setting each component and stabilization holds lotus ability;
B, it removes former sunpender, complete conversion of the Suo Li systems to hood type automatic leveling anchor:
Former sunpender(17)When formal dismounting, former sunpender is cut off step by step(17)Steel wire, interim rope under synchronous tensioning step by step(9), It realizes and converts former suspender force to hood type automatic leveling anchor, complete Suo Li system transforms;Suo Li is converted step by step The variation control of process floor elevation is within ± 5mm, former sunpender(17)After cut-out, interim rope under anchoring(9), remove later former Old sunpender(17);
C, new sunpender is installed, complete conversion of the Suo Li systems to new sunpender:
New sunpender is installed to finish, step by step the new sunpender of tensioning, it is synchronous put step by step under interim rope(9), realize and adjust hood type automatically Flat anchor Suo Li is converted to new sunpender, completes Suo Li system transforms, step by step Suo Li transfer processes floor elevation variation control Within ± 5mm, new suspender tension in place after, pass through anchor head nut and anchor new sunpender;
D, hood type automatic leveling anchor is removed, is transferred at next former sunpender;
E, every suspender replacement repeats step A~step D, completes other suspender replacements.
CN201710084222.XA 2017-02-16 2017-02-16 For the hood type automatic leveling anchor of CFST Arch Bridge suspender replacement and its for the method for suspender replacement Active CN106758882B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710084222.XA CN106758882B (en) 2017-02-16 2017-02-16 For the hood type automatic leveling anchor of CFST Arch Bridge suspender replacement and its for the method for suspender replacement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710084222.XA CN106758882B (en) 2017-02-16 2017-02-16 For the hood type automatic leveling anchor of CFST Arch Bridge suspender replacement and its for the method for suspender replacement

Publications (2)

Publication Number Publication Date
CN106758882A CN106758882A (en) 2017-05-31
CN106758882B true CN106758882B (en) 2018-07-27

Family

ID=58957229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710084222.XA Active CN106758882B (en) 2017-02-16 2017-02-16 For the hood type automatic leveling anchor of CFST Arch Bridge suspender replacement and its for the method for suspender replacement

Country Status (1)

Country Link
CN (1) CN106758882B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162209B (en) * 2018-09-04 2021-06-01 广东和立土木工程有限公司 Quick replacement construction method for half-through type and through type arch bridge suspenders
CN109537476B (en) * 2018-12-10 2024-02-23 河海大学 Pin lug type double-temporary-rope self-balancing pulling type suspension bridge sling replacement underpinning device
CN109487709B (en) * 2018-12-10 2024-02-23 河海大学 One-side riding type temporary rope self-balancing pushing type suspension bridge sling replacement underpinning device
CN110055907B (en) * 2019-05-08 2024-03-22 中交第二航务工程局有限公司 Concrete simply supported hollow slab beam carrying reinforcing structure
CN110219230B (en) * 2019-06-13 2024-02-13 福州大学 Steel pipe concrete truss arch bridge web member replacement structure and construction method
CN111335183A (en) * 2020-04-21 2020-06-26 中建八局第三建设有限公司 Double-hoop supporting system for single-column bent cap construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007126848A (en) * 2005-11-02 2007-05-24 Mitsubishi Heavy Industries Bridge & Steel Structures Engineering Co Ltd Aseismatic repair method of existing bridge
CN105401532A (en) * 2015-12-16 2016-03-16 柳州欧维姆工程有限公司 Device for replacing traction friction type anchoring hanger rod and method for replacing steel tube arch bridge hanger rod by using device
CN105887703A (en) * 2016-06-06 2016-08-24 江苏华通工程检测有限公司 Replacing device for concrete tied arch bridge flexible suspension rod and using method thereof
CN106087770A (en) * 2016-08-12 2016-11-09 柳州欧维姆工程有限公司 Hood type instrument derrick rig for steel pipe truss concrete arch-type bridge suspender replacement
CN206591449U (en) * 2017-02-16 2017-10-27 柳州欧维姆工程有限公司 Hood type automatic leveling anchor for CFST Arch Bridge suspender replacement

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007126848A (en) * 2005-11-02 2007-05-24 Mitsubishi Heavy Industries Bridge & Steel Structures Engineering Co Ltd Aseismatic repair method of existing bridge
CN105401532A (en) * 2015-12-16 2016-03-16 柳州欧维姆工程有限公司 Device for replacing traction friction type anchoring hanger rod and method for replacing steel tube arch bridge hanger rod by using device
CN105887703A (en) * 2016-06-06 2016-08-24 江苏华通工程检测有限公司 Replacing device for concrete tied arch bridge flexible suspension rod and using method thereof
CN106087770A (en) * 2016-08-12 2016-11-09 柳州欧维姆工程有限公司 Hood type instrument derrick rig for steel pipe truss concrete arch-type bridge suspender replacement
CN206591449U (en) * 2017-02-16 2017-10-27 柳州欧维姆工程有限公司 Hood type automatic leveling anchor for CFST Arch Bridge suspender replacement

Also Published As

Publication number Publication date
CN106758882A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN106758882B (en) For the hood type automatic leveling anchor of CFST Arch Bridge suspender replacement and its for the method for suspender replacement
CN106702910B (en) A kind of main girder construction technique of the double rope face low-pylon cable-stayed bridges of double tower
CN206591449U (en) Hood type automatic leveling anchor for CFST Arch Bridge suspender replacement
CN101864737B (en) Secondary vertical rotating construction method for arch rib of long-span steel arch bridge
CN108532465A (en) A kind of construction method of Through Steel case arch bridge
CN106087770B (en) Hood type instrument derrick rig for steel pipe truss concrete arch-type bridge suspender replacement
CN106758883B (en) The interim pocket device for hoisting of steel wire rope for steel pipe truss concrete arch-type bridge suspender replacement and its for the method for suspender replacement
WO2012030018A1 (en) Partially/completely earth-anchored and cable-stayed bridge using a main span tension means, and method for constructing same
CN106702909B (en) A kind of double width steel box-girder entirety swivel structure and construction method
CN106848938B (en) Cable testing bridge hangs installation method under a kind of High Altitude Platform
CN107604827A (en) A kind of porous large-span freely-supported steel truss girder bridge erection method
CN210946498U (en) Prestressed anchorage utensil is used in public road bridge roof beam construction
CN105297631B (en) Traction-type tool derrick rig for replacing derricks of steel tube truss-concrete arch bridge
CN207244452U (en) A kind of suspension bridge vice saddle adjusting apparatus in place
CN210658022U (en) A one-way perpendicular commentaries on classics device for oblique steel tower of single limb
CN205348010U (en) Pull change of friction formula anchor jib and use device
CN105401532B (en) Device for replacing traction friction type anchoring hanger rod and method for replacing steel tube arch bridge hanger rod by using device
CN206928188U (en) A kind of bracket system for the positioning of T negative moment of girder stretch-draw jack
CN106120573B (en) Multispan cable-carried arch bridge self-balancing button over strait hangs construction method
CN209308433U (en) A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation
CN206874293U (en) Subway tunnel soft oil support device
CN111155412A (en) Large swing angle steel pipe concrete arch bridge suspension cable system
CN106968178A (en) A kind of cable-stayed type suspension bridge main girder construction method
CN109607384A (en) The turn-over method of super-large-diameter shield machine knife disk
CN206784195U (en) The interim pocket device for hoisting of steel wire rope for steel pipe truss concrete arch-type bridge suspender replacement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant